MONTHYEARML24304A8492024-10-31031 October 2024 December 2024 Requalification Inspection Notification Letter IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 ML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 2024-09-08
[Table view] Category:Notice of Violation
MONTHYEARIR 05000327/20150082015-03-0909 March 2015 Sequoyah Final EA-14-003 ML15068A1322015-03-0909 March 2015 Final EA-14-003 ML13155A5602013-06-0404 June 2013 Final Determination EA-13-023 and 045 IR 05000327/20130112013-06-0404 June 2013 Sequoyah Final Determination EA-13-023 and 045 IR 05000327/20120052013-02-13013 February 2013 IR 05000327-12-005, 05000328-12-005; 10/1-12/31/2012; Sequoyah Nuclear Plant, Units 1 and 2; (I.E. Adverse Weather Protection, Fire Protection, Inservice Inspection Activities, Refueling and Outage Activities, and Problem Identification and ML0913206232009-05-12012 May 2009 IR 05000327-09-007, IR 05000328-09-007, on 12/16/2008, for Sequoyah, Notice of Violation ML0901600052009-01-15015 January 2009 Notice of Violation and Expiration of License ML0900606072009-01-0505 January 2009 IA-08-038, Hickey, Notice of Violation (Nuclear Regulatory Commission Office of Investigation Report No. 2-2007-025, Sequoyah Nuclear Plant) ML0733808782007-06-20020 June 2007 IA-07-033, Notice of Violation IR 05000327/20050072005-01-26026 January 2005 Final Significance Determination for a White Finding and Notice of Violation (NRC IR 05000327-05-007 Sequoyah Nuclear Power Plant) ML0201004782002-01-10010 January 2002 EA-01-316 & EA-01-317, Sequoyah Nuclear Plant, Notice of Violation 2015-03-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 January 15, 2009 IA-09-002 Mr. Paul M. Alley
[NOTE: HOME ADDRESS DELETED UNDER 10 CFR 2.390]
SUBJECT:
NOTICE OF VIOLATION AND EXPIRATION OF LICENSE
Dear Mr. Alley:
The Nuclear Regulatory Commission (NRC) has received a letter dated December 12, 2008, from the Tennessee Valley Authority (TVA), informing us that the Sequoyah Nuclear Plant no longer has a need to maintain your operating license for the Sequoyah Nuclear Plant. We also received a separate letter dated December 12, 2008, from TVA containing information about your confirmed positive Fitness-For-Duty (FFD) test for marijuana. We plan to place both of these letters from TVA in your 10 CFR Part 55 docket file.
In accordance with 10 CFR 55.55(a), the determination by your facility licensee that you no longer need to maintain a license has caused your license SOP-21010-2 to expire as of December 12, 2008. In addition, the following violation is being issued on your docket:
10 CFR 55.53(j) prohibits the use of illegal drugs (marijuana) and prohibits the licensee from performing activities authorized by a license issued under 10 CFR Part 55 while under the influence of drugs. "Under the influence" is defined in 10 CFR 55.53(j) to mean that the "licensee exceeded, as evidenced by a confirmed positive test, the lower of the cutoff levels for drugs or alcohol contained in 10 CFR Part 26, Appendix A, of this chapter, or as established by the facility licensee."
10 CFR 26.10(a) requires, in part, that nuclear power plant personnel perform their tasks in a reliable and trustworthy manner and are not under the influence of any substance which in any way adversely affects their ability to safely and competently perform their duties. 10 CFR 26 Appendix A, Subpart B, paragraph 2.7(f)(2) specifies, in part, a confirmatory test cut-off level for marijuana metabolites of 15 ng/ml.
Contrary to the above, the licensee violated 10 CFR 55.53(j), as evidenced by a confirmed positive test for that drug resulting from a urine sample submitted on November 3, 2008.
Mr. P. M. Alley 2 This is a Severity Level III violation (Supplement I)
The purpose of the Commission's Fitness-for-Duty requirements is to provide reasonable assurance that nuclear power plant personnel work in an environment that is free of drugs and alcohol and the effects of the use of these substances. The use of illegal drugs is a serious matter which undermines the special trust and confidence placed in you as a licensed operator.
This violation is categorized as a Severity Level III violation in accordance with the NRC Enforcement Policy because the use of illegal drugs by licensed operators is a significant regulatory concern.
Because your license has expired, you are not required to respond to the Notice of Violation at this time unless you contest the violation. Should you contest the Notice of Violation, a response is required within 30 days of the date of this letter addressing the specific basis for disputing the violation. This response should be sent to the Regional Administrator, NRC Region II, 61 Forsyth Street SW, Suite 23T85, Atlanta, GA, 30303-8931 and marked, "Open by Addressee Only - Response to a Notice of Violation; IA-09-002."
The purpose of this letter is to make clear to you the consequences of your violation of NRC requirements governing fitness-for-duty as a licensed operator, in accordance with 10 CFR Part 55. If you reapply for an operating license, you will need to satisfy not only the requirements of 10 CFR 55.31, but also those of 10 CFR 2.201, by addressing the reasons for the violation and the actions you have taken to prevent recurrence in order to ensure your ability and willingness to carry out the special trust and confidence placed in you as a licensed operator and to abide by all fitness-for-duty and other license requirements and conditions.
In accordance with Section 2.390 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, enforcement actions are made available electronically for public inspection in the NRC Public Document Room and from the NRC=s document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. A copy of this letter with your address removed will be made available to the Public unless you provide a sufficient basis to withdraw this violation within the 30 days specified above for a response to this Notice of Violation. The NRC also includes significant enforcement actions on its Web site at (http://www.nrc.gov/reading-rm/doc-collections/enforcement/actions/). In addition, this letter will be maintained by the Office of Enforcement in an NRC Privacy Act system of records, NRC-3, AEnforcement Actions Against Individuals.@ The NRC-3 system notice, which provides detailed information about this system of records, can be accessed from the NRC Web site at http://www.nrc.gov/reading-rm/foia/privacy-systems.html.
Should you have any questions concerning this action, please contact either Mr. Malcolm T.
Widmann (Malcolm.Widmann@NRC.gov) or Mr. Richard S. Baldwin Richard.Baldwin@NRC.gov) of my staff.
Mr. P. M. Alley 3 They can be reached at either the address listed above or 404-562-4550 and 404-562-4642, respectively.
Sincerely,
/RA R. Croteau for/
Kriss M. Kennedy, Director Division of Reactor Safety Docket No. 55-21045 License No. SOP-21010-2 CERTIFIED MAIL: 7007-2680-0002-0816-7471 RETURN RECEIPT REQUESTED cc: Mr. William R. Campbell, Jr.
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
_________________________ G SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS RII:EICS SIGNATURE */RA/ /RA/ /RA R. Croteau for/ /RA/
NAME RBaldwin MWidmann KKenndey C, Evans DATE 01/05/2009 01/15/2009 01/15/2009 01/15/2009 1/ 1/ /2009 1/ /2009 E-MAIL COPY? YES NO YES NO YES NO YES NO /2009 YES YES NO YES NO