ML100600682
| ML100600682 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 02/15/2010 |
| From: | Gerlach R Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 028401, 2010-5612 | |
| Download: ML100600682 (37) | |
Text
Feb.
15, 2010 Page 1
of 2
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2010-5612 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#:
0363 Address: NUCSA2 Phone#:
254-3194 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSE M 02/15/2010 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION:
"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRMl -
TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 01/29/2010 ADD MANUAL TABLE OF CONTENTS DATE: 02/12/2010 CATEGORY:
DOCUMENTS TYPE: TRMl Ao
Feb.
15, 2010 Page 2
of 2
ID:
TEXT 2.2 ADD:
REV:
8 REMOVE:
REV:7 CATEGORY:
ID:
TEXT REMOVE:
DOCUMENTS TYPE: TRM1 LOES REV:53 ADD:
REV:
54
.ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL
- USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date:
C Procedure Name TEXT LOES
Title:
LIST OF EFI
)2/12/2010 Rev 54 FECTIVE SECTIONS Issue Date 02/12/2010 Change ID Change Number TEXT TOC
Title:
TEXT 1.1
Title:
TEXT 2.1
Title:
TEXT 2.2
Title:
TEXT 3.0
Title:
16 04/16/2009 TABLE OF CONTENTS 0
11/18/2002 USE AND APPLICATION DEFINITIONS 1
02/04/2005 \\
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS 8
Q02/12/2010 PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE LDCN
~
LDCN.
4443 4414
- \\ 4 05/23/2008 TECHNICAL REQUIREMENT FOR OPERATION (TRO)
APPLICABILITY & SURVEILLANCE (TRS)
APPLICABILITY TEXT 3.1.1 1
11/09/2007
Title:
REACTIVITiY\\CONTROL SYSTEMS-ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION ('ATWS-ARI)
INSTRUMENTATION TEXT 3.1.2 0
11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT 3.1.3 5
04/16/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &
CHECK VALVE TEXT 3.2.1 10 01/20/2010
Title:
CORE OPERATING LIMITS REPORT (COLR)
Page I of.15 Report Date: 02/16/10
SS9ES MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 0
11/18/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2
11/09/2007
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2
11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 5
05/23/2008
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/18/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 2
10/19/2005
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1
11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3
04/17/2008
Title:
OPRM INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION Page 2.
of 15 Report Date: 02/16/10 Page 2 of
.15 Report Date: 02/16/10
SSES MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3. 4.1
Title:
REACTOR TEXT 3.4.2
Title:
REACTOR TEXT 3.4.3
Title:
REACTOR TEXT 3.4.4
Title:
REACTOR TEXT 3.4.5
Title:
REACTOR TEXT 3.5.1 1
04/26/2006 COOLANTSYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS 2
04/17/2008 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1
04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1
02/04/2005
Title:
EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1
11/09/2007
Title:
EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/18/2002
Title:
EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/18/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0
11/18/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/18/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0
11/18/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Pae3_o 5ReotDae-2/61 Page3 of
.15 Report Date: 02/16/10
- SSES MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL :UNIT 1 TEXT 3.7. 1
Title:
PLANT TEXT 3.7.2
Title:
PLANT TEXT 3.7.3.1
Title:
PLANT TEXT 3.7.3.2
Title:
PLANT TEXT 3.7.3.3
Title:
PLANT TEXT 3.7.3.4
Title:
PLANT TEXT 3.7.3.5
Title:
PLANT TEXT 3.7.3.6
Title:
PLANT TEXT 3.7.3.7
Title:
PLANT 0
11/18/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)
SHUTDOWN 0
11/18/2002 SYSTEMS ULTIMATE HEAT SINK (UHS). AND GROUND WATER LEVEL 2
04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3
04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3
SYSTEMS C02 SYSTEMS 2
SYSTEMS HALON SYSTEMS 04/16/2009 04/16/2009 2
04/16/2009 SYSTEMS FIRE HOSE STATIONS 2
04/16/2009 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1
04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 7
01/20/2010
'Title:
PLANT SYSTEMS FIRE DETECTION'INSTRUMENTATION TEXT 3.7.4 1
04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM LDCN 3503 TEXT 3.7.5.1 0
11/18/.2002
Title:
PLANT. SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR Page 4 of 15 Report Date: 02/16/10 Page 4 of
.15 Report Date: 02/16/10
SSES MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.2 0
11/18/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3
Title:
PLANT TEXT 3.7.6
Title:
PLANT 1
04/26/2006 SYSTEMS LIQUID HOLDUP TANKS.
2 06/27/2008 SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7
Title:
PLANT SYSTEMS MONITORING 2
09/05/2008 MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION TEXT 3.7.8 4
06/21/2007
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1
.08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11
Title:
STRUCTURAL TEXT 3.8.1
Title:
ELECTRICAL PROTECTIVE TEXT 3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT 3.8.2.2
Title:
ELECTRICAL AUTOMATIC 0
04/16/2009 INTEGRITY 1
02/,04/2005 POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 2
11/09/2007 POWER MOTOR OPERATED. VALVES -(MOV)
THERMAL OVERLOAD PROTECTION 2
12/14/2004 POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION TEXT 3.8.3 0
11/18/2002
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES Page 5.
of 15 Report Date: 02/16/10 Page 5 of 1_55 Report Date: 02/16/10
SSES MANUAl..
Manual Name:
TRMI1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.4 0
11/18/2002
Title:
ELECTRICAL POWER 24 VDC ELECTRICALPOWER SUBSYSTEM TEXT 3.8.5 0
11/18/2002
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION-TEXT 3.'8.6 0
11/18/2002
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 1
06/15/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0
11/18/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/18/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/18/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 2
08/08/2006
Title:
MISCELLANEOUS SHUTDOWN MARGIN. TEST RpS INSTRUMENTATION TEXT 3.10.3 1
04/26/2006
Title:
MISCELLANEOUS INDEPENDENT SPENTFUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 2
04/17/2008
Title:
MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)
TEXT 3.11.1.1 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Page 6 of
.15 Report Date: 02/16/10
SSES MANUAL Manual Name:
TRIMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.2
Title:
RADIOACTIVE TEXT 3.11.1.3
Title:
RADIOACTIVE TEXT 3.11.1.4
Title:
RADIOACTIVE TEXT 3.11.1.5
Title:
RADIOACTIVE TEXT 3.11.2.1
Title:
RADIOACTIVE TEXT 3.11.2.2
Title:
RADIOACTIVE TEXT 3.11.2.3
Title:
RADIOACTIVE FORM TEXT 3.11.2.4
Title:
RADIOACTIVE TEXT 3.11.2.5
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
LIQUID 1
LIQUID 1
LIQUID 04/26/2006 EFFLUENTS DOSE 04/26/2006 WASTE TREATMENT SYSTEM 12/14/2004 RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2
05/02/2007 RADIOACTIVE-LIQUID PROCESS MONITORING INSTRUMENTATION 3
04/26/2006 DOSE RATE 1
04/26/2006 DOSE -
NOBLE GASES 1
04/26/2006 DOSE -
11/18/2002 GASEOUS RADWASTE TREATMENT SYSTEM 3
11/14/2006 EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 4
09/16/2009
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 4
08/08/2006
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM Page 7 of
.15 Report Date: 02/16/10
.SSES-MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS-MANUAL UNIT 1 TEXT 3.11.4.2 2
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0
i/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4
04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0
11/19/2002
- Title: LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1
Title:
TEXT 4.2
Title:
TEXT 4.3
Title:
TEXT 4.4
Title:
TEXT 4.5
Title:
TEXT 4.6
Title:
TEXT 4.7
Title:
ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0
08/31/1998 CONTROLS ORGANIZATION 0
08/31/1998 CONTROLS REPORTABLE EVENT ACTION 0
08/31/1998 CONTROLS SAFETY LIMIT VIOLATION 1
12/18/2008 CONTROLS PROCEDURES & PROGRAMS 0
08/31/1998 CONTROLS REPORTING REQUIREMENTS 0
08/31/1998 CONTROLS RADIATION PROTECTION PROGRAM 0
08/31/1998 CONTROLS TRAINING Page ~
of 15 Report Date: 02/16/10 Page 8 of
.15 Report Date: 02/16/10
SSES MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.0 4
05/23/2008
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION.(TRO)
APPLICABILITY TEXT B3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT B3.1.3 3
03/31/2006
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS.INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1
Title:
INSTRUMENTATION TEXT B3.3.2
Title:
INSTRUMENTATION TEXT B3.3.3
Title:
INSTRUMENTATION TEXT B3.3.4
Title:
INSTRUMENTATION TEXT B3.3.5
Title:
INSTRUMENTATION TEXT B3.3.6
Title:
INSTRUMENTATION 0
11/19/2002 BASES RADIATION MONITORING INSTRUMENTATION 1
11/09/2007 BASES SEISMIC MONITORING INSTRUMENTATION 3
12/18/2008 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 3
11/09/2007 BASES TRM POST ACCIDENT MONITORING (PAM)
INSTRUMENTATION 2
11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 3
10/19/2005 BASES TRM ISOLATION ACTUATION INSTRUMENTATION Page ~
of 15 Report Date: 02/16/10 Page 9 of
.15 Report Date: 02/16/10
SSES. MANUAL Manual Name:
TR.MI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.7 1
11/09/2007
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1
10/22/2003
Title:
INSTRUMENTATION BASES TRM REACTOR PROTECTION SYSTEM (RPS)
INSTRUMENTATION TEXT B3.3.9
Title:
OPRM INSTRUMENTATION 3
04/17/2008 TEXT B3.3.10 1
12/18/2008
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1
10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0
ý 04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1
Title:
REACTOR TEXT B3.4.2
Title:
REACTOR TEXT B3.4.3
Title:
REACTOR TEXT B3.4.4
Title:
REACTOR TEXT B3.4.5
Title:
REACTOR TEXT B3.5.1 0
11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0
11/19/2002 COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0
11/19/2002 COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS 0
11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT Page i.Q of I~
Report Date: 02/16/10 Page 10 of 15 Report Date: 02/16/10
SSES MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.5.2 1
11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1
11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2
04/17/2008
Title:
CONTAtNMENT BASES SUPPRESSION POOL!ALARM INSTRUMENTATION LDCN 3933 TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1
Title:
PLANT TEXT B3.7.2
Title:
PLANT TEXT B3.7.3.1
Title:
PLANT TEXT B3.7.3.2
Title:
PLANT TEXT B3.7.3.3
Title:
PLANT TEXT B3.7.3.4
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 1i/19/2002 ULTIMATE HEAT SINK'(UHS)
GROUND WATER LEVEL 2
01/07/2008 FIRE SUPPRESSION WATER SUPPLY SYSTEM 2
04/26/2006 SPRAY AND SPRINKLER SYSTEMS 0
11/19/2002 C02 SYSTEMS 1
04/26/2006 HALON SYSTEMS Page li of 15 Report Date: 02/16/10 Page 11 of 15 Report Date: 02/16/10
SSES MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.5
Title:
PLANT TEXT B3.7.3.6
Title:
PLANT TEXT B3.7.3.7
Title:
PLANT TEXT B3.7.3.8
Title:
PLANT TEXT B3.7.4
Title:
-PLANT TEXT B3.7.5.1
Title:
PLANT TEXT B3.7.5.2
Title:
PLANT TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 1
FIRE 1
YARD 0
FIRE 1
FIRE 04/26/2006 HOSE STATIONS 04/26/2006 FIRE HYDRANTS AND HYDRANT HOSE HOUSES 11/19/2002 RATED ASSEMBLIES 01/-12/2004 DETECTION INSTRUMENTATION 0
11/19/2002 SYSTEMS-BASES SOLID RADWASTE SYSTEM SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
r11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/19/2,002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0
11/19/2002 LIQUID HOLDUP TANKS 2
Q6/27/2008 ESSW PUMPHOUSE VENTILATION TEXT B3.7.7
Title:
PLANT SYSTEMS BASES 2
01/31/2008 MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3
Title:
PLANT SYSTEMS BASES SNUBBERS 06/21/2007 TEXT B3.7.9 1
12/14/2004
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC Page 12.
of 15 Report Date: 02/16/10 Page 12 of
.15 Report Date: 02/16/10
SSES MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11
Title:
STRUCTURAL TEXT B3.8.1
Title:
ELECTRICAL PROTECTIVE TEXT B3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT B3.8.2.2
Title:
ELECTRICAL AUTOMATIC TEXT B3.8.3
Title:
ELECTRICAL TEXT B3.8.4
Title:
ELECTRICAL TEXT B3.8.5
Title:
ELECTRICAL TEXT B3.8.6
Title:
ELECTRICAL TEXT B3.8.7 0
04/16/2009 INTEGRITY 1
02/04/2005 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0
11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
1 09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
0
'11/19/2002 POWER BASES DIESEL GENERATOR (DG)
MAINTENANCE 0
11/19/2002-POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0
11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 1
02/04/2005 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 1
06/15/2009 ACTIVITIES
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS Page 13 of 15 Report Date: 02/16/10 Page 13 of
.15 Report Date: 02/16/10
SSES. MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10;2 1
03/31/2006
Title:
MISCELLANEOUS BASES SHUTDOWN:MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI,)
TEXT B3.10.4 1
Title:
MISCELLANEOUS BASES LEADING 04/17/2008 EDGE FLOW METER (LEFM)
TEXT B3.11.1.1
Title:
RADIOACTIVE TEXT B3.11.1.2
Title:
RADIOACTIVE TEXT B3.11.1.3
Title:
RADIOACTIVE TEXT B3.11.1.4
Title:
RADIOACTIVE TEXT B3.11.1.5
Title:
RADIOACTIVE 0
BASES 11/19/2002 LIQUID EFFLUENTS CONCENTRATION EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 0
11/19/2002 BASES LIQUID EFFLUENTS DOSE 0
BASES 0
BASES.
11/19/2002 LIQUID WASTE TREATMENT SYSTEM 11/19/2 002 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 0
11/19/2002 BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2
Title:
RADIOACTIVE EFFLUENTS 0
BASES 11/19/2002 DOSE -
NOBLE GASES Page 14 of 15 Report Date: 02/16/10 Page 14 of 15 Report Date: 02/16/10
SSES MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.3
Title:
RADIOACTIVE EFFLUENTS PARTICULATES FORM 0
BASES 11/19/2002 DOSE -
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 4
11/14/2006
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.3
Title:
RADIOACTIVE EFFLUENTS 1
BASES 0
BASES 01./27/2004 RADIOACTIVE GASEOUS EFFLUENT MONITORING 11/19/2002 TOTAL DOSE TEXT B3.11.4.1 2
01/06/2006
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3
Title:
RADIOACTIVE EFFLUENTS TEXT B3.12.1
Title:
LOADS CONTROL PROGRAM 0
BASES 1
BASES 11/19/2002 INTERLABORATORY COMPARISON PROGRAM 10/04/2007 CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12..2 0
11/19/2002
Title:
LOADS CONTROL PROGRAMBASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page i5~
of 15 Report Date: 02/16/10 Page 15 of 15 Report Date: 02/16/10
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC 1.0 2.0 TABLE OF CONTENTS USE AND APPLICATION Pages TRM / 1.0-1 through TRM / 1.0-3 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM / 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Page TRM / 2.0-8 Page TRM / 2.0-9 Page TRM / 2.0-10 Page TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM /2.0-14 Page TRM / 2.0-15 3.0 APPLICABILITY Page TRM / 3.0-1 Page TRM / 3.0-2 Page TRM / 3.0-3.
Page TRM / 3.0-4 04/07/2009 10/04/2002 08/31/1998 01/28/2005 06/25/2002 04/02/1999 03/27/2008 05/15/2008 03/27/2008 11/15/2004 02/02/2010 11/15/2004 03/27/2008 11/15/2004 11/15/2005 04/14/2008 04/12/2007 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/22/2006 04/07/2009 03/27/2008 02/18/1999 02/18/1999 07/07/1999 01/14/2010 07/16/1999 10/31/2007 08/31/1998 10/31/2007 08/31/1998 04/12/2007 3.1 3.2 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Page TRM / 3.3-4 and TRM / 3.3-5 Page TRM / 3.3-6 Page TRM / 3.3-7 Page 3.3-8 Page TRM / 3.3-9 3.3 SUSQUEHANNA - UNIT 1 TRM / LOES-1 EFFECTIVE DATE 02/02/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.4 Page TRM / 3.3-9a Page TRM / 3.3-10 Page TRM / 3.3-11 Page TRM / 3.3-1 la Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 Page TRM / 3.3-17 Page TRM /3.3-18 Pages TRM / 3.3-19 through TRM / 3.3-2.1 Page TRM / 3.3-22 Page TRM / 3.3-22a Pages TRM / 3.3-22b through TRM / 3.3-22d Page TRM / 3.3-23 Pages TRM / 3.3-24 and TRM / 3.3-25 Page TRM / 3.3-26 Pages TRM / 3.3-27 and TRM / 3.3-28 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page TRM / 3.4-9 Page TRM / 3.4-10 Page TRM / 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Pages TRM / 3.5-4 and TRM / 3.5-5 Pages 3.5-6 and 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-3 Page TRM / 3.6-4 Page 3.6-5 Pages TRM / 3.6-6 through TRM / 3.6-8 12/17/1998 10/31/2007 06/02/2005 04/14/2008 03/30/2001 09/13/2005 12/14/1998 10/22/2003 06/27/2001 06/14/2002 10/31/2007 10/22/2003 03/27/2008 11/15/2004 03/22/2006 12/03/2004 05/16/2003 10/22/2003 04/07/2009
-03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 03/27/2008 03/31/2006 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 08/31/1998 03/31/2006 3.5 3.6 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 Page TRM / 3.7-4 SUSQUEHANNA - UNIT 1 TRM / LOES-2.
EFFECTIVE DATE 02/02/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7.13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Pages TRM / 3.7-25 and TRM 3.7-26 Page TRM 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Pages TRM / 3.7-31 and TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Page TRM / 3.7-34a Page TRM / 3.7-35 Pages TRM / 3.7-36 and TRM / 3.7-37 Pages 3.7-38 and 3.7-39 Page TRM / 3.7-40 Page TRM / 3.7-41 Page TRM / 3.7-41a Page TRM / 3.7-42 Page TRM / 3.7-43 Pages TRM / 3.7-44 through TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Pages TRM / 3.7-55 through TRM / 3.7-57 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 through TRM / 3.8-4 04/07/2009 08/02/1999 04/07/2009 12/29/1999 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 10/31/2007 11/29/2006 08/09/2005 01/13/2010 11/16/2001 01/09/2004 11/16/2001 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 06/20/2008 09/04/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 04/02/2002 01/28/2005 3.8 SUSQUEHANNA
- UNIT 1 TRM / LOES-3 EFFECTIVE DATE 02/02/2010 SUSQUEHANNA - UNIT 1 TRM / LOES-3 EFFECTIVE DATE 02/02/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / 3.8-5 and TRM / 3.8-6 Page TRM / 3.8-7 Pages TRM / 3.8-8 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Pages TRM / 3.8-15 through TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Page TRM / 3.8-26 Page TRM / 3.8-27 Pages TRM / 3.8-28 and TRM / 3.8-29 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.10 3.11 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 and 3.10-3 Pages 3.10-2 and 3.10-3 Page TRM / 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 and 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages TRM / 3.11-7 through TRM /3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 04/02/2002 10/31/2007 12/03/2004 09/03/2004 12/03/2004 08/31/1998 04/02/2002 08/31/1998 04/02/2002 08/31/1998 06/06/1999 08/31/1998 05/28/2009 11/29/2006 05/28/2009 08/31/1998 03/31/2006 08/31/1998 08/31/1998 08/01/2006 03/22/2006 03/31/2006 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 12/03/2004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 SUSQUEHANNA
- UNIT I TRM / LOES-4 EFFECTIVE DATE 02/02/2010 SUSQUEHANNA - UNIT 1 TRM / LOES-4 EFFECTIVE DATE 02/02/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM / 3.11.30 through TRM / 3.11.32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-43 Page TRM / 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 08/01/2006 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA
- UNIT I TRM / LOES-5 EFFECTIVE DATE 02/02/2010 SUSQUEHANNA - UNIT 1 TRM / LOES-5 EFFECTIVE DATE 02/02/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LISTOF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title B 3.0 B 3.1 B 3.2 B 3.3 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Page TRM / B 3.1-5 Pages TRM / B 3.1-6 and TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTR*UMENTATION BASES Page TRM / B 3.3-1 Pages TRM / B 3.3-2 and TRM / B 3.3-2a Page TRM / B 3.3-3 Page TRM / B 3.3-3a Pages TRM / B 3.3-4 and TRM / B 3.3-5 Pages TRM / B 3.3-6 through TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM / B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 and TRM / B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B 3.3-17a through TRM / B 3.3-17c Page TRM / B 3.3-17d Pages TRM / B 3.3-17e and TRM / B 3.3-17f Page TRM / B 3.3-18 Page TRM / B 3.3-19 Page TRM / B 3.3-20 Page TRM / B 3.3-21 Pages TRM I B 3.3-22 and TRM / B 3.3-23 Effective Date 08/31/1998 01/10/2007 04/14/2008 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 11/15/2005 03/22/2006 02/18/1999 08/31/1998 04/07/2000 10/31/2007 12/11/2008 10/31/2007 05/30/2006 10/31/2007 08/31/1998 09/13/2005 12/03/2004 06/25/2002 10/31/2007 10/31/2007 10/22/2003 03/22/2006 03/22/2006 03/27/2008 03/22/2006 12/11/2008 05/16/2008 10/22/2003 05/16/2003 04/07/2009 SUSQUEHANNA - UNIT 1 TRM / LOES-6 EFFECTIVE DATE 02/02/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.4 B 3.5 B 3.6 B 3.7 REACTOR COOLANT SYSTEM BASES Page B 3.4-1 Pages TRM / B 3.4-2 and TRM / B 3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 through TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages B.3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 and TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Page TRM / B 3.7-6 Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Page TRM / B 3.7-1Oa Page TRM / B 3.7-11 Page TRM / B 3.7-11a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Page TRM / B 3.7-14a Page TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Page TRM / B 3.7-21a Page TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-28 Pages TRM / B 3.7-29 and TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/27/2008 04/04/2007 12/03/2004 12/31/2002 08/31/1998 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 06/20/2008 01/30/2008 10/05/2006 06/07/2007 10/05/2006 12/03/2004 03/09/2001 SUSQUEHANNA - UNIT 1 TRM / LOES-7 EFFECTIVE DATE 02/02/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.8 B.3.9 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 through TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-1 Ia Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11.23 Page TRM / B 3.11.23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 and B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.7-31 through B 3.7-35 Page TRM / B 3.11-36 04/15/2003 12/03/2004 07/05/2000 04/01/2009 04/02/2002 01/28/2005 04/02/2002 04/02/2002 08/10/2004 04/02/2002 08/31/1998 04/02/2002 01/28/2005 11/29/2006 05/28/2009 08/31/1998 08/31/1998 03/22/2006 08/23/1999 08/30/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/30/1998 04/02/2002 04/02/2002 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/30/1998 11/30/2005 12/03/2004 08/30/1998 02/12/1999 SUSQUEHANNA - UNIT 1 TRM / LOES-8 EFFECTIVE DATE 02/02/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Pages TRM / B 3.12-2 and TRM / B 3.12-3 09/19/2007 02/05/1999 TRM1 text LOES 02/04/2010 SUSQUEHANNA - UNIT 1 TRM / LOES-9 EFFECTIVE DATE 02/02/2010
Instrument Trip Setpoint Program PPL Rev. 8 2.2 2.0 PLANT PROGRAMS AND SETPOINTS 2.2 Instrument Trip Setpoint Table The Instrument Trip Setpoint Limits in Table 2.2-1 are the Trip Setpoint value limits that were contained in the Instrumentation Setpoint tables for protection systems and other functions important to safety that were included in the scope of the original Standard Technical Specifications. Actual instrument setpoints are established utilizing the Allowable Values specified in the Technical Specifications and Technical Requirements. Allowable Values are established in the Reference LCOs and TROs identified in this Table. TRO references are enclosed in square brackets.
Instrumentation process setpoints for the listed subsystems and trip functions are set consistent with the Trip Setpoint Limit Column of Table 2.2-1. Actual setpoints are established in accordance with engineering procedures.
Alarm setpoints and other non-protection system trip settings as may befound in the Technical Specifications or in the Technical Requirements are not included in this table.
Reference NDAP-QA-1104 Setpoint Change Control SUSQUEHANNA - UNIT 1 TRM / 2.0-5 EFFECTIVE DATE 04/02/1999
Instrument Trip Setpoint Program 2.2 PPL Rev. 8 TABLE 2.2-1 (Page 1 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.1 Reactor Protection 2.2.1.1 3.3.1.1 Intermediate Range Monitor, Neutron Flux -
- 120/125 divisions of full scale High 2.2.1.2 3.3.1.1 Average Power Range Monitor, Neutron Flux
- 18% of RATED THERMAL POWER
- High (Setdown) 2.2.1.3 3.3.1.1 Average Power Range Monitor, Simulated 0.55 W + 58.7%
Thermal Power-High, Two Loop Operation 2.2.1.4 3.3.1.1 Average Power Range Monitor, Simulated 0.55 (W-AW) + 5 8.7 %(b)
Thermal Power-High, Single Loop Operation 2.2.1.5 3.3.1.1 Average Power Range Monitor, Simulated
- 113.5% of RATED THERMAL Thermal Power-High, Clamp POWER 2.2.1.6 3.3.1.1 Average Power Range Monitor, Neutron Flux -
_< 118% of RATED THERMAL High POWER 2.2.1.7 3.3.1.1 Reactor Vessel Steam Dome Pressure - High
< 1087 psig 2.2.1.8 3.3.1.1 Reactor Vessel Water Level - Low, Level 3
>13.0 inches (a) 2.2.1.9 3.3.1.1 Main Steam Isolation Valve - Closure
< 10% closed 2.2.1.10 This Section Not Used 2.2.1.11 3.3.1.1 Drywell Pressure-High
< 1.72 psig.
2.2.1.12 3.3.1.1 Scram Discharge Volume Water Level - High -
- 65 gallons-Level Transmitter 2.2.1.13 3.3.1.1 Scram Discharge Volume Water Level - High -
- 61 gallons Float Switch 2.2.1.14 3.3.1.1 Turbine Stop Valve - Closure
< 5.5% closed 2.2.1.15 3.3.1.1 Turbine Control Valve Fast Closure, Trip
>500 psig Oil Pressure - Low (continued)
(a) See Figure 2.2-1 (b) For Single loop operation, the value of AW = 8.7 SUSQUEHANNA - UNIT 1 TRM / 2.0-6 EFFECTIVE DATE 03/27/2008
Instrument Trip Setpoint Program 2.2 PPL Rev. 8 TABLE 2.2-1 (Page 2 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.1.16 OPRM Instrumentation 2.2.1.16.1 3.3.1.1 Sp PBA Amplitude Trip See COLR - TRO 3.2 2.2.1.16.2 3.3.1.1 Np PBA Successive Confirmation Count Trip See COLR - TRO 3.2 2.2.1.16.3
[3.3.9]
TOL (z) Period Tolerance 0.10 sec 2.2.1.16.4
[3.3.9]
fc Conditioning Filter Cutoff Frequency 1.50 Hz 2.2.1.16.5
[3.3.9]
Tmin Oscillation Period Lower Time Limit 1.00 sec 2.2.1.16.6
[3.3.9]
Tmax Oscillation Period Upper Time Limit 3.50 sec 2.2.1.16.7
[3.3.9]
LPRMmin Minimum LRPMs/CeIl Required for 2
Cell Operability 2.2.1.16.8
[3.3.9]
S1 Peak Threshold SetpointlABA & GRBA 1.20 2.2.1.16.9
[3.3.9]
S2 Valley Threshold SetpointlABA & GRBA 0.85 2.2.1.16.10
[3.3.9]
Smax Amplitude Trip Setpoint/ABA 1.50 2.2.1.16.11
[3.3.9]
DR3 Growth Rate Factor Setpoint/GRBA 1.60 2.2.2 Isolation Actuation Instrumentation 2.2.2.1 Primary Containment Isolation 2.2.2.1.1 3.3.6.1 Reactor Vessel Water Level Low, Level 3
> 13.0 inches~a) 2.2.2.1.2 3.3.6.1 Reactor Vessel Water Level Low Low, Level 2
>-38.0 inches(a) 2.2.2.1.3 3.3.6.1 Reactor Vessel Water Level Low Low Low,
> -129 inches(a)
Level 1 2.2.2.1.4 3.3.6.1 Drywell Pressure - High
< 1.72 psig 2.2.2.1.5 3.3.6.1 SGTS Exhaust Radiation - High
< 23.0 mR/hr 2.2.2.1.6
[3.3.6]
Main Steam Line Radiation - High High
< 15 x full power background without hydrogen injection (continued)
(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-7 EFFECTIVE DATE 05/15/2008
Instrument Trip Setpoint Program 2.2 PPL Rev. 8 TABLE 2.2-1 (Page 3 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO
[TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.2.2 2.2.2.2.1 2.2.2.2.2 2.2.2.2.3 2.2.2.2.4 2.2.2.2.5 Secondary Containment Isolation 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 2.2.2.3 Main Steam Line Isolation 2.2.2.3.1 2.2.2.3.2 2.2.2.3.3 2.2.2.3.4 2.2.2.3.5 2.2.2.3.6 2.2.2.3.7 2.2.2.3.8 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1
[3.3.6]
[3.3.6]
Reactor Vessel Water Level - Low Low, Level 2 Drywell Pressure - High Refuel Floor High Exhaust Duct Radiation -
High Railroad Access Shaft Exhaust Duct Radiation - High Refuel Floor Wall Exhaust Duct Radiation -
High Reactor Vessel Water Level - Low Low Low, Level 1 Main Steam Line Pressure - Low Main Steam Line Flow - High Condenser Vacuum - Low Reactor Building Main Steam Lir'e Tunnel Temperature - High This Section Not Used Reactor Building Main Steam Line Tunnel A Temperature - High Turbine Building Main Steam Tunnel Temperature - High
>-38.0 inches(a)
- 1.72 psig
_ 18 mR/hr
< 5 mR/hr
- < 21 mR/hr
> -129 inches(a)
> 861 psig
< 173 psid
> 9.0 inches Hg vacuum
< 177OF
< 991F
< 1970F 2.2.2.4 Reactor Water Cleanup System Isolation 2.2.2.4.1 2.2.2.4.2 2.2.2.4.3 2.2.2.4.4 2.2.2.4.5 2.2.2.4.6 2.2.2.4.7 2.2.2.4.8 2.2.2.4.9 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1
[3.3.6]
3.3.6.1
[3.3.6]
3.3.6.1
[3.3.6]
Reactor Vessel Water Level - Low Low, Level 2 RWCU A Flow - High RWCU Flow - High RWCU Penetration Area Temperature - High RWCU Penetration Room Area A Temperature
- High RWCU Pump Area Temperature - High RWCU Pump Room Area A Temperature -
High RWCU Heat Exchanger Area Temperature-High RWCU Heat Exchanger Room Area A Temperature - High
> -38 inches(a)
- 59 gpm
< 462 gpm
< 131°F
< 691F
< 1471F
< 69°F
< 147°F
< 690F (continued)
(continued)
(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-8 EFFECTIVE DATE 03/27/2008
Instrument Trip Setpoint Program 2.2 PPL Rev. 8 TABLE 2.2-1 (Page 4 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO
[TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.2.5 Reactor Core Isolation Cooling System Isolation 2.2.2.5.1 3.3.6.1 RCIC Steam Line A Pressure - High 2.2.2.5.2 3.3.6.1 RCIC Steam Supply Line Pressure - Low 2.2.2.5.3 3.3.6.1 RCIC Turbine Exhaust Diaphragm Pressure
- High 2.2.2.5.4 3.3.6.1 RCIC Equipment Room Temperature - High 2.2.2.5.5 3.3.6.1 RCIC Pipe Routing Area Temperature - High 2.2.2.5.6 3,3.6.1 RCIC Emergency Area Cooler Temperature -
High 2.2.2.5.7 3.3.6.1 Drywell Pressure - High 2.2.2.5.8
[3.3.6]
RCIC Equipment Room A Temperature - High 2.2.2.5.9
[3.3.6]
RCIC Pipe Routing Area A Temperature -
High 2.2.2.6 High Pressure Coolant Injection System Isolation
< 188 inches H 20
> 60 psig
- 10.0 psig
< 167°F
_ 167°F
< 167OF
<_ 1.72 psig
_ 89OF 89OF 2.2.2.6.1 2.2.2.6.2 2.2.2.6.3 2.2.2.6.4 2.2.2.6.5 2.2.2.6.6 2.2.2.6.7 2.2.2.6.8 2.2.2.6.9 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1
[3.3.6]
[3.3.6]
2.2.2.7 Shutdown Cooling/System Isola HPCI Steam Line A Pressure - High HPCI Steam Supply Line Pressure - Low HPCI Turbine*Exhaust Diaphragm Pressure -
High HPCI Equipment Room Temperature - High HPCI Emergency Area Cooler Temperature -
High HPCI Pipe Routing Area Temperature - High Drywell Pressure - High HPCI Equipment Room A Temperature - High HPCI Pipe Routing Area A Temperature -
High tion Reactor Vessel Water Level - Low, Level 3 Reactor Vessel Steam Dome Pressure - High RHR Flow - High Reactor Vessel Water Level - Low Low Low, Level 1 Drywell Pressure - High Reactor Vessel Steam Dome Pressure - Low injection permissive
< 370 inches H 20
_ 104 psig
_ 10 psig
- 167OF
< 167OF
- 167°F
< 1.72 psig
< 89OF
_ 89OF
> 13.0 inches(a)
< 98 psig
<25,000 gpm
>-129 inches(a)
!5 1.72 psig
Ž413, *427 psig 2.2.2.7.1 2.2.2.7.2 2.2.2.7.3 2.2.3 2.2.3.1 2.2.3.1.1 2.2.3.1.2 2.2.3.1.3 3.3.6.1 3.3.6.1
[3.3.6]
ECCS Actuation Core Spray System 3.3.5.1 3.3.5.1 3.3.5.1 (continued)
(a)See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-9 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Program2.2 PPL Rev. 8 TABLE 2.2-1 (Page 5 of 8)
INSTRUMENTATION SETPOINTS SYSTEMIREFERENCE LCO
[TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.3.2 LPCI Mode of RHR System 2.2.3.2.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low,
> -129 inches(a)
Level 1 2.2.3.2.2 3.3.5.1 Drywell Pressure - High
< 1.72 psig 2.2.3.2.3 3.3.5.1 Reactor Vessel Steam Dome Pressure-
_413, <_ 427 psig Low, injection permissive 2.2.3.2.4 3.3.5.1 Reactor Vessel Steam Dome Pressure -
Ž> 236 psig, decreasing Low, Recirculation Discharge Valve permissive 2.2.3..3 HPCI System 2.2.3.3.1 3.3.5.1 Reactor Vessel Water Level - Low Low,
> -38 inches(a)
Level 2 2.2.3.3.2 3.3.5.1 Drywell Pressure - High
< 1.72 psig 2.2.3.3.3 3.3.5.1 Condensate Storage Tank Level - Low
> 40.5 inches above tank bottom 2.2.3.3.4 3.3.5.1 Reactor Vessel Water Level - High, Level 8
< 54 inches 2.2.3.4 Automatic Depressurization System (ADS) 2.2.3.4.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low,
>--129 inches Level 1 2.2.3.4.2 3.3.5.1 Drywell Pressure - High
< 1.72 psig 2.2.3.4.3 3.3.5.1 ADS Timer
< 102 seconds 2.2.3.4.4 3.3.5.1 Core Spray Pump Discharge Pressure - High
_ 135, < 155 psig 2.2.3.4.5 3.3.5.1 Low Pressure Coolant Injection Pump
> 121, < 129 psig Discharge Pressure - High 2.2.3.4.6 3.3.5.1 Reactor Vessel Water Level - Low, Level 3
_> 13 inches Confirmatory 2.2.3.4.7 3.3.5.1 ADS Drywell Pressure Bypass Timer
<420 seconds 2.2.3.5 Loss of Power - ECCS Actuation 2.2.3.5.1 4.16kv ESS Bus Undervoltage (Loss of Voltage < 20%)
2.2.3.5.1.1 3.3.8.1 Bus Undervoltage
> 823.2, < 856.8 Volts 2.2.3.5.1.2 3.3.8.1 Time delay
Ž0.4, _< 0.6 seconds (continued)
(a) See Figure 2.2-1 SUSQUEHANNA - UNIT I TRM / 2.0-10 EFFECTIVE DATE 02/02/2010
Instrument Trip Setpoint Program 2.2 PPL Rev. 8 TABLE 2.2-1 (Page 6 of 8)
INSTRUMENTATION SETPOINTS 2.2.3.5.2 2.2.3.5.2.1 2.23.5.2.2 2.2.3.5.3 2.2.3.5.3.1 2.2.3.5.3.2 2.2.3.5.3.4 2.2.3.5.4 2.2.3.5.4.1 2.2.3.5.4.2 2.2.3.5.5 2.2.3.5.5.1 2.2.3.5.5.2 2.2.4 2.2.4.1 2.2.4.1 2.2.5 2.2.5.1 2.2.5.2 2.2.6 2.2.6.1 2.2.6.2 2.2.6.3 SYSTEM/REFERENCE LCO
[TRO]
TRIP FUNCTION 4.16kV ESS Bus Undervoltage (Degraded Voltage < 65%)
3.3.8.1 Bus Undervoltage 3.3.8.1 Time delay 4.16kV ESS Bus Undervoltage (Degraded Voltage, < 93%)
3.3.8.1 Bus Undervoltage 3.3.8.1 Time Delay (Non-LOCA) 3.3.8.1 Time Delay (LOCA) 480V ESS Bus 0B565 Undervoltage (Degraded Voltage, < 65%)
[3.8.5]
480V Basis
[3.8.5]
Time Delay 480V ESS Bus 0B565 Undervoltage (Degraded Voltage, < 92%)
[3.8.5]
480V Basis
[3.8.5]
Time Delay ATWS Alternate Rod Injection and Recirculation Pump Trip 3.3.4.2J[3.1.1]
Reactor Vessel, Water Level - Low Low, Level 2 3.3.4.2/3.1.1]
Reactor Vessel Steam Dome Pressure-High End of Cycle Recirculation Pump Trip 3.3.4.1 Turbine Stop Valve-Closure 3.3.4.1 Turbine Control Valve - Fast Closure Reactor Core Isolation Cooling System Actuation 3.3.5.2 Reactor Vessel Water Level - Low Low, Level 2 3.3.5.2 Reactor Vessel Water Level - High, Level 8 3.3.5.2 Condensate Storage Tank Level - Low TRIP SETPOINT
_> 2641.1, <2748.9 Volts
>_ 2.7, < 3.3 seconds
>_ 3829.3, < 3906.7 Volts
> 4 minute, 30 seconds
< 5 minute, 30 seconds
>9, < 11 seconds
>308.9, < 315.1 Volts
>4.5, < 5.5 seconds
> 437.6, < 446.4 Volts
>9, < 11 seconds
>-38 inches(a)
- 1135 psig
< 5.5% closed
> 500 psig
>-38 inches(a)
< 54 inches(a)
> 36.0 inches abovetank bottom (continued)
(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-11 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Program 2.2 PPL Rev. 8 TABLE 2.2-1 (Page 7 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO
[TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.7 Control Rod Block 2.2.7.1 Rod Block Monitor 2.2.7.1.1 3.3.2 3.3.2 3.3.2 3.3.2 3.3.2 3.3.2 Low Power Range - Upscale Intermediate Power Range - Upscale High Power Range - Upscale Low Power Range Setpoint Intermediate Power Range Setpoint High Power Range Setpoint See COLR TRO 3.2 See COLR TRO 3.2 See COLR TRO 3.2 See COLR TRO 3.2 See COLR TRO 3.2 See COLR TRO 3.2 2.2.7.1.2 2.2.7.2 APRM 2.2.7.2.1 2.2.7.2.2
-2.2.7.2.3 2.2.7.2.4 2.2.7.2.5
[3.1.3]
[3.1.31
[3.1.3]
[3.1.3]
[3.1.3]
Simulated Thermal Power-High
- Two Loop Operation Simulated Thermal Power-High
- Single Loop Operation Simulated Thermal Power-High - Clamp Downscale Neutron Flux - High (Setdown) 0.55W + 54.2%
0.55 (W-AW) + 54.2% Cc)
_ 108% of RATED THERMAL POWER
Ž 5% of RATED THERMAL POWER
- 12% of RATED THERMAL POWER 2.2.7.3 Source Range Monitors 2.2.7.3.1 2.2.7.3.2 2.2.7.4 2.2.7.4.1 2.2.7.4.2
[3.1.3]
[3.1.3]
[3.1.3]
[3.1.3]
Upscale Downscale Upscale Downscale
< 2E5 cps
> 3.0 cps(b).
- _ 108/125 divisions of full scale
> 5/125 divisions of full scale 2.2.7.5 Scram Discharge Volume 2.2.7.5.1
[3.1.31 Water Level - High
< 35.9 gallons 2.2.7.6 Reactor Coolant System Recirculation Flow 2.2.7.6.1
[3.1.3]
Upscale 114%
(continued)
(b) With a signal-to-noise ratio > 2, or within the limits of Figure 2.2-2.
(c) For single loop operation, the value of AW = 8.7 SUSQUEHANNA - UNIT 1 TRM / 2.0-12 EFFECTIVE DATE 03/27/2008
Instrument Trip Setpoint Program 2.2 PPL Rev. 8 TABLE 2.2-1 (Page 8 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO
[TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.8 CREOASS 2.2.8.1 3.3.7.1 Main Control Room Outside Air Intake 5 5 mR/hr Radiation Monitor 2.2.8.1.1 3.3.7.1 Reactor Vessel Water Level - Low Low,
>-38.0 inches(a)
Level 2 2.2.8.1.2 3.3.7.1 Drywell Pressure - High
< 1.72 psig 2.2.8.1.3 3.3.7.1 Refuel Floor High Exhaust Duct Radiation
- '18 mR/hr
- High 2.2.8.1.4 3.3.7.1 Railroad Access Shaft Exhaust Duct
< 5 mR/hr
- Radiation - High 2.2.8.1.5 3.3.7.1 Refuel Floor Wall Exhaust Duct Radiation
- 21 mR/hr
- High 2.2.9 Feedwater/Main Turbine Trip System Actuation 2.2.9.1 3.3.2.2 Reactor Vessel Level - High
< 54.0 inches(a) 2.2.10 MVP Isolation 2.2.10.1
[3.3.11]
Main Steam Line Radiation - High High
< 15 x full power background without hydrogen injection (a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-13 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Table 2.2 PPL Rev. 8 FIGURE 2.2-i REACTOR VESSEL WATER LEVEL SUSQUEHANNA - UNIT 1 TRM / 2.0-14 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Table 2.2 PPL Rev. 8 Instrument Trip Setpoint Table 2.2 U) 03 0
M i~i 0
0 n,-
2.8 2.6 2.4 2.2 2
1.8 1.6 1.4 1.2 1
0.8 0.6 0.4 0.2 0
~
-Acceptable Not Acceptable 2
6 10 14 18 22 26 30 Signal-to-Noise Ratio Figure 2.2-2 Minimum SRM Trip Setpoint Versus Signal-to-Noise Ratio SUSQUEHANNA - UNIT 1 TRM / 2.0-15 EFFECTIVE DATE 11/15/2005