CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM09 A Pressurize Cold Leg Accumulator 1A CANDIDATE EXAMINER JPM09A JPM09 A Page 1 of 9

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Pressurize Cold Leg Accumulator 1A Alternate Path:

No Facility JPM #:

CLA-109 KIA Rating(s):

SYS006 A 1.13 (3.5/3.7) Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits associated with operating the ECCS controls including - Accumulator pressure (level, boron concentration).

Task Standard:

Cold Leg Accumulator 1A is pressurized with nitrogen to clear annunciator 1AD-9, E/1.

Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator X In-Plant _ __ _...!..X~

Perform _~X~ Simulate _ __

References:

OP/1/A/6200/009 (Cold Leg Accumulator Operation), Enclosure 4.6 rev 073 OP/1/A/6200/010J (annunciator Response for 1AD-9, E/1) rev. rev xxx Validation Time: 8 min. Time Critical: No

=======================================================================
=======================================================================

Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time Examiner: /

NAME SIGNATURE DATE

=======================================================================
=======================================================================

COMMENTS JPM09A JPM09 A Page 2 of 9

SIMULATOR SETUP SHEET

1. Reset to any 100% power IC set.
2. Reduce pressure in 1A CLA to approximately 600 psig
3. Ensure CLA 1A pressure is below 1AD-9, E/1 setpoint and that the annunciator is lit.
4. Freeze simulator and write to a snap.

IC SELECTED _ _ _ _ __

SIMULATOR OPERATOR INSTRUCTIONS:

None.

Tools/Equipment/Procedures Needed:

1. OP/11A162001009 (Cold Leg Accumulator Operation), Enclosure 4.6 revision 073 JPM09 A JPM09A Page 3 of 9

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Reactor power level is at 100%. Cold Leg Accumulator 1A nitrogen overpressure has decreased and annunciator 1AD-9, E/1 ACCUM TANK A HIILO PRESS is lit.

INITIATING CUES:

Restore CLA 1A pressure to clear annunciator 1AD-9, E/1. The initial conditions for OP/1/A/6200/09, Encl. 4.6 (Increasing Accumulator Pressure) have been satisfied.

JPM09 A Page 4 of 9

START TIME: _ __

STEP 2.1: CRITICAL STEP Open 1NI-47A (C-Leg Accum N2 Sup Cont Isol).

STANDARD: OPEN pushbutton depressed for 1NI-47A (Cold Leg Accum SAT N2 Supply Containment Isolation). RED "OPEN" light lit on 1MC-11.

COMMENTS: UNSAT NOTE: If N2 inlet temperature decreases to 65°F, accumulator N2 supply isolation valves will auto close. There is no alarm with this condition.

When N2 inlet temperature increased above 66°F, this condition will auto SAT clear.

CAUTION: Pressurization shall be performed on only one accumulator at a time. UNSAT STANDARD: Reads and acknowledges note and caution.

COMMENTS:

STEP 2.2: CRITICAL STEP Position 1 CB-1 (located behind control panel 1CB-1(1ocated 1MC-6, BB-56) to "ON".

paneI1MC-6, STANDARD: Breaker 1CB-1 placed to the "ON" position. Located inside SAT 1MC-6 on right side of instrument rack support column.

UNSAT COMMENTS:

JPM08A Page 5 of 9

STEP 2.3: CRITICAL STEP Open the corresponding valve to increase pressure in the desired accumulator:

  • 1NI-SO (C-Leg Accum A N2 Supply Isol) SAT STANDARD: OPEN pushbutton depressed for 1NI-SO (Cold Leg Accum A N2 Supply Isol). RED "OPEN" light lit on 1MC-11. Verify UNSAT that 1A Cold Leg Accumulator pressure is increasing.

(1 NIPS040, 1NIPSOSO, on 1MC-11).

COMMENTS STEP 2.4:

If the accumulator N2 supply isolation valve frequently auto closes, ensure SAT the following:

UNSAT

  • The thermostat is set at 7soF.

STANDARD: If 1 1NI-SO NI-SO cycles closed and reopens, dispatch NLO to check power supply and thermostat setting.

EXAMINER NOTE: If examinee calls to dispatch an operator to check power supply for nitrogen heater and thermostat setting, repeat back only what you are told.

COMMENTS JPM08A JPM08 A Page 6 of 9

STEP 2.5: CRITICAL STEP When the accumulator is at the desired pressure, close the appropriate valve as follows:

SAT "CLS" pushbutton for the appropriate valve:

Depress the "ClS"

UNSAT Verify the appropriate valve is closed:

  • (C-Leg Accum A N2 Supply Isol) 1NI-50 (C-leg STANDARD: Determines Cold leg Leg Accumulator 1A 1A N2 overpressure restored within limits by verifying annunciator 1AD-9, E/1 clears. Depress (C-Leg Accum A N2 Supply Isol).

the CLOSE pushbutton for 1NI-50 (C-leg "CLSD" light lit on 1MC-11.

GREEN "ClSD" COMMENTS STEP 2.6:

If necessary, repeat Steps 2.3 through 2.5 to increase pressure in SAT additional accumulators.

STANDARD: Determines no other accumulators need pressure increased.

UNSAT COMMENTS STEP 2.7:

SAT 1CB-1 (located behind control panel 1MC-6, BB-56) to "OFF".

Position 1CB-1 STANDARD: Breaker 1CB-1 placed to "OFF".

UNSAT

_UNSAT COMMENTS JPM08 A JPM08A Page 7 of 9

STEP 2.8:

1NI-47A (C-Leg Accum N2 Sup Cont Isol).

Close 1NI-47A - SAT 1NI-47A (C-Leg Accum STANDARD: Depress the CLOSE pushbutton for 1NI-47A N2 Supply Cont Isol). GREEN "CLSD" light lit on 1MC-11.

- UNSAT COMMENTS This JPM is complete.

TIME STOP: _ __

JPM08 A JPM08A Page 8 of 9

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Reactor power level is at 100%. Cold Leg Accumulator 1A nitrogen overpressure has decreased and annunciator 1AD-9, E/1 ACCUM TANK A HI/LOHIILO PRESS is lit.

INITIATING CUES:

Restore CLA 1A pressure to clear annunciator 1AD-9, E/1. The initial conditions for OP/1/A16200109, OP/1/A/6200109, Encl.

Ene!. 4.6 (Increasing Accumulator Pressure) have been satisfied.

I I

I

Enclosure 4.6 OPI 1IA/62001009 OP/l!Al6200/009 Increasing Accumulator Pressure Page 1 of2

1. Initial Conditions 1.1 Review the Limits and Precautions.

1.2 Verify the GN System is in operation per OP/OIA/64501008 OP/OIAl6450/008 (Nitrogen System).

1.3 Verify the cold leg accumulators have been filled to the desired levels.

1.4 Obtain key #11

  1. 11 to gain access to the backside of the control boards.
2. Procedure

- - 2.1 IN1-47A (C-Leg Accum N2 Sup Cont Isol).

Open INI-47A Is01).

- - 2.2 Position 1lCB-l CB-l (located behind control pane11MC6, panellMC6, BB-56) to "ON".

NOTE: IfN2 1fN2 inlet temperature decreases to 65°F, accumulator N2 supply isolation valves will auto close. There is no alarm associated with this condition. When N2 inlet temperature increased above 66°F, this condition will auto clear.

CAUTION: Pressurization shall be performed on only one accumulator at a time.

2.3 Open the corresponding valve to increase pressure in the desired accumulator:

  • INI-50 IN1-50 (C-Leg Accum A N2 Supply 1sol) Iso1)
  • INI-61 IN1-61 (C-Leg Accum B N2 Supply 1sol) Iso1)
  • INI-72 IN1-72 (C-Leg Accum C N2 Supply Iso1) 1sol)
  • INI-84 IN1-84 (C-Leg Accum D N2 Supply Iso1) 1sol) 2.4 IF the accumulator N2 supply isolation valve frequently auto closes, ensure the following:

--. SMXB-F05E (Safety Injection Accumulator Nitrogen Heater) (AB-560, HH-52) is energized.

--. The thermostat is set at 75°F.

Enclosure 4.6 OP/l!Al6200/009 Increasing Accumulator Pressure Page 2 of2 2.S WHEN the accumulator is at the desired pressure, close the appropriate valve as follows:

2.S.1 Depress the "CLS" pushbutton for the appropriate valve:

  • INI-SO (C-Leg Accum A N2 Supply Isol)
  • INI-61 (C-Leg Accum B N2 Supply Isol)
  • INI-72 (C-Leg Accum C N2 Supply Isol)
  • INI-84 (C-Leg Accum D N2 Supply Isol) 2.S.2 Verify the appropriate valve is closed:
  • INI-SO (C-Leg Accum A N2 Supply Isol)
  • INI-61 (C-Leg Accum B N2 Supply Isol)
  • INI-72 (C-Leg Accum C N2 Supply Isol)
  • INI-84 (C-Leg Accum D N2 Supply Isol) 2.6 IF necessary, repeat Steps 2.3 through 2.S to increase pressure in additional accumulators.

--2.7 Position lCB-l (located behind control panellMC6, BB-S6) to "OFF".

--2.8 Close INI-47A (C-Leg Accum N2 Sup Cont Isol).

2.9 Do NOT file this enclosure in the Control Copy folder of this procedure.

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM09 B Align the NS System to Cold Leg Recirculation CANDIDATE EXAMINER JPM09 B Page 1 of 11

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Align the NS System to Cold Leg Recirculation Alternate Path:

YES Facility JPM #:

NS-102 KIA Rating(s):

SYS026 A4.01 (4.5/4.3) Ability to manually operate and/or monitor in the control room: CCS controls.

Task Standard:

NS Pump 1B is in operation with suction aligned to the containment sump and RN flow established to the NS heat exchangers.

Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator X In-Plant _ __ _-,-X-,---

Perform _...!..X"---- Simulate _ __

References:

EP/1/N5000/ES-1.3 (Transfer to Cold Leg Recirculation) Enclosure 2 rev 021 Validation Time: 15 min. Time Critical: No

=======================================================================

Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time Examiner: 1 NAME SIGNATURE DATE

=======================================================================

COMMENTS JPM09 B Page 2 of 11

SIMULATOR SETUP SHEET

1. Reset to any power IC snap.
2. Insert MAL-NC013A (Cold Leg Leak) set Severity Value = 27.5.
3. Insert VLV-NS010F (NS20A NS Pmp A Suct From RWST Isol Fail To Position) VALUE = 1
4. Run simulator until "FWST LO-LO Level' alarm is received while performing all required actions of EP/E-O, EP/E-1 and EOP/ES-1.3 up to step 6.
5. Insert MAL-NS001B (CONTAINMENT SPRAY NS PUMP 1A FAILURE), VALUE=AUTO
6. Insert OVR-W042D (ARF-1B (ARF-18 CNT AIR RET FAN ON POSITION), VALUE=OFF
7. Insert OVR-W038D (ARF-1A CNT AIR RET FAN ON POSITION), VALUE=OFF
8. Insert OVR-W042C (ARF-1B (ARF-1 8 CNT AIR RET FAN OFF POSITION), VALUE=ON
9. Insert OVR-W038C (ARF-1A CNT AIR RET FAN OFF POSITION), VALUE=ON
10. Freeze and write to a snap.

IC SELECTED _ _ _ _ __

SIMULATOR OPERATOR INSTRUCTIONS:

Do not place simulator in RUN until the candidate signals that he/she is ready to begin.

Tools/Equipment/Procedures Needed:

1. EP/1/A/5000/ES-1.3 EP/1/A/SOOO/ES-1.3 (Transfer to Cold Leg Recirculation), Enclosure 2, rev 021 JPM098 JPM09 B Page 3 of 11

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A LOCA occurred on Unit 1.
  • 80th VX fans failed to operate.

Both

  • EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) is in progress.

EP/1/A15000/ES-1.3

  • NS Pumps have just been secured per Step 6.

INITIATING CUES:

Perform Enclosure 2 (Aligning NS for Recirculation) of EP/1/A/5000/ES-1.3.

EP/1/A15000/ES-1.3.

JPM098 JPM09 B Page 4 of 11

START TIME: _ __

STEP 1: CRITICAL STEP Close the following valves SAT

  • 1NS-20A (NS Pump 1A SuctSuet From FWST) -
  • 1NS-38 NS-3B (NS Pump 18 1B Suct From FWST)

STANDARD: Determines 1NS-20A will not close. Depresses GREEN - UNSAT

'CLOSE' pushbuttons for 1NS-3B.

NS-38. Verifies GREEN 'CLSD' light lit and RED 'OPEN' light dark.

COMMENTS:

STEP 2:

Verify at least one of the following annunciators - LIT - SAT

- UNSAT STANDARD: Determines both lights are lit.

COMMENTS:

JPM088 JPM08 B Page 5 of 11

STEP 3:

Verify both NS trains - AVAILABLE FOR SERVICE.

- SAT STANDARD: Student may say that A train is available based on ability to align to the FWST and continue to step 4, however step 4b will not be met and the student will transition to Step 6 either

- UNSAT at this time or when step 4b is read.

COMMENTS STEP 3 RNO:

IF NS Train 1B available, THEN GO TO step 6. - SAT STANDARD: Determines 1B is available and goes to step 6 AlER column.

- UNSAT COMMENTS STEP 6a:

Align NS Train 1B as follows:

- SAT

a. Verify 1NI-184B (NO Pump 1B 1NI-184B (ND 1B Cont Sump Suct) - OPEN.

STANDARD: Verifies RED 'OPEN' light lit and GREEN "CLSD' light dark. - UNSAT COMMENTS JPM08 B Page 6 of 11

STEP 6b:

SAT Verify 1NS-3B (NS Pump 1B Suet from FWST) - CLOSED.

STANDARD: Verifies GREEN "CLSD' light lit and RED 'OPEN' light dark UNSAT COMMENTS STEP 6e: CRITICAL STEP Open 1NS-1 B (NS Pmp B Suet From Cont Sump).

SAT STANDARD: Depresses RED open pushbutton and verifies RED 'OPEN' light lit and GREEN 'Closed' light dark.

COMMENTS UNSAT STEP 6d:

SAT Ensure the following valves - OPEN:

  • 1NS-15B (NS Spray Hdr 1B Cont Isol)
  • 1NS-12B (NS Spray Hdr 1B Cont Isol) UNSAT STANDARD: Verifies RED 'OPEN' lights lit and GREEN 'CLOSED' lights dark ..

COMMENTS JPM08 B Page 7 of 11

STEP 7:

Verifies containment pressure - HAS EXCEEDED 3 PSIG SAT STANDARD: Determines containment pressure has exceeded 3 PSIG since NS has actuated and Phase B reset lights are dark.

Can also check chart recorder of containment pressure. UNSAT COMMENTS STEP 8:

Verify Containment pressure - GREATER THAN 1 PSIG. SAT STANDARD: Verifies containment pressure is > 1 psig using 1NSP5040/5050/5060/5070 (1 MC-11), or 1NCCR5040/5390 (pen 1) or 1MICR5340/5350 (pen 3) or OAC indication. UNSAT COMMENTS STEP 9: CRITICAL STEP Ensure NS pump(s) aligned to an open containment suction valve - ON. SAT STANDARD: Determines GREEN 'OFF' light is lit. Depresses RED 'ON' pushbutton and verifies 1B NS pump starts.

UNSAT EXAMINER NOTE: The 1B NS pump should have auto started, but auto start was blocked.

COMMENTS STEP 10:

Verify all Unit 1 and Unit 2 RN pumps - ON SAT STANDARD: Verifies RED 'ON' Lights lit and GREEN 'OFF' lights dark for all unit 1 and unit 2 RN pumps.

UNSAT COMMENTS JPM08 B Page 8 of 11

CAUTION: Exceeding 4650 GPM RN flow through an NS Hx will cause damage to the Hx tubes. SAT STANDARD: Acknowledges caution.

COMMENTS UNSAT STEP 11a:

Align RN to NS Hx(s) as follows: SAT

a. Open 1RN-144A 1RN-144A (NS Hx 1A Inlet Isol)

STANDARD: Depresses the RED 'OPEN' pushbutton for 1RN-144A UNSAT COMMENTS STEP 11b:

SAT 1RN144A begins to open, THEN throttle open 1 WHEN 1RN144A 1RN-148A RN-148A (NS Hx 1A Otlt Isol) to obtain one of the following:

  • 4500 GPM flow through NS Hx 1A UNSAT OR
  • 1RN-148A 1RN-148A full open STANDARD: Begins to throttle open 1 1RN-148A RN-148A to obtain 4500 gpm OR 1RN-148A 1RN-148A full open.

COMMENTS STEP 11c: CRITICAL STEP Open 1RN-225B (NS Hx 1B Inlet Isol) SAT STANDARD: Depresses the RED 'OPEN' pushbutton for 1RN-225B.

COMMENTS UNSAT JPM08 B Page 9 of 11

STEP 11d: CRITICAL STEP WHEN 1RN225B begins to open, THEN throttle open 1RN-229B (NS Hx SAT 1B Otlt Isol) to obtain one of the following:

  • 4500 GPM flow through NS Hx 1 A 1A OR UNSAT

COMMENTS STEP 11e:

SAT GO TO step 13 STANDARD: Goes to step 13

_UNSAT UNSAT COMMENTS STEP 13:

SAT Verify adequate RN heat sink as follows:

  • RN System - SUCTION ALIGNED TO LAKE WYLIE
  • RN essential header temperature at one of the following UNSAT locations - LESS THAN OR EQUAL TO 93°F o 1MC-9 1 MC-9 OR o RO Logbook STANDARD: Verifies the RED 'OPEN lights lit and the GREEN 'CLOSED' 1RN-1 A, 1RN-2B, lights dark for 1RN-1A, 1RN-2B, 1RN-5A, 1RN-5A, and 1RN6B 1RN6B Verifies RN essential temp on 1MC-9 < 93°F using 1RNP5000 1RNP5000 or 1RNP5010 1RNP501 0 (1 MC-9) or request RN temp from RO Logbook.

EXAMINER CUE: If asked, state: "RO Logbook indicates essential header temp is 70°F."

COMMENTS complete.

This JPM is comQlete.

TIME STOP: _ __

JPM08 B Page 10 of 11

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • A LOCA occurred on Unit 1.
  • Both VX fans failed to operate.
  • EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) is in progress.
  • NS Pumps have just been secured per Step 6.

INITIATING CUES:

Perform Enclosure 2 (Aligning NS for Recirculation) of EP/1/A/5000/ES-1.3.

CNS TRANSFER TO COLD LEG RECIRCULATION PAGE NO.

EP/1/N5000/ES-1.3 EP/1/A/5000/ES-1.3 21 of 38 Enclosure 2 - Page 1 of 13 Revision 21 Aligning NS for Recirculation ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

1. Close the following valves:
  • 1NS-20A (NS Pump 1A Suct From FWST)
  • 1NS-38 (NS Pump 18 Suct From FWST).
2. Verify at least one of the following Perform the following:

annunciators - LIT:

a. WHEN at least one "CO NT. SUMP

_ . 1AD-20, 8/3 "CONT.

"CO NT. SUMP LEVEL >3.3 LEVEL >3.3 ft" annunciator is LIT, ft" THEN GO TO Step 3.

OR b. Do not continue in this enclosure until at least one annuciator is LIT.

"CO NT. SUMP LEVEL >3.3 ft" .

ft".

3. Verify both NS trains - AVAILABLE FOR Perform the following:

SERVICE.

a. IF NS Train 1A is available, THEN GO TO Step 5.
b. IF NS Train 18 is available, THEN GO TO Step 6.

CNS TRANSFER TO COLD LEG RECIRCULATION PAGE NO.

EP/1/A/5000/ES-1.3 22 of 38 Enclosure 2 - Page 2 of 13 Revision 21 Aligning NS for Recirculation ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

4. Align NS as follows:
a. Verify the following valves - OPEN: a. Perform the following:

1NI-185A (NO Pump 1A Cont

b. Verify 1NS-20A (NS Pump 1A Suct b. GO TO Step 6.

From FWST) - CLOSED.

c. Open 1NS-18A (NS Pmp A Suct From Cont Cant Sump).
d. Verify 1NS-3B (NS Pump 1B Suct From d. GO TO Step 5.

FWST) - CLOSED.

e. Open 1NS-1 B (NS Pmp B Suct From Cont Cant Sump).
f. Ensure the following valves - OPEN:
  • 1NS-29A (NS Spray Hdr 1A1A Cant Cont Isol)
  • 1 NS-15B (NS Spray Hdr Hd r 1B 1B Cont Cant Isol)
  • 1 NS-12B (NS 1NS-12B Spray Hdr 1B1B Cant Cont Isol).

_ g. GO TO Step 7.

CNS TRANSFER TO COLD LEG RECIRCULATION PAGE NO.

EP/1/A/5000/ES-1.3 EP/1/A15000/ES-1.3 23 of 38 Enclosure 2 - Page 3 of 13 Revision 21 Aligning NS for Recirculation ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

5. Align NS Train 1A as follows:
a. Verify 1NI-185A (ND(NO Pump 1A Cant Cont a. GO TO Step 6.

Sump Suet) - OPEN.

b. Verify 1NS-20A (NS Pump 1A Suet b. GO TO Step 6.

From FWST) - CLOSED.

c.

e. Open 1NS-18A (NS Pmp A Suet From Cant Cont Sump).
d. Ensure the following valves - OPEN:
  • 1NS-29A (NS Spray Hdr 1A Cant Cont 1501)

Isol)

  • 1NS-32A (NS Spray Hdr 1 1A Cont A Cant 1501).

Isol).

_ e. GO TO Step 7.

6. Align NS Train 1B as follows:
a. Verify 1NI-1848 (ND(NO Pump 18 Cant Cont a. GO TO Step 5.

Sump Suet) - OPEN.

b. Verify 1NS-38 (NS Pump 18 Suet From b. GO TO Step 5.

FWST) - CLOSED.

c.

e. Open 1NS-18 NS-1 8 (NS Pmp 8 Suet From Cont Cant Sump).
d. Ensure the following valves - OPEN:
  • 1NS-158 (NS Spray Hdr 18 Cant Cont 1501)

Isol)

  • 1NS-128 (NS Spray Hdr 18 Cant Cont 1501).

Isol).

7. Verify containment pressure - HAS _ GO TO Step 10.

EXCEEDED 3 PSIG.

CNS TRANSFER TO COLD LEG RECIRCULATION PAGE NO.

EP/1/A/SOOO/ES-1.3 24 of 38 Enclosure 2 - Page 4 of 13 Revision 21 Aligning NS for Recirculation ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

8. Verify containment pressure - GREATER Perform the following:

THAN 1 PSIG.

a. Reset NS.
b. Stop NS pumps.
c. GO TO Step 10.
9. Ensure NS pump(s) aligned to an open containment sump suction valve - ON.
10. Verify all Unit 1 and Unit 2 RN pumps - _ GO TO Step 12.

ON.

CNS TRANSFER TO COLD LEG RECIRCULATION PAGE NO.

EP/1/A/5000/ES-1.3 25 of 38 Enclosure 2 - Page 5 of 13 Revision 21 Aligning NS for Recirculation ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION Exceeding 4650 GPM RN flow through an NS Hx will cause damage to the Hx tubes.

11. Align RN to NS Hx(s) as follows:
a. Open 1 RN-144A (NS Hx 1A Inlet Isol).

1RN-144A 1501).

b. WHEN 1RN-144A begins to open, THEN throttle open 1RN-148A (NS Hx 1501) to obtain one of the 1A Otlt Isol) 1A following:

_

  • 4500 GPM flow through NS Hx 1A OR

_ . 1RN-148A full open.

c. Open 1RN-225B (NS Hx 1B Inlet Isol). 1501).
d. WHEN 1 RN-225B begins to open, THEN throttle open 1RN-229B (NS Hx 1501) to obtain one of the 1B Otlt Isol) following:

_

  • 4500 GPM flow through NS Hx 1B OR

_ . 1 RN-229B full open.

e. GO TO Step 13.

CNS TRANSFER TO COLD LEG RECIRCULATION PAGE NO.

EP/1/Al5000/ES-1.3 EP/1/A/5000/ES-1.3 26 of 38 Enclosure 2 - Page 6 of 13 Revision 21 Aligning NS for Recirculation ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION Exceeding 4650 GPM RN flow through an NS Hx will cause damage to the Hx tubes.

12. Align RN to NS Hx(s) based on RN and NS pump status as follows:
a. Verify NS Pump 1A - ON. a. Perform the following:

_ 1) IF only one 8 Train RN pump is on, THEN close 2RN-4 2RN-47A7A (RN Supply X-Over 1501).

Isol).

2) IF only 8 Train RN pumps are on, THEN close one of the following valves:

_ . 2RN-488 (RN Supply X-Over 1501) Isol)

OR

_ . 2RN-47A (RN Supply X-Over Isol).

1501).

_ 3) Open 1RN-2258 (NS Hx 18 Inlet Isol).

1501).

4) WHEN 1 RN-2258 begins to open, 1RN-2258 THEN throttle open 1RN-2298 (NS Hx 18 Otlt Isol) 1501) to obtain one of the following:

_ .* 4500 GPM flow through NS Hx 18 OR

_ . 1RN-2298 full open.

_ 5) GO TO Step 13.

CNS TRANSFER TO COLD LEG RECIRCULATION PAGE NO.

EP/1/A/5000/ES-1.3 27 of 38 Enclosure 2 - Page 7 of 13 Revision 21 Aligning NS for Recirculation ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

12. (Continued)
b. Verify NS Pump 1B - ON. b. Perform the following:

_ 1) IF only one A Train RN pump is on, THEN close 2RN-48B (RN Supply X-Over Isol).

2) IF only A Train RN pumps are on, THEN close one of the following valves:

_ . 2RN-47 2RN-47A A (RN Supply X-Over Isol)

OR

_ .* 2RN-48B (RN Supply X-Over Isol).

_ 3) Open 1RN-144A (NS Hx 1A Inlet Isol).

4) WHEN 1RN-144A begins to open, THEN throttle open 1 RN-148A (NS Hx 1A1A Otlt Isol) to obtain one of the following:

_

  • 4500 GPM flow through NS Hx 1A OR

_. 1 RN-148A full open.

1RN-148A

_ 5) GO TO Step 13.

CNS TRANSFER TO COLD LEG RECIRCULATION PAGE NO.

EP/1/A/5000/ES-1.3 28 of 38 Enclosure 2 - Page 8 of 13 Revision 21 Aligning NS for Recirculation ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

12. (Continued)
c. Verify at least one A Train RN pump - c. Perform the following:

ON.

1) IF both B Train RN pumps are on, THEN close one of the following valves:

_

  • 2RN-47A (RN Supply X-Over Isol) 1501)

OR

_ . 2RN-48B (RN Supply X-Over 1501).

Isol).

_ 2) IF only one B Train RN pump is on, THEN close 2RN-47A (RN Supply 1501).

X-Over Isol).

_ 3) Open 1RN-225B (NS Hx 1B Inlet 1501).

Isol).

4) WHEN 1RN-225B 1RN-225B begins to open, THEN throttle open 1RN-229B (NS 1501) to obtain one of the Hx 1B Otlt Isol) following:

_

  • 4500 GPM flow through NS Hx 1B OR

_ . 1RN-229B full open.

_ 5) GO TO Step 13.

CNS TRANSFER TO COLD LEG RECIRCULATION PAGE NO.

EP/1/A15000/ES-1.3 29 of 38 Enclosure 2 - Page 9 of 13 Revision 21 Aligning NS for Recirculation ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

12. (Continued)
d. Verify at least one B 8 Train RN pump - d. Perform the following:

ON.

1)) IF both A Train RN pumps are on, 1

THEN close one of the following valves:

_ . 2RN-47A 2RN-47A (RN Supply X-Over Isol)

OR 2RN-488 (RN Supply X-Over

_ . 2RN-48B Isol).

_ 2) IF only one A Train RN pump is on, THEN close 2RN-488 2RN-48B (RN Supply X-Over Isol).

_ 3) Open 1RN-144A (NS Hx 1A Inlet Isol).

4) WHEN 1RN-144A begins to open, THEN throttle open 1RN-148A (NS Hx 1A Otlt Isol) to obtain one of the following:

_ .* 4500 GPM flow through NS Hx 1A OR

_. 1 RN-148A full open.

1RN-148A

_ 5) GO TO Step 13.

CNS TRANSFER TO COLD LEG RECIRCULATION PAGE NO.

EP/1/A/5000/ES-1.3 30 of 38 Enclosure 2 - Page 10 of 13 Revision 21 Aligning NS for Recirculation ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

12. (Continued)
e. Verify RN Pump 1A and 2A - ON. e. Perform the following:
1) IF only one RN pump is on in each train, THEN align RN to only one NS Hx as follows:
  • NS Hx 1A:

_ a) Open 1RN-144A (NS Hx 1A Inlet Isol).

b) WHEN 1RN-144A begins to open, THEN throttle open 1RN-148A (NS Hx 1A Otlt Isol) to obtain one of the following:

_

  • 4500 GPM flow through NS Hx 1A OR

_ . 1RN-148A full open.

_ c) GO TO Step 13.

OR

  • NSHx1B:

_ a) Open 1RN-225B (NS Hx 1B Inlet Isol).

b) WHEN 1RN-225B begins to open, THEN throttle open 1RN-229B (NS Hx 1B Otlt Isol) to obtain one of the following:

_ . 4500 GPM flow through NS Hx 1B OR

_ . 1RN-229B full open.

_ c) GO TO Step 13.

(RNO continued on next page)

CNS TRANSFER TO COLD LEG RECIRCULATION PAGE NO.

EP/11A15000/ES-1.3 EP/1/A/5000/ES-1.3 31 of 38 Enclosure 2 - Page 11 of 13 Revision 21 Aligning NS for Recirculation ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

12. (Continued)

_ 2) Open 1RN-225B (NS Hx 1B Inlet Isol).

3) WHEN 1RN-225B begins to open, THEN throttle open 1RN-229B (NS Hx 1B Otlt Isol) to obtain one of the following:

_

  • 4500 GPM flow through NS Hx 1B OR

_ . 1RN-229B full open.

_ 4) GO TO Step 13.

f. Open 1RN-144A (NS Hx 1A Inlet Isol).
g. WHEN 1RN-144A begins to open, THEN throttle open 1RN-148A (NS Hx 1A Otlt Isol) to obtain one of the following:

_

  • 4500 GPM flow through NS Hx 1A OR

CNS TRANSFER TO COLD LEG RECIRCULATION PAGE NO.

EP/1/A/5000/ES-1.3 32 of 38 Enclosure 2 - Page 12 of 13 Revision 21 Aligning NS for Recirculation ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

13. Verify adequate RN heat sink as follows: Perform the following:
  • RN System - SUCTION ALIGNED TO a. Ensure the following valves - OPEN:

LAKE WYLIE

  • 1RN-3A (RN P/H Pit A Isol From
  • RN essential header temperatures at one SNSWP) of the following locations - LESS THAN OR EQUAL TO 93°F:
  • 1RN-4B (RN P/H Pit B Isol From SNSWP)

OR

  • RO Logbook.

_

_ .* 2RN-848B (DIG 2B Hx Ret To SNSWP).

(RNO continued on next page)

CNS TRANSFER TO COLD LEG RECIRCULATION PAGE NO.

EP/1/A1S000/ES-1.3 EP/1/A/SOOO/ES-1.3 33 of 38 Enclosure 2 - Page 13 of 13 Revision 21 Aligning NS for Recirculation ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

13. (Continued)
b. Ensure the following valves - CLOSED:
  • 1 RN-1A (RN P/H Pit A Isol From Lake)
  • 1RN-2B RN-28 (RN P/H Pit A Isol From Lake)
  • 1RN-SA (RN P/H Pit B 8 Isol From Lake)
  • 1RN-6B RN-68 (RN P/H Pit B 8 Isol From Lake)
  • 1RN-S38 RN-S3B (Station RN Disch Hdr X-Over)

_ .* 1RN-S4A (Station RN Disch Hdr X-Over) 1 RN-S7A (Station RN Disch To RL

RN-8438 (Station RN Disch To RL

  • 1RN-847A 1 RN-847A (DIG 1A Hx Ret To Lake)

RN-8498 (DIG 1

  • 1 RN-849B 18 B Hx Ret To Lake)

_ .* 2RN-847A (DIG 2A Hx Ret To Lake) 2RN-8498 (DIG 2B

_ .* 2RN-849B 28 Hx Ret To Lake).

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM09 C Restore Offsite Power to 6.9 kV Busses per AP/07 (Loss of Normal Power)

Enclosure 21 (Black Restart Procedure)

CANDIDATE EXAMINER JPM09 C Page 1 of 12

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE AP/07 (Loss of Normal Power) Enclosure 21 (Black Restart Restore Offsite Power to 6.9Kv per AP/O?

Procedure)

Alternate Path:

Yes Facility JPM #:

BANK KIA Rating(s):

EA 1.07 (4.3/4.5) Ability to operate and monitor the following as they apply to a Station EPE055 EA1.0?

Blackout - Restoration of power from offsite.

Task Standard:

Power has been restored to three 6.9 KV busses from the yellow buss via B train.

Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator X In-Plant _ __ Perform _~X-,--

_-,-X,,-- Simulate _ __

References:

AP/1/A/5500/007 (Loss of Normal Power) Enclosure 21 (Black (Slack Start Procedure) rev 057 Validation Time: 18 min. Time Critical: No

=======================================================================

Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time Examiner: I NAME SIGNATURE DATE

=======================================================================

COMMENTS JPM09 C Page 2 of 12

SIMULATOR SETUP SHEET

1. Reset to any 100% power IC set.
2. Place simulator in RUN.
3. Trip all a" Unit Tie PCBs.
4. Ensure turbine trips.
5. Perform appropriate actions of E-O and ES-0.1.

ES-O.1.

6. Perform actions of AP/11A155001007.

AP/1/A/5500/007.

7. Perform actions of Enclosure 21 through step 11.

A"ow simulator to run until the plant is stable.

8. Allow
9. Insert OVR-EP024B (PCB 18 TRIP TRIP PB), Value = =ON, DELAY = = 1 second, EVENT 1 10.Set EVENT 1 =JBKPCB18
11. Freeze, and write to a snap.

IC SELECTED _ __ __ __ __ __ _'

SIMULATOR OPERATOR INSTRUCTIONS:

None.

Tools/Equipment/Procedures Needed:

1. AP/1/A/5500107 AP/11A15500107 (Loss of Normal Power) Enclosure 21 (Black Start Procedure) rev 057 JPM09 C Page 3 of 12

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • AP/1/AJ55001007 (Loss Both units experienced a loss of offsite power due to a Loss of Grid and AP/1/A/5500/007 of Normal Power) is in progress.
  • The TCC has reported that the Yellow Bus is energized and can be used on a limited basis to re-energize plant equipment.
  • AP/1/AJ55001007 AP/1/A/5500/007 Enclosure 21 has been completed through step 12.

INITIATING CUES:

The SRO instructs you to restore power to the Unit 1 6.9 KV Busses per Enclosure 21 (Black Start Procedure) of AP/1/AJ5500107 AP/1/A/5500/07 (Loss of Normal Power) starting at step 13.

JPM09 C Page 4 of 12

START TIME: _ __

NOTE Zone A or B lockout will occur if at least one main transformer cooling circuit is not restored within 15 minutes of re-energizing the main transformer.

STEP 13: Energize A train as follows:

a. Contact TCC for permission to close PCB 18.

- SAT STANDARD: Calls TCC and requests permission.

INSTRUCTOR CUE: "You have permission to close PCB 18."

- UNSAT EXAMINER NOTE: If the red phone is used, it will contact the SOC and the cue provided by the booth will be "This is the SOC; you need to contact the TCC at extension 3307."

COMMENTS:

STEP 13:

b. WHEN permission is granted, THEN close PCB 18. - SAT STANDARD: Depresses the CLOSE pushbutton for PCB 18 and notes that the PCB 18 closes and then reopens in 1 second.

- UNSAT COMMENTS:

STEP 13 RNO: b. IF PCB 18 cannot be closed, THEN perform the following:

1) Contact TCC for permission to energize Unit 1B - SAT train from the Yellow Bus.

STANDARD: Calls TCC and requests permission.

- UNSAT INSTRUCTOR CUE: "You have permission to energize B Train from the Yellow Bus."

EXAMINER NOTE: If the red phone is used, it will contact the SOC and the cue provided by the booth will be "This is the SOC; you need to contact the TCC at extension 3307."

COMMENTS JPM08 C Page 5 of 12

STEP 13 RNO: b.2) WHEN permission granted, THEN perform the following:

a) Ensure MOD 1B - CLOSED. SAT STANDARD: Determines MOD 1B is closed on MC-11 UNSAT COMMENTS STEP 13 RNO: b.2) WHEN permission granted, THEN perform the following:

b) Ensure PCB 14 - OPEN. SAT STANDARD: Ensures PCB 14 is OPEN UNSAT COMMENTS STEP 13 RNO: b.2) WHEN permission granted, THEN perform the CRITICAL following: STEP c) Close PCB 15.

SAT STANDARD: Closes PCB 15 from MC-11 UNSAT COMMENTS STEP 13: c. Do not continue until one of the following PCBs is closed:

  • PCB 15.

STANDARD: Determines PCB 15 is closed.

UNSAT COMMENTS NOTE:

  • Desired loading rate is 1-2 MW increments.
  • Total load per unit may be initially limited to approximately 11 MWs.

JPM08 C Page 6 of 12

STEP 14: IF "TRANSF 1A" energized, THEN perform the following:

STANDARD: Due to previous steps and plant condition should determine SAT Transformer 1A is NOT energized and continue to next step.

COMMENTS _UNSAT STEP 15: IF "TRANSF 1B" 1B" energized, THEN perform the following: CRITICAL TO as follows:

a. Energize 1TD STEP
1) Place "7KV BUS 1 1TD TD MODE SEL" switch in "MAN B&TIE". SAT

_SAT STANDARD: Place lTDITO switch to Man B and tie.

UNSAT

_UNSAT COMMENTS STEP 15a: 2) Close "7KV 1 1TD FOR FRM 1 TD FDR 1T1B".

T1 B". CRITICAL STEP STANDARD: Closes "7KV 1 1TD FOR FRM 1 TD FDR 1T1B" T1 B" SAT COMMENTS

_UNSAT STEP 15a: 3) Verify "7KV BUS 1TD TIE BKR" - CLOSED.

STANDARD: Verifies tie breaker closed on MC-11 SAT COMMENTS UNSAT JPM08 C Page 7 of 12

STEP 15: b. Energize 1TC as follows:

1) Verify with TCC that additional load can be accepted prior to energizing 6.9 KV bus. SAT STANDARD: Calls TCC and requests permission.

INSTRUCTOR CUE: "Additional load can be accepted at this time." UNSAT EXAMINER NOTE: If the red phone is used, it will contact the SOC and the cue provided by the booth will be "This is the SOC; you need to contact the TCC at extension 3307."

COMMENTS STEP 15b: 2) Place "7KV BUS 1TC MODE SEL" switch in "MAN B & & TIE". CRITICAL STEP STANDARD: Places 1TC in Man B and Tie position.

SAT COMMENTS UNSAT STEP 15b: 3) Close "7KV 1TC FDRFOR FRM 1T2B". CRITICAL STEP STANDARD: Closes "7KV 1 1TC FOR FRM 1 TC FDR 1T2B" T2B" SAT COMMENTS UNSAT STEP 15b: 4) Verify "7KV BUS 1TC TIE BKR" - CLOSED.

STANDARD: Determines breaker is closed. SAT COMMENTS UNSAT JPM08 C Page 8 of 12

STEP 15: c. Verify 1AD-11 F/2 "TRANSFORMER 1B 1B FORCED COOLING REDUCTION" - DARK.

SAT STANDARD: Determines the annunciator dark UNSAT COMMENTS STEP 15: d. Energize 1TB as follows:

1) Verify with TCC that additional load can be accepted prior to energizing 6.9 KV bus SAT STANDARD: Calls TCC and requests permission.

INSTRUCTOR CUE: "Additional load can be accepted at this time."

UNSAT EXAMINER NOTE: If the red phone is used, it will contact the SOC and the cue provided by the booth will be "This is the SOC; you need to contact the TCC at extension 3307."

COMMENTS STEP 15d: 2) Place "7KV BUS 1TB MODE SEL" switch in "MAN B & & TIE". CRITICAL STEP STANDARD: Places 1TB in Man B and Tie SAT COMMENTS UNSAT STEP 15d: 3) Close "7KV 1TB FORFDR FRM 1T1B". CRITICAL STEP STANDARD: Closes "7KV 1TB FOR FDR FRM 1T1B" SAT COMMENTS UNSAT JPM08 C Page 9 of 12

STEP 15d: 4) Verify "7KV BUS 1TB TIE BKR" - CLOSED.

STANDARD: Determines breaker is closed. SAT COMMENTS

- UNSAT STEP 15: e. Energize 1TA as follows:

1) Verify with TCC that additional load can be accepted prior to energizing 6.9 KV bus. - SAT STANDARD: Calls TeC TCC and requests permission.

INSTRUCTOR CUE: "No additional loading should be attempted at - UNSAT this time."

EXAMINER NOTE: If the red phone is used, it will contact the SOC and the cue provided by the booth will be "This is the SOC; you need to contact the TCC at extension 3307."

COMMENTS STEP 15e RNO: 1) Do not energize 1TA until additional load can be accepted.

- SAT STANDARD: Does NOT energize 1TA.

COMMENTS - UNSAT STEP 15: f. Verify all 6.9 KV busses - ENERGIZED.

STANDARD: Determines "A" 6.9 KV is NOT energized and goes to RNO - SAT COMMENTS

- UNSAT JPM08 C Page 10 of 12

STEP 15f RNO: Perform the following:

TCC approval to energize additional

1) IF waiting on TCe 6.9 KV busses, THEN RETURN TO Step 15 and energize busses as TCC allows. - SAT STANDARD: Returns to Step 15.

EXAMINER CUE: Another Operator will complete the procedure. - UNSAT COMMENTS This JPM is complete.

TIME STOP: _ __

C JPM08 e Page 11 of 12

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Both units experienced a loss of offsite power due to a Loss of Grid and AP/1/A/5500/007 AP/11A155001007 (Loss of Normal Power) is in progress.
  • The TCC has reported that the Yellow Bus is energized and can by used on a limited basis to re-energize plant equipment.
  • AP/1/A/5500/007 AP/11A155001007 Enclosure 21 has been completed through step 12.

INITIATING CUES:

The SRO instructs you to restore power to the Unit 1 6.9 KV Busses per Enclosure 21 (Black Start Procedure) of AP/1/A/5500/07 AP/11A15500107 (Loss of Normal Power) starting at step 13.

I I

CNS LOSS OF NORMAL POWER PAGE NO.

AP/1 AP 11/IAJ55001007 Al55001007 125 of 154 Enclosure 21 - Page 1 of 12 Revision 57 Black Start Procedure ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

1. Ensure the following PCBs - OPEN:
  • PCB 14
  • PCB 15
  • PCB 17
  • PCB 18.
2. Place the following pump switches in "OFF":
  • All hotwell pumps
  • All condensate booster pumps.
3. Depress OFF on the following equipment:
  • KR Pump A
  • KR Pump B
  • KR Pump C.
4. Dispatch operator to ensure breakers for all motor loads on all de-energized 6.9 KV busses open. REFER TO Enclosure 22 (Load Shed of 6.9 KV Busses).
5. Dispatch operator to align 600 volt load centers for black start. REFER TO Enclosure 25 (600 Volt Load Center Black Start Alignment).
6. Ensure PZR HTR GROUP 1C - OFF.
7. Place PZR HTR GROUP 1 1D D in "MAN" and "OFF".
8. Shutdown the rod control system.

REFER TO OP/1/A16150/008 OP/1/Al6150/o08 (Rod Control).

CNS LOSS OF NORMAL POWER PAGE NO.

AP/1 / Al5500/007 AP/1/A/5500/007 126 of 154 Enclosure 21 - Page 2 of 12 Revision 57 Black Start Procedure ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED The TCC black start procedure energizes plant auxiliaries via A Train Main Power from the Yellow Bus for both units.

9. Verify with TCC - YELLOW BUS Do not continue until the Yellow Bus ENERGIZED. energized.
10. Ensure MOD 1A - CLOSED.
11. Do not continue until the following conditions are met:
  • Rod control system is shutdown
  • Enclosure 22 (Load Shed of 6.9 KV Busses) is complete
  • Enclosure 25 (600 Volt Load Center Black Start Alignment) is complete.
12. Coordinate energizing plant loads with Unit 2 to prevent over loading the grid.

CNS LOSS OF NORMAL POWER PAGE NO.

AP 111Al55001007 AP/1/N5500/007 127 of 154 Enclosure 21 - Page 3 of 12 Revision 57 Black Start Procedure ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED Zone A or B lockout wi" occur if at least one main transformer cooling circuit is not restored within 15 minutes of re-energizing the main transformer.

13. Energize A train as follows:
a. Contact TCC for permission to close PCB 18.
b. WHEN permission granted, THEN b. IF PCB 18 cannot be closed, THEN close PCB 18. perform the following:

_ 1) Contact TCC for permission to energize Unit 1B train from the Yellow Bus.

2) WHEN permission granted, THEN perform the following:

_ a) Ensure MOD 1B - CLOSED.

_ b) Ensure PCB 14 - OPEN.

_ c) Close PCB 15.

c. Do not continue until one of the following PCBs is closed:
  • PCB 15.

CNS LOSS OF NORMAL POWER PAGE NO.

AP/11A155001007 AP/1/A15500/007 128 of 154 Enclosure 21 - Page 4 of 12 Revision 57 Black Start Procedure ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

  • Desired loading rate is 1-2 MW increments .
  • Total load per unit may be initially limited to approximately 11 MWs.
14. IF "TRANSF 1A" energized, THEN perform the following:
a. Energize 1 TD as follows:

1TD

_ 1) Place "7KV BUS 1 TD MODE SEL" 1TD switch in "MAN A & TIE".

_ 2) Close "7KV 1TD nD FDR FRM 1T1A".

_ 3) Verify "7KV BUS nD TIE BKR"-

BKR" -

CLOSED.

b. Energize nc 1TC as follows:

_ 1) Verify with TCC that additional load _ 1) Do not energize 1TC until additional can be accepted prior to energizing load can be accepted.

6.9 KV bus.

_ 2) Place "7KV BUS 1TC MODE SEL" switch in "MAN A & TIE".

_ 3) Close "7KV nc1TC FDR FRM 1T1A".

_ 4) Verify "7KV BUS 1TC TIE BKR"-

CLOSED.

c. Verify 1AD-11 C/2 "TRANSFORMER c. Restore transformer cooling. REFER 1A FORCED COOLING REDUCTION"- TO OP/1/Al6350/005 OP/1/A16350/005 (Alternate AC DARK. Power Sources).

CNS LOSS OF NORMAL POWER PAGE NO.

AP/1 IAl55001007 AP/1/A155001007 129 of 154 Enclosure 21 - Page 5 of 12 Revision 57 Black Start Procedure ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

14. (Continued)
d. Energize 1TB as follows:

_ 1) Verify with TCC that additional load _ 1) Do not energize 1TB until additional can be accepted prior to energizing load can be accepted.

6.9 KV bus.

_ 2) Place "7KV BUS 1TB MODE SEL" switch in "MAN A & TIE".

_ 3) Close "7KV 1TB FORFDR FRM 1T2A".

_ 4) Verify "7KV BUS 1TB TIE BKR"-

CLOSED.

e. Energize 1T A as follows:

_ 1) Verify with TCC that additional load _ 1) Do not energize 1TA1TA until additional can be accepted prior to energizing load can be accepted.

6.9 KV bus.

_ 2) Place "7KV BUS 1TA MODE SEL" switch in "MAN A & TIE".

_ 3) Close "7KV 1TA FORFDR FRM 1T2A".

_ 4) Verify "7KV BUS 1TA TIE BKR"-

CLOSED.

f. Verify all 6.9 KV busses - ENERGIZED. f. Perform the following:

_ 1) IF waiting on TCC approval to energize additional 6.9 KV busses, THEN RETURN TO Step 14 and energize busses as TCC allows.

_ 2) IF all available 6.9 KV busses are energized, THEN GO TO Step 16.

CNS LOSS OF NORMAL POWER PAGE NO.

AP/1/A155001007 AP/1/A/5500/007 130 of 154 Enclosure 21 - Page 6 of 12 Revision 57 Black Start Procedure ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

15. IF "TRANSF 1B" energized, THEN perform the following:
a. Energize 1TD HD as follows:

_ 1) Place "7KV BUS 1TD 1TO MODE SEL" switch in "MAN B & TIE".

_ 2) Close "7KV HD FDR FOR FRM 1T1B".

_ 3) Verify "7KV BUS 1TDHD TIE BKR"-

BKR" -

CLOSED.

b. Energize 1 1TC TC as follows:

_ 1) Verify with TCC that additional load _ 1) Do not energize 1TC until additional can be accepted prior to energizing load can be accepted.

6.9 KV bus.

_ 2) Place "7KV BUS 1TC 1TC MODE SEL" switch in "MAN B & TIE".

_ 3) Close "7KV HC FDR FOR FRM 1T2B".

H2B".

_ 4) Verify "7KV BUS 1TCHC TIE BKR"-

CLOSED.

c. Verify 1AD-11 F/2 "TRANSFORMER 1 B 1B c. Restore transformer cooling. REFER FORCED COOLING REDUCTION" - TO OP/1/A163501005 OP/1/A/6350/005 (Alternate AC DARK. Power Sources).
d. Energize 1TB HB as follows:

_ 1) Verify with TCC that additional load _ 1) Do not energize 1TB until additional can be accepted prior to energizing load can be accepted.

6.9 KV bus.

_ 2) Place "7KV BUS 1 HB TB MODE SEL" switch in "MAN B & TIE".

_ 3) Close "7KV 1TB FDRFOR FRM 1T1B".

H1 B".

_ 4) Verify "7KV BUS 1TB HB TIE BKR"-

BKR" -

CLOSED.

CNS LOSS OF NORMAL POWER PAGE NO.

AP/1/Al5500/007 AP/1/A/5500/007 131 of 154 Enclosure 21 - Page 7 of 12 Revision 57 Black Start Procedure ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

15. (Continued)
e. Energize 1 TA as follows:

1TA

_ 1) Verify with TCC that additional load _ 1) Do not energize 1TA1TA until additional can be accepted prior to energizing load can be accepted.

6.9 KV bus.

_ 2) Place "7KV BUS 1TA MODE SEL" switch in "MAN B & & TIE".

_ 3) Close "7KV 1TA FDR FRM 1T2B".

_ 4) Verify "7KV BUS 1TA TIE BKR"-

CLOSED.

f. Verify all 6.9 KV busses - ENERGIZED. f. Perform the following:

_ 1) IF waiting on TCC approval to energize additional 6.9 KV busses, THEN RETURN TO Step 15 and energize busses as TCC allows.

_ 2) IF all available 6.9 KV busses are energized, THEN GO TO Step 16.

16. Re-energize the shared 600 volt load centers that were isolated by Enclosure 25 (600 Volt Load Center Black Start Alignment) as follows:
a. Verify with TCC that additional load can a. Perform the following:

be accepted prior to energizing 600 volt load centers. _ 1) WHEN additional load can be accepted, THEN perform Step 16.

_ 2) GO TO Step 17.

b. Energize 1SLXD as follows:

_ 1) Verify 1TD - ENERGIZED. _ 1) GO TO Step 16.c.

_ 2) Close 1SLXD-4B (Load Center 1SLXD Incoming Breaker) ..

CNS LOSS OF NORMAL POWER PAGE NO.

AP/1/N5500/007 AP/1/AJ5500/007 132 of 154 Enclosure 21 - Page 8 of 12 Revision 57 Black Start Procedure ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

16. (Continued)
c. Energize 1SLXC as follows:

_ 1) Verify 1TC - ENERGIZED. _ 1) GO TO Step 16.d.

_ 2) Verify with TCC that additional load 2) Perform the following:

can be accepted prior to energizing 600 volt load center. _ a) WHEN additional load can be accepted, THEN perform Step 16.

_ b) GO TO Step 17.

_ 3) Close 1SLXC-4B 1SLXC-4B (Load Center 1SLXC Normal Incoming Breaker).

d. Energize 1SLXB as follows:

_ 1) Verify 1TB - ENERGIZED. _ 1) GO TO Step 16.e.

_ 2) Verify with TCC that additional load 2) Perform the following:

can be accepted prior to energizing 600 volt load center. _ a) WHEN additional load can be accepted, THEN perform Step 16.

_ b) GO TO Step 17.

_ 3) Close 1SLXB-4B 1SLXB-4B (Load Center 1SLXB Incoming Breaker).

e. Energize 1SLXG as follows:

_ 1) Verify 1TA- ENERGIZED. _ 1) GO TO Step 16.f.

_ 2) Verify with TCC that additional load 2) Perform the following:

can be accepted prior to energizing 600 volt load center. _ a) WHEN additional load can be accepted, THEN perform Step 16.

_ b) GO TO Step 17.

_ 3) Close 1SLXG-4B (Load Center 1SLXG 1 SLXG Incoming Breaker).

CNS LOSS OF NORMAL POWER PAGE NO.

AP111AJ55001007 AP/11Al55001007 133 of 154 Enclosure 21 - Page 9 of 12 Revision 57 Black Start Procedure ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

16. (Continued)
f. Energize 1SLXA as follows:

_ 1) 1} Verify 1TA - ENERGIZED. _ 1) 1} GO TO Step 17.

_ 2) 2} Verify with TCC that additional load 2) 2} Perform the following:

can be accepted prior to energizing 600 volt load center. _ a} WHEN additional load can be a) accepted, THEN perform Step 16.

_ b} GO TO Step 17.

b)

_ 3) Close 1SLXA-4B (Load Center 3}

1SLXA Incoming Breaker).

17. Ensure the following battery chargers energized as follows:
  • WHEN 1TB is energized, THEN ensure Switchyard battery chargers energized.

REFER TO OP/O/B/63501015 (230 KV Switchyard 125 VDC Power System) .

  • WHEN 1TC is energized, THEN ensure the following:
  • Aux Control Power battery chargers energized. REFER TO OP/1/B/63501009 (125 VDC 2401120 240/120 VAC Auxiliary Control Power System)
  • 250 VDC battery chargers energized.

REFER TO OP/O/B/63501007 (250 VDC Auxiliary Power System).

18. Contact Chemistry to ensure YM is available for makeup to the UST.

CNS LOSS OF NORMAL POWER PAGE NO.

AP/11Al55001007 AP/1/AJ55001007 134 of 154 Enclosure 21 - Page 10 of 12 Revision 57 Black Start Procedure ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

19. IF AT ANY TIME the TCC Tee requests additional load to stabilize the grid, THEN the following can be performed to provide rapid load to the grid:
a. Energize 1HTA as follows:

_ 1) Verify 2HTA - DE-ENERGIZED. 1)

1) IF 1HTA to be energized from Unit 2, THEN perform the following:

_ a) REFER TO OP/11A163501005 OP/1/AJ63501005 (Alternate AC Power Sources).

_ b) WHEN power available to cooling tower fans, THEN start fans as needed to stabilize the grid.

_ c) GO TO Step 20.

_ 2) Place 1HTAJ2HTA 1HTAl2HTA MODE SELECT switch (2MC-11) in - MANUAL.

_ 3) Close 1HTA-1 (Inc Fdr From Xfmr 1ATE).

_ 4) Close 1HTA-3 HTA-3 (600V Xfmr 1&2 TXJ Fdr).

_ 5) Ensure relay targets on front of 1HT HTAA Switchgear - RESET.

b. Start 1A cooling tower fans as needed to stabilize the grid. REFER TO OP/1/B/64001001A OP/1/S/64001001A (Condenser Circulating Water System).
c. Start 2A cooling tower fans as needed to stabilize the grid. REFER TO OP/2/B/64001001A OP/2/S/64001001A (Condenser Circulating Water System).

CNS LOSS OF NORMAL POWER PAGE NO.

AP/1/A15500/007 AP/1/A155001007 135 of 154 Enclosure 21 - Page 11 of 12 Revision 57 Black Start Procedure ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

19. (Continued)
d. IF desiree desires to align 1TXL nXL and 2TXL from Unit 1, THEN perform the following:

_ HTA-4 (600 V Xfmr 1&2 TXL

1) Close 1HTA-4 Fdr).

_ 2) Verify 2HTA-1 (600 V Xfmr 1&2 TXL Fdr) - OPEN.

e. Start 1C cooling tower fans as needed to stabilize the grid. REFER TO OP/1/B/64001001A OP/1/B/6400/001A (Condenser Circulating Water System).
f. Start 2C cooling tower fans as needed to stabilize the grid. REFER TO OP/2IB/64001001A (Condenser OP/2/B/6400/001A Circulating Water System).

_ g. IF desired to align 2HT A to Unit 1, 2HTA THEN REFER TO OP/2/A16350/005 OP/21A163501005 (Alternate AC Power Sources).

h. Place 1HTAl2HTA MODE SELECT switch (2MC-11) in - AUTO.
20. Verify with TCC that additional Do not continue until additional load can equipment can be energized. be accepted.
21. Restore Turbine Building Ventilation.

REFER TO OP/1/B/6450/016 (Turbine Building Ventilation Systems).

CNS LOSS OF NORMAL POWER PAGE NO.

AP/1/A/55001007 APf1f Al5500fOO7 136 of 154 Enclosure 21 - Page 12 of 12 Revision 57 Black Start Procedure ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

22. Coordinate with Unit 2 to restore the following systems to normal operation:
a. RL system. REFER TO OPfOfBf6400f003 (Low Pressure OP/O/S/64001003 Service Water System).
b. KR system. REFER TO OPfOfBf6400f004 (Recirculated Cooling OP/O/S/64001004 Water System)
c. VI system. REFER TO OPfOfAl6450f005 {Instrument Air OP/O/A/64501005 System}.
d. WHEN the RL, KR and VI systems are operating as desired, THEN GO TO Step 23.
e. Do not continue.
23. Verify with TCC that additional Do not continue until additional load can equipment can be energized. be accepted.
24. Coordinate with Unit 2 to restore the following systems to normal:
  • Restore proper NF System operation.

OPfOfAl6200f008 (Ice REFER TO OP/O/A/62001008 Condenser Refrigeration System).

  • Restore cooling to OAC computer room.

OPfOfBf6450f014 (Computer REFER TO OP/O/S/64501014 Room Ventilation System).

25. RETURN TO step in effect.

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM09 D Verify Adequate Shutdown Margin Following a Reactor Trip CANDIDATE EXAMINER JPM09D JPM09 D Page 1 of 8

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Verify Adequate Shutdown Margin Following a Reactor Trip Alternate Path:

YES Facility JPM #:

NEW KJA KIA Rating(s):

EPE007 EA 1.09 (3.2/3.3) Ability to operate and/or monitor the following as they apply to a reactor trip - eves.

CVCS.

Task Standard:

Initiates boration based on lowest T cold @ 30 gallons for each degree less than limit of Rod Book section Tcold 2.6. (for EOl EOL snap 450EFPD this is 529°F)

Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator X In-Plant _

__ _ _ Perform _...:...Xo--

X Simulate _

References:

EP/1/A/5000/ES-0.1 (Reactor Trip Response) Revision 030DeS 030DCS Validation Time: 5 min. Time Critical: No

=======================================================================

Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time Examiner: 1 NAME SIGNATURE DATE

=======================================================================

COMMENTS JPM09D JPM09 D Page 2 of 8

SIMULATOR SETUP SHEET

1. Reset to any 100% IC set.
2. Insert EVENT 1 - x10i1160
3. Insert EVENT 2 - x10i218b
4. Insert MAL-SM002B (S/G PORV SV13 FAILURE), VALUE=58)
5. Insert VLV-NV044F (NV238A BORIC ACID BLEND FLOW CNTRL FAIL TO POSITION),

VALUE=0.8, EVENT 1

6. Insert VLV-NV044F (NV238A BORIC ACID BLEND FLOW CNTRL FAIL TO POSITION),

VALUE=0.8, EVENT 2

7. Insert OVR-SG047A (1SVML013 S/G 1B PORV - MAN CTRL LIGHTS GREEN LT), VALUE=ON
9. Insert OVR-SG047B (1SVML013 S/G 1 1B B PORV - MAN CTRL LIGHTS RED LT), VALUE=OFF
10. Manually trip the reactor.
11. Cooldown using PORVs to -520°F on Tcolds while maintaining Pzr level >17%.
12. When stable, close PORVs.
13. Freeze simulator and write to a SNAP.

IC SELECTED _ _ _ _ __

SIMULATOR OPERATOR INSTRUCTIONS:

DO NOT go to RUN until candidate is ready to perform task.

Tools/Equipment/Procedures Needed:

EP/1/A15000/ES-O.1 (Reactor Trip Response) Revision 030DeS 030DCS JPM09 D Page 3 of 8

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A reactor trip occurred due to an EHC leak causing a turbine trip at 100% power. Actions are being EP/11A1S000/ES-0.1 (Reactor Trip Response).

performed in EP/11A15000/ES-0.1 INITIATING CUES:

Perform a verification of shutdown margin per Step 7 of EP/11A15000/ES-0.1.

EP/11A1S000/ES-0.1.

JPM09 D Page 4 of 8

START TIME: _ __

STEP 7.a

- SAT Verify adequate shutdown margin as follows:

a. DRPI indication - AVAILABLE.

STANDARD: Notes DRPI indication is available. - UNSAT COMMENTS:

STEP 7.b:

FULLY INSERTED.

b. All control and shutdown rods - FULLY - SAT STANDARD: Checks DRPI panel and notes all rods inserted.

- UNSAT COMMENTS:

STEP 7.c: CRITICAL STEP

c. All NC T-Colds - GREATER THAN 545°F.

STANDARD: Notes temperatures are -522°F on Tcolds. SAT COMMENTS:

- UNSAT JPM09 D Page 5 of 8

STEP 7.c.1) RNO: CRITICAL STEP Perform the following:

Determine lowest T-Cold.

SAT STANDARD: Notes lowest Tcold is -522°F.

EXAMINER NOTE: The amount of boron to be added is based on the temperature noted by the candidate and may vary based on timing. UNSAT Record the temperature stated and subtracts it from 529°F. Multiply the result by 30 to get the total number of gallons to be added as a minimum.

(529 - _ _ _ _) x 30 = =______

_ _ _ _ _ _ gallons COMMENTS STEP 7.c.2) RNO CRITICAL STEP Determine core burnup in effective full power days (EFPD) (OAC Point P1457 or from Reactor Operators logbook). SAT STANDARD: Based on OAC, core burn up is 450 EFPD.

UNSAT COMMENTS STEP 7.c.3) RNO CRITICAL STEP Verify lowest current T-Cold is greater than or equal to the allowable limit at present burnup. REFER TO ROD Book, Section 2.6.

STANDARD: Determines lower limit is 529°F from ROD BOOK section SAT 2.6.

COMMENTS UNSAT JPM09D Page 6 of 8

STEP 7.cA) RNO CRITICAL STEP IF lowest T-cold is less than allowable limit, THEN immediately add 30 gallons of 7000 PPM boron solution at greater than or equal to 30 GPM for each degree lowest T-Cold is below limit of ROD Book, Section 2.6.

SAT STANDARD: Establishes ~ 30 gpm flow from the BAT using the emergency borate valve and determines the total amount to be added using the formula stated above.

UNSAT (529 - 522) x 30 =210 gallons (may vary based on temperature noted in step 7.c.1)

EXAMINER NOTE:

The normal blender flowpath if used will fail to meet the required 30 gpm flow but the emergency borate valve will work. The student will likely try the normal blender flowpath first.

COMMENTS STEP 7.cA) RNO GO TO Step 7.e.

SAT STANDARD: Goes to step 7.e COMMENTS UNSAT STEP 7.e:

Stop any boron dilutions in progress.

SAT STANDARD: Ensures no dilutions are in progress.

COMMENTS UNSAT This JPM is complete.

TIME STOP: _ __

JPM09 D Page 7 of 8

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

A reactor trip occurred due to an EHC leak causing a turbine trip at 100% power. Actions are being EP/11A15000/ES-0.1 (Reactor Trip Response).

performed in EP/1/A/5000/ES-0.1 INITIATING CUES:

Perform a verification of shutdown margin per Step 7 of EP/1/A/5000/ES-0.1.

EP/11A15000/ES-0.1.

CNS REACTOR TRIP RESPONSE PAGE NO.

EP/1/N5000/ES-0.1 EP/1 IN5000/ES-0. 1 5 of 30 50f30 Rev 30DCS ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

7. Verify adequate shutdown margin as follows:
a. DRPI indication - AVAILABLE. a. Verify adequate shutdown margin as follows:
1) Emergency borate 14,000 gallons of 7000 PPM boron solution as follows:

_ a) Open 1NV-236B (Boric Acid To NV Pumps Suct).

_ b) IF 1NV-236B will not open, THEN dispatch operator to open 1NV-236B (Boric Acid To NV Pumps Suet)

Suct) (AB-550, HH-JJ, 53-54, Rm 234).

c) WHEN 1NV-236B is open, THEN:

_ (1) Start boric acid transfer pumps.

_ (2) Calculate required injection time based on boric acid flowrate.

_ (3) WHEN required boric acid is injected, THEN secure emergency boration.

_ 2) Notify Reactor Group Duty Engineer to perform analysis to determine required shutdown margin.

_ 3) GO TO Step 7.c.

CNS REACTOR TRIP RESPONSE PAGE NO.

EP/1/A/5000/ES-0.1 6 of 30 60f30 Rev 30DCS Rev30DCS ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

7. (Continued)
b. All control and shutdown rods - FULLY b. IF two or more rods are not fully INSERTED. inserted, THEN:
1) Emergency borate 150 PPM for each rod not fully inserted as follows:

_ a) Open 1NV-236B (Boric Acid To NV Pumps Suct).

_ b) IF 1NV-236B will not open, THEN dispatch operator to open 1NV-236B (Boric Acid To NV Pumps Suct) (AB-550, HH-JJ, 53-54, Rm 234).

c) WHEN 1NV-236B is open, THEN:

_ (1) Start boric acid transfer pumps.

_ (2) Calculate required boron addition. REFER TO ROD Book, Section 4.1.

_ (3) Calculate required injection time based on boric acid flowrate.

_ (4) WHEN required boric acid is injected, THEN secure emergency boration.

_ 2) Notify Reactor Group Duty Engineer to perform analysis to determine required shutdown margin.

CNS REACTOR TRIP RESPONSE PAGE NO.

EP/1/A15000/ES-0.1 EP/1/A/5000/ES-0.1 70f30 7 of 30 Rev30DCS ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

7. (Continued)
c. All NC T-Colds - GREATER THAN c. Perform the following:

545°F.

_1)1) Determine lowest T-Cold.

_ 2) Determine core burnup in effective full power days (EFPD) (OAC Point P1457 or from Reactor Operators logbook).

_ 3) Verify lowest current T -Cold is greater than or equal to the allowable limit at present burnup.

REFER TO ROD Book, Section 2.6.

_4) IF lowest T-Cold T -Cold is less than allowable limit, THEN immediately add 30 gallons of 7000 PPM boron solution at greater than or equal to 30 GPM for each degree lowest T -Cold is below limit of ROD Book, Section 2.6.

_ 5) GO TO Step 7.e.

d. IF AT ANY TIME NC T-Colds decrease to less than or equal to 545°F, THEN perform Step 7.c.
e. Stop any boron dilutions in progress.

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM09 E Place Steam Dumps in Automatic Mode in Preparation for Unit Startup CANDIDATE EXAMINER JPM09 E Page 1 of 10

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Place Steam Dumps in Automatic Mode in Preparation for Unit Startup Alternate Path:

No Facility JPM #:

N/A (new)

KIA Rating(s):

SYS041 A3.02 (3.3/3.4) - Ability to monitor automatic operation of the SDS, including RCS pressure, RCS temperature, and reactor power.

Task Standard:

Places Steam Dumps in automatic operation per OP/1/A161 OP/1/A/61 001001 (Controlling Procedure for Unit Startup).

Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator X In-Plant _ __ Perform _~X,,--

_...!.X.!.....- Simulate _ __

References:

OP/1/A161001001 OP/1/A/61001001 (Controlling Procedure for Unit Startup), Enclosure 4.1 revision 217DCS OP/1/A162501006 OP/1/A/62501006 (Main Steam), Enclosure 4.5 revision 041 Validation Time: 10 min. Time Critical: No

=======================================================================
=======================================================================

Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time Examiner: 1 NAME SIGNATURE DATE

=======================================================================

COMMENTS JPM09 E Page 2 of 10

SIMULATOR SETUP SHEET

1. Reset to a BOL 10-8 amp snap
2. Open MSIV bypass valves
3. Close MSIVs
4. Reduce Tavg to -554-555°F
5. Adjust steam dump demand to "0" and place in manual
6. When stable, freeze simulator and write to a SNAP.

IC SELECTED _ _ _ _ __

SIMULATOR OPERATOR INSTRUCTIONS:

Do not place the simulator in RUN until the candidate is ready to begin.

Tools/Equipment/Procedures Needed:

OP/1/Al6100/001 (Controlling Procedure for Unit Startup), Enclosure 4.1 revision 217 OP/1/A/6100/001 OP/1/Al6250/006 (Main Steam), Enclosure 4.5 revision 041 OP/1/A/6250/006 JPM09 E Page 3 of 10

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is preparing to increase power from 1 x 10-8 amps. Pressure equalization across the MSIVs is OP/1/A/6250/006 (Main Steam), Enclosure 4.5.

in progress through step 2.2 of OP/1/Al6250/006 INITIATING CUES:

OP/1/A/61 00/001 (Controlling Procedure for Unit Startup), Enclosure 4.1 Complete steps 2.137 - 2.139 of OP/1/Al61 (Unit Startup) to place steam dumps in automatic operation in preparation for increasing power to 1%. 1%.

JPM09 E Page 4 of 10

START TIME: _ __

STEP 2.137: CRITICAL STEP Establish automatic steam dump control as follows: (RM) 2.137.1 Adjust the "Stm Dump Ctrl" setpoint to 1092 psig. SAT STANDARD: Sets "Stm Dump Ctrl" to 11092 092 psig.

UNSAT

_UNSAT COMMENTS:

STEP 2.137.2:

Ensure MSIVs are open per Step 2.136.3. SAT STANDARD: Notes that step 2.136.3 is not signed off, and per the initiating cue, equalization of pressure across the MSIVs is in progress.

UNSAT

_UNSAT EXAMINER NOTE: The student should review the equalization paperwork and determine that steps need to be completed in OP/1/N6250/006.

OP/1/A/6250/006.

COMMENTS:

Transition to OP/1/A/6250/006 OP/1/N6250/006 (Main Steam)

STEP 2.3:

Verify the MSIV Bypass Valves have been open for greater than the SAT minimum time specified in Step 2.1 STANDARD: Notes that at current plant conditions, >30 minutes is required and per step 2.2, the time opened is listed as "40 MIN AGO" so UNSAT

_UNSAT he/she can continue.

COMMENTS JPM09 E Page 5 of 10

NOTE:

  • Always use analog computer points when monitoring SAT pressures.
  • The time required to equalize pressure across the S/G MSIVs will be directly dependent on the temperature of the downstream piping. It may require several hours to equalize UNSAT when piping is cold.

STANDARD: Reads note and acknowledges it.

COMMENTS STEP 2.4 CRITICAL STEP If steam pressure has equalized across the S/G SM Isolations AND Main Steam header pressure no longer trending towards S/G pressure AND differential pressure across the S/G SM Isolations < 10 psid, then perform SAT the following:

2.4.1 Open the following valves one at a time:

STANDARD Depresses the OPEN pushbutton and verifies the RED OPEN light illuminates for each valve.

COMMENTS JPM09 E Page 6 of 10

STEP 2.4.2: CRITICAL STEP 2.4.2 When the S/G SM Isolations are fully open, close the following valves:

  • 1 SM-9 (S/G 1 1SM-9 D SM Isol 8yp) 1D Byp)

SAT

- UNSAT STANDARD: Turns the control knob for each valve counterclockwise and notes the valve position indicator going to 0, GREEN light comes on and RED light goes off.

COMMENTS STEP 2.4.3:

N/A the remaining steps of this enclosure.

SAT STANDARD: N/As remaining steps.

COMMENTS UNSAT Transition back to OP/1/A/61 00/001 (Controlling Procedure for Unit Startup)

STEP 2.136.3 Equalize pressure across and open the MSIVs per OP/1/A/6250/006 (Main SAT Steam)

STANDARD: Step is signed off as complete. UNSAT COMMENTS JPM09 E Page 7 of 10

STEP 2.137.2:

- SAT Ensure MSIVs are open per Step 2.136.3 STANDARD: Notes MSIVs are open and checks off.

- UNSAT COMMENTS STEP 2.135.3:

Ensure T-AVG T -AVG is less than or equal to 55rF 55JDF per Step 2.134.1.

- SAT STANDARD: Notes that step 2.134.1 is signed off and current Tavg is

<55rF. Checks off this step.

<55JDF.

COMMENTS - UNSAT STEP 2.135.4: CRITICAL STEP Place the "Stm Dump Ctrl" in auto.

STANDARD Depresses the "A" pushbutton on the steam dump controller.

- SAT COMMENTS

- UNSAT JPM09 E Page 8 of 10

STEP 2.136: CRITICAL STEP Turn the following switches to the "ON" position:

  • Steam Dump Intlk Byp Trn A
  • Steam Dump Intlk Byp Trn B SAT STANDARD Turns hand switches to the ON position.

COMMENTS UNSAT STEP 2.137:

  • When the MSIVs are open verify the steam dumps maintain approximately 1090 psig. SAT STANDARD Notes that steam pressure is maintained at approximately 1092 psig.

UNSAT

_UNSAT EXAMINER NOTE: If temperature is < 557°F, dumps will remain closed.

COMMENTS This JPM is complete.

TIME STOP: _ __

JPM09 E Page 9 of 10

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 is preparing to increase power from 1 x 10-8 amps. Pressure equalization across the MSIVs is in progress through step 2.2 of OP/1/A/62501006 OP/1/Al6250/006 (Main Steam), Enclosure 4.5.

INITIATING CUES:

OP/1/A/61 00/001 Complete steps 2.137 - 2.139 of OP/1/Al61 001001 (Controlling Procedure for Unit Startup), Enclosure 4.1 1%.

(Unit Startup) to place steam dumps in automatic operation in preparation for increasing power to 1%.

I I

I I

Enclosure 4.5 OP!l/A/625 0/006 OP/l!AJ6250/006 Equalizing Pressure Across the Main Steam Page 1 of 6 Isolation Valves

1. Initial Conditions 1.1 Review the Limits and Precautions.

1.2 Verify the following valves are closed:

0 lSM-1 (S/G 1D SM Isol) 0 lSM-3 (S/G 1C SM Isol) 0 lSM-5 (S/G 1B SM Isol) 0 lSM-7 (S/G 1A SM Isol) 0 lSM-9 (S/G 1D SM Isol Byp) lSM-lO (S/G 1C SM Isol Byp) 0 lSM-10 0 lSM-ll ISM-II (S/G 1B SM Isol Byp) 0 lSM-12 (S/G 1A SM Isol Byp) 1.3 VerifyNC Temperature> 200°F.

2. Procedure CAUTION:
  • S/G level indication may shrink or swell when the MSIV's are opened due to the change in S/G pressure. This could result in an inadvertent S/G high or low level actuation. {PIP 99-2428}
  • P-14 may be blocked when the unit is in Modes 4-6 and in No Mode.

OP/1/A/6100/002 (Controlling Procedure for Unit Shutdown) provides guidance OP/1/AJ6100/002 on the blocking of ofP-14.

P-14.

2.1 Determine the minimum time required to equalize pressure across the MSIV's based on current NC System temperature. Refer to the table below: {PIP 99-2428}

NC Tcold eF) TIME REQUIRED (MIN) 200 - 224 180 225 -249 120 250-299 250 -299 90 300 - 350 60

> 350 30

Enclosure 4.5 op;1/A/625 0/006 OP/l/A/62so/006 Equalizing Pressure Across the Main Steam Page 2 of 6 Isolation Valves 2.2 Slowly open the following valves:

oD ISM-9 (S/G lD lSM-9 ID SM Isol Byp) oD ISM-I0 ISM-lO (S/G Ie SM Isol Byp) o D ISM-ll (S/G IB SM Isol Byp) oD ISM-12 (S/G lA SM Isol Byp)

Time last valve was opened opened.-

- - 2.3 Verify the MSIV Bypass Valves have been open greater than the minimum time specified in Step 2.1.

NOTE:

  • Always use analog computer points when monitoring pressures.
  • The time required to equalize pressure across the MSIVs will be directly dependent on the temperature of the downstream piping. It may require several hours to equalize when piping is cold.

2.4 stearn pressure has equalized across the S/G SM Isolations AND Main Steam IF steam Stearn header pressure no longer trending towards S/G pressure AND differential pressure across the S/G SM Isolations < 10 psid, then perform the following:

2.4.1 Open the following valves one at a time:

oD ISM-l (S/G ID SM Isol) oD ISM-3 (S/G Ie SM Isol) oD ISM-S (S/G IB SM Isol)

ISM-5 oD ISM-7 (S/G lA SM Isol) 2.4.2 WHEN the S/G SM Isolations are fully open, close the following valves:

oD ISM-9 (S/G ID SM Isol Byp) oD ISM-lO (S/G Ie SM Isol Byp)

ISM-I0 oD ISM-ll (S/G IB SM Isol Byp) oD ISM-12 (S/G lA SM Isol Byp) 2.4.3 N/A the remaining steps of this enclosure.

2.5 2.S Maintain a minimum constant S/G blowdown rate on all four S/Gs as low as S/G water chemistry allows.

2.6 Ensure S/G levels approx. equal across all four S/Gs.

Enclosure 4.1 OP/l!A/61001001 OP/VA/6100/001 Unit Startup of 66 Page 43 of66 2.135 IF Step 2.6 was completed to supply Unit 1 Turbine warming from the AS System, perform the following to restore AS to normal alignment: (R.M.)

2.135.l 2.135.1 Ensure turbine warming has been secured.

2.135.2 Notify the Control Room Supervisor that an approximate 5 MW increase in generator output on Unit 2 may occur when isolating the Unit 2 supply via the AS System for Unit 1 Turbine Shell Warming.

2.135.3 Monitor the Unit 1 SM piping for water hammer.

2.l35.4 2.135.4 Notify the Control Room Supervisor to monitor Unit 2 Reactor Power, Generator MW, and AS header pressure while performing the following step.

2.135.5 Slowly close lAS-4 (Main Steam to Aux Steam Header Control Bypass) (TB-61O, (TB-610, IM-32).

lM-32).

2.136 IF the NC System heatup was performed with the MSN's MSIV's closed, open the MSN's MSIV's as follows:

CAUTION: steam line drains shall be open for at least 15 minutes prior to opening MSNs Main steamline MSIVs or MSIV Bypasses.

MSN

- - 2.136.1 Open the following valves:

o ISM-132 (SM Equalization Hdr Trap T-05 Byp) (TB-594, IH-32)

D o ISM-139 (SM Equalization Hdr Trap T-06 Byp).(TB-594, IH-32)

D

- - 2.136.2 After 15 minutes, close the following valves:

o ISM-132 (SM Equalization Hdr Trap T-05 Byp)

D o ISM':139 D ISM~139 (SM Equalization Hdr Trap T-06 Byp).

NOTE: The following step will take a minimum of 30 minutes to perform. The procedure may continue while performing Step 2.136.3 2.l36.3 2.136.3 OP/I/A/62501006 (Main MSIV's per OP/l/A/6250/006 Equalize pressure across and open the MSN's Steam).

Enclosure 4.1 OP!l/A/61 00/00 1 OP/I/A/61001001 Unit Startup Page 44 of66 2.137 Establish automatic steam dump control as follows: (R.M.)

oD 2.137.1 Adjust the "Stm Dump Ctrl" setpoint to 1092 psig.

o D 2.137.2 MSN's are open per Step 2.136.3.

Ensure MSIV's o

D 2.137.3 Ensure T-AVG is less than or equal to 557°F per Step 2.134.1.

o D 2.137.4 Place the "Stm Dump Ctrl" in auto.

Tum the following switches to the "ON" position:

2.138 Turn o "Steam Dump Intlk Byp Tm A" D

o "Steam Dump Intlk Byp Tm B".

D 2.139 WHEN MSIV's MSN's are open verify the steam dumps maintain approximately 1090 psig (approximately 557° T-AVG).

2.140 Ensure S/G PORV's in "AUTO".

S/G( s) reverse purge flow by performing the following:

2.141 Verify S/G(s) o 2.141.1 D Record the temperature for the following OAC points: (OAC Group Display GD OPCFTEMP)

  • CIA0141 (S/G A After CF Isol Vlv Line Temp)
  • CIA0125 (S/G B After CF Isol Vlv Line Temp)
  • CIA0275 (S/G C After CF Isol Vlv Line Temp)
  • CIA0815 (S/G DAfter CF Isol Vlv Line Temp)

o 2.141.2 D Compare the values recorded above to the values recorded in 2.77.15.7, 2.100.1, 2.114.1 and 2.122.1 to verify reverse purge (increasing Steps 2.77.15.7,2.100.1,2.114.1 temperature).

o 2.141.3 D IF no sign of reverse purge, determine what is causing the loss of reverse purge and correct the problem.

o 2.141.4 D Monitor OAC Group Display OPCFTEMP for increasing temperatures as a sign of reverse purge while continuing with the procedure.

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Transfer Emergency Core Cooling System to Hot Leg Recirculation JPM09 F CANDIDATE EXAMINER JPM09 F Page 1 of 12

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Transfer Emergency Core Cooling System to Hot Leg Recirculation Alternate Path:

YES Facility JPM #:

NI-098 KIA Rating(s):

SYS006 A4.05 (3.9/3.8) Ability to manually operate and/or monitor in the control room: Transfer of ECCS flowpaths f10wpaths prior to recirculation.

Task Standard:

Hot leg recirculation flow indicated from both trains of the ND system.

Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator X In-Plant _ __ Perform _~X~

_....:...X"'---- Simulate _ __

References:

EP/1/A15000/ES-1.4 (Transfer to Hot Leg Recirculation) revision 005 EP/1/A/5000/ES-1.4 Validation Time: 15 min. Time Critical: No

=======================================================================
=======================================================================

Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time Examiner: 1 NAME SIGNATURE DATE

=======================================================================
=======================================================================

COMMENTS JPM09 F Page 2 of 12

SIMULATOR SETUP SHEET

1. Reset to any 100% power IC set.
2. Insert MAL-NC013A (NC COLD LEG LEAK) VALUE 27.5
3. Complete required steps of E-O, E-1 and ES-1.3
4. Once swap to CLR is complete insert the following:
  • MAL-NI001A (SI Pump A failure), VALUE = BOTH
  • MAL-NI001 B (SI Pump B failure), VALUE= MANUAL
5. Freeze simulator and write to a snap.

IC SELECTED _ _ _ _ __

SIMULATOR OPERATOR INSTRUCTIONS:

None Tools/Equipment/Procedures Needed:

EP/1/A/5000/ES-1.4 (Transfer to Hot Leg Recirculation) revision 005 JPM09 F Page 3 of 12

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A LOCA on the NC System has been in progress for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The Emergency Core Cooling System (ECCS) is in the Cold Leg Recirculation lineup. 1A NI pump failed to start automatically and could not be manually started.

INITIATING CUES:

Transfer the ECCS System to Hot Leg Recirculation per EP/1/A/5000/ES-1.4 (Transfer to Hot Leg Recirculation)

JPM09 F Page 4 of 12

START TIME: _ __

STEP 1a:

Align NI pumps for Hot Leg Recirc as follows: -- SAT

a. Stop NI Pump 1A.

STANDARD: Notes pump is off.

- UNSAT COMMENTS:

STEP 1b:

b. Close 1NI-118A 1NI-118A (NI Pump 1A C-Leg Inj Isol). - SAT STANDARD: Depresses the GREEN "CLOSED" pushbutton and verifies the GREEN "CLSD" light is LIT.

- UNSAT COMMENTS:

STEP 1.c:

Place "PWR DISCON FOR 1NI-121A" switch in "ENABLE"

- SAT STANDARD: Places "PWR DISCON FOR 1 NI-121A" switch to the 1NI-121A" "ENABLE" position.

COMMENTS - UNSAT STEP 1.d:

- SAT Open 1 1NI-121A NI-121A (NI To C-Legs Inj Hdr Isol).

STANDARD: Depresses the RED "OPEN" pushbutton and verifies the RED "OPEN" light is LIT. - UNSAT COMMENTS JPM09 F Page 5 of 12

STEP 1.1:

- SAT I. WHEN 1NI-121A is open, THEN start NI Pump 1A.

STANDARD: Depresses the red "ON" pushbutton and notes it will not start and continues. - UNSAT COMMENTS STEP 1.f:

f. Stop NI Pump 1B. - SAT STANDARD: Depressed the GREEN "OFF" pushbutton and verified the GREEN "OFF" light is lit.

- UNSAT COMMENTS STEP 1.g:

1.9:

g. Close 1NI-150B (NI Pump 1B C-Leg Inj Isol). - SAT STANDARD: Depresses the GREEN "CLOSED" pushbutton and verifies the GREEN "CLSD" light is LIT.

- UNSAT COMMENTS STEP 1.h:

Place "PWR DISCON FOR 1NI-162A" switch in "ENABLE"

- SAT STANDARD: Places "PWR DISCON FOR 1NI-162A" switch to the "ENABLE" position.

COMMENTS - UNSAT JPM09 F Page 6 of 12

STEP 1.i:

- SAT Close 1NI-162A (NI To C-Legs Inj Hdr Isol).

STANDARD: Depresses the GREEN "CLOSED" pushbutton and verifies the GREEN "CLSD" light is LIT. - UNSAT COMMENTS STEP 1.j:

j. Place "PWR DISCON FOR 1NI-152B" 1N 1-152B" switch in "ENABLE". - SAT STANDARD: Places "PWR DISCON FOR 1NI-152B" switch to the "ENABLE" position

- UNSAT COMMENTS STEP 1.k:

k. Open 1NI-152B 1NI-152B (NI Pump 1B 1B To H-Legs A&D). - SAT STANDARD: Depresses the RED "OPEN" pushbutton and notes the RED "OPEN" light is lit.

- UNSAT COMMENTS STEP 1.1:

I. WHEN 1NI-152B is open, THEN start NI Pump 1B. - SAT STANDARD: Depresses the red "ON" pushbutton and notes it will not start and continues.

- UNSAT COMMENTS JPM09 F Page 7 of 12

STEP 2: CRITICAL STEP Verify flow from at least one train of NI.

- SAT STANDARD: Notes that both NI pumps are off and goes to RNO.

COMMENTS

- UNSAT STEP 2 RNO:

Perform the following: - SAT

a. Notify station management that NI flow not indicated.
b. GO TO Step 4.

STANDARD: Notifies management that no NI flow is indicated and goes to - UNSAT step 4.

EXAMINER NOTE: When management is notified, repeat back what they say.

COMMENTS STEP 4a:

Align ND pumps for Hot Leg Recirc as follows: - SAT

a. Verify the following valves - CLOSED.
  • 11ND-1B ND-1 B (ND Pump 1A Suct Frm Loop B)
  • 1ND-2A (ND Pump 1A Suct Frm Loop B)
  • 1ND-36B (ND Pump 1B Suct Frm Loop C) - UNSAT
  • 1ND-37 ND-37A A (ND Pump 1B Suct Suet Frm Loop C)
  • 1ND-32A (ND Train 1A Hot Leg Inj Isol)
  • 1ND-65B (ND Train 1B Hot Leg Inj Isol).

STANDARD: All valves should be noted closed.

COMMENTS JPM09 F Page 8 of 12

STEP 4b: CRITICAL STEP

b. Place "PWR DISCON FOR 1NI-183B" in "ENABLE".

- SAT STANDARD: Places "PWR DISCON FOR 1NI-183B" to the "ENABLE" position.

COMMENTS - UNSAT STEP 4c: CRITICAL STEP Open 1 1NI-183B NI-183B (ND Hdr A&B Hot Leg Inj Isol).

- SAT STANDARD: Depresses RED "OPEN" pushbutton and verifies RED "OPEN" light is LIT.

COMMENTS - UNSAT STEP 4d: CRITICAL STEP

e. For A ND Train:
1) Verify 1NS-43A (ND Pmp 1A To Cont Spray Hdr) - CLOSED.
2) Place "PWR DISCON FOR 1NI-173A" 1NI-173A" switch in "ENABLE". - SAT
3) Close 1NI-173A 1NI-173A (ND Hdr 1A To Cold Legs A&B).
4) Open 1ND-32A (ND Train 1A Hot Leg Inj Isol).

STANDARD: - UNSAT

1. Notes 1NS-43A is closed.
2. Places "PWR DISCON FOR 1 1NI-173A" NI-173A" switch to the "ENABLE" position.
3. Depresses the GREEN "CLOSE" pushbutton on 1NI-173A and verifies the GREEN "CLSD" light is LIT.
4. Depresses the RED "OPEN" pushbutton for 1ND-32A and verifies the RED "OPEN" light is LIT.

COMMENTS JPM09 F Page 9 of 12

STEP 4e: CRITICAL STEP

e. For B ND Train:
1) Verify 1NS-38B (ND Pmp 1B To Cont Spray Hdr) - CLOSED. SAT
2) Place "PWR DISCON FOR 1NI-178B" switch in "ENABLE".
3) Close 1NI-178B 1NI-178B (ND Hdr 1B 1B To Cold legs Legs A&B).
4) Open 1ND-65B 1ND-65B (ND Train 1B 1B Hot leg Leg Inj Isol).

UNSAT STANDARD:

1. Notes 1NS-38B is closed.
2. Places "PWR DISCON FOR 1NI-178B" 1NI-178B" switch to the "ENABLE" position.
3. Depresses the GREEN "CLOSE" pushbutton on 1NI-178B and verifies the GREEN "ClSD" "CLSD" light is LIT.
4. Depresses the RED "OPEN" pushbutton for 1ND-65B and verifies the RED "OPEN" light is LIT.

COMMENTS STEP 5:

Ensure Monitor Light Panel Group 6 HlR HLR lights - LIT. SAT STANDARD: All lights are noted to be in the correct state.

COMMENTS UNSAT STEP 6:

Verify flow to NC hot legs from at least one train of ND. SAT STANDARD: Notes flow to the hot legs with both 1A and 1B 1B ND pump in service.

UNSAT COMMENTS JPM09 F Page 10 of 12

STEP 7:

RETURN TO procedure and step in effect. - SAT STANDARD: Reads step.

COMMENTS - UNSAT This JPM is complete.

TIME STOP: _ __

JPM09 F Page 11 of 12

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

A LOCA on the NC System has been in progress for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The Emergency Core Cooling System (ECCS) is in the Cold Leg Recirculation lineup. 1A NI pump failed to start automatically and could not be manually started.

INITIATING CUES:

Transfer the ECCS System to Hot Leg Recirculation per EP/1/A/5000/ES-1.4 (Transfer to Hot Leg Recirculation)

I I

Duke Power Company Procedure No.

Catawba Nuclear Station EP/I/A/5000/ES-1.4 Revision No.

005 Transfer to Hot Leg Recirculation Electronic Reference No.

Continuous Use CPOO94CX PERFORMANCE I

  • * * * * * * * *
  • UNCONTROLLED FOR PRINT * * * * * * * * * *

(ISSUED) - PDF Format

CNS TRANSFER TO HOT LEG RECIRCULATION PAGE NO.

EP/1/A15000/ES-1.4 EP/1/A/SOOO/ES-1.4 S 1 of 5 Revision S 5

A. Purpose This procedure provides the necessary instructions for transferring the safety injection system to Hot Leg Recirculation.

B. Symptoms or Entry Conditions This procedure is entered from:

a. EP/1/A15000/E-1 EP/1/A/SOOO/E-1 (Loss Of Reactor Or Secondary Coolant), Step 20, when the specified time interval has elapsed.
b. When a decision is made, based upon the recommendation of station management, that transfer to Hot Leg Recirc is required. Transfer to Hot Leg Recirc might be required eventually, after transferring to Cold Leg Recirc during the implementation of:
  • EP/1/A15000/ES-1.2 EP/1/A/SOOO/ES-1.2 (Post LOCA Cooldown And Depressurization)
  • EP/1/A15000/ECA-3.1 EP/1/A/SOOO/ECA-3.1 (SGTR With Loss Of Reactor Coolant - Subcooled Recovery Desired)
  • EP/1/A15000/ECA-3.2 EP/1/A/SOOO/ECA-3.2 (SGTR With Loss Of Reactor Coolant - Saturated Recovery Desired).

CNS TRANSFER TO HOT LEG RECIRCULATION PAGE NO.

EP/1/A15000/ES-1.4 EP/11A15000/ES-1.4 2 of 5 Revision 5 ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED C. Operator Actions

1. Align NI pumps for Hot Leg Recirc as follows:
a. Stop NI Pump 1A.
b. Close 1NI-118A(NI 1NI-118A (NI Pump 1AC-Leg 1A C-Leg Inj b. Perform the following:

Isol}.

Isol).

_ 1} Dispatch operator to close 1N1-118A (NI Pump 1A C-Leg Inj Isol)

(AB-553, GG-HH, 53-54, Rm 235).

_ 2} WHEN 1NI-118A is closed, THEN perform steps 1.c through 1.e.

_ 3} GO TO Step 1.f.

c. Place "PWR DISCON FOR 1NI-121A" switch in "ENABLE".
d. Open 1NI-121A (NI Pump 1A To d. Dispatch operator to open 1NI-121A (NI H-Legs B&C). Pump 1A To H-Legs B&C) (AB-572, (AB-5?2, FF-GG, 52, Rm 318).
e. WHEN 1NI-121A is open, THEN start NI Pump 1A.
f. Stop NI Pump 1B.

_ g. Close 1NI-150B (NI Pump 1B C-Leg Inj g. Perform the following:

Isol).

_ 1} Dispatch operator to close 1NI-150B (NI Pump 1B C-Leg Inj Isol)

(AB-550, HH-JJ, 53-54, Rm 234).

_ 2} WHEN 1NI-150B is closed, THEN perform steps 1.h through 1.1.

_ 3} GO TO Step 2.

h. Place "PWR DISCON FOR 1NI-162A" switch in "ENABLE".
i. Close 1NI-162A 1NI-162A (NI To C-Legs Inj Hdr i. Dispatch operator to close 1 1NI-162A NI-162A (NI Isol). To C-Legs Inj Hdr Isol) (AB-56?, JJ-51, JJ-51 ,

Rm 318A).

CNS TRANSFER TO HOT LEG RECIRCULATION PAGE NO.

EP/1/A/5000/ES-1.4 3 of 5 Revision 5 ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

1. (Continued)

_ j. Place "PWR DISCON OISCON FOR 1NI-152B" switch in "ENABLE".

k. Open 1 NI-152B (NI Pump 1 1NI-152B 1BB To k. Dispatch operator to open 1N 1-152B (NI H-Legs A&O).

A&D). Pump 1B To H-Legs A&O)

A&D) (AB-580, GG-HH, 52-53, Rm 419).

I. WHEN 1NI-152B is open, THEN start NI Pump 1B.

2. Verify flow from at least one train of NI. Perform the following:
a. Notify station management that NI flow not indicated.
b. GO TO Step 4.
3. RETURN TO Procedure and step in effect.
4. Align NO pumps for Hot Leg Recirc as follows:
a. Verify the following valves - CLOSED. a. Perform the following:

1ND-1 B (NO Pump 1A Suct Frm

  • 1NO-1B _ 1) Contact station management for Loop B) guidance to align NI or NO for Hot
  • 1 NO-2A (NO Pump 1A Suct Frm 1ND-2A Leg Recirc.

Loop B)

  • 1NO-36B ND-36B (NO Pump 1B Suct Frm _ 2) RETURN TO Procedure and step in Loop C) effect.
  • 1NO-37 ND-37A A (NO Pump 1B Suct Frm Loop C)
  • 1NO-32A ND-32A (NO Train 1A Hot Leg Inj Isol)
  • 1NO-65B ND-65B (NO Train 1B Hot Leg Inj 1501).

Isol).

b. Place "PWR DISCONOISCON FOR 1NI-183B" in "ENABLE".

CNS TRANSFER TO HOT LEG RECIRCULATION PAGE NO.

EP/1/A15000/ES-1.4 EP/1/A/5000/ES-1.4 4 of 5 Revision 5 ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

4. (Continued)
c. Open 1NI-183B (ND Hdr A&B Hot Leg c. Perform the following:

Inj Isol).

1} Close ND train discharge crossovers:

  • 1ND-32A (ND Train 1A Hot Leg Inj Isol)
  • 1ND-65B (ND Train 1B Hot Leg Inj Isol).

_ 2} Open 1NI-173A (ND Hdr 1A To Cold Legs C&D).

_ 3} Dispatch operator to open 1NI-183B (ND Hdr A&B Hot Leg Inj Isol)

(AB-571, EE-FF, 52-53, Rm 333A).

_ 4} WHEN 1NI-183B is open, THEN perform Step 4.

_ 5} GO TO Step 5.

d. For A ND Train:

_ 1} Verify 1NS-43A (ND Pmp 1A To _ 1} GO TO Step 4.e.

Cont Spray Hdr) - CLOSED.

_ 2} Place "PWR DISCON FOR 1NI-173A" switch in "ENABLE".

_ 3} Close 1NI-173A (ND Hdr 1A To _ 3} Dispatch operator to close 1NI-173A Cold Legs C&D). (ND Hdr 1A To Cold Legs C&D)

(AB-566, HH-52, Rm 318A).

_ 4} Open 1ND-32A (ND Train 1A Hot _ 4} Dispatch operator to open 1ND-32A Leg Inj Isol). (ND Train 1A Hot Leg Inj Isol)

(AB-568, LL-MM, 51-52, Rm 434).

CNS TRANSFER TO HOT LEG RECIRCULATION PAGE NO.

EP/1/A/5000/ES-1.4 EP/1/Al5000/ES-1.4 5 of 5 50f5 Revision 5 ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

4. (Continued)
e. For B NDNO Train:

_ 1) Verify 1NS-38B (ND (NO Pmp 1B To _ 1) GO TO Step 5.

Cont Spray Hdr) - CLOSED.

_ 2) Place "PWR DISCON FOR 1NI-178B" switch in "ENABLE".

_ 3) Close 1NI-178B 1NI-178B (ND (NO Hdr 1B 1B To _ 3) Dispatch operator to close 1 1NI-178B NI-178B Cold Legs A&B). (NO Hdr 1B (ND 1B To Cold Legs A&B)

(AB-561, FF-GG, 52-53, Rm 318A).

_ 4) Open 1 ND-65B (ND 1ND-65B (NO Train 1 1BB Hot _ 4) Dispatch operator to open 1ND-65B Leg Inj Isol). (NO Train 1B Hot Leg Inj Isol)

(ND (AB-570, KK-LL, 51-52, Rm 435).

5. Ensure Monitor Light Panel Group 6 HLR lights - LIT.
6. Verify flow to NC hot legs from at least _ Contact station management for one train of NO. guidance to align NO for Hot Leg Recirc.
7. RETURN TO procedure and step in effect.

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM09 G Start Reactor Coolant Pump 1B CANDIDATE EXAMINER JPM09 G Page 1 of 15

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Start Reactor Coolant Pump 1B Alternate Path:

YES Facility JPM #:

NCP-081 KIA Rating(s):

Rating(s}:

SYS003 A 1.01 (2.9/2.9) Ability to manually operate and lor monitor changes in parameters (to prevent exceeding design limits) associated with operating the RCP controls including: RCP vibration.

Task Standard:

Seal injection flow to 1B NCP is restored to 7-10 gpm. 1B reactor coolant pum pumpp is tripped when vibration is noted to be greater than NC Pump trip criteria.

Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator X In-Plant _ __ _~X,,--

Perform _...:..X,,-- Simulate _ __

References:

OP/1/A/6150/002A (Reactor Coolant Pump), Enclosure 4.1 rev 061 DCS OP/1/A/61501002A Validation Time: 11 min. Time Critical: No

=======================================================================

Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time Examiner: I NAME SIGNATURE DATE

=======================================================================

COMMENTS JPM09 G Page 2 of 15 '

SIMULATOR SETUP SHEET

1. Reset to any 100% power IC set.
2. Manually trip the reactor at 1MC-1.
3. Trip all (4) four NCP breakers at 1MC-10.
4. Reset CA and control flow to maintain S/G levels at 38% N/R level.
5. Place 1NV-309 in manual and reduce total seal water flow to - 12 gpm
6. Insert MAL-NCP003B (NCP B VIBRATION) Value=30, RAMP=60, EVENT =1, DELAY=150
7. Insert EVENT 1 = x10d185M >400 (NCP B AMPS>400)
8. Freeze simulator and write to a snap.

IC SELECTED _ _ _ _ __

SIMULATOR OPERATOR INSTRUCTIONS:

ENSURE BENTLEY NEVADA VIBRATION MONITORS ON BACK BOARD ARE RESET AND THAT ALARMS 1AD-6 Al5 A15 AND B/5 ARE CLEARED BETWEEN STUDENTS.

Tools/Equipment/Procedures Needed:

OP/1/A/6150/002A

1. OP/11 Al61501002A (Reactor Coolant Pump), Enclosure 4.1 rev 061 DCS JPM09 G Page 3 of 15

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

EP/1/A/5000/ES-O.2, EP/11A15000/ES-O.2, Natural Circulation Cooldown has been implemented following a Reactor Trip.

Control problems with 1NV-309 require the valve be operated in manual.

INITIATING CUES:

Start NC Pump 1B by completing OP/11A161501002A, OP/1/A/6150/002A, NC Pump Operation Enclosure 4.1. The Initial Conditions of Enclosure 4.1 have been satisfied.

JPM09 G Page 4 of 15

START TIME: _ __

CAUTION: An NC Pump shall NOT be started if associated 6.9 KV switchgear is supplying essential switchgear 1ETA or 1ETB and switchyard voltage is less than or equal to 223 KV or only one off-site source of power - SAT is available.

NOTE: 1. In order to start an NC Pump, the underfrequency condition must be cleared by having at least three of four 6900V breakers (1TA, B, C, D-3) - UNSAT racked in and energized.

2. NC Pump operational configuration restrictions, as follows, will ensure adequate PZR spray for press control, maintain spray line water solid, and prevent thermal stratification of spray line {PIP C-OO-04752}:

-For single pump operation, ensure NC Pump B is in service,

-For multiple pump operation, if NC Pump B is NOT in service, NC Pumps A, C and D will need to be in service, {PIP C-01-4130}

otherwise, Auxiliary PZR spray flow will have to be used.

STANDARD: Acknowledges notes and cautions.

COMMENTS:

STEP 2.1 If Unit 1 is in Mode 5 ...

STANDARD: This step is N/A per plant conditions.

COMMENTS:

STEP 2.2 If the pump to be started will be the fourth NC pump in service on Unit 1...

- SAT STANDARD: This step is N/A per plant conditions.

COMMENTS: UNSAT JPM09 G Page 5 of 15

NOTE: If #1 Seal LiP f1P gauge overranged, LiP deterrDined using f1P can be determined 1NV125B (Excess Letdn Hx Otlt Ctrl) "VCT" or "NCDT" switch position as follows: SAT

=

  • "VCT" position: NC Press minus Excess Letdn Hx Otlt Press #1 Seal LiP f1P

=

  • "NCDT" position: NC Press minus VCT Press =#1 Seal LiP f1P STANDARD: Acknowledges note. UNSAT

_UNSAT COMMENTS:

STEP 2.3:

No.11 Seal DIP is greater than 200 psig for the pump to be started Verify No. SAT per the following gauges: (Control Board MC-5)

  • 1B 1B NCP: 1 1NVP NVP 5220 UNSAT

_UNSAT STANDARD: Verifies seal DIP> 200 psig using stated gauge.

COMMENTS STEP 2.4:

Verify that the standpipe level for the pump to be started is normal by its SAT associated annunciator DARK.

"NCP B #2 SEAL S-PIPE HilLa HIILO LVL" 1AD-7 Al2 A/2 UNSAT STANDARD: Notes the stated alarm is DARK.

COMMENTS STEP 2.5:

Verify VCT pressure is equal to or greater than 15 psig.: SAT STANDARD: Verifies VCT pressure is ~ 15 psig UNSAT COMMENTS JPM09 G . Page 6 of 15

STEP 2.6: CRITICAL STEP Verify 7-10 gpm seal injection flow on the pump to be started by the following gauges: (Control Board MC-5) SAT

  • 1B NCP: 1NCP5320 STANDARD: Notes seal injection flow is <7 gpm on stated gauge. Adjusts UNSAT 1NV-309 in manual to restore seal injection flow to proper range of 7-10 GPM.

EXAMINER CUE: IF student contacts supervision, state:

"Restore seal injection to its required range."

COMMENTS NOTE:

1. If #1 Seal Leakoff Flow rate is < 1.0 gpm, the # 1 Seal Low Flow SAT indication shall be used.

~P gauge overranged, llP

2. If #1 Seal llP ~P can be determined using 1NV125B (Excess Letdn Hx Otlt Ctrl) "VCT" or "NCDT" switch position as follows:

=

  • "VCT" position: NC Press minus Excess Letdn Hx Otlt Press = #1 Seal UNSAT

~P llP

=

  • "NCDT" position: NC Press minus VCT Press = #1 Seal llP ~P STANDARD: Acknowledges note.

COMMENTS STEP 2.7 Verify adequate #1 Seal Leakoff Flow on the pump to be started as follows: SAT 2.7.1 Determine required #1 Seal Leakoff Flow from Revised Data Book Figure 26 (NC Pump No.1 No. 1 Seal Normal Operating Range).

UNSAT STANDARD: Determines that based on data book Figure 26 or OAC databook that -1 gpm is the minimum required.

COMMENTS JPM09 G Page 7 of 15

STEP 2.7 2.7.2 Add 0.26 gpm to the minimum required #1 Seal Leakoff Flow of - SAT Figure 26 to correct for an expected drop in leakoff flow on pump start (0.20 gpm) and instrument inaccuracy (0.06 gpm).

STANDARD: Determines that the minimum required is 1+0.26 =1.26 - UNSAT COMMENTS STEP 2.7 2.7.3 Obtain the current #1 Seal Leakoff Flow per one of the following: - SAT DCS graphic 6002 (NC PUMPS)

OR Unit 1 Reactor Coolant Pumps graphic (NCPMPALL)

OR - UNSAT 1NVCR5140 (NC Pump Lo Leakoff Flow) (1MC5) (1 MC5)

OR 1NVCR5121 (NC Pump Hi Leakoff Flow) (1MC5)

OR Appropriate OAC point C1 A 1376 (NC Pmp B No.1 C1A1376 No. 1 Seal Leakoff Lo Flow)

C1A0442 (NC Pmp B No.1 Seal Leakoff Flow)

STANDARD: Notes sealleakoff is within limits.

COMMENTS STEP 2.7 2.7.4 IF the current #1 Seal Leakoff Flow (Step 2.7.3) is less than the - SAT minimum flow ...

STANDARD: Determines that this step is N/A and continues.

- UNSAT COMMENTS JPM09 G Page 8 of 15

STEP 2.7 2.7.5 Verify the indicated #1 Seal Leakoff Flow (Step 2.7.3) is within the _SAT range of Revised Data Book Figure 26 as adjusted per Step 2.7.2.

STANDARD: Determines that the sealleakoff seal leakoff is within the normal range.

_UNSAT COMMENTS STEP 2.8:

Verify upper and lower oil pot levels normal, for the pump to be started, via one of the following: SAT

OR

  • Visual Inspection _UNSAT OR

"NCP A UPPER/LOWER OIL RESERVOIR LO LEVEL" 1AD-6 F/2 STANDARD: Verifies upper and lower pot levels normal NCP GRAPHIC or Visual inspection (local) or Annunciator 1AD-6 F/2, "NCP B PPER/LOWER OIL RESERVOIR LO LEVEL" Dark.

COMMENTS NOTE: KC flow is NOT required to the Thermal Barrier Hx whenever NC system temperature is less than 200°F. SAT STANDARD: Acknowledges note and continues.

COMMENTS UNSAT

_UNSAT JPM09 G Page 9 of 15

STEP 2.9:

Verify KC flow to the Thermal Barrier Heater Exchanger normal, for the pump to be started,via one of the following: - SAT Unit 1 Reactor Coolant Pumps graphic (NCPMPALL)

OR Associated annunciators DARK:

- UNSAT "NCP B THERMAL BARRIER KC OUTLET HilLa HIILO FLOW" 1AD-6 E/2 STANDARD: Verifies KC flow to Thermal Barrier Heat Exchanger: NC Pump GRAPHIC or Annunciator 1AD-6 E/2, "NCP B THERMAL BARRIER KC OUTLET H lILa FLOW", Dark is normal.

HI/LO COMMENTS STEP 2.10:

Verify KC flow to the Upper Motor Bearing Oil Cooler normal, for the pump to be started, via one of the following: - SAT Unit 1 Reactor Coolant Pumps graphic (NCPMPALL)

OR Associated annunciators DARK:

"NCP B MTR UPPER BRG KC OUTLET HilLa HI/LO FLOW" FLOW"1AD-6 1AD-6 C/2 - UNSAT STANDARD: Verifies KC flow to upper motor bearing oil cooler: NCP GRAPHIC or Annunciator 1AD-6 C/2 "NCP B MTR UPPER BRG KC OUTLET HilLa HIILO FLOW", Dark is normal.

COMMENTS JPM09 G Page 10 of 15

STEP 2.11:

Verify KC flow to the Lower Motor Bearing Oil Cooler normal, for the pump to be started, via one of the following: SAT Unit 1 Reactor Coolant Pumps graphic (NCPMPALL)

OR Associated annunciators DARK:

"NCP B MTR LOWER BRG KC OUTLET LO FLOW" 1AD-6 D/2 _UNSAT UNSAT STANDARD: Verifies KC flow to lower motor bearing oil cooler (NCP GRAPHIC or Annunciator 1AD-6 D/2 "NCP B MTR LOWER BRG KC OUTLET LO FLOW", Dark) is normal.

COMMENTS STEP 2.12:

Verify "230KV SWITCHYARD VOLTAGE LO" Annunciator on 1AD-11, Kl6 dark. SAT STANDARD: Verifies Annunciator "230KV Swyd Volt Lo" on 1AD-11, Kl6 is dark.

UNSAT

_UNSAT COMMENTS STEP 2.13: CRITICAL Two minutes prior to starting NC pump, start one oil lift pump for NCP to be STEP started by pressing the "ON" pushbutton for:

"NC PUMP OIL LIFT PUMP B1" SAT "NC PUMP OIL LIFT PUMP B2" STANDARD: Depresses RED "ON" pushbutton for NC PMP OIL LIFT PMP B1 or B2 approximately two minutes prior to starting 1B NC Pump. UNSAT

_UNSAT Verifies RED "ON" light lit.

COMMENTS JPM09 G Page 11 of 15

NOTE:

1. If NC pump is NOT started, the oil lift pump shall be secured to minimize stress on oil nozzles. - SAT
2. The Degraded Bus Voltage Relays (27N) may actuate on the essential bus being supplied by the 6.9KV Switchgear associated with the NC Pump to be started in the following step. The alarm condition is expected to clear within 36 seconds.{PIP 95-0287} -- UNSAT STANDARD: Acknowledges note.

COMMENTS STEP 2.14: CRITICAL Start desired NC pump by pressing the "ON" pushbutton for: STEP "NC PMP 1B" STANDARD: Depress RED "ON" pushbutton for NC PMP 1B. Verifies - SAT RED "ON" light lit and pump amps stabilized near midscale on ammeter.

COMMENTS - UNSAT JPM09 G Page 12 of 15

STEP 2.15:

Observe all pump and motor parameters to verify proper operation.

SAT STANDARD: Verifies pump and motor parameters indicating proper operations:

a. #1 Seal DIP greater than or equal to 200 psid.
b. Inlet Seal Water Flow 7-10 gpm (may be greater than 10 due to pump UNSAT start)
c. #1 Seal Leakoff Flow appropriate for current Delta P per Revised Data Book Figure 26.
d. Pump Radial Bearing Temp less than 225°F (1 MC5: 1NVP5360 or NCP GRAPHIC).
e. #1 Seal Outlet Temp between 60°F & & 235°F (1 MC5: 1NVP5400 or NCP GRAPHIC).
f. Pump Shaft Vibration less than 15 mils. (NCP GRAPHIC or PANEL on rear of 1MC-6).
g. Motor Bearings less than 190°F (NCP GRAPHIC).
h. Motor Winding Temp less than 302°F (NCP GRAPHIC).
i. Motor Frame Vibration less than 3 mils. (NCP GRAPHIC or PANEL on rear of 1MC-6).

COMMENTS STEP 2.16:

Three minutes after flow in the affected NC loop exceeds 90%, stop the oil lift pump started in step 2.13.

SAT STANDARD: Depress GREEN "OFF" pushbutton and verify GREEN "OFF" light lit for selected oil lift pump.

COMMENTS UNSAT CRITICAL STEP EXAMINER NOTE: Approximately 3 minutes after the pump is started, NCP vibration will increase to maximum in less than 15 seconds. SAT STANDARD: When student determines that trip criteria has been exceeded (30 mils below Mode 2), he will trip the 1B NCP.

UNSAT JPM09 G Page 13 of 15

EXAMINER CUE: When pump is tripped, state: "The CRS has pulled AP/1/A15500/004 (Loss of Reactor Coolant Pump) and is ready to proceed."

- SAT STANDARD: Determines that the task has been completed.

COMMENTS

- UNSAT This JPM is complete.

TIME STOP: _ __

JPM09 G Page 14 of 15

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

EP/1/A15000/ES-O.2, Natural Circulation Cooldown EP/1/A/SOOO/ES-O.2, Cool down has been implemented following a Reactor Trip.

Control problems with 1NV-309 require the valve be operated in manual.

INITIATING CUES:

Start NC Pump 1B by completing OP/1/A161501002A, OP/1/A/61S0/002A, NC Pump Operation Enclosure 4.1. The Initial Conditions of Enclosure 4.1 have been satisfied.

Enclosure 4.1 OP/l/AJ6150/002 OP!lIAl61501002 A Startup and Operation of the NC Pumps Page 1 of7

1. Initial Conditions 1.1 Review the Limits and Precautions.

1.2 Verify seal injection flow has been established to each Reactor Coolant Pump per OP/1/A/6200/001 (Chemical and Volume Control System).

OP/1/A/62001001 1.3 Verify Component Cooling System is in Operation per OP/1/AJ6400/005 OP/1/Al64001005 (Component Cooling System).

1.4 Verify Reactor Coolant Pumps are aligned per OP/1/AJ6150/002 OP/1/ Al6150/002 B (NC Pump Motor Oil Fill and Drain System).

1.5 Verify Reactor Coolant System is filled per OP/1/AJ6150/001 OP/1/Al6150/00 1 (Filling and Venting The Reactor Coolant System).

1.6 Verify the NCDT is aligned for operation per OP/1/AJ65 00/0 14 (Operations Controlled OP/1/Al6500/o14 Liquid Waste Systems).

1.7 IF NC Pump operation is expected to exceed one minute, verify NCP motor cooling water from YV (preferred) or RN has been established.

1.8 Ensure that a Written prejob briefing has been performed per Site Directive 3.0.21 (Prejob (prejob Briefing) that includes a discussion of reactivity management concerns with this procedure.

Enclosure 4.1 OP/l!A161501002 OP/I/A/6 I 501002 A Startup and Operation of the NC Pumps Page 2 of7

2. Procedure CAUTION: An NC Pump shall NOT be started if associated 6.9 KV switchgear is supplying essential switchgear lETA or 1ETB lETB and switchyard voltage is less than or equal to 223 KV or only one off-site source of power is available .

NOTE: 1.

I. In order to start an NC Pump, the underfrequency condition must be cleared by having at least three of four 6900V breakers (I (1 TA, B, C, D-3) racked in and energized.

2. NC Pump operational configuration restrictions, as follows, will ensure adequate PZR spray for press control, maintain spray line water solid, and prevent thermal stratification of spray line {PIP C-00-04752}:

C-00-04 752}:

  • For single pump operation, ensure NC Pump B is in service,
  • For multiple pump operation, ifNC Pump B is NOT in service, NC Pumps A, C and D will need to be in service, {PIP C-01-4130}

otherwise, Auxiliary PZR spray flow will have to be used.

2.1 IF Unit 1I is in Mode 5, refer to Tech Spec Table 3.4.12-1 (Reactor Coolant Pump Operating Restrictions For Low Temperature Overpressure Protection) for temperature limitations on NC Pump starts.

2.2 IF the pump to be started will be the fourth NC Pump in service on Unit 1, verifyNC I, verity NC temperature is ~ 130°F. {PIP 96-1290, PIP 02-484}

is:::::

NOTE: 1f#1 Seal ~P gauge overranged, 8P If#1 Seal8P ~P can be determined using 1NV125B INVI25B (Excess Letdn Hx Otlt Ctrl) "VCT" or "NCDT" switch position as follows:

  • "VCT" position: NC Press minus Excess Letdn Hx Otlt Seal ~P Odt Press = #1 Seal8P
  • "NCDT" position: NC Press minus VCT Press = #1 Seal M 2.3 No.1I seal M Verify that No.

Verity M is greater than 200 psig for the pump to be started per the following gauges: (Control Board 1MC5) IMC5) oD 1A IA NCP: 1NVP5230 INVP5230 oD 1B IB NCP: 1NVP5220 INVP5220 oD 1C IC NCP: 1NVP5210 INVP5210 oD 1D ID NCP: 1NVP5200 INVP5200

Enclosure 4.1 OP/l!Al6 1501002 A OP/l!Al61501002 Startup and Operation of the NC Pumps Page 3 of7 2.4 Verify VerifY that the standpipe level for the pump to be started is normal nonnal by its associated annunciator DARK:

oD "NCP A #2 SEAL S-PIPE HIILO HI/LO LVL" lAD-7 All oD "NCP B #2 SEAL S-PIPE HIILO L LVL" VL" lAD-7 A/2 oD "NCP C #2 SEAL S-PIPE HIILO HI/LO LVL" lAD-7 Al3 o

D "NCP D #2 SEAL S-PIPE HIILO LVL" LVL" lAD-7 A/4 2.5 VerifY that VCT pressure is ~ 15 psig.

Verify 2.6 VerifY 7-10 gpm seal injection flow on the pump to be started by the following gauges:

Verify (Control Board lMC5) oD lA NCP: lNVP5330 oD lB NCP: lNVP5320 oD lC NCP: lNVP5310 lNVP53l0 oD lD NCP: lNVP5300

Enclosure 4.1 OP/l!A/6150/002 A Startup and Operation of the NC Pumps Page 4 of7 NOTE: If#1 Seal LeakoffFlow rate is < 1.0 gpm, the # 1 Seal Low Flow indication shall be used.

1. 1f#1 If#1 Seal ~P gauge overranged, ~P can be determined using INV125B
2. 1f#1 (Excess Letdn Hx Otlt Ctrl) "VCT" or "NCDT" switch position as follows:
  • "VCT" position: NC Press minus Excess Letdn Hx Otlt Press == ##11 Seal ~P
  • "NCDT" position: NC Press minus VCT Press = #1 Seal ~P 2.7 Verify adequate #1 Seal LeakoffFlow on the pump to be started as follows:

2.7.1 LeakoffFlow from Revised Data Book Figure 26 (NC Determine required #1 Seal LeakoffF10w Pump No.1 Seal Normal Operating Range).

2.7.2 Add 0.26 gpm to the minimum required #1 Seal LeakoffFlow of Figure 26 to correct for an expected drop in leakoffflow on pump start (0.20 gpm) and instrument inaccuracy (0.06 gpm).

2.7.3 Obtain the current #1 Seal LeakoffF10w LeakoffFlow per one of the following:

Do DCS graphic 6002 (NC PUMPS)

OR Do Unit 1 Reactor Coolant Pumps graphic (NCPMPALL)

OR Do 11NVCR5140 NVCR5 140 (NC Pump Lo LeakoffFlow) (lMC5)

OR Do 1NVCR5121 INVCR5121 (NC Pump Hi LeakoffFlow) (IMC5) (lMC5)

OR

  • Appropriate OAC point oD CIA1370 C1A1370 (NC Pmp A No.1 Seal LeakoffLo Flow) oD CIA0436 C1A0436 (NC Pmp A No.1 Seal LeakoffFlow) oD CIA1376 C1A1376 (NC Pmp B No.1 Seal LeakoffLo Flow) oD CIA0442 C1A0442 (NC Pmp B No.1 Seal LeakoffFlow) oD CIA1382 C1A1382 (NC Pmp C No.1 Seal LeakoffLo Flow) oD CIA0448 (NC Pmp C No.1 Seal LeakoffF10w)

LeakoffFlow) oD CIA1388 C1A1388 (NC Pmp D No.1 Seal LeakoffLo Flow) oD CIA0454 C1A0454 (NC Pmp D No.1 Seal LeakoffFlow) 2.7.4 IF the current #1 Seal LeakoffF10w LeakoffFlow (Step 2.7.3) is less than the minimum flow determined in Step 2.7.2, refer to Enclosure 4.4 (Operator Action For Low #1 Seal LeakoffFlow).

LeakoffF10w).

2.7.5 Verify the indicated #

  1. 11 Seal Leakoff Flow (Step 2.7.3) is within the range of LeakoffFlow Revised Data Book Figure 26 as adjusted per Step 2.7.2.

Enclosure 4.1 OPIl!Al61501002 OP;1/A/6150/002 A Startup and Operation of the NC Pumps Page 5 of7 2.8 Verify upper and lower oil pot levels normal, for the pump to be started, via one of the VerifY following:

o Unit 1 Reactor Coolant Pumps graphic (NCPMP (NCPMPALL) ALL)

OR o Visual inspection (local)

OR

o "NCP A UPPERILOWER OIL RESERVOIR LO LEVEL" lAD-6 F/l 1AD-6 FI1 o "NCP B UPPERILOWER UPPER/LOWER OIL RESERVOIR LO LEVEL" lAD-6 F12 1AD-6 F/2 o "NCP

NCP C UPPERILOWER OIL RESERVOIR LO LEVEL" lAD-6 F/3 1AD-6 o "NCP D UPPER/LOWER OIL RESERVOIR LO LEVEL" lAD-6 F/4 1AD-6 NOTE: KC flow is NOT required to the Thermal Barrier Hx whenever NC System temperature is less than 200°F.

2.9 Verify KC flow to the Thermal Barrier Heater Exchanger normal, for the pump to be started, VerifY via one of the following:

o Unit 1 Reactor Coolant Pumps graphic (NCPMPALL)

OR

o "NCP A THERMAL BARRIER KC OUTLET HIILO FLOW" lAD-6 Ell 1AD-6 o "NCP B THERMAL BARRIER KC OUTLET HIlLO HIILO FLOW" lAD-6 E/2 1AD-6 o "NCP C THERMAL BARRIER KC OUTLET HIILO FLOW" lAD-6 E/3 o "NCP D THERMAL BARRIER KC OUTLET HIILO FLOW" lAD-6 E/4 1AD-6 2.10 Verify VerifY KC flow to the Upper Motor Bearing Oil Cooler normal, for the pump to be started, via one of the following:

o Unit 1 Reactor Coolant Pumps graphic (NCPMPALL)

OR

o "NCP A MTR UPPER BRG KC OUTLET HIILO FLOW" lAD-6 C/1 CII o "NCP B MTR UPPER BRG KC OUTLET HIILO FLOW" 1AD-6 lAD-6 C/2 o "NCP C MTR UPPER BRG KC OUTLET HIILO FLOW" lAD-6 C/3 o "NCP D MTR UPPER BRG KC OUTLET HIILO FLOW" 1AD-6 lAD-6 C/4

Enclosure 4.1 OP!lIA/61501002 OP!l/A/61501002 A Startup and Operation of the NC Pumps Page 60f7 6 of7 2.11 Verify KC flow to the Lower Motor Bearing Oil Cooler normal,nonnal, for the pump to be started, via one of the following:

oD Unit 1 Reactor Coolant Pumps graphic (NCPMPALL)

OR

oD "NCP A MTR LOWER BRG KC OUTLET LO FLOW" 1AD-6 Dil DIl oD "NCP B MTR LOWER BRG KC OUTLET LO FLOW" 1AD-6 D/2 oD "NCP C MTR LOWER BRG KC OUTLET LO FLOW" 1AD-6 D/3 oD "NCP D MTR LOWER BRG KC OUTLET LO FLOW" IAD-6 lAD-6 D/4 2.12 Verify annunciator 1AD-ll, K-6, "230 KV SWITCHYARD VOLTAGE LO" is dark.

2.13 Two minutes prior to starting NNC C pump, start one oil lift pump for N CP to be started by NCP pressing the "ON" pushbutton for:

oD "NC PUMP OIL LIFT PUMP AI" oD "NC PUMP OIL LIFT PUMP A2" oD "NC PUMP OIL LIFT PUMP B B1" 1"

oD "NC PUMP OIL LIFT PUMP B2" oD "NC PUMP OIL LIFT PUMP C1" oD "NC PUMP OIL LIFT PUMP C2" oD "NC PUMP OIL LIFT PUMP D1" oD "NC PUMP OIL LIFT PUMP D2" NOTE: 1. IfNC pump is NOT started, the oil lift pump shall be secured to minimize stress on oil nozzles.

2. The Degraded Bus Voltage Relays (27N) may actuate on the essential bus being supplied by the 6.9KV Switchgear associated with the NC Pump to be started in the following step. The alann alarm condition is expected to clear within 36 seconds. {PIP 95-0287}

2.14 Start desired NC pump by pressing the "ON" pushbutton for: (R.M.)

oD "NC PUMP lA" 1A" oD "NC PUMP 1B" oD "NC PUMP "NCPUMP 11C" CIt oD "NC PUMP 1D" lD"

Enclosure 4.1 OP!l/A/6150/o02 A OP/I/A/61501002 Startup and Operation of the NC Pumps Page 7 of7 2.15 Observe all pump and motor parameters to verify proper operation.

NOTE: If#1 Seal ~P gauge overranged, ~ ~P can be determined using INV12SB INV125B (Excess Letdn Hx Otlt Ctrl) "VCT" or "NCDT" switch position as follows:

  • "VCT" position: NC Press minus Excess Letdn Hx Odt Otlt Press = #1 Seal ~P
  • "NCDT" position: NC Press minus VCT Press = = #1 Seal ~P
  • ~ ;:::
  1. 1 Seal M 2: 200#.
  • Inlet Seal Water Flow 7 gpm to 10 gpm.

NOTE: If#1 Seal LeakoffFlow Rate is < 1.0 gpm, the #1 Seal Low Flow indication shall be used.

The 0.26 gpm flow correction for the required flow rate per Step 2.7.2 of Enclosure 4.1 (Startup and Operation of the NC Pumps), shall be reduced to 0.06 gpm (instrument accuracy).

  • #1 Seal LeakoffFlow per Step 2.7.
  • Pump Radial Bearing Temp. < 225°F.
  • No.1 Seal Outlet temp. between 60°F and 235°F.
  • Pump shaft vibration < 15 mils.
  • Motor bearings < 190°F.
  • Motor winding temp. < 302°F.
  • Motor frame vibration < 3 mils.

2.16 Three minutes after flow in the affected NC Loop exceeds 90%, stop the oil lift pump started in Step 2.13.

2.17 Repeat Steps 2.1 through 2.16 of this enclosure for starting additional NC pumps.

2.18 Do NOT file this enclosure in the Control Copy folder ofofthis this procedure.

DUKE POWER CATAWBA OPERATIONS TRAINING Start Reactor Coolant Pump 1 B JOB PERFORMANCE MEASURE

© 1995 Duke Power JPM Selection Check

. (complete . to copying)

JPM is current with latest procedure/reference document revision (all JPMs)

JPM setup on simulator is current with the simulator training disk to be used (MALF, GCF, LOA, OVR) (N/A if plant JPM)

'JPM* (All JPMs)

(c()mplet~ after copying)

Each individual JPM packet has been reviewed to contain the following:

Complete JPM - all pages procedure/reference document as specified in JPM Complete and appropriate procedurelreference initial conditions One page (examinee's copy) of JPM initial conditions

~~~ =~~~~~~~--~~~~~--~I (N/Aif plal1tJPM)

Prior to JPM session, ensure simulator IC snap that establishes initial conditions for the JPM is accurate and complete Prior to each JPM, ensure simulator setup for the performance of the JPM is verified as accurate as follows:

Appropriate IC selected Test area ready for conduct of JPM Prepared By: R. J. Katalinich Date: 10/2/00 Reviewed By: R. W. Smith Date: 10/3/00 OPS Review: N/A Date Approved By: D. P. Mc Intosh Date: 10/4/00 OP-CN-PS-NCP-OB1 FOR TRAINING PURPOSES ONL Y REV. 12 Page 10'B

DUKE POWER CATAWBA OPERATIONS TRAINING Start Reactor Coolant Pump 1B Examinee: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Examinee:

SYSTEM ....*... TESTING KIA #

ENVIRONMENT IV NCP SIMULATOR 003 000 GEN 13 (3.6/3.7)

POSITION FAULTEd* VALIDATED TIME TlfIIIl:::CRITICAL (YIN)

('(!t-J)

ROISRO RO/SRO Y 10 N STANDARD:

Seal injection flow to 1B NCP is restored to 7-10 gpm and 1B reactor coolant pump is successfully started.

REFERENCES:

  • OP/1/A/61S01002A OP/1/N61501002A (Reactor Coolant Pump) Encl. 4.1 INITIATING CUE:

IA/SOOO/ES-O.2, Natural Circulation Cooldown has been implemented following a Reactor EP/1/N5000/ES-O.2, EP/1 Trip. Control problems with 1NV-309 require the valve be operated in manual. The SRO instructs you to attempt to start NC Pump 1B 1B by completing OP/1/A/61S01002A, OP/1/N61501002A, NC Pump Operation Encl.

4.1. The Initial Conditions of Encl. 4.1 have been satisfied.

SiARTTIME i' END TIME DURATION (minutes)

.,'" OP~RATOR PERFORMANCEAS EVALUATED TO STANOA(tD (circ(eone)

, . <, "  ;. ~. .' .. .' ", ' . ... , . ',. . c * ".'

  • SATISFACTORY UNSATISFACTORY EXAMINER SIGNATURE: _ _ _ _ _ _ _ _ _ _ _ __ DATE:

EXAMINER (print):

OP-CN-PS-NCP-OB1 FOR TRAINING PURPOSES ONL Y REV. 12 Page 2 ofB

DUKE POWER CATAWBA OPERATIONS TRAINING SIMULATOR SETUP SHEET power" SNAP.

1. Reset to any "at power"
2. Manually trip the reactor at 1MC-1.
3. Trip all (4) four NCP breakers at 1MC-10.
4. Reset CA and control flow to maintain S/G levels at 38% N/R level.

- 12 gpm.

5. Place 1NV-309 in manual and reduce total seal water flow to ....
6. Freeze the simulator and write to SNAP.

IC SELECTED _ _ _ _ __

OP-CN-PS-NCP-OB1 FOR TRAINING PURPOSES ONL Y REV. 12 Page 3 ofB Page30fB

DUKE POWER CATAWBA OPERATIONS TRAINING

  • indicates,a "critical" step ,

H, ' ,",'

'<'_','i STEP " " " "

STANDARD >, S/U

1. Caution and Note prior to Step 2.1 Operator determines that the offsite power is correctly aligned for NCP 1B start and the Underfrequency condition does not exist.
2. If Unit 1 is in Mode 5, refer to Tech Spec Per Initiating cue the reactor should be Table 3.4.12-1 (NC Pump Operational determined to not be in Mode 5.

Restriction for low temperature overpressure protection).

3. If the pump to be started will be the fourth Per the initiating cue this is the first pump to NC pump in service on Unit 1, perform the be started. Examinee should go on to step following: 2.3.
4. Verify No.1 Seal DIP is greater than 200 Verifies DIP indication (1 MC5: 1 NVP5220) psig for the pump to be started per the for 1B NC Pump is greater than 200 psig.

following gauges: (Control Board MC-5)

    • 1B NCP: 1NVP 5220
5. Verify that the standpipe level for the pump A12 "NCP B #2 SEAL S-PIPE Verifies 1AD-7 Al2 to be started is normal by its associated HIILO LVL" alarm is dark.

annunciator DARK.

    • "NCP B #2 SEAL S-PIP HIILO LVL" 1AD-7 A12 Al2
6. Verify VCT pressure is equal to or greater Verifies VCT pressure (1 MC5: 1NVP5500 or than 15 psig. NV GRAPHIC) is greater than 15 psig.
7. Verify 7-10 gpm seal injection flow on the Observes seal injection flow (1 NVP5320 on pump to be started by the following gauges: 1MC-5) is approximately 4-5 gpm.

(Control Board MC-5)

    • 1B NCP: 1NCP5320 OP-CN-PS-NCP-OB1 FOR TRAINING PURPOSES ONL Y REV. 12 Page 4 of8 ofB

DUKE POWER CATAWBA OPERATIONS TRAINING

  • indicatesc:i:'"critical" ~tep/. . ..'\
  1. STEP .. ,  ; STANDARD S/U
  • 7. Response to low seal injection flow. Either:
1. Manually adjust 1NV-309 to restore seal injection flow OR
2. Inform Supervisor of problem.

If Supervisor informed:

CUE: Inform examinee to restore seal injection flow to its required value.

NOTE: Examinee should manually adjust 1NV-309.

8. Verify adequate No.1 No. 1 Sealleakoff Seal leakoff flow on Verifies #1 seal leakoff flow:

the pump to be started.

a. Determines required #1 Seal Leakoff Flow from Revised Data Book Figure 26.
b. Adds 0.26 gpm to the minimum required
  1. 1 Seal Leakoff flow of Figure 26
c. Verify the indicated #1 Seal Leakoff flow is within the range of Data Book Figure 26 as adjusted per step 2.7.2 per one of the following: OAC computer point C1A1376, or C1A0442, Chart recorders 1NVCR-5140 or 1NVCR-5121, or Computer NCP Graphic
9. Verify upper and lower oil pot levels normal, Verifies upper and lower pot levels normal for the pump to be started. NCP GRAPHIC or Visual inspection (local) or Annunciator 1AD-6 F/2, "NCP B UPPER/LOWER OIL RESERVOIR LO LEVEL" Dark.
10. Verify KC flow to Thermal Barrier Heat Verifies KC flow to Thermal Barrier Heat Exchanger normal, for the pump to be Exchanger: NC Pump GRAPHIC or started. Annunciator 1AD-6 E/2, El2, "NCP B THERMAL BARRIER KC OUTLET HIILO HI/LO FLOW", Dark is normal.

OP-CN-PS-NCP-OB1 FOR TRAINING PURPOSES ONL Y REV. 12 Page 5 o'B

DUKE POWER CATAWBA OPERATIONS TRAINING

  • indicates a "critical" step '.:.

, .*. STA~DARD .' . stu

11. Verify KC flow to Upper Motor Brg. Oil Verifies KC flow to upper motor bearing oil Cooler normal, for the pump to be started. cooler: NCP GRAPHIC or Annunciator 1AD-6 C/2 "NCP B MTR UPPER BRG KC OUTLET HilLa FLOW", Dark is normal.
12. Verify KC flow to Lower Motor Brg. Oil Verifies KC flow to lower motor bearing oil Cooler normal, for the pump to be started. cooler (NCP GRAPHIC or Annunciator 1AD-6D~"NCPBMTRLOWERBRGKC 6 D/2 "NCP B MTR LOWER BRG KC OUTLET HilLa FLOW", Dark) is normal.
13. Verify "230KV Swyd Volt Lo" Annunciator Verify alarm 1AD-11, Kl6 dark.

on 1 AD-11, Kl6 dark.

1AD-11,

  • 14. Two minutes prior to starting NC pump, Depresses RED "ON" pushbutton for NC start one oil lift pump for NCP to be started. PMP OIL LIFT PMP B1 or B2 approximately two minutes prior to starting 1B NC Pump.

Verifies RED "ON" light lit.

EXAMINER NOTE: Step 15 cannot be performed unless step 14 is completed satisfactorily.

CUE: Two minutes have elapsed.

  • 15. Start desired NC pump by pressing the Depress RED "ON" pushbutton for NC PMP "ON" pushbutton for: 1B. Verifies RED "ON" light lit and pump amps stabilized near midscale on ammeter.
  • "NC PMP 1B" NOTE: The following items 16a, b, c were checked previously on control board or OAC.

OP-CN-PS-NCP-OB1 FOR TRAINING PURPOSES ONL Y REV. 12 Page 60fB Page60fB

DUKE POWER CATAWBA OPERATIONS TRAINING STANDARD < S/U

16. Observe all pump and motor parameters to Verifies pump and motor parameters verify proper operation. indicating proper operations:
a. #1 Seal DIP greater than or equal to 200 psid.
b. Inlet Seal Water Flow 7-10 gpm (may be greater than 10 due to pump start)
c. #1 Seal Leakoff Flow appropriate for current Delta P per Revised Data Book Figure 26.
d. Pump Radial Bearing Temp less than 225°F (1MC5:

(1 MC5: 1NVP5360 or NCP GRAPHIC).

e. #1 Seal Outlet Temp between 60°F & &

235°F (1MC5:

(1 MC5: 1NVP5400 or NCP GRAPHIC).

f. Pump Shaft Vibration less than 15 mils.

(NCP GRAPHIC or PANEL on rear of 1MC-6).

g. Motor Bearings less than 190°F (NCP GRAPHIC).
h. Motor Winding Temp less than 302°F (NCP GRAPHIC).

I. Motor Frame Vibration less than 3 mils.

(NCP GRAPHIC or PANEL on rear of 1MC-6).

17. Three minutes after flow in the affected NC Depress GREEN "OFF" pushbutton and loop exceeds 90%, stop the oil lift pump verify GREEN "OFF" light lit.

started previously.

END TIME: _ _ _ _ __

OP-CN-PS-NCP-OB1 FOR TRAINING PURPOSES ONL Y REV. 12 Page 70fB

DUKE POWER CATAWBA OPERATIONS TRAINING INITIATING CUE:

EP/1/A15000/ES-O.2, Natural Circulation Cooldown has been implemented following a Reactor EP/1/A/5000/ES-O.2, Trip. Control problems with 1NV-309 require the valve be operated in manual. The SRO 1B by completing OP/1/A161501002A, instructs you to attempt to start NC Pump 1B OP/1/A/6150/002A, NC Pump Operation Encl. 4.1. The Initial Conditions of Encl. 4.1 have been satisfied.

OP-CN-PS-NCP-OB1 OP-CN-PS-NCP-081 FOR TRAINING PURPOSES ONL Y REV. 12 Page 80f8 B ofB

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM09 H Shift Operating RC Pumps CANDIDATE EXAMINER JPM09 H Page 1 of 11

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Shift Operating RC Pumps.

Alternate Path:

YES Facility JPM #:

NRC BANK KIA Rating(s):

SYS075 K4.01 Knowledge of circulating water system design feature(s) and interlocks which provide for the following: Heat Sink (CFR 41.7) 2.5/2.8 Task Standard:

1A and 1D RC pumps are in service and 1RC-22 is closed.

Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator _..t..X!....-

X In-Plant _ __ X Perform -_...:..X-,--

Simulate - _-_

References:

OP/1/B/6400/001A (Condenser Circulating Water) Enclosure 4.7 rev 066 OP/1/B/64001001A Validation Time: 10 min. Time Critical: No

=======================================================================

Candidate: Time Start: _ _ __

NAME Time Finish: _ _ __

Performance Rating: SAT ___ UNSAT _ __ Question Grade - _- _- _ Performance Time - - -

Examiner: _ _ __ ____....,...,...,...,....,.=-_


~/------


~~~~ _____ ~/_----

NAME SIGNATURE DATE

=======================================================================

COMMENTS JPM09 H Page 2 of 11

SIMULATOR SETUP SHEET

1. Reset to any 50% power snap.
2. Ensure 1 1A A and 1B RC pumps in service.
3. Insert XMT-RC063 (TRC_6960 RC PUMP B LOWER GUIDE BRG TEMP (OAC) VALUE = 235, RAMP 600
4. Insert LOA-RC066 (RACKOUT RC PMP 1B), VALUE= RACKOUT, EVENT=1, DELAY = 240 s
5. Insert VLV-RC011 F (RC23 CCW PUMP 1C DISCHARGE VLV FAIL TO POSITION)

VALUE = 0, EVENT = 1, DELAY = 15 s

6. Insert EVENT 1 as: x13i159n (This is the ON pushbutton for 1C 1C RC pump being depressed.)
7. SNAP to an open IC set.

SIMULATOR OPERATOR INSTRUCTIONS:

Do not go to RUN until the student is ready to proceed.

Tools/Equipment/Procedures Needed:

1. OP/1 OP/1/B/64001001A IB/64001001 A (Condenser Circulating Water), Enclosure 4.7 rev 066 JPM09 H Page 3 of 11

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned aSSigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is operating at 50% power following repair of a condenser tube leak.
  • The turbine building rounds NLO reports severe vibration and noise coming from 1B RC pump and states that the motor is extremely hot to the touch.
  • The NLO has checked out 1C and 1D RC Pump and they are not rotating in the reverse direction.

INITIATING CUES:

Start 1C RC Pump and secure 1B RC Pump per Enclosure 4.7 of OP/1 IB/64001001 A (Condenser Circulating Water). Initial Conditions are complete.

JPM09 H Page 4 of 11

START TIME: _ __

STEP 2.1:

SAT 2.1 Start the desired RC pump as follows:

2.1.1 Verify the RC pump to be started is NOT rotating in the reverse direction.

UNSAT STANDARD: Per initiating cue it is NOT rotating in reverse.

COMMENTS:

STEP 2.1:

_SAT 2.1.2 Ensure "RCP DISCH VALVE MODE SEL" in the "NORM" position.

STANDARD: Check switch in NORM position.

_UNSAT COMMENTS:

STEP 2.1

_SAT NOTE:

To start a third RC pump three cooling towers are required to be in service to meet the interlock. This is accomplished by temporarily opening a third tower inlet UNSAT isolation, it will be reclosed by Step 2.3.

STANDARD: Acknowledges note.

COMMENTS:

JPM09 H Page 5 of 11

STEP 2.1:

- SAT 2.1.3.1 IF starting a third RC pump, indicate which cooling tower inlet isolation is closed:

D 1RC-25 (Cool Twr 1A Inlet Isol)

- UNSAT STANDARD: Examinee notes that 1RC-25 is closed.

COMMENTS:

STEP 2.1: .'

- SAT 2.1.3.2 ENSURE all three cooling tower inlet isolation valves are open D 1RC-25 (Cool Twr 1A Inlet Isol)

- UNSAT STANDARD: Examinee opens 1RC-25 by depressing the RED "OPEN" pushbutton and noting the RED "OPEN" light illuminates.

EXAMINER NOTE: This is a large valve and takes -3.5 minutes

.to stroke.

COMMENTS:

STEP 2.1.

NOTE; Wait approximately two minutes after starting an RC pump before stopping - SAT the desired RC pump to allow flow to stabilize.

Following each configuration change, sufficient time should be allowed for RC Cooling Tower Levels to stabilize prior to aligning additional components

- UNSAT STANDARD: Examinee acknowledges notes.

COMMENTS:

JPM09 H Page 6 of 11

STEP 2.1.

2.1.4 Start the desired RC pump SAT STANDARD: Examinee starts 1C 1C RC Pump per the initiating cue.

UNSAT

_UNSAT COMMENTS:

Critical Step STEP 2.1:

2.1.5 Ensure that its discharge valve fully opens. (Valve begins to open six seconds _SAT SAT after pump start.)

STANDARD: Examinee should note that valve 1RC-23 begins to open and then recloses and 1C RC pump trips. UNSAT

_UNSAT EXAMINER NOTE: Examinee should realize that it is critical that 1B pump be shut down and that 1D RC pump is available to start. Should go back and re-perform step 2.1.4 and 2.1.5 for 1D RC pump.

EXAMINER CUE: If notified that 1C RC pump discharge valve did NOT open provide the following cue: "Start 1D RC Pump and secure 1 B RC Pump".

18 COMMENTS:

STEP 2.1.

NOTE; Wait approximately two minutes after starting an RC pump before stopping _SAT SAT the desired RC pump to allow flow to stabilize.

Following each configuration change, sufficient time should be allowed for RC Cooling Tower Levels to stabilize prior to aligning additional components UNSAT STANDARD: Examinee acknowledges notes.

COMMENTS:

JPM09 H Page 7 of 11

Critical Step STEP 2.1.

2.1.4 Start the desired RC pump SAT STANDARD: Examinee starts 1D 1D RC Pump.

_UNSAT UNSAT COMMENTS:

STEP 2.1:

SAT 2.1.6 Ensure that its discharge valve fully opens. (Valve begins to open six seconds after pump start.)

STANDARD: Examinee notes that 1RC-24 reaches fully open. UNSAT

_UNSAT COMMENTS:

Critical Step STEP 2.2:

2.2 Stop the desired RC pump as follows: SAT 2.2.1 Dispatch an operator to the cooling tower area to monitor for cooling tower overflow periodically for the next hour.

_UNSAT UNSAT STANDARD: Dispatched operator as stated.

EXAMINER CUE: This is Rob, I will monitor Unit 1 Cooling Tower levels.

COMMENTS:

JPM09 H Page 8 of 11

STEP 2.2: Critical Step 2.2.2 Close the discharge valve of the pump to be stopped:

D 1RC-22 (RC Pump 1B Disch Isol) SAT STANDARD: Depresses the CLOSE button for 1RC-22 and noted the Green CLOSED light illuminates.

UNSAT

_UNSAT EXAMINER NOTE: The valve may take 1 minute to close.

EXAMINER NOTE: The 1B RC Pump may trip before it can be manually secured~ secured.

COMMENTS:

STEP 2.2:

_SAT SAT 2.2.3 Ensure that the pump stops when the valve closes.

STANDARD: Notes the 1 B RC Pump GREEN "OFF" light is illuminated either 1B because the valve has closed, or because it tripped off due to the UNSAT

_UNSAT malfunction.

COMMENTS:

Critical Step STEP 2.3:

_SAT If step 2.1.3.1 indicates a cooling tower inlet isolation valve was initially closed, close that cooling tower inlet isolation valve:

1RC-2S (Cool Twr 1A Inlet Isol) UNSAT

_UNSAT STANDARD: Notes the 1RC-2S was originally closed and recloses the valve ensuring the GREEN "CLSD" light illuminates when it closes.

COMMENTS:

JPM09 H Page 9 of 11

STEP 2.4:

Ensure the cooling towers are aligned properly for the number of pumps remaining in operation per the cooling tower configuration limits: SAT Riser Bypasses Riser Bypasses Open Tower Inlets RC Pumps Open Passing Flow Isolated Running 3 2 1 1 (Throttled)

- UNSAT 3 2 1 2 (Throttled) 2 o0 2 1 1 (Th,r",..,tltlorl (Throttled)

  • 0. 1 2 o

0 o0 o0 3 STANDARD: Notes configuration is proper. (see bold)

COMMENTS:

complete.

This JPM is com lete.

TIME STOP: _ __

JPM09 H Page 10 of 11

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Unit 1 is operating at 50% power following repair of a condenser tube leak.
  • The turbine building rounds NLO reports severe vibration and noise coming from 1B RC pump and states that the motor is extremely hot to the touch.
  • The NLO has checked out 1C and 1D RC Pump and they are not rotating in the reverse direction.

INITIATING CUES:

1C RC Pump and secure 1 Start 1C B RC Pump per Enclosure 4.7 of OP/1/B/64001001 1B OP/1 IB/64001001 A (Condenser Circulating Water). Initial Conditions are complete.

Enclosure 4.7 OPil/B/6400100 1 A OPil/B/6400/001 Shifting of Operating RC Pumps Page 1 of3

1. Initial Conditions 1.1 Review the Limits and Precautions.

1.2 Verify two or more RC pumps are running per Enclosure 4.2 (Placing Cooling Towers In Service).

2. Procedure NOTE: If it is desired to swap which RC pumps are in service while reducing or increasing the number of RC pumps and cooling towers in service, this enclosure is used first.

Enclosure 4.3 (Removing Cooling Towers From Service) is then used to remove RC pump(s) and cooling tower(s) from service OR Enclosure 4.2 (Placing Cooling Towers In Service) is then used to place RC pump(s) and cooling tower(s) in service.

2.1 Start the desired RC Pump as follows:

2.1.1 Verify the RC pump to be started is NOT rotating in the reverse direction.

2.1.2 Ensure "RCP DISCH VALVE MODE SEL" in the "NORM" position.

NOTE: To start a third RC pump three cooling towers are required to be in service to meet the interlock. This is accomplished by temporarily opening the third tower inlet isolation, it will be reclosed by Step 2.3.

2.1.3 IF starting a third RC pump, perform the following:

2.1.3.1 Indicate below which cooling tower inlet isolation is closed:

o 1RC-25 lRC-25 (Cool Twr 1A lA Inlet Isol) o 1RC-26 lRC-26 (Cool Twr 1B IB Inlet Isol)

Iso1) o lRC-27 (Cool Twr lC Inlet Isol) 1RC-27 2.1.3.2 Ensure all three cooling tower inlet isolation valves are open:

o lRC-25 (Cool Twr 1A 1RC-25 lA Inlet Isol) o 1RC-26 lRC-26 (Cool Twr 1B IB Inlet Isol) o 1RC-27 lRC-27 (Cool Twr 1C 1C Inlet Isol)

Enclosure 4.7 OP!l/B/64001001 A Shifting of Operating RC Pumps Page 2 of3 NOTE:

  • Wait approximately two minutes after starting an RC pump before stopping the desired RC pump to allow flow to stabilize.
  • Following each configuration change, sufficient time needs to be allowed for RC Cooling Tower Levels to stabilize prior to aligning additional components.

2.1.4 Start the desired RC pump 2.1.5 Ensure that its discharge valve fully opens. (Valve begins to open six seconds after pump start.)

2.2 Stop the desired RC pump as follows:

2.2.1 Dispatch an operator to the cooling tower area to monitor for cooling tower overflow periodically for the next hour.

2.2.2 Close the discharge valve of the pump to be stopped:

D 1RC-21 (RC Pump 1A Disch Isol)

D 1RC-22 (RC Pump 1B Disch Isol)

D 1RC-23 (RC Pump 1C Disch Isol)

D 1RC-24 (RC Pump 1D Disch Isol) 2.2.3 Ensure that the pump stops when the valve closes.

2.3 IF Step 2.1.3.1 indicates a cooling tower inlet isolation was initially closed, close that cooling tower inlet isolation.

D 1RC-25 (Cool Twr 1A Inlet Isol)

D 1RC-26 (Cool Twr 1B Inlet Iso1)

D 1RC-27 (Cool Twr 1C Inlet Isol)

Iso1) 2.4 Ensure the cooling towers are aligned properly for the number of pumps remaining in operation per the following cooling tower configuration limits:

Riser Bypasses Riser Bypasses Open T ower Inlets Tower RCPumps RC Pumps Open Passing Flow Isolated Running 3 2 1 1 (Throttled) 3 2 1 2 (Throttled) 2 0 2 1 (Throttled) 1 0 1 2 0 0 0 3

Enclosure 4.7 OP/I/B/6400/001 A OPil/B/6400/001 Shifting of Operating RC Pumps Page 3 of3 2.5 File this enclosure in the Control Copy folder of this procedure.

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM09 I JPM091 Transfer Control to the Standby Shutdown System CANDIDATE EXAMINER JPM091I JPM09 Page 1 of 11

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Transfer Control to the Standby Shutdown System Alternate Path:

No Facility JPM #:

AD-001 KIA Rating(s):

APE068 AA1.21 Ability to operate or monitor the following as they apply to the control room evacuation: Transfer of controls from the control room to shutdown panel or local control (3.9/4.1)

Task Standard:

Control is transferred to the Standby Shutdown System, solenoid isolation valve disconnects transferred, CAPT T&T valve power is transferred and Train A Neutron Monitoring System power is transferred.

Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator _ __ n-Plant ~X:.!.-_

IIn-Plant ---,X-,--_ Perform _

__ ___ Simulate _~X'--_

_~X,---_

References:

OP/0/B/61 00/013 (Standby Shutdown Facility Operation) Enclosure 4.2 revision 049 Validation Time: 10 min. Time Critical: No

=======================================================================
=======================================================================

Candidate: Time Start: _ __ __ __

NAME Time Finish: -_- _ -_-

Performance Rating: SAT ___ UNSAT _ __ Question Grade _ __ Performance Time _ __

Examiner: ________

NAME

-_ -_ -_ -_- _- ------~~~~~


~~~~~~---~/_~~~

SIGNATURE

____ ~/_~~

DATE

=======================================================================
=======================================================================

COMMENTS JPM091 Page 2 of 11

SIMULATOR SETUP SHEET N/A SIMULATOR OPERATOR INSTRUCTIONS:

N/A Tools/Equipment/Procedures Needed:

OP/0/B/61 OP/0/B/51 001013 00/013 (Standby Shutdown Facility Operation) Enclosure 4.2 revision 049 JPM091 Page 3 of 11

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 2 has just suffered a fire that results in evacuation of the control room.

INITIATING CUES:

Transfer control to the Standby Shutdown System per OP/O/B/61 00/013 Enclosure 4.2 steps OP/0/S/61 001013 2.1 through 2.4. All initial conditions have been satisfied.

JPM091 Page 4 of 11

START TIME: _ __

STEP 2.1:

Transfer control to the Standby Shutdown System (SSS) as follows: SAT NOTE: These breakers are kirk-key interlocked to prevent both feeders from being closed at the same time.

_UNSAT STANDARD: Acknowledges note.

COMMENTS:

STEP 2.1.1: CRITICAL STEP Open 2EMXS-F01A (Normal Incoming Breaker Fed From Motor Control Center 2EMXA) (AB-577, BB-65, Rm 486). SAT STANDARD: Rotate 2EMXS-F01A switch to "OFF".

EXAMINER CUE: "2EMXS-F01A is OFF." _UNSAT COMMENTS:

STEP 2.1.2 CRITICAL STEP Close 2EMXS-F03A (Alternate Incoming Bkr Fed From Motor Control Center SMXG) SAT STANDARD: Rotate Kirk-Key in 2EMXS-F01A and remove.

Insert Kirk-Key in 2EMXS-F03A and rotate.

Rotate 2EMXS-F03A switch to "ON" _UNSAT EXAMINER NOTE: Kirk Key must be obtained from 2EMXS-F01A to be inserted into 2EMXS-F03A.

EXAMINER CUE: "2EMXS-F03A is ON."

COMMENTS:

JPM09 JPM091I Page 5 of 11

CRITICAL STEP STEP 2.1.3:

Close 2EMXS-F03E (Reactor Vessel Head Vent Motor (2NC253A) to restore power _SAT to 2NC-253A (Rx Head Vent).

STANDARD: Rotate 2EMXS-F03E switch to "ON".

_UNSAT EXAMINER CUE: "2EMXS-F03E is ON."

COMMENTS:

STEP 2.2:

_SATSAT Ensure significant solenoid isolation valve are closed by transferring disconnects as follows:

CAUTION: The plugs shall be inserted squarely and the ring tightened to ensure UNSAT

_UNSAT proper connection of all pins.

STANDARD: Acknowledges Caution.

COMMENTS:

CRITICAL STEP STEP 2.2.1:

Remove Train A Plug 1 disconnect from the "PLUG 1: PLANT MODE" receptacle and _SATSAT connect to the" PLUG 1: SSF MODE" receptacle located in terminal box 2TBOX0396 2T80X0396 (Train A SSF Disconnect Enclosure) (AB-577, (A8-577, BB-69, 88-69, Rm 486).

STANDARD: Rotate lock ring and remove Train "A" Plug 1 from "PLANT MODE" _UNSAT UNSAT and place in "SSF MODE" receptacle and tighten lock ring EXAMINER CUE: "Train "A" Plug 1 is installed in "SSF Mode".

COMMENTS:

JPM09 I Page 6 of 11

CRITICAL STEP STEP 2.2.2 Remove Train A Plug 2 disconnect from the" PLUG 2: PLANT MODE" receptacle SAT and connect to the" PLUG 2: SSF MODE" receptacle located in terminal box 2TBOX0396 (Train A SSF Disconnect Enclosure) (AB-577, BB-69, Rm 486).

STANDARD: Rotate locking ring and Remove Train "B" disconnect from "PLANT UNSAT

_UNSAT MODE" and place in "SSF MODE" receptacle and tighten lock ring.

EXAMINER CUE: "Train "A" Plug 2 is installed in "SSF Mode".

COMMENTS:

CRITICAL STEP STEP 2.2.3:

Remove Train B disconnect from the "PLANT OPERATION" receptacle and SAT connect to the "SSF OPERATION" receptacle located in 2TBOX0395 (Train B SSF Disconnect Enclosure) (inside small door "Unit 2 Auxiliary Building SSF Disconnect") (AB-577, BB-69, Rm 486).

UNSAT STANDARD: Rotate locking ring and Remove Train "B" disconnect from "PLANT OPERATION" and place in "SSF OPERATION" receptacle and tighten lock ring.

EXAMINER CUE: "Train "8" disconnect is installed in "SSF OPERATION."

COMMENTS:

NOTE: The power disconnect breaker for 2NC-252B (Rx Head Vent Block) is located in 2TBOX0395 (Train B SSF Disconnect Enclosure) (inside small door "Unit 2 SAT Auxiliary Building SSF Disconnect") (AB-577, BB-69, Rm 486).

STANDARD: Acknowledges note.

UNSAT COMMENTS:

JPM09 I Page 7 of 11

STEP 2.2.4 SAT Ensure the 600V power disconnect breaker (SSF Pwr Disconnect For 2NC-252B) for 2NC-252B (Rx Head Vent Block) is in the "OFF" position.

STANDARD: Ensures 2NC-252B disconnect BKR in "OFF" position. UNSAT EXAMINER CUE: "2NC-252 disconnect BKR is in the OFF position" COMMENTS:

STEP 2.3 SAT Transfer power for CAPT Trip and Throttle valve as follows:

NOTE: These breakers are Kirk-Key interlocked to prevent both feeders from being closed at the same time. (on 2ELCP0250 (125 VDC CAPT Trip And Throttle Valve UNSAT Power Transfer Panel>>

Panel>>

STANDARD: Acknowledges note.

COMMENTS:

CRITICAL STEP STEP 2.3.1:

2ELCP0250-F01 B (Incoming Line From 2EDE 125 VDC 1 Open 2ELCP0250-F01B E) (AB-577, 1E) SAT BB-64, Rm 486).

STANDARD: Rotate 2ELCP0250-F01B, switch to :"OFF".

UNSAT EXAMINER CUE: "2ELCP0250-F01 B is OFF" COMMENTS:

JPM091 Page 8 of 11

CRITICAL STEP STEP 2.3.2

- SAT Close 2ELCP0250-F01C 2ELCP0250-F01 C (Incoming Line From SDSP2 125 VDC NE).

STANDARD: Rotate Kirk-Key in 2ELCP0250-F01 B and remove.

Insert Kirk-Key in 2ELCP0250-F01 C and rotate. -_UNSAT UNSAT Rotate 2ELCP0250-F01 C switch to "ON" EXAMINER NOTE: Kirk Key must be obtained from 2ELCP0250-F01 B to be inserted into 2ELCP0250-F01 C.

EXAMINER CUE: "2ELCP0250*F01C switch to "ON""

COMMENTS:

CRITICAL STEP STEP 2.4 Transfer power to Train A Neutron Monitoring System as follows: (2TBOX0603, AB-577, BB-62, Rm 486) - SAT 2.4.1 Disconnect the power plug from the "NORMAL IE OPERATION" receptacle.

STANDARD: Rotate lock ring and remove plug from "NORMAL IE OPERATION" - UNSAT EXAMINER CUE: "Power Plug is disconnected."

COMMENTS:

JPM091 Page 9 of 11

CRITICAL STEP STEP 2.4.2 CAUTION: The plug shall be inserted squarely and the ring tightened to ensure proper connection of all pins. - SAT Connect the power plug to the "SSF NE OPERATION" receptacle.

STANDARD: Acknowledges caution and Installs power plug in "SSF NE - UNSAT OPERATION" receptacle and tighten lock ring.

EXAMINER CUE: "Power Plug is connected."

COMMENTS:

This JPM is complete.

TIME STOP: _ __

JPM091 Page 10 of 11

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 2 has just suffered a fire that results in evacuation of the control room.

INITIATING CUES:

Transfer control to the Standby Shutdown System per OP/0/B/61 00/013 Enclosure 4.2 steps OP/0/S/61 001013 2.1 through 2.4. All initial conditions have been satisfied.

Enclosure 4.2 OP/O/B/6100/013 OP/O/B/61001013 Maintaining Unit 2 in Hot Standby Following Page 1 of 11 a Fire Event

1. Initial Conditions 1.1 Review the Limits and Precautions.

1.2 Preferred controls necessary to maintain Hot Standby (Control Room and Auxiliary Shutdown Panels) are unresponsive or NOT accessible due to fire.

1.3 The following actions have been completed by AP/2/A/55001017 AP/2/A/5500/017 (Loss of Control Room).

D Reactor tripped D Turbine tripped D All NC pumps tripped D CFPTs tripped

2. Procedure NOTE: 1. NC System will NOT be able to be cooled down below approximately 567°F, because the lowest steam line safety valve is set at 1175 psig.
2. Steps 2.1 through 2.5 may be in progress per AP/2IA155001017 AP/21A15500/017 (Loss of Control Room), Enclosure 8 (Transfer Control to SSF) and AP/lIAl55001017 APilIAl5500/017 (Loss of Control Room), Enclosure 10 (SSF DIG Startup).
3. Steps 2.1 through 2.4 may be performed concurrently with Steps 2.5 through 2.8.
4. For a list of valves affected by the transfer, see Enclosure 4.6 (Equipment Affected on Transfer).

2.1 Transfer control to the Standby Shutdown System (SSS) as follows:

NOTE: These breakers are kirk-key interlocked to prevent both feeders from being closed at the same time.

D 2.1.1 Open 2EMXS-FOIA (Normal Incoming Breaker Fed From Motor Control Center 2EMXA) (AB-577, BB-65, Rm 486).

D 2.1.2 Close 2EMXS-F03A (Alternate Incoming Bkr Fed From Motor Control Center SMXG).

D 2.1.3 Close 2EMXS-F03E (Reactor Vessel Head Vent Motor (2NC253A)) to restore power to 2NC-253A (Rx Head Vent).

Enclosure 4.2 OP/O/B/61001013 Maintaining Unit 2 in Hot Standby Following Page 2 of 11 a Fire Event 2.2 Ensure significant solenoid isolation valves are closed as follows:

CAUTION: The plugs shall be inserted squarely and the ring tightened to ensure proper connection of all pins.

D 2.2.1 Remove Train A Plug 1 disconnect from the "PLUG 1: PLANT MODE" receptacle and connect to the" PLUG 1: SSF MODE" receptacle located in terminal box 2TBOX0396 (Train A SSF Disconnect Enclosure) (AB-577, BB-69, Rm 486).

D 2.2.2 Remove Train A Plug 2 disconnect from the" PLUG 2: PLANT MODE" receptacle and connect to the" PLUG 2: SSF MODE" receptacle located in terminal box 2TBOX0396 (Train A SSF Disconnect Enclosure) (AB-577, BB-69, Rm 486).

D 2.2.3 Remove Train B disconnect from the "PLANT OPERATION" receptacle and connect to the "SSF OPERATION" receptacle located in 2TBOX0395 (Train B SSF Disconnect Enclosure) (inside small door "Unit 2 Auxiliary Building SSF Disconnect") (AB-577, BB-69, Rm 486).

NOTE: The power disconnect breaker for 2NC-252B (Rx Head Vent Block) is located in 2TBOX0395 (Train B SSF Disconnect Enclosure) (inside small door "Unit 2 Auxiliary Building SSF Disconnect") (AB-577, BB-69, Rm 486).

D 2.2.4 Ensure the 600V power disconnect breaker (SSF Pwr Disconnect For 2NC-252B) for 2NC-252B (Rx Head Vent Block) is in the "OFF" position.

2.3 Transfer power for CAPT Trip and Throttle valve as follows:

NOTE: These breakers are Kirk-Key interlocked to prevent both feeders from being closed at the same time. (on 2ELCP0250 (125 VDC CAPT Trip And Throttle Valve Power Transfer Panel))

D 2.3.1 Open 2ELCP0250-FOIB (Incoming Line From 2EDE 125 VDC IE) (AB-577, BB-64, Rm 486).

D 2.3.2 Close 2ELCP0250-FOIC (Incoming Line From SDSP2 125 VDC NE).

Enclosure 4.2 OP/O/B/61001013 OP/O/B/61 00/0 13 Maintaining Unit 2 in Hot Standby Following Page 3 of 11 a Fire Event 2.4 Transfer power to Train A Neutron Monitoring System as follows: (2TBOX0603, AB-577, BB-62, Rm 486) oD 2.4.1 Disconnect the power plug from the "NORMAL IE OPERATION" receptacle.

CAUTION: The plug shall be inserted squarely and the ring tightened to ensure proper connection of all pins.

o 2.4.2 D Connect the power plug to the "SSF NE OPERATION" receptacle.

2.5 IF at any time power is lost to ISLXG as indicated by "LINE VOLTS" voltmeter (located on SSF Control Console panel), place SSF diesel in operation as follows:

CAUTION: The emergency mode overrides the SSF Diesel Generator "High Jacket Water Temperature" and "Low Lube Oil Pressure" trips.

o 2.5.1 D Ensure the "SSF DIG MODE" switch is in the "EMERG" position on the SSF console.

o 2.5.2 D Place the "SSF DIG" switch in the "ON" position.

o 2.5.3 D IF the engine does NOT start within 30 seconds, perform the following:

o 2.5.3.1 D Place the "SSF DIG" switch in the "OFF" position.

o 2.5.3.2 D IF DIG turned over but did NOT fire during the DIG start attempt, turn the manual override knob on the shutdown valve (shown in Enclosure 4.7, Top View of Fuel Oil Pump) clockwise to permit fuel flow through the valve.

o 2.5.3.3 D After 1 to 2 minutes has passed, return to Step 2.5.2 to attempt to re-start the DIG.

o 2.5.4 D Adjust "SSF DIG VOLT ADmST"ADJUST" until generator voltage is 600 volts.

o 2.5.5 D Adjust the "SSF DIG GOV CTRL" to bring frequency to 60 +/- 1.2 Hz.

o 2.5.6 D Press the "TRIP" pushbutton on "ISLXG NORM FDR FRM 1ITA" TA" on the SSF console.

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM09 J Locally Operate Steam Generator PORVs During a SGTR CANDIDATE EXAMINER JPM09 J Page 1 of 10

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Locally Operate Steam Generator PORVs During a SGTR Alternate Path:

No Facility JPM #:

EP4-009 KIA Rating(s):

EPE038 EA 1.41 Venting of the S/G to the atmosphere (3.4/3.4)

Task Standard:

Steam Generator PORV 2SV-1 is manually engaged for local operation and the operator has demonstrated rotation of the handwheel in the proper direction to open the valve within 18 minutes Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator _ __ IIn-Plant ----'X'-!.-_

n-PI ant -----'X..:.-_ Perform _ __ Simulate _.:....:X,--_

_.!...:X,--_

References:

EP/2/N5000/E-3 (Steam Genratior Tube Rupture) Enclosure 3 revision 032 Validation Time: 10 min. Time Critical: Yes 12 minutes

=======================================================================

Candidate: Time Start: _ __

NAME Time Finish: _ __

Performance Rating: SAT ___ UNSAT _ __ Question Grade - _- _-_ Performance Time - _- _-_

Examiner: _ _ __ __ __ __ __ __ __ __ __ __ ___


~/_--


~/_--

NAME SIGNATURE DATE

=======================================================================

COMMENTS JPM09 J Page 2 of 10

SIMULATOR SETUP SHEET N/A SIMULATOR OPERATOR INSTRUCTIONS:

N/A Tools/Equipment/Procedures Needed:

EP/21A15000/E-3 EP/2/A/5000/E-3 (Steam Generator Tube Rupture) Enclosure 3 revision 032 JPM09 J Page 3 of 10

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A SGTR has occurred coincident with a loss of offsite power and 2ERPO. The CRS has EP/21A15000/E-3 (Steam Generator Tube Rupture). Step 19 is currently in effect implemented EP/2/A/5000/E-3 to cooldown the NCS.

INITIATING CUES:

The CRS directs you to fully open 2SV-1 (S/G 20 PORV) locally per EP/21A15000/E-3 EP/2/A/5000/E-3 Enclosure 3 (Local Operation of S/G PORVs).

This JPM is time critical.

JPM09 J Page 4 of 10

STARTTIME:

START TIME: _ __

EXAMINER NOTE:

In the analysis for this event, it has been determined that a maximum of 18 minutes is allowed from the time the NLO is given the procedure in the control room, to the time the valve is fully open. Since 10 minutes were allotted to get to the valve, and 2 minutes are allotted to expose the shaft for manual engagement, the trainee must have 6 minutes left to fully open the valve once the clevis is engaged, and he has demonstrated the proper direction to turn the handwheel to open the valve.

Critical Time starts when the student states he/she is ready to proceed.

TIME CRITICAL START TIME:

STEP 1:

NOTE Emergency flashlights and Merlin-Gerins are available in the control room. - SAT Obtain the following:

o D Flashlight o

D Merlin-Gerin. -- UNSAT STANDARD: Obtains flashlight.

EXAMINER CUE: "Flashlight and Merlin-Gerin obtained."

EXAMINER NOTE: This is for outside Doghouse, Merlin Gerin not required.

Emergency Flashlights and Merlin-Gerins are located in the Control Room (SSA desk)

COMMENTS:

JPM09 J Page 5 of 10

STEP 2:

2. Establish communications with the control room as follows: SAT
a. Obtain sound powered phones from storage on 627' elevation.

- Outside doghouse (DH-627, FF-70, Rm 581)

b. Establish communications from the nearest phone jack at the selected S/G PORV( s): UNSAT

- Outside doghouse (DH-627, FF-70, Rm 581)

STANDARD: Eastablishes CR communications by locating a sound powered phone and phone jack ..

EXAMINER CUE: "Communication has been established with the Control Room."

COMMENTS:

Caution: Severe damage to the actuator assembly can result if operated with the clevis engaged to the actuator shaft and the equalizing valve closed.

SAT Note: 2SV-13 turns counterclockwise to open. 2SV-1, 2SV-7 and 2SV-19 turn clockwise to open.

STANDARD: acknowledges note and caution. UNSAT COMMENTS:

STEP 3a:

SAT Place S/G PORV(s) in local operation as follows:

a. Select desired PORV(s):

PORV( s):

D 2SV-1 (S/G 20 PORV Manual Ctrl) (DH-635, FF-GG, 69-70, Rm 581 )..

UNSAT STANDARD: 2SV-1 selected based on initial conditions.

COMMENTS:

JPM09 J Page 6 of 10

CRITICAL STEP STEP 3.b:

SAT Unscrew clevis from manual override shaft.

STANDARD: Examinee describes unscrewing clevis from manual override shaft.

_UNSAT UNSAT EXAMINER CUE: "Clevis has been removed."

COMMENTS:

CRITICAL STEP STEP 3.c:

Turn handwheel in the "close" direction to expose actuator shaft below manual SAT override shaft.

STANDARD: Examinee describes turning the handwheel COUNTERCLOCKWISE to expose actuator shaft below manual override shaft. UNSAT EXAMINER CUE: "Actuator shaft has been exposed."

COMMENTS:

CRITICAL STEP STEP 3.d Open equalizing valve on side of PORV actuator. SAT STANDARD: Examinee locates and describes attaching valve handle to the equalizing valve (on the side of the PORV actuator) and opens the equalizing valve. _UNSAT EXAMINER CUE: "Equalizing valve is open."

COMMENTS:

JPM09 J Page 7 of 10

CRITICAL STEP STEP 3.e:

Slide clevis onto actuator shaft. SAT STANDARD: Examinee describes sliding the clevis onto the exposed actuator shaft.

UNSAT EXAMINER CUE: "Clevis is secure on the shaft."

COMMENTS:

CRITICAL STEP STEP 3.f Turn handwheel to position valve as desired. SAT STANDARD: Examinee describes turning handwheel in the CLOCKWISE direction to fully open the valve.

UNSAT EXAMINER CUE: "Open 2SV-1 to the full open position."

EXAMINER NOTE: The time critical activity ends at this point. Actual time critical activity is 18 minutes but 12 minutes is allotted for this point assuming 6 minutes to fully open the valve.

TIME CRITICAL END TIME: _ _ __

COMMENTS:

JPM09 J Page 8 of 10

STEP 4

- SAT WHEN directed by the control room, THEN restore S/G PORV(s) to control room control as follows: ...

STANDARD: Waits for Control Room direction. - UNSAT EXAMINER CUE: "Another operator will return PORV to control room controL" control."

COMMENTS:

This JPM is complete.

TIME STOP: _ __

JPM09 J Page 9 of 10

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

2ERPO. The CRS has A SGTR has occurred coincident with a loss of offsite power and 2ERPD.

implemented EP/2/A/5000/E-3 (Steam Generator Tube Rupture). Step 19 is currently in effect to cooldown the NCS.

INITIATING CUES:

20 PORV) locally per EP/2/A/5000/E-3 The CRS directs you to fully open 2SV-1 (S/G 2D Enclosure 3 (Local Operation of S/G PORVs).

This JPM is time critical.

CNS STEAM GENERATOR TUBE RUPTURE PAGE NO.

EP/21A15000/E-3 EP/2/A15000/E-3 65 of 110 Enclosure 3 - Page 1 of 2 Revision 32 Local Operation of S/G PORVs Emergency flashlights and Merlin-Gerins are available in the control room.

1. Obtain the following:

_ **** Flashlight

        • Merlin-Gerin.

The following are preferred routes to the doghouses:

        • Outside doghouse (2A and 2D S/G) - Through northeast door of Unit 2 turbine building
  • **Inside Inside doghouse (2B and 2C S/G) - Through northeast control room exit to the auxiliary building.
2. Establish communications with the control room as follows:
a. Obtain sound powered phones. from storage on 627' elevation.

phones.from

_ * **Outside Outside doghouse (DH-627, FF-70, Rm 581)

_ ** Inside doghouse (DH-627, FF-61

  • *Inside FF-61,, Rm 562).
b. Establish communications from the nearest phone jack at the selected S/G PORV(s):

_ * **Outside Outside doghouse (DH-627, FF-70, Rm 581)

_ * **Inside Inside doghouse (DH-627, FF-61 , Rm 562).

CNS GENERATOR STEAM GENERA TOR TUBE RUPTURE PAGE NO.

EP/2/A/5000/E-3 EP/2/A15000/E-3 66 of 110 Enclosure 3 - Page 2 of 2 Revision 32 Local Operation of S/G PORVs CAUTION Severe damage to the actuator assembly can result if operated with the clevis engaged to the actuator shaft and the equalizing valve closed.

NOTE 2SV-13 turns counter clockwise to open. 2SV-1, 2SV-7 and 2SV-19 turn clockwise to open.

3. Place S/G PORV(s) in local operation as follows:
a. Select desired PORV(s):

_ 0 o2SV-19 (S/G 2A PORV Manual Control) (DH-635, (OH-635, FF-GG, 70-71, Rm 581)

_ 0 o2SV-13 (S/G 2B PORV Manual Control) (DH-635, (OH-635, FF-GG, 60-61, Rm 562)

_ 0 o2SV-7 (S/G 2C PORV Manual Control) (DH-635, (OH-635, FF-GG, 61-62, Rm 562)

__ 2SV-1 (S/G 2D o2SV-1 00 0 20 PORV Manual Control) (DH-635, (OH-635, FF-GG, 69-70, Rm 581).

b. Unscrew clevis from manual override shaft.
c. Turn handwheel in the "close" direction to expose actuator shaft below manual override shaft.
d. Open equalizing valve on side of PORV actuator.
e. Slide clevis onto actuator shaft.
f. Turn handwheel to position valve as desired.
4. WHEN directed by the control room, THEN restore S/G PORV(s) to control room control as follows:
a. Notify the control room to transmit a closed actuating signal from MCB to the valve positioner.
b. Turn handwheel until the PORV is in the "closed" position and pressure is relieved from the clevis and actuator shaft.
c. Remove clevis from actuator shaft.
d. Turn handwheel until manual override shaft is fully extended.
e. Screw clevis onto manual override shaft.
f. Close equalizing valve on side of PORV actuator.

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM09 K Locally Trip the Reactor CANDIDATE EXAMINER JPM09 K Page 1 of 7

CATAWBA NUCLEAR STATION INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Locally Trip the Reactor Alternate Path:

No Facility JPM #:

IPX-016 KIA Rating(s}:

EPE029 EA1.12 ATWS - MIG set power supply and reactor trip breakers (4.1/4.0)

Task Standard:

At least one Motor or Generator breaker on each train is open isolating all power to the control rod drive system.

Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator _ __ In-Plant In-Pia ----'X....!....-_

nt ---"X-'--_ Perform _ __ Simulate _~X,--_

_;";X'--_

References:

EP/1/A/SOOO/FR-S.1 (Response to Nuclear Power Generation/ATWS)

Validation Time: 8 min. Time Critical: No

=======================================================================
=======================================================================

Candidate: Time Start: _

NAME Time Finish: - _ -_-

Performance Rating: SAT ___ UNSAT _ __ Question Grade _ __ Performance Time - _- _- _

Examiner:

Examiner: - _-_- -_. ._. ._

- c_

NAME

-- _ = _ -_- -_

--_ ------~~~~~

SIGNATURE

____ _ ~/ __

_~/--~=- -

DATE

=======================================================================
=======================================================================

COMMENTS JPM09 K Page 2 of 7

SIMULATOR SETUP SHEET N/A SIMULATOR OPERATOR INSTRUCTIONS:

N/A Tools/Equipment/Procedures Needed:

None JPM09 K Page 3 of 7

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 was operating at 100% power when the main turbine tripped. The reactor could not be tripped from the control room and the crew entered EP/1/A15000/FR-S.1 (Response to Nuclear Power Generation (ATWS>>.

(ATWS)).

INITIATING CUES:

The CRS directs you to perform the following:

  • The following breakers for CRD MIG sets:

o "MOTOR" Breaker o "GENERATOR" Breaker JPM09 K Page 4 of 7

START TIME: _ __

Open Reactor Trip Breakers.

STANDARD: Depress the RED "TRIP" plate for Reactor Trip Breaker A. SAT EXAMINER CUE: "1RTA indicates closed."

COMMENTS: _UNSAT Open Reactor Trip Breakers.

STANDARD: Depress the RED "TRIP" plate for Reactor Trip Breaker B. SAT EXAMINER CUE: "1 "1RTB RTB indicates closed."

COMMENTS: UNSAT Open the Reactor Trip Bypass Breakers.

STANDARD: Depress the RED "TRIP" plate for Bypass Breaker A. SAT EXAMINER CUE: "1BYA indicates open."

EXAMINER NOTE: Reactor Trip Bypass Breakers are normally "OPEN". UNSAT

_UNSAT COMMENTS:

Open the Reactor Trip Bypass Breakers.

STANDARD: Depress the RED "TRIP" plate for Bypass Breaker B. SAT EXAMINER CUE: "1 BYB indicates open."

EXAMINER NOTE: Reactor Trip Bypass Breakers are normally "OPEN". _UNSAT COMMENTS:

JPM09 K Page 5 of 7

Open the following breakers for CRD MIG sets on 1MGBA: CRITICAL STEP o "MOTOR" Breaker o "GENERATOR" Breaker _SATSAT STANDARD: Circuit Breaker Control switch for MG set 1A "MOTOR" breaker and "GENERATOR" breaker is turned to the (left) "TRIP" position and notes GREEN "OPEN" light lit. UNSAT

_UNSAT EXAMINER CUE: Read as each breaker is tripped:

"MG Set 1A Motor Breaker has been tripped and the GREEN OPEN light is lit."

"MG Set 1A Gen Breaker has been tripped and the GREEN OPEN light is lit."

EXAMINER NOTE: It is critical that at least one of these two breakers be opened.

COMMENTS:

Open the following breakers for CRD MIG sets on 1MGBB: CRITICAL STEP o "MOTOR" Breaker o "GENERATOR" Breaker _SATSAT STANDARD: Circuit Breaker Control switch for MG set 1B "MOTOR" breaker and "GENERATOR" breaker is turned to the (left) "TRIP" position and notes GREEN "OPEN" light lit. UNSAT

_UNSAT EXAMINER CUE: Read as each breaker is tripped:

1B Motor Breaker has been tripped and the GREEN OPEN light is lit."

"MG Set 1B "MG Set 1 B Gen Breaker has been tripped and the GREEN OPEN light is lit."

1B EXAMINER NOTE: It is critical that at least one of these two breakers be opened.

COMMENTS:

This JPM is complete.

TIME STOP: _ __

JPM09 K Page 6 of 7

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 was operating at 100% power when the main turbine tripped. The reactor could not be tripped from the control room and the crew entered EP/1/A/SOOO/FR-S.1 EP/11A15000/FR-S.1 (Response to Nuclear Power Generation (ATWS>>.

(ATWS)).

INITIATING CUES:

The CRS directs you to perform the following:

  • The following breakers for CRD MIG sets:

o "MOTOR" Breaker o "GENERATOR" Breaker

DUKE POWER CATAWBA OPERATIONS TRAINING Locally Trip the Reactor JOB PERFORMANCE MEASURE

© 2005 Duke Power Each individual JPM packet has been reviewed to contain the following:

Complete JPM - all pages N/A Complete and appropriate procedure/reference document as specified in JPM initial conditions One page (examinee's copy) of JPM initial conditions N/A N/A Prior to JPM session, ensure simulator IC snap that establishes initial conditions for the JPM is accurate and complete N/A N/A Prior to each JPM, ensure simulator setup for the performance of the JPM is verified as accurate as follows:

N/A Appropriate IC selected N/A Test area ready for conduct of JPM Prepared By: Brett Moore Date: 06/06/05 Reviewed By: C. T. Kiker, Jr. Date: 06/20/05 06/20105 OPS Review: N/A Date Approved By: R. E. Kimray Date: 06/22/05 OP-CN-IC-IPX-016 FOR TRAINING PURPOSES ONL Y Y REV. 18 Page 1 10f4 0'4

DUKE POWER CATAWBA OPERA TlONS T/ONS TRAINING Locally Trip the Reactor Examinee: ____________________________________

TESTING ..

NU2I'iME~T '

PLANT N

STANDARD:

Examinee opens both Reactor Trip Breakers, and opens both Control Rod Drive M-G Set Generator and Motor Breakers to shutdown the Reactor.

REFERENCES:

  • EP/1/A/5000/FR-S.1 (Response to Nuclear Power Generation/ATWS)

INITIATING CUE:

Unit 1 is operating at 100% power when annunciator "La "LO FLOW P-8 PERM ISS RX TRIP" is received. The OATC observes that "1A" "1 A" NCP has tripped, but the reactor has failed to trip.

EP/1/A/5000/FR-S.1 (Response to Nuclear Power Generation (ATWS) is in effect. The Control Room Supervisor dispatches you to locally perform the following: Open the Reactor Trip breakers, Reactor Trip Bypass breakers and the following breakers for the CRD MIG Sets: MOTOR breaker and GENERATOR breaker.

SATISFACTORY UNSATISFACTORY EXAMINER SIGNATURE: _ _ _ _ _ _ _ _ _ _ _ __ DATE: _ _ _ __

EXAMINER (print): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

OP-CN-IC-IPX-016 FOR TRAINING PURPOSES ONL Y REV. 18 Page 2 0'4

DUKE POWER CATAWBA OPERATIONS OPERA TlONS TRAINING

2. Open the Reactor Trip Bypass Breakers Depress the RED "TRIP" plate for Bypass Breaker A A and B.

EXAMINER NOTE: Reactor Trip Bypass Breakers are normally "OPEN".

  • 3. Open both Control Rod Drive MIG set Circuit Breaker Control switch for each MG Motor and Generator Breakers set "MOTOR" breaker and each "GENERATOR" breaker are turned to the (left) "TRIP" position. GREEN "OPEN" light lit.

- MG Set 1A Motor Breaker

- MG Set 1B Motor Breaker

- MG Set 1 A Gen Breaker 1A

- MG Set 1B Gen Breaker END TIME: _ _ _ __

OP-CN-IC-IPX-016 FOR TRAINING PURPOSES ONL Y REV. 18 Page 3 of4

DUKE POWER CATAWBA OPERAOPERATIONS TlONS TRAINING INITIATING CUE:

Unit 1 is operating at 100% power when annunciator "LO FLOW P-8 PERMPERMISSISS RX TRIP" is received. The OATC observes that "1A" NCP has tripped, but the reactor has failed to trip.

EP/1/A/SOOO/FR-S.1 (Response to Nuclear Power Generation (ATWS) is in effect. The Control Room Supervisor dispatches you to locally perform the following: Open the Reactor Trip breakers, Reactor Trip Bypass breakers and the following breakers for the CRD MIG Sets: MOTOR breaker and GENERATOR breaker.

OP-CN-IC-IPX-016 FOR TRAINING PURPOSES ONL Y Y REV.1B Page 4 of4