Letter Sequence Other |
---|
|
|
MONTHYEARML0835106152008-12-11011 December 2008 License Renewal Application, Part 3 of 3 Project stage: Other ML0911302212009-04-14014 April 2009 Supplement 1 to License Renewal Application Project stage: Supplement ML0911000862009-05-18018 May 2009 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the Palo Verde, Units 1, 2, and 3 Project stage: Other ML0911000782009-05-18018 May 2009 Federal Register Notice - Intent to Prepare EIS for Palo Verde Nuclear Generating Station Project stage: Other ML0913903692009-05-19019 May 2009 License Renewal Environmental Report - Figures 3-1 - 3.3 Project stage: Other ML0913905812009-06-0101 June 2009 Request for Scoping Comments Concerning the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application Review Project stage: Other ML0920401212009-06-25025 June 2009 Transcript of Palo Verde, Units 1, 2 & 3, License Renewal Application Review, Public Meeting, Afternoon Session, Thursday, June 25, 2009, Pages 1-26 Project stage: Meeting ML0920401252009-06-25025 June 2009 Comment (2), Transcript of Palo Verde Nuclear Generating Station License Renewal Public Meeting Evening Session, Thursday, June 25, 2009, Pages 1-48 Project stage: Meeting ML0918100672009-06-25025 June 2009 License Renewal Process and and Environmental Scoping Public Meeting, Slides and Handout Project stage: Meeting ML0919001382009-08-0404 August 2009 06/25/09 Summary of Public Environmental Scoping Meetings Related to the Review of the Palo Verde License Renewal Application Project stage: Meeting ML0919002442009-08-0707 August 2009 License Renewal Application Online Reference Portal (TAC Nos. ME0261, ME0262, ME0263) Project stage: Other ML0924300842009-09-16016 September 2009 Safety Project Manager Change for the License Renewal Project for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (TAC Nos. ME0261-ME0266) Project stage: Other ML0925903952009-09-29029 September 2009 Environmental Site Audit Regarding Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Project stage: Other ML0924705512009-09-30030 September 2009 RAI, for Environmental Review Renewal Application Project stage: RAI ML0931400092009-11-17017 November 2009 Environmental Project Manager Change for the License Renewal Project for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Project stage: Other ML1019606362010-07-16016 July 2010 Revision of Schedule for Review of Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application Project stage: Approval ML1021102232010-08-12012 August 2010 Notice of Availably of the Draft Plant-Specific Supplement 43 to Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Palo Verde Nuclear Generating Station (Tac ME0261, MD0262, & ME0263) Project stage: Draft Other 2009-06-25
[Table View] |
|
---|
Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) 2024-09-27
[Table view] |
Text
May 18, 2009 Mr. Randall K. Edington Executive Vice President, Nuclear Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT AND CONDUCT SCOPING PROCESS FOR LICENSE RENEWAL FOR THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (TAC NOS. ME0261, ME0262, ME0263)
Dear Mr. Edington:
The U.S. Nuclear Regulatory Commission (NRC or the staff) has received your application dated December 11, 2008, and supplemented on April 14, 2009, for the renewal of the Operating License Nos. NPF-41, NPF-51, and NPF-74 for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Palo Verde). In support of the application and in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 51 and 10 CFR Part 54, Arizona Public Service Company (APS) submitted an environmental report (ER). This letter provides information related to the staff=s review of the ER.
The NRC has prepared a notice of intent advising the public that the NRC intends to gather information necessary to prepare a plant-specific supplement to the Commission=s ?Generic Environmental Impact Statement for License Renewal of Nuclear Plants,@ (NUREG-1437) related to the review of the application for the renewal of the Palo Verde operating licenses.
Enclosed is a copy of the Notice of Intent, which has been forwarded to the Office of the Federal Register for publication.
Pursuant to 10 CFR 51.28, APS is invited to participate in the environmental scoping process.
As discussed in the enclosed notice, the staff is providing the public with the opportunity to participate in two environmental scoping meetings to be held June 25, 2009. The first session will be held in the afternoon and an identical session will be held later that evening. The afternoon session will be held at the Tonopah Valley High School, 38201 West Indian School Road, Tonopah, AZ 85354. The evening session will be held at Estrella Mountain Community College, 3000 North Dysart Road, Avondale, AZ 85392. The NRC will present an overview of the environmental, as well as safety, review process and will describe how the process will be implemented for the review of the Palo Verde license renewal application. A separate NRC meeting notice with a more detailed agenda is forthcoming. You will be provided a copy of that notice.
R. Edington In the interim, should you have any questions regarding the scoping meeting, please contact the NRC=s Project Manager, Lisa Regner, at 1-800-368-5642, extension 1906 or by e-mail at Lisa.Regner@nrc.gov.
Sincerely,
/RA/
David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530
Enclosure:
Federal Register Notice cc w/encl: See next page
ML091100088 (Pkg), ML091100086 (Ltr), ML091100078 (FRN)
OFFICE LA:DLR PM:RPB2:DLR EPM:RPB2:DLR OGC (NLO) BC:RPB2:DLR NAME S Figueroa J Rowley L Regner B Mizuno D.Wrona DATE 04/21/09 05/04/09 05/04/09 05/12/09 05/18/09
Letter to R. Edington from D. Wrona, dated May 18, 2009 DISTRIBUTION:
SUBJECT:
NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT AND CONDUCT SCOPING PROCESS FOR LICENSE RENEWAL FOR THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (TAC NOS. ME0261, ME0262, ME0263)
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsOgcMailCenter
________
LRegner JRowley BMizuno, OGC MHays, RIV RTreadway, RIV JBashore, RIV MCatts, RIV JMelfi, RIV
Palo Verde Nuclear Generating Station cc:
Mr. Steve Olea Mr. James Ray Arizona Corporation Commission Public Service Company of New Mexico 1200 W. Washington Street 2401 Aztec NE, MS Z110 Phoenix, AZ 85007 Albuquerque, NM 87107-4224 Mr. Douglas Kent Porter Mr. Geoffrey M. Cook Senior Counsel Southern California Edison Company Southern California Edison Company 5000 Pacific Coast Hwy., Bldg. D21 Law Department, Generation Resources San Clemente, CA 92672 P.O. Box 800 Rosemead, CA 91770 Mr. Robert Henry Salt River Project Senior Resident Inspector 6504 E. Thomas Road U.S. Nuclear Regulatory Commission Scottsdale, AZ 85251 P.O. Box 40 Buckeye, AZ 85326 Michael G. Green Senior Regulatory Counsel Regional Administrator, Region IV Pinnacle West Capital Corporation U.S. Nuclear Regulatory Commission P.O. Box 52034, Mail Station 8695 612 E. Lamar Blvd., Suite 400 Phoenix, Arizona 85072-2034 Arlington, TX 76011-4125 Mr. Jeffrey T. Weikert Chairman Assistant General Counsel Maricopa County Board of Supervisors El Paso Electric Company 301 W. Jefferson, 10th Floor Mail Location 167 Phoenix, AZ 85003 123 W. Mills El Paso, TX 79901 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency Mr. Eric Tharp 4814 S. 40th Street Los Angeles Department of Water & Power Phoenix, AZ 85040 Southern California Public Power Authority P.O. Box 51111, Room 1255-C Mr. Scott Bauer, Director Los Angeles, CA 90051-0100 Regulatory Affairs Palo Verde Nuclear Generating Station Mr. Brian Almon Mail Station 7636 Public Utility Commission P.O. Box 52034 William B. Travis Building Phoenix, AZ 85072-2034 P.O. Box 13326 1701 N. Congress Avenue Mr. Dwight C. Mims, Vice President Austin, TX 78701-3326 Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Ms. Karen O'Regan Mail Station 7605 Environmental Program Manager P.O. Box 52034 City of Phoenix Phoenix, AZ 85072-2034 Office of Environmental Programs 200 W. Washington Street Mr. John C. Taylor Phoenix, AZ 85003 Director, Nuclear Generation El Paso Electric Company 340 E. Palm Lane, Suite 310 Phoenix, AZ 85004