|
---|
Category:Report
MONTHYEARML22013A7062022-01-13013 January 2022 Investigation Report of LLRW Shipment Pursuant to 10 CFR 20, Appendix G ML21056A0782021-04-0707 April 2021 Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Indian Point ISFSI (Docket: 72-51) NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement2021-02-10010 February 2021 Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement ML20259A2172020-09-14014 September 2020 Commitment Change Summary Report ML20260H0722020-06-18018 June 2020 IP-RPT-14-00013, Revision 3, Indian Point Nuclear Generating Units 2 and 3, Consequences of a Postulated Fire and Explosion Following the Release of Natural Gas from the New Aim 42 Pipeline Near Ipec ML20122A1052020-05-27027 May 2020 Letter from Margaret M. Doane to John B. Rhodes, Chair and Executive Officer, Ny State Public Service Commission: Response to Ny State Public Service Commission Regarding Natural Gas Transmission Pipelines Near Indian Point Nuclear Power Pl ML20100F6352020-04-0808 April 2020 Expert Team Final Report NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-10-22022 October 2019 Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML19252A3182019-09-0909 September 2019 Entergy to NRC, IPEC Weekly Sturgeon Monitoring Report for Week of Sept 2, 2019 NL-19-061, Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements2019-06-13013 June 2019 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements ML19114A0742019-04-22022 April 2019 Entergy to NRC, IPEC Weekly Sturgeon Monitoring Report for Week of April 15, 2019 NL-19-012, Request for Approval of a Certified Fuel Handler Training and Retraining Program2019-04-15015 April 2019 Request for Approval of a Certified Fuel Handler Training and Retraining Program ML18098A0882018-04-0606 April 2018 Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability NL-18-021, Indian Point, Unit 2, Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability2018-04-0606 April 2018 Indian Point, Unit 2, Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability NL-20-066, Engineering Report IP-RPT-11-00032, Revision 5, Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel at the Indian Point Energy Center2017-12-19019 December 2017 Engineering Report IP-RPT-11-00032, Revision 5, Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel at the Indian Point Energy Center ML17349A1562017-12-0808 December 2017 Risk Impact of One-Time Extending the ILRT Interval Associated with the Proposed Technical Specification Changes ML17279A2472017-10-0606 October 2017 2017 Annual Assessment Meeting Written Comments Compilation ML17222A2392017-10-0404 October 2017 NRC Response to Request for Deferral of Actions Related to Beyond-Design-Basis Seismic and Flooding Hazard Reevaluations ML17289A6552017-10-0202 October 2017 Attachment 6 to NL-17-115, Revised HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Energy Center, Revision 9 NL-17-122, Transmittal of 10 CFR 50.59(d)(2) Summary Report, March 26, 2015 to May 18,20172017-09-28028 September 2017 Transmittal of 10 CFR 50.59(d)(2) Summary Report, March 26, 2015 to May 18,2017 ML17096A2122017-03-23023 March 2017 Entergy Engineering Report No. IP-RPT-16-00078, Indian Point RAI CLI-16-07 SAMA Cost-Benefit Sensitivities Rev. 1 (March 23, 2017) NL-17-020, License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan2017-02-0606 February 2017 License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan ML17096A2112017-01-0404 January 2017 Entergy Engineering Report No. IP-RPT-16-00077, Indian Point RAI CLI-16-07 MACCS2 Sensitivities, Rev. 0 (Jan 4, 2017) ML16280A2282016-09-19019 September 2016 Indian Point 2 Technical Requirements Manual NL-16-109, Indian Point 2 Technical Requirements Manual2016-09-19019 September 2016 Indian Point 2 Technical Requirements Manual NL-16-109, HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Indian Point Energy Center.2016-09-19019 September 2016 HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Indian Point Energy Center. ML16250A2762016-09-13013 September 2016 Evaluation of Impacts to Proposed Critical Habitat for the Atlantic Sturgeon for Indian Point Nuclear Generating Units 2 and 3 Proposed License Renewal NL-16-083, Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 32016-08-0101 August 2016 Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 3 ML18115A0592016-06-28028 June 2016 After Action Report/Improvement Plan, Drill Date June 28, 2016 ML17052A2662015-10-0202 October 2015 Sturgeon Mobile Tracking for the New Ny Bridge at Tappan Zee NL-15-128, Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments Implemented Between 04/01/2013 and 03/25/2015, And/Or Utilized in Support of the UFSAR Update2015-09-28028 September 2015 Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments Implemented Between 04/01/2013 and 03/25/2015, And/Or Utilized in Support of the UFSAR Update NL-15-118, Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 32015-09-0303 September 2015 Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 3 NL-15-099, Submittal of 2014 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report2015-07-30030 July 2015 Submittal of 2014 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report NL-15-072, 2015 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements2015-06-18018 June 2015 2015 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements NL-15-030, Revised 10 C.F.R. 50.59 Safety Evaluation and Supporting Analyses Prepared in Response to the Algonquin Incremental Market Natural Gas Project2015-04-0808 April 2015 Revised 10 C.F.R. 50.59 Safety Evaluation and Supporting Analyses Prepared in Response to the Algonquin Incremental Market Natural Gas Project NL-15-029, Summary of Analysis Results Based on Corrected Format 2 Data Files Dated March 20152015-04-0606 April 2015 Summary of Analysis Results Based on Corrected Format 2 Data Files Dated March 2015 ML15062A2002015-02-19019 February 2015 NET-300067-01, Revision 1, Criticality Safety Analysis of the Indian Point, Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels. (Non-Proprietary) NL-15-013, Re-Submittal of Netco Report NET-300067-01, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels, for NRC Review and Approval2015-01-28028 January 2015 Re-Submittal of Netco Report NET-300067-01, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels, for NRC Review and Approval ML15061A2772014-12-31031 December 2014 WCAP-17954-NP, Revision 0, Indian Point Unit 3 Heatup and Cooldown Limit Curves for Normal Operation. NL-14-152, Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From...2014-12-22022 December 2014 Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From... ML14329A1952014-11-0404 November 2014 NET-300067-01, Rev. 0, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels NL-14-115, 10 CFR 50.59(d)(2) Summary Report for Indian Point, Units 1 and 2 April 1, 2012 to March 19, 20142014-09-18018 September 2014 10 CFR 50.59(d)(2) Summary Report for Indian Point, Units 1 and 2 April 1, 2012 to March 19, 2014 ML14304A7012014-09-16016 September 2014 Reliability Needs Assessment ML15166A0702014-08-31031 August 2014 Algonquin Incremental Market (Aim) Project, Phase 2 Acoustic Survey for Indiana Bats (Myotis Sodalis) and Northern Long-Eared Bats (Myotis Septentrionalis), August 2014 NL-14-110, Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-27027 August 2014 Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-14-071, Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 3 of 52014-06-0505 June 2014 Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 3 of 5 NL-14-071, Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 2 of 52014-06-0505 June 2014 Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 2 of 5 ML14168A0592014-06-0505 June 2014 Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 1 of 5 ML14168A0602014-06-0505 June 2014 Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 2 of 5 ML14168A0612014-06-0505 June 2014 Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 3 of 5 2022-01-13
[Table view] Category:Technical
MONTHYEARNL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement2021-02-10010 February 2021 Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement ML20259A2172020-09-14014 September 2020 Commitment Change Summary Report ML20100F6352020-04-0808 April 2020 Expert Team Final Report ML18098A0882018-04-0606 April 2018 Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability NL-18-021, Indian Point, Unit 2, Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability2018-04-0606 April 2018 Indian Point, Unit 2, Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability NL-20-066, Engineering Report IP-RPT-11-00032, Revision 5, Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel at the Indian Point Energy Center2017-12-19019 December 2017 Engineering Report IP-RPT-11-00032, Revision 5, Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel at the Indian Point Energy Center ML17349A1562017-12-0808 December 2017 Risk Impact of One-Time Extending the ILRT Interval Associated with the Proposed Technical Specification Changes ML17289A6552017-10-0202 October 2017 Attachment 6 to NL-17-115, Revised HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Energy Center, Revision 9 NL-17-122, Transmittal of 10 CFR 50.59(d)(2) Summary Report, March 26, 2015 to May 18,20172017-09-28028 September 2017 Transmittal of 10 CFR 50.59(d)(2) Summary Report, March 26, 2015 to May 18,2017 ML17096A2122017-03-23023 March 2017 Entergy Engineering Report No. IP-RPT-16-00078, Indian Point RAI CLI-16-07 SAMA Cost-Benefit Sensitivities Rev. 1 (March 23, 2017) ML17096A2112017-01-0404 January 2017 Entergy Engineering Report No. IP-RPT-16-00077, Indian Point RAI CLI-16-07 MACCS2 Sensitivities, Rev. 0 (Jan 4, 2017) NL-16-109, Indian Point 2 Technical Requirements Manual2016-09-19019 September 2016 Indian Point 2 Technical Requirements Manual ML16280A2282016-09-19019 September 2016 Indian Point 2 Technical Requirements Manual NL-16-109, HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Indian Point Energy Center.2016-09-19019 September 2016 HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Indian Point Energy Center. ML16250A2762016-09-13013 September 2016 Evaluation of Impacts to Proposed Critical Habitat for the Atlantic Sturgeon for Indian Point Nuclear Generating Units 2 and 3 Proposed License Renewal ML17052A2662015-10-0202 October 2015 Sturgeon Mobile Tracking for the New Ny Bridge at Tappan Zee NL-15-029, Summary of Analysis Results Based on Corrected Format 2 Data Files Dated March 20152015-04-0606 April 2015 Summary of Analysis Results Based on Corrected Format 2 Data Files Dated March 2015 ML15062A2002015-02-19019 February 2015 NET-300067-01, Revision 1, Criticality Safety Analysis of the Indian Point, Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels. (Non-Proprietary) ML15061A2772014-12-31031 December 2014 WCAP-17954-NP, Revision 0, Indian Point Unit 3 Heatup and Cooldown Limit Curves for Normal Operation. ML14304A7012014-09-16016 September 2014 Reliability Needs Assessment NL-14-071, Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 2 of 52014-06-0505 June 2014 Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 2 of 5 NL-14-071, Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 1 of 52014-06-0505 June 2014 Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 1 of 5 NL-14-071, Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 4 of 52014-06-0505 June 2014 Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 4 of 5 NL-14-071, Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 3 of 52014-06-0505 June 2014 Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 3 of 5 ML14168A0592014-06-0505 June 2014 Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 1 of 5 ML14168A0602014-06-0505 June 2014 Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 2 of 5 ML14168A0632014-06-0505 June 2014 Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 5 of 5 NL-14-071, Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 4 of 52014-06-0505 June 2014 Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 4 of 5 ML14168A0612014-06-0505 June 2014 Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 3 of 5 ML14107A0432014-03-31031 March 2014 Enclosure 2 to NL-14-045 - Acceptable Value of the Location of the Bottom of the Expansion Transition (Bet) for Implementation of H* at Indian Point Unit 2 ML13337A5942014-01-24024 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14027A5152014-01-16016 January 2014 WCAP-17828-NP, Revision 0, Indian Point Unit 2 H* Alternate Repair Criteria for the Tubesheet Hydraulic Expansion Region (Model 44F - 4-Loop) ML14010A3312014-01-14014 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Indian Point Energy Center, Units 2 and 3, TAC Nos.: MF0744 and MF0745 NL-14-027, LTR-PAFM-13-115-NP, Rev. 0, Technical Justification to Support Extended Volumetric Examination Interval for Indian Point Generating Station Unit 3 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds.2013-11-30030 November 2013 LTR-PAFM-13-115-NP, Rev. 0, Technical Justification to Support Extended Volumetric Examination Interval for Indian Point Generating Station Unit 3 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds. NL-13-089, Indian Point, Unit 3, Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 1 of 62013-05-24024 May 2013 Indian Point, Unit 3, Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 1 of 6 NL-13-089, Indian Point, Unit 3, Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 5 of 62013-05-24024 May 2013 Indian Point, Unit 3, Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 5 of 6 NL-13-089, Indian Point, Unit 3, Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 4 of 62013-05-24024 May 2013 Indian Point, Unit 3, Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 4 of 6 NL-13-089, Indian Point, Unit 3, Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 3 of 62013-05-24024 May 2013 Indian Point, Unit 3, Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 3 of 6 NL-13-089, Indian Point, Unit 3, Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 6 of 62013-05-24024 May 2013 Indian Point, Unit 3, Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 6 of 6 ML13176A0082013-05-24024 May 2013 Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 4 of 6 NL-13-089, Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 2 of 62013-05-24024 May 2013 Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 2 of 6 ML13176A0122013-05-24024 May 2013 Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 1 of 6 ML13176A0102013-05-24024 May 2013 Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 6 of 6 ML13176A0092013-05-24024 May 2013 Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 5 of 6 ML13176A0072013-05-24024 May 2013 Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 3 of 6 ML17052A3142013-03-29029 March 2013 Analysis of Potential Sedimentation Effects of Proposed Cylindrical Wedgewire Screens for Intake of Cooling Water at Indian Point Energy Center ML13072A0832013-01-31031 January 2013 12-4116.IPEC.V002, Revision 1, Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation: EA-12-051 ML12353A4662012-11-20020 November 2012 Indian Point Energy Center - Engineering Report No. IP-RPT-12-00039, Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 4 NL-12-168, Indian Point Energy Center - Engineering Report No. IP-RPT-12-00039, Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 42012-11-20020 November 2012 Indian Point Energy Center - Engineering Report No. IP-RPT-12-00039, Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 4 NL-12-168, Indian Point Energy Center - Engineering Report No. IP-RPT-12-00039, Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 42012-11-20020 November 2012 Indian Point Energy Center - Engineering Report No. IP-RPT-12-00039, Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 4 2021-02-10
[Table view] |
Text
CHAPTER 3 PHYSICAL/CHEMICAL PARAMETERS This chapter provides information on the parameters of temperature, salinity, and dissolved oxygen as measured during the 2005 surveys. Although parameters were measured with the BSS, emphasis will be placed on data from the LRS/FJS because these surveys encompassed the entire fish sampling period. In addition, freshwater flow data obtained from the U.S.
Geological Survey for the Green Island Dam near Troy, New York, and daily water temperature data from the Poughkeepsies Water Treatment Facility are discussed. Physical and chemical parameters are presented in Appendix B.
3.1 GREEN ISLAND DAM FLOWS During 2005, daily freshwater flow for Green Island, New York was estimated from discharge data provided by the U.S. Geological Survey for the Hudson River above Lock 1, the Mohawk River at Cohoes, and the Mohawk River diversion at Crescent Dam. At the time of publication, the data from October through December 2005 were provisional. The daily flow in 2005 ranged from 95 to 3,339 m3/sec/day (Figure 3-1, Appendix Table B-1). The primary peak in daily flow occurred in April with flows over 3,000 m3/sec/day and secondary peaks occurred in January and December with flows over 1,500 m3/sec/day. Periods of daily flow less than 200 m3/sec/day occurred in July and August (Figure 3-1, Appendix Table B-1).
The 2005 monthly freshwater flow rates were comparable to the long-term (1947-2004) monthly average flow rates, with highest flows seen in April and again in November and December and lowest flows during summer months (Figure 3-1, Appendix Table B-2). The monthly average flows during the fall months of 2005 were consistently higher than average. When compared to monthly average flow rates since the Hudson River surveys began in 1974 (Appendix Table B-3), the 2005 monthly flows were very similar to the long-term average flows for most of the year, but were higher than average during the fall.
Average annual freshwater flow for the Hudson River as estimated at Green Island during 1947 to 2005 has varied from a minimum of 219 m3/sec/day in 1965 to a maximum of 603 m3/sec/day in 1976 (Figure 3-2, Appendix Table B-4). For 2005, the provisional average annual flow of 451 m3/sec/day was the 15th highest flow in the 59 years of data.
3.2 POUGHKEEPSIES WATER TREATMENT FACILITY TEMPERATURES Long-term (1951-2005) daily temperature records are available from the Poughkeepsies Water Treatment Facility, located just north of the City of Poughkeepsie, New York, at RM 76. The lowest recorded temperature in 2005 was 0.5°C occurring in January, February, and March (Appendix Table B-5). Water temperatures in 2005 remained relatively low (<3°C) through mid-March, increased steadily during the spring and early summer, and reached a high of 27.8°C in mid-August. Temperatures started to decline in late September and cooled rapidly until the end of October (Figure 3-3).
The 2005 mean water temperature profile was similar to the long-term (1951-2004) average temperatures for most of the year except in the summer when temperatures were warmer than average (Figure 3-3). During this period, 2005 temperatures were near long-term maximum temperatures and even exceeded the long-term maximum in September. Average annual water temperature for the Hudson River as measured at Poughkeepsies Water Treatment Facility 2005 Year Class Report 3-1
during 1951 to 2005 has varied from a minimum of 11.29°C in 1960 to a maximum of 13.96°C in 1998 (Figure 3-4, Appendix Table B-6). For 2005, the average annual temperature of 12.94°C was the 13th highest temperature in the 55 years of data.
3.3 HUDSON RIVER SURVEYS 3.3.1 Spatiotemporal Pattern in Temperature Average weekly water temperature measured during the 2005 LRS/FJS increased from the beginning of sampling in March to early August and then began decreasing until the end of the sampling program in December (Figure 3-5). This temporal pattern observed throughout the Hudson River estuary closely reflected that recorded at Poughkeepsies Water Treatment Facility. Average weekly temperatures measured during the LRS/FSS were similar to concurrent Poughkeepsies Water Treatment Facility temperatures. Peak river temperatures occurred during early August when the river-wide mean temperature, as measured from Battery to Poughkeepsie, was 28.1°C and regional mean values were between 25.3 and 29.6°C (Appendix Table B-7) (Poughkeepsies Water Treatment Facility daily temperatures averaged 27.6°C for this period). Lowest values occurred during mid-March when the mean temperature in the lower river was 2.5°C and regional mean temperatures from Battery to Cornwall ranged from 1.4 to 3.0°C (Poughkeepsies Water Treatment Facility daily temperatures averaged 1.8°C for this period).
Average weekly water temperatures in 2005 were consistent with the long-term (1974-2004) average temperatures observed in previous Hudson River surveys except during summer when temperatures were above average (Figure 3-5). From late July through mid-October, average temperatures in 2005 were near or exceeded the highest weekly mean temperatures for the 32-year period. Average annual water temperature measured during the LRS/FSS from 1974 through 2005 has varied from 19.1°C in 1983 to 23.6°C in 1991 (Figure 3-5, Appendix Table B-8). For 2005, the average annual temperature of 22.1°C was the 4th highest temperature in the 32 years of data.
Temporal patterns in the 2005 BSS temperature data resembled the pattern observed in LRS/FJS measurements with summer peak temperatures around 28.4°C achieved in early August (Figure 3-6). Mean weekly regional temperatures at the peak were 26.5 to 30.2°C (Appendix Table B-9). Minimum mean temperatures of 14-18°C were recorded during the last week of sampling that began on 17 October.
Average weekly temperatures during the 2005 BSS were higher than the average temperatures observed in the long-term (1974-2004) record for most of the sampling season and, in the early fall, they were greater than the long-term high weekly mean temperatures (Figure 3-6). Average annual water temperature measured during the BSS from 1974 through 2005 has varied from 21.3°C in 1974 to 25.7°C in 2005, setting a new record high in 2005 for the 32 years of data (Figure 3-6, Appendix Table B-10).
3.3.2 Spatiotemporal Pattern in Salinity Seasonal variations in salinity occur in response to freshwater inputs to the Hudson River estuary: increasing freshwater flows lead to decreasing salinity and, likewise, decreasing flows will increase salinity. The overall pattern of salinity, as measured during the 2005 LRS/FJS, showed fluctuating levels in spring during periods of varying freshwater inputs, increasing values in summer, and declining values in fall (Figure 3-7). Salinity was lowest in early April 2005 Year Class Report 3-2
when the river-wide mean value was 0.6 parts per thousand (ppt) and regional values were as low as 6.6 ppt in the Battery region (Appendix Table B-11). Maximum salinity was observed in late summer when regional values were above 20 ppt in the Battery region and extended to over 2 ppt in the Cornwall region.
The spatiotemporal pattern of salinity observed during the BSS typically resembles that observed during the LRS/FJS: increasing salinity during the summer and decreasing levels in the fall. Actual salinity measured during the BSS was lower than during the LRS/FJS because of the tendency for the denser, saline water to follow the deeper channel rather than the shorezone area. In the 2005 BSS, the salinity pattern was typical with low salinity in the late spring, increasing values during the summer, and declining values in the fall (Appendix Table B-12). Maximum salinity of 12.4 ppt in the Yonkers region in late August decreased to 0.3 ppt in mid-October (Appendix Table B-12). Mean weekly regional salinity was highest in the Yonkers region and decreased upstream.
3.3.3 Spatiotemporal Pattern in Dissolved Oxygen Dissolved oxygen concentration varies inversely with temperature and salinity. The seasonal pattern of dissolved oxygen typically observed during the Hudson River surveys consists of high concentrations in the spring, declining to minimum values in the summer, and increasing levels in the fall. As temperatures rose in the spring and summer of 2005, dissolved oxygen, as recorded in the LRS/FJS, declined from peak mean weekly regional values of 11-13 mg/L in late March to minimum mean levels of 4-6 mg/L in mid-August (Figure 3-8, Appendix Table B-13).
Average weekly dissolved oxygen concentrations in 2005 were lower than the long-term (1974-2004) average values except during the fall when concentrations were slightly above average (Figure 3-8). High summer temperatures in 2005 contributed to summer dissolved oxygen values in 2005 that were near or exceeded the low weekly mean for the long-term record.
Average annual dissolved oxygen measured during the LRS/FSS from 1974 through 2005 has varied from 7.0 mg/L in 2005 to 8.6 mg/L in 1984, setting a new record low in 2005 for the 32 years of data (Figure 3-8, Appendix Table B-14).
Percent oxygen saturation relates the theoretical limit of oxygen saturation (adjusted for temperature and salinity influences) to the observed dissolved oxygen concentrations. Mean weekly regional percent saturation based on measurements taken during the 2005 LRS/FJS were usually above 70 percent for most of the sampling season with occasional dips below 70 percent in the summer especially in the downriver regions (Appendix Table B-17). Individual mean weekly regional values were never lower than 56 percent, the minimum recorded during late September from the Battery region.
Data collected in the 2005 BSS (Appendix Tables B-15 and B-18) indicated similar mean regional dissolved oxygen and percent oxygen saturation to that recorded in the LRS/FJS.
When compared to the long-term (1974-2004) average weekly dissolved oxygen, 2005 values were well below average for the sampling season and were below historic minimum values during some weeks (Figure 3-9), but percent oxygen saturation levels did not drop below 67 percent and were usually in the 70 to 85 percent range.
Average annual dissolved oxygen measured during the BSS from 1974 through 2005 has varied from 6.4 mg/L in 2005 to 8.8 mg/L in 1991, setting a new record low in 2005 for the 32 years of data (Figure 3-9, Appendix Table B-16).
2005 Year Class Report 3-3
Link to Chapter 4 2005 Year Class Report 3-4
Daily Average Flow, 2005 4000 3500 3000 Flow (cubic meters/second) 2500 2000 1500 1000 500 0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Monthly Average Flow, 1947-2005 2000 1800 2005 Mean 1947-2004 Low Monthly Mean 1600 High Monthly Mean 1400 Flow (cubic meters/second) 1200 1000 800 600 400 200 0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Figure 3-1. Hudson River daily average flow rate in 2005 and monthly average flow rates from 1947 to 2005, Green Island, New York. (Note: Data for October through December 2005 are provisional.)
Average Annual Flow, 1947 - 2005, Green Island, NY 700 600 500 Flow, cubic meters per second 400 300 200 100 0
1945 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Figure 3-2. Average annual Hudson River flow from 1947 to 2005, Green Island, New York. (Note: Data for 2005 are provisional.)
Poughkeepsie's Water Treatment Facility 2005 1951-2004 Average Minimum Temperature Maximum Temperature 30 25 20 Water Temperature (C) 15 10 5
0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Figure 3-3. Seasonal variations in water temperature from 1951 to 2005 as measured at Poughkeepsies Water Treatment Facility.
Average Annual Temperature, 1951-2005, Poughkeepsie's Water Treatment Facility 15.00 14.00 Water Temperature (C) 13.00 12.00 11.00 10.00 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Figure 3-4. Average annual water temperature from 1951 to 2005 as measured at Poughkeepsies Water Treatment Facility.
Long River/Fall Juvenile Survey Average Weekly Water Temperature 30 2005 High Weekly Mean, 1974-2004 25 Mean, 1974-2004 Low Weekly Mean, 1974-2004 Water Temperature (C) 20 15 10 5
0 Week 1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Average Annual Water Temperature 24.0 23.0 Water Temperature (C) 22.0 21.0 20.0 19.0 18.0 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 Figure 3-5. Seasonal and annual variations in water temperature from the Long River/Fall Juvenile surveys, 1974 - 2005.
Beach Seine Survey Average Weekly Water Temperature 30 2005 High Weekly Mean, 1974-2004 25 Mean, 1974-2004 Low Weekly Mean, 1974-2004 Water Temperature (C) 20 15 10 5
0 Week 1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Average Annual Water Temperature 26.0 25.0 Water Temperature (C) 24.0 23.0 22.0 21.0 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 Figure 3-6. Seasonal and annual variations in water temperature from the Beach Seine surveys, 1974 - 2005.
Average Weekly Salinity 2005 Long River/Fall Juvenile Surveys Albany Salinity Level, ppt 0
2 4
Catskill 6 8
Saugerties Kingston Hyde Park Poughkeepsie Cornwall West Point Indian Point Croton-Haverstraw Tappan Zee Yonkers Battery MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Figure 3-7. Seasonal variations in average weekly salinity from the 2005 Long River/Fall Juvenile surveys.
Long River/Fall Juvenile Survey Average Weekly Dissolved Oxygen 15 2005 High Weekly Mean, 1974-2004 13 Mean, 1974-2004 Low Weekly Mean, 1974-2004 Dissolved Oxygen (ppm) 11 9
7 5
3 Week 1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Average Annual Dissolved Oxygen 10.0 9.0 Dissolved Oxygen (ppm) 8.0 7.0 6.0 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 Figure 3-8. Seasonal and annual variations in dissolved oxygen from the Long River/Fall Juvenile surveys, 1974 - 2005.
Beach Seine Survey Average Weekly Dissolved Oxygen 15 2005 High Weekly Mean, 1974-2004 13 Mean, 1974-2004 Low Weekly Mean, 1974-2004 Dissolved Oxygen (ppm) 11 9
7 5
3 Week 1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Average Annual Dissolved Oxygen 10.0 9.0 Dissolved Oxygen (ppm) 8.0 7.0 6.0 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 Figure 3-9. Seasonal and annual variations in dissolved oxygen from the Beach Seine surveys, 1974 - 2005.