Letter Sequence Draft RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement
|
MONTHYEARML0525500522005-09-0101 September 2005 Response to Requested Information Part 2 of NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0603903012006-02-0909 February 2006 GSI Letter RAI Response to GL 2004-02 (TAC Nos. MC4676 and 4677) Project stage: RAI CP-200700085, Supporting Information Regarding the Proprietary Nature of Gothic Code Input Data2007-12-0303 December 2007 Supporting Information Regarding the Proprietary Nature of Gothic Code Input Data Project stage: Request CP-200700090, Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2007-12-0303 December 2007 Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request CP-200800834, Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors2008-06-19019 June 2008 Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors Project stage: Request ML0817601002008-06-27027 June 2008 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors, Approval of Extension Request Project stage: Other ML0835004652008-11-26026 November 2008 Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Cover Letter Project stage: Request ML0916604102009-05-11011 May 2009 E-mail Draft Request for Additional Information, Licensees Supplemental Responses Dated February 29 and November 26, 2008, to GL 2004-02 Project stage: Draft RAI ML0916604222009-05-11011 May 2009 Request for Additional Information Supplemental Responses to Generic Letter (GL) 2004-02 Dated 02/29/2008 and 11/26/2008 Project stage: RAI ML0915307112009-06-16016 June 2009 Notice of Meeting with Representatives of Luminant Generation Company Llc., to Discuss Draft Request for Information for Generic Letter 2004-02 Response Project stage: Draft RAI ML0918207102009-07-0202 July 2009 Revised Notice of Meeting with Representatives of Luminant Generation Co., LLC, Comanche Peak to Discuss Draft Request for Information for Generic Letter 2004-02 Response Project stage: Draft RAI ML0919604492009-07-0808 July 2009 Alion Meeting Presentations on RAI 9 - Pool Fill Transport, & RAI 6 - Fiber Erosion Testing Project stage: Request ML0919402772009-07-0909 July 2009 Luminant Holistic Overview: Presentation Will Cover Information Related to RAIs 1 - 5, 7, 12 - 14,16 - 19, 21, 25 - 36 and Overall Response to GL 2004-02 Project stage: Request ML0919400832009-07-0909 July 2009 Pci RAI 8, Test Protocol, Erosion Issue, RAI 15, Test Protocol, Latent Fiber Issue, Areva RAI 20, Test Flume, Fiberglass Larges Question Project stage: Request ML0919400852009-07-0909 July 2009 Luminant RAI 24 and 37, Secondary Line Breaks, Debris Load and Testing Project stage: Request ML0919400842009-07-0909 July 2009 Luminant RAI 22 and 23 SBLOCA, Vortex, Air Ingestion, Void Fraction and Flashing Issues Project stage: Request ML0919402762009-07-0909 July 2009 NRC Opening Remarks Discuss the Draft Us Nuclear Regulatory Commission Request for Additional Information for Generic Letter GL-2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressur Project stage: Draft RAI ML0919403532009-07-13013 July 2009 Notice of Forthcoming Conference Call on July 23, 2009, with Luminant Generation Company LLC to Discuss Draft Request for Additional Information Re Generic Letter 2004-02, Dated May 11, 2009 Project stage: Draft RAI ML0916707382009-07-15015 July 2009 Request for Additional Information Supplemental Responses to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0920203432009-07-22022 July 2009 Revised Conference Call with Luminant Generation Company, LLC, to Discuss Draft Request for Additional Information Re Generic Letter 2004-02, Dated May 11, 2009 Project stage: Draft RAI ML0919705782009-07-31031 July 2009 Summary of Category 1 Meeting with Luminant Generation Company LLC, Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Meeting ML0923300622009-09-0101 September 2009 Summary of Meeting with Luminant Generation Company LLC, to Discuss Draft Request for Additional Information Re Generic Letter 2004-02 for Comanche Peak, Units 1 and 2 Project stage: Draft RAI ML0926107912009-09-10010 September 2009 Supplement Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request CP-200901396, Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basic Accidents at Pressurized-water Reactors2009-10-12012 October 2009 Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basic Accidents at Pressurized-water Reactors Project stage: Supplement ML0930800032009-10-13013 October 2009 Supplement to Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML1009505642010-04-19019 April 2010 Generic Letter 2004-02 Supplemental Response Project stage: Other ML13045A4102013-02-15015 February 2013 2/28/13 Notice of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 Project stage: Meeting ML13059A2022013-02-28028 February 2013 Email Licensee Slides for 2/28/13 Meeting Via Conference Call Project stage: Meeting ML13059A1812013-02-28028 February 2013 Licensee Slides for 2/28/13 Meeting Via Conference Call with Luminant Generation Company, LLC, Project stage: Meeting ML13067A0292013-03-15015 March 2013 2/28/13 - Summary of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 Project stage: Meeting CP-201300670, Closure Options for Generic Safety Issue 191 (GSI-191), Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance2013-05-16016 May 2013 Closure Options for Generic Safety Issue 191 (GSI-191), Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance Project stage: Other ML13267A1972013-09-30030 September 2013 Request for Additional Information, Closure of Option 2a to Address In-Vessel Mitigative Measures for Potential In-Vessel Blockage; Related to Generic Safety Issue 191 Project stage: RAI CP-201301214, Response to Request for Additional Information Regarding Closure Options for Generic Safety Issue 1912013-10-31031 October 2013 Response to Request for Additional Information Regarding Closure Options for Generic Safety Issue 191 Project stage: Response to RAI 2009-07-02
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 13, 2009 MEMORANDUM TO:
Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Balwant K. Singal, Senior Project Manager b "", LA) C1 ",-t t-&""-9f Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING CONFERENCE CALL WITH LUMINANT GENERATION COMPANY LLC (LUMINANT) (TAC NOS.
MC4676 AND MC4677)
DATE &TIME:
Thursday, July 23, 2009 10:00 a.m. - 11 :30 a.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, 04B4 Rockville, Maryland PURPOSE:
Follow-up Discussion of the Draft U.S. Nuclear Regulatory Commission (NRC) Request for Additional Information (RAI) for Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors," dated May 11, 2009 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML091660376).
CATEGORY:*
This is a Category 1 meeting via conference call. The public is participate in this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC LlIMINANT Michael Scott NRR Jimmy Seawright Reg. Affairs John Lehning NRR Chuck Feist Engineering Stephen Smith NRR Ben Mays Engineering Balwant Singal NRR Stuart Cain ALDEN et al.
Ludwig Haber ALDEN et al.
- Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002.
M. Markley
- 2 Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts listed below before July 22,2009,4:30 p.m.
(Eastern Standard Time) to get the telephone number and the pass code.
MEETING CONTACTS:
Balwant K. Singal, NRR Mohan C. Thadani, NRR 301-415-3016 301-415-1476 Balwant.Singal@nrc.gov Mohan.Thadani@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),
please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket Nos. 50-445 and 50-446
Enclosure:
Agenda cc w/encl: Distribution via Listserv
AGENDA FORTHCOMING CONFERENCE CALL WITH LUMINANT GENERATION COMPANY LLC AND NUCLEAR REGULATORY COMMISSION Thursday, July 23,2009 10:00 a.m. - 11 :30 a.m.
- 1.
Introductions
- 2.
Follow-up Discussion of the Draft U.S. Nuclear Regulatory Commission (NRC) Request for Addition Information (RAI) for Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML091660376).
- 3.
Public Input
- 4.
Adjourn Enclosure
M. Markley
- 2 Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts listed below before July 22,2009,4:30 p.m.
(Eastern Standard Time) to get the telephone number and the pass code.
MEETING CONTACTS:
Balwant K. Singal, NRR Mohan C. Thadani, NRR 301-415-3016 301-415-1476 Balwant. Singal@nrc.gov Mohan.Thadani@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),
please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket Nos. 50-445 and 50-446
Enclosure:
Agenda cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrLAJBurkhardt Resource WWalker, RIV LPLIV Reading RidsOgcMailCenter Resource VDricks, OPA RIV RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource CTucci, NRR RidsNrrAdro Resource RidsOpaMail Resource OWFN Receptionist RidsNrrDorl Resource RidsRgn4MailCenter Resource TWFN Receptionist RidsNrrDorlLpl4 Resource JLehning, NRR/DSS/SSIB PMNS Resource RidsNrrDssSsib Resource NDiFrancesco, NRRlDORLlLPL4 RidsNrrPMComanchePeak Resource LTrocine, EDO RIV ADAMS Accession No ML091940353 OFFICE DORULPL4/PM DORULPL4/PM DORLlLPL4/LA DSS/SSIB/BC DORULPL4/BC DORULPL4/PM NAME NDiFrancesco BSingal JBurkhardt MScotl RArchitzel for MMarkfey MThadani for BSingai DATE 7/13/09 7/13/09 7/13/09 7/13/09 7/13/09 7113/09