ML072920286

From kanterella
Jump to navigation Jump to search
Final As-Administered Scenarios for the Quad Cities Initial Examination - June 2007
ML072920286
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 10/18/2007
From:
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co, Exelon Nuclear
References
50-254/07-301, 50-265/07-301 50-254/07-301, 50-265/07-301
Download: ML072920286 (62)


Text

Appendix D Scenario Outline Form ES-D-1 Facility: Quad Cities Unit 1 & 2 Scenario No.: 1 Time Start: _______

Examiners: ____________________________ Operators: (SRO)________________________

____________________________ (ATC)________________________

____________________________ (BOP)________________________

Initial Conditions: Reactor Power is at 81% and 100% rod line. Torus cooling is running with 1D RHR pump and 1B and 1C RHRSW pumps running to the 1B RHR Heat exchanger. APRM 2 is Inoperable and bypassed due to a failed power supply. Maintenance repair is complete. IMDI&C is presently reviewing closeout paperwork.

Outboard Drywell Isolation Spray Valve, MO1-1001-23A, is OOS because the motor tripped on overcurrent during valve testing. Inboard Drywell Isolation Spray Valve, MO1-1001-26A, is closed as per TS LCO 3.6.1.3, Condition A. Because Drywell Spray Subsystem A is Inoperable, TRM 3.6.a, Condition A, has been entered.

Turnover: Raise reactor power to 88-90% using recirculation flow. Secure RHR Torus Cooling.

Even t No.

Malf. No.

Event Type*

Event Description 1

N/A R (ATC)

Raise recirculation flow to achieve 88% power IAW QCOP 0202-03 and QCGP 3-1.

2 N/A N (BOP)

Shut down RHR Torus Cooling 3

Nm1413249d I/C (ATC)

T/S (SRO)

Fail LPRM 32-49-D DOWNSCALE. TS 3.3.1.1 4

rr19A I/C (ATC)

TS (SRO)

ATWS/ECCS/RFP/HPCI/RCIC/TURB transmitter 1-0263-23A slowly fails downscale. TS 3.3.2.2, 3.3.4.1, 3.3.5.1, 3.3.5.2 5

ms04c M (all)

Rising Containment pressure and temperature due to a LOCA. Initiate an Emergency Depressurization when torus pressure cannot be maintained or when drywell temperature cannot be restored. Includes a failure of Drywell Spray.

(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (T)echnical Specification

Simulator Setup and Turnover Information The simulator setup is contained in IC #130, which MUST be copied onto the S: drive iaw special instructions (see M. Jensen or D. Decker)

Commands to be utilized DURING the scenario are contained in the CAEP file nrc scenario 1.cae LOAD the DEFAULT RWM sequence for Unit Shutdown:

LOAD0601SU2957 (verify RWM load name is U1SUSI)

Verify the following commands / overrides are inserted as part of the IC:

Dihs1100126b close (overrides 1001-26B closed)

Dihs1100123a close (overrides 1001-23A closed)

Dihs1100126a close (overrides 1001-26A closed)

Lohs1100123a1 off (turns 1001-23A green light indication off)

Lohs110012ga1 off (turns 1001-26A green light indication off)

The following two commands, if present in the IC, should be DELETED from the command summary (These were initially part of scenario, but are no longer necessary.)

dmf rp10a (Delete the Group III isolation failure if present) dmf rp10b (Delete the Group III isolation failure if present)

Hang OOS INFO cards on 1001-23A and 1001-26A Bypass APRM #2 and hang EST tag.

Need to have blank EST and LPRM Bypass card available for use during the scenario Need to have LPRM LOG available CREW TURNOVER 81% power on FCL 96%

Rod step 35 is at Target-Out The Fourth Condensate / Condensate Booster Pump and third Reactor Feed Pump were started at the end of the last shift (QCGP 3-1 step F.3.g.(6))

TRM 3.6.a day 2 of 7 for DW sprays (QCAP 230-19 completed)

TS 3.6.1.3 A for PCIV 1-1001-23A APRM #2 is bypassed. IMs replaced a power supply and are preparing to perform post-maintenance testing.

Online Risk is GREEN.

Protected Systems: None.

Direction for the oncoming shift:

Raise Reactor Recirc flow to achieve Reactor power of 88-90 percent IAW QCGP 3-1 and QCOP 0202-03 and then await QNE instructions for Control Rod withdraw to raise FCL.

Secure Torus from Suppression Pool Cooling IAW QCOP 1000-09.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 1 Page 1 of 1 Event

Description:

Raise recirculation flow to achieve 88-90% power IAW QCOP 0202-03 and QCGP 3-1.

Time Position Applicants Actions or Behavior SRO Provides SRO oversight for reactor power increase using core SRO Directs RO to perform QCOP 0202-03 IAW step F.3 or QCGP 3-1 IAW step F.3.e.2.

NOTE Recirc flow control should be in MASTER Mode at the beginning of this scenario.

ATC Depresses RAISE pushbutton on 1-0262-22, MASTER SPEED ATC Raises Recirculation flow to increase power.

BOP/ATC Adjusts pressure set and load set as necessary by depressing the Increase pushbutton on Pressure Setpoint Select on Panel 901-7.

NOTE Crew can proceed to Event 2.

Quad Cities Scenario No.: 1 Event No.: 2 Page 1 of 1 Event

Description:

Shut down RHR Torus Cooling Time Position Applicants Actions or Behavior NOTE Crew can perform Event 1 concurrently with Event 2.

SRO Provides SRO oversight for shut down of RHR Torus Cooling.

BOP Obtains a copy of procedure QCOP 1000-09.

BOP Throttles closed MO 1-1001-36A/B BOP Stops running RHR pump and fully closes MO 1-1001-36A/B BOP Closes MO 1-1001-34A/B BOP Opens MO 1-1001-16A/B BOP Opens MO 1-1001-18A/B BOP Secure RHRSWPs. Close 1-1001-5A/B valves.

NOTE:

After BOP secures RHRSW pumps and lineup, crew can proceed to next event.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 3 Page 1 of 3 Event

Description:

Fail LPRM 32-49-D downscale. TS 3.3.1.1 Condition A Time Position Applicants Actions or Behavior SIMOP: When directed by the lead Examiner: Fail LPRM 32-49D downscale by inserting:

imf nm14l3249d 0 ATC Reports LPRM DOWNSCALE alarm to SRO.

ATC References QCAN 901(2)-5 E-7.

ATC Reports LPRM 32-49-D is DOWNSCALE.

ATC Selects rod near LPRM location; reports all other C level detectors in area read normally.

ATC/

BOP Demands OD-8 printout.

SRO Refers to QCOP 0700-03.

SRO Directs actions of QCOP 0700-03.

ATC Selects 1D on APRM 3 and verifies 0 output on meter.

SRO Fills out LPRM bypass card and log per QCOP 0700-03, Attachment B.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 3 Page 2 of 3 Event

Description:

Fail LPRM 16-33-C downscale. TS 3.3.1.1 Condition A Time Position Applicants Actions or Behavior ATC Reports APRM 3 will have only ONE D level input when LPRM is bypassed.

ATC Reports APRM 3 will have less than minimum number of inputs.

CUE IMD reports APRM #2 has been repaired but not tested.

ATC Unbypasses Channel #2 APRM, Bypasses Channel #3 APRM.

SRO Recognizes entry in TS LCO 3.3.1.1, condition A.

SRO Refers to QCOP 0700-10 and/or QCAN 901-5, H2 to address OPRMs.

ATC Determines appropriate OPRM affected.

SRO Refers to QCAP 0230-19 for APRM outage report.

ATC Bypass LPRM 32-49-D on APRM 3 per QCOP 0700-03. (Turns switch on back panel down 2 notches.)

BOP Verifies count meter drops 5%.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 3 Page 3 of 3 Event

Description:

Fail LPRM 16-33-C downscale. TS 3.3.1.1 Condition A Time Position Applicants Actions or Behavior ATC/

BOP Resets LPRM alarm on APRM by depressing the trip reset on APRM channel 3 meter.

ATC Verifies full core display alarm light off and LPRM alarm clears.

NOTE Crew can proceed to Event 4.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 4 Page 1 of 3 Event

Description:

ATWS/ECCS/RFP/HPCI/RCIC/TURB transmitter 1-0263-23A slowly fails downscale.

Time Position Applicants Actions or Behavior SIMOP: When directed by the Lead Examiner, insert malfunction to fail LT 1-0263-23A downscale over 3 minutes: imf rr19A 0 3:

ATC Recognizes LI 1-0263-100 is trending downscale.

ATC Verifies RPV level is stable by cross checking to other RPV level instruments, FRV position and steam flow/feed flow mismatch.

ATC Reports 901-3, G-15, Reactor Vessel Low Low Level is alarming and refers to QCAN.

SRO Acknowledge and direct.

ATC/

BOP Verifies no ECCS system or RCIC has started.

ATC/

BOP Determine if any instrument testing is being performed.

ATC Inform SRO to perform QCOS 1600-06.

SRO Acknowledge and direct.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.:

1 Event No.: 4 Page 2 of 3 Event

Description:

ATWS/ECCS/RFP/HPCI/RCIC/TURB transmitter 1-0263-23A slowly fails downscale.

Time Position Applicants Actions or Behavior BOP Refers to QCOA 0600-12, FWLC System Trouble, for DFWLC system alarm.

ATC/

BOP Verifies RPV level is stable.

CREW Contact Maintenance to inform them of failure.

ATC Acknowledges OS alarm IAW QCOP 0600-21.

SRO Refers to TS, QCAP 0230-19, QCOS 1600-05 and QCOS 1600-

06.

SRO Determines the following TS LCOs apply:

TS 3.3.2.2; (RFP / Main Turbine high level trip) (2 hr LCO)

TS 3.3.4.1; (ATWS ARI initiation) (Tracking LCO)

TS 3.3.5.1, Function 1.a; (Core Spray initiation)

(Tracking LCO)

TS 3.3.5.1, Function 2.a; (EDG initiation) (Tracking LCO)

TS 3.3.5.1, Function 3.c; (HPCI high level trip) (24 hr LCO)

TS 3.3.5.1, Function 4.a; (LPCI initiation) (Tracking LCO)

TS 3.3.5.1, Function 5.a; (ADS initiation) (Tracking LCO)

TS 3.3.5.2; Function 1 (RCIC initiation) (Tracking LCO)

TS 3.3.5.2, Function 2 (RCIC high level trip) (24 hr LCO)

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.:

1 Event No.: 4 Page 3 of 3 Event

Description:

ATWS/ECCS/RFP/HPCI/RCIC/TURB transmitter 1-0263-23A slowly fails downscale.

Time Position Applicants Actions or Behavior NOTE Crew can proceed to Event 5.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 6 Page 1 of 6 Event

Description:

Rising Containment pressure and temperature due to a LOCA. Initiate an Emergency Depressurization when torus pressure cannot be maintained or when drywell temperature cannot be restored. Includes a failure of Drywell Spray.

Time Position Applicants Actions or Behavior SIMOP: When directed by the Lead Examiner, insert a Main Steam Line break inside the containment imf ms04C.5 4: (0.5% ramped over 4 minutes)

When Torus pressure reaches 5 psig, modify the leak to 6% ramped over 4 minutes mmf ms04C 6 4:

ATC/BOP Reports to SRO alarm 901-3 A-16, PRIM CNMT HI PRESS, actuated and refers to annunciator procedure.

ATC/BOP Reports drywell pressure rising.

SRO Refers to QCOA 0201-01.

ATC/BOP Performs actions to:

Investigate cause of increasing Drywell pressure; Attempt to isolate leak; If a reactor scram or Group II isolation occur, refer to appropriate QGA.

ATC/BOP Notifies Radiation Protection of elevated drywell pressure.

ATC/BOP Monitor leak rate.

ATC/BOP Starts another drywell cooler before drywell pressure reaches 2.5 psig.

SRO Briefs crew on expected auto actions at 2.5 psig.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 6 Page 2 of 6 Event

Description:

Rising Containment pressure and temperature due to a LOCA. Initiate an Emergency Depressurization when torus pressure cannot be maintained or when drywell temperature cannot be restored. Includes a failure of Drywell Spray.

Time Position Applicants Actions or Behavior SRO Orders Reactor scrammed on high drywell pressure SRO Enters QGA 100 and QGA 200 when drywell pressure reaches 2.5 psig.

ATC Scrams the reactor, reports all rods in.

SRO Re-enters QGA 100.

ATC/BOP Verifies isolations, ECCS starts, and DG starts (as applicable).

ATC/BOP Reports ECCS auto started.

ATC/BOP Reports Group II isolation occurred properly.

ATC/BOP Controls HPCI injection manually or trip latches HPCI.

ATC/BOP Reports Diesels auto started.

ATC/BOP Controls level 0 - 48 inches.

NOTE HPCI, RCIC, and FW high level trips are disabled due to previous failure of transmitter 1-0263-23A.

ATC/BOP Confirms pressure is stabilized to below 1060 psig with ADS.

ATC/BOP Initiates RPV cooldown at #100 °F/hr with bypass valves, (if MSIVs are opened), or ADS valves as appropriate.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 6 Page 3 of 6 Event

Description:

Rising Containment pressure and temperature due to a LOCA. Initiate an Emergency Depressurization when torus pressure cannot be maintained or when drywell temperature cannot be restored. Includes a failure of Drywell Spray.

Time Position Applicants Actions or Behavior SRO May Anticipate Blowdown and direct rapid RPV depressurization using Main Turbine bypass valves when entry into QGA 500-1 RPV Blowdown is anticipated due to rising Containment pressures and DW temperature.

ATC Closes 1A and 1B FWRV isolation valves.

ATC/BOP Opens all Turbine Bypass valves using the bypass jack.

ATC/BOP Reports load shed has occurred tripping RBCCW pumps and drywell coolers.

SRO Directs actions of QCOP 5750-19 to restore RBCCW and DW coolers.

ATC/BOP Verifies Bus 18 and 19 voltage >450 volts.

ATC/BOP Takes the U1 DIV I DW CLR/RBCCW/FPC TRIP BYPASS switch to BYPASS position.

ATC/BOP Takes the U1 DIV II DW CLR/RBCCW/FPC TRIP BYPASS switch to BYPASS position. Checks Drywell temperature is less than 260 °F.

ATC/BOP Starts 1A and 1B RBCCW pump.

ATC/BOP Starts drywell coolers one at a time.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 6 Page 4 of 6 Event

Description:

Rising Containment pressure and temperature due to a LOCA. Initiate an Emergency Depressurization when torus pressure cannot be maintained or when drywell temperature cannot be restored. Includes a failure of Drywell Spray.

Time Position Applicants Actions or Behavior ATC/BOP Starts Drywell Booster Fan.

SRO Directs actions of QGA 200.

SRO Directs torus sprays when torus pressure is >2.5 psig.

ATC/BOP Verifies torus level < 27 feet.

ATC/BOP Initiates torus sprays.

SRO Verifies drywell parameters are within DSIL curve when torus pressure exceeds 5 psig.

SRO Directs DW sprays.

ATC/BOP Verifies Torus level <17 feet.

ATC/BOP Verifies recirc pumps tripped.

ATC/BOP Trips all drywell coolers when directed by SRO.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 6 Page 5 of 6 Event

Description:

Rising Containment pressure and temperature due to a LOCA. Initiate an Emergency Depressurization when torus pressure cannot be maintained or when drywell temperature cannot be restored. Includes a failure of Drywell Spray.

CT denotes Critical Task Time Position Applicants Actions or Behavior ATC/BOP Attempts to initiate drywell sprays.

ATC/BOP Reports unable to initiate drywell sprays.

SRO/BOP Directs NLO investigate 26B valve breaker.

SRO Directs restart of DW coolers ATC/BOP Restart drywell coolers ATC/BOP Starts torus cooling.

ATC/BOP Monitors torus level.

ATC/BOP Starts CAMs, monitors drywell and torus hydrogen and oxygen concentration.

CT SRO Enters QGA 500-1 to blowdown the vessel when it is determined drywell temperature cannot be restored below 280 degrees F or torus cannot be maintained within PSP limits.

SRO Directs actions of QGA 500-1.

SRO/

ATC/BOP Report Drywell pressure above 2.5 psig.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 6 Page 6 of 6 Event

Description:

Rising Containment pressure and temperature due to a LOCA. Initiate an Emergency Depressurization when torus pressure cannot be maintained or when drywell temperature cannot be restored. Includes a failure of Drywell Spray.

CT denotes Critical Task Time Position Applicants Actions or Behavior ATC/BOP Prevent injection from Core Spray and LPCI not needed for Core Cooling by diverting LPCI flow to Torus cooling and/or placing pumps in PTL.

ATC/BOP Reports torus level > 5 feet.

CT ATC/BOP Opens all ADS valves, leaves switches in MAN.

ATC/BOP Verifies all ADS valves open by acoustic monitor indication.

ATC/BOP Trips RFPs due to level exceeding +48 inches.

SRO Stays in QGA 500-1 for pressure control.

ATC/BOP Monitors level instrument watching for indications of saturation ATC/BOP Reports RCIC isolated on low RPV pressure.

ATC/BOP Reports HPCI isolated on low RPV pressure NOTE End of Event 6.

Appendix D Scenario Outline Form ES-D-1 Facility: Quad Cities Unit 1 & 2 Scenario No.: 2 Time Start: _______

Examiners: ____________________________ Operators: (SRO)_______________________

____________________________ (ATC)_______________________

(BOP)_______________________

Initial Conditions: Unit is shutting down. The shift is ready to begin step F.3 of QCGP 2-1 and 4-1.

RHRSW B is OOS. 1A Core Spray is Inoperable due to replacement of its motor. In TS LCO 3.5.1, Condition B, day 2 of 7. De-inerting of the Drywell is complete and de-inerting of the Torus through the Reactor Building vents is in progress. In the 10th hour of a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> LCO for both TS LCO 3.6.2.5, Condition A, and 3.6.3.1, Condition A.

Turnover: QCGP 2-1 has been completed up to and including Step F.2.

Even t No.

Malf. No.

Event Type*

Event Description 1

N/A R (ATC)

Continue plant shutdown by inserting rods IAW step F.4 of QCGP 2-1 and 4-1.

2 & 3 NM08B I/C (ATC)

TS (SRO)

APRM channel #2 fails upscale with a failure to 1/2 scram.

TS 3.3.1.1 4

TS (SRO)

Large Lube Oil Leak from Unit 1 EDG. Unit 1 EDG to be declared INOPERABLE. TS 3.8.1, 3.5.1, 3.0.3 5

ano9013b13 I/C (BOP)

T/S (SRO)

ADS Timer initiation. Invalid signal.

TS 3.3.5.1, 3.5.1 6

rr10a M (All)

Recirculation Suction line break.

7 ed02 I/C (BOP)

Station Blackout occurs. Take actions to monitor plant parameters and restore electrical power IAW QCOA 6100-04, QCOA 6100-03 and/or QCOP 6500-08.

(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (T)echnical Specification Simulator Setup and Turnover Information

The simulator setup is contained in IC #131, which MUST be copied onto the S: drive iaw special instructions (see M. Jensen or D. Decker)

Commands to be utilized DURING the scenario are contained in the CAEP file nrc scenario 2.cae LOAD the correct RWM sequence for Unit Shutdown:

LOAD0601SD (verify RWM load name is U1SIM Verify the following commands / overrides are inserted as part of the IC:

rp02a RPS A1 auto-scram failure rp02c RPS A2 auto-scram failure dg03a U1 EDG failure to start dg03b 1/2 EDG failure to start ed02 Loss of T12 (LOOP) tied to go insert when TRIGGER 2 goes true TRIGGER 2 Goes true upon DW pressure exceeding 2.4 psig o pcpdwg.gt.2.4.

dihs1140225a close (CS 25A c/s overridden to CLOSE) dihs114024a close (CS 4A c/s overridden to CLOSE) dihs114023a close (CS 3A c/s overridden to CLOSE) dihs1140224a close (CS 24A c/s overridden to CLOSE) dihs1140238a close (CS 8A c/s overridden to CLOSE) 1A CS pump in PTL hang info card lohs1140225a1 off (CS 25A closed light OFF) hang info card lohs114024a1 off (CS 4A closed light OFF) hang info card lohs114023a1 off (CS 3A closed light OFF) hang info card lohs1140224a1 off (CS 24A closed light OFF) hang info card lohs1140238a1 off (CS 38A closed light OFF) hang info card TRIGGERS 5 & 6 set to go true IF RPS test switch A2 is operated o zdihs10590302c (5 and 6) with commands dmf rp02a and dmf rp02c respectively TRIGGERS 7 & 8 set to go true IF RPS test switch A1 is operated o zdihs10590302a (7 and 8 ) with commands dmf rp02a and dmf rp02c respectively Turnover INFO Unit is shutting down for a regularly scheduled refueling outage per QCGP 2-1 and QCGP 4-1. Aux Power transfer per QCGP 2-1 step F.3 has been completed.

Rod step 13 is partially inserted Recirc Pumps are at minimum.

Reactor power is 16 %

1A CS loop is OOS for motor replacement TS 3.5.1 Condition B day 2 of 7

Containment De-inerting is in progress per QCOP 1600-08 step F.3 DW is de-inerted Torus de-inerting is in progress TS 3.6.2.5 (DW to Torus d/p) 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> applicability statement TS 3.6.3.1 (Primary Containment oxygen concentration) 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> applicability statement Online Risk is YELLOW due to YELLOW SFAT for Low Pressure Injection.

Protected Systems include: B Loop LPCI/SDC Injection Valves, 1B Core Spray Loop Direction for the oncoming shift:

Continue power reduction as directed by QCGP 2-1 step F.4

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 1 Page 1 of 1 Event

Description:

Continue plant shutdown by inserting rods IAW step F.4 of QCGP 2-1 and 4-1.

Time Position Applicants Actions or Behavior SRO/US Directs and supervises.

NOTE First rod to be inserted by the ATC will be rod D-6.

ATC Continue to insert rods in sequence per QCGP 4-1.

BOP Monitors and assists as directed.

NOTE After 3 rods are inserted, crew can proceed to Event 2.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 2 & 3 Page 1 of 2 Event

Description:

APRM channel #2 fails upscale with a failure to 1/2 scram.

Time Position Applicants Actions or Behavior SIMOP: When directed by the Lead Examiner, fail APRM 2 upscale.

imf nm08b 100 ATC Reports APRM #2 failed upscale.

ATC/BOP

/SRO Determines that a 1/2 scram was not inserted.

SRO Reviews QCOA 0700-03.

CUE If QCOA 0500-01 is entered, then simulate half scram when RPS test switch 1-590-302 A-D is placed in TRIP.

ATC Manually inserts a 1/2 scram on the affected (A) channel.

ATC/BOP

/SRO Verifies the APRM #2 channel is failed by checking the back panel indications.

ATC/BOP Refers to QCOA 0700-03.

SRO Directs APRM #2 bypassed IAW QCOP 0700-04, Step F.3.

SRO Verifies minimum number of OPERABLE APRMs per TS 3.3.1.1, Condition A, and TRM Section 3.3.a.

ATC Places APRM Bypass joystick to bypass APRM CH 2.

ATC/BOP Verifies B-14, D-2, H-1, C-14 are reset on the 901-5 panel.

Deleted:

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 2 Page 2 of 2 Event

Description:

APRM channel #2 fails upscale with a failure to 1/2 scram.

Time Position Applicants Actions or Behavior ATC/BOP Verifies OPRM INOP LED lit and 901-5, H-1 alarms.

ATC/BOP Hangs an EST or AR tag on bypass joystick.

SRO Refers to QCAP 0230-19.

ATC/SRO Contacts Maintenance to investigate the APRM and RPS failures.

NOTE: The crew may go to the back panels to investigate cause of failure to receive a 1/2 SCRAM. If relay 590-107E is checked, indicate that it looks as if the glass is discolored and that there is an acrid odor.. IF the crew does not check this relay, when Maintenance investigates, report the same.

SRO Checks Tech Specs to insure requirements of TS 3.3.2.1 (Rod Block Actuation) and TRM 3.3.a are met.

NOTE Crew can proceed to Event 4. The following step resets the half scram. This can occur while Event 4 is running.

CUE Report to SRO that Maintenance has determined that the failure to scram was due to an APRM CH 2 circuit failure.

SRO Directs the 1/2 scram per QCOP 500-3.

ATC Resets the 1/2 scram per QCOP 500-3.

CUE Crew can proceed to Event 4.

Deleted: 3

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 4 Page 1 of 1 Event

Description:

Large Lube Oil Leak from Unit 1 EDG. Unit 1 EDG to be declared INOPERABLE. TS 3.8.1, 3.7.1, 3.4.7 Time Position Applicants Actions or Behavior CUE NLO calls Control Room and reports a large lube oil leak from the Unit 1 EDG. The oil appears to be leaking from the engine sump and is NOT going into the floor-drain SRO Enters into LCO 3.8.1, Condition B.

BOP Positions Unit 1 EDG Control Switch to STOP.

SRO Recognizes that SR 3.8.1.1 is required to be performed within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

SRO Recognizes, per TS Action 3.8.1, B.2, that B Core Spray Subsystem is to be declared INOPERABLE since A Core Spray Subsystem is INOPERABLE.

NOTE TS Action 3.8.1, B.2, needs to be met within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Therefore, entry into TS 3.5.1, Condition I, does not need to be taken immediately, but the candidate should be aware that entry is required within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. May be addressed as follow-up question.

SRO Recognizes that entry into LCO 3.5.1, Condition I, is required.

Condition I requires entry into TS LCO 3.0.3.

CUE Crew can proceed to Event 5.

Deleted: 3 Deleted: 4

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 5 Page 1 of 1 Event

Description:

ADS Timer Initiation. Invalid signal.

Time Position Applicants Actions or Behavior SIMOP: When directed by the Lead Examiner, insert ADS timer started alarm.

imf ano9013b13 on BOP Reports that ADS A has initiated.

BOP Refer to QCAN 901(2)-3 B-13 to respond to ADS initiation.

BOP Confirms that Drywell pressure is < 2.43 psig.

BOP Confirms that Rx Low-Low Level > -56.78 inches.

BOP Depresses and holds pushbutton TIMER RESET for 3 seconds.

BOP Verifies that alarm does NOT clear.

BOP Places AUTO BLOWDOWN INHIBIT keylock switch to INHIBIT.

SRO Acknowledge and direct.

SRO Refers to Technical Specification 3.3.5.1 and 3.5.1.

CUE Crew can proceed to Event 6.

ATC Monitor and assist.

Deleted: 4 Deleted: 5

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 6 Page 1 of 2 Event

Description:

Suction Line break in the Recirculation Piping.

Time Position Applicants Actions or Behavior SIMOP: When directed by the Lead Examiner, insert a suction line break in the A recirc loop. imf rr10a 0.2 NOTE: Station Blackout (Event 7) will occur automatically when DW pressure exceeds 2.4 psig.

CREW Recognizes increase in drywell pressure.

SRO Directs scram due to increasing drywell pressure.

ATC Manually scrams the reactor.

ATC Reports Mode Switch in Shutdown and all rods are in.

ATC/BOP Injects with RCIC, HPCI, or the SSMP to control reactor water level.

SRO Enters QGA 100 and 200 due to High Drywell pressure. (2.5 psig)

ATC/BOP Verifies isolations and auto initiations at 2.5 psig.

ATC/BOP Dispatches operators to locally monitor containment parameters.

ATC/BOP Dispatches operators to restore A & B RPS to normal.

ATC/BOP Starts RHR Pump.

Deleted: 5

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 6 Page 2 of 2 Event

Description:

Suction Line break in the Recirculation Piping.

CT denotes Critical Task Time Position Applicants Actions or Behavior ATC/BOP Backfeed MCCs 13-1 and 14-1.

ATC/BOP While loading Bus 13-1 and 14-1, verifies that loading is less than 600 Amps.

SRO Orders Torus sprays when Torus pressure exceeds 2.5 psig ATC/BOP Starts torus sprays. (when power is restored in event 7)

SRO VERIFIES DW coolers and Reactor Recirc pumps OFF prior to ordering DW sprays.

CT SRO Orders DW sprays when Torus pressure exceeds 5 psig after verifying DW pressure and temperature are within the limitations of the DSIL curve. (occurs AFTER power is restored in event 7)

CT ATC/BOP Starts drywell spray.

NOTE: Due to 600 amp load limitations on the crosstie breakers, the SRO may not order backfeed of Busses 13 and 14. IF not, then the next step will be NA.

ATC/BOP Starts RHRSW pump from either (or both) 13 (A, B) or 14 (C, D).

CUE End of Event 6.

Deleted: 5 Deleted: 5

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 7 Page 1 of 4 Event

Description:

Station Blackout occurs. Take actions to monitor plant parameters and restore electrical power IAW QCOA 6100-04, QCOA 6100-03 and/or QCOP 6500-

08.

Time Position Applicants Actions or Behavior ATC Reports that reactor has scrammed. Reports that all rods are in.

SRO Directs operators to take actions of QCOA 6100-3, LOSS OF OFF-SITE POWER.

BOP Attempts to start the Unit 1 and the 1/2 diesel generator.

CUE Air system to 1/2 EDG is ruptured.

BOP/ SRO Dispatches an operator to start the Unit 1 and the 1/2 diesel generator locally.

BOP/ATC Places the following breakers in PTL IAW QCOA 6100-03:

T11 to B11, B12, B13, B14 T12 to B11, B12, B13, B14 B13 to T15 B14 to T16, T17 B14 to B14-1 B13 to B13-1 B13-1 to T10 B13 to T1A SRO/BOP/

ATC Dispatches NLO to investigate loss of T-12.

CUE There was a lightning strike on T-12.

Deleted: 6

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 7 Page 2 of 4 Event

Description:

Station Blackout occurs. Take actions to monitor plant parameters and restore electrical power IAW QCOA 6100-04, QCOA 6100-03 and/or QCOP 6500-

08.

Time Position Applicants Actions or Behavior BOP/ATC Operates HPCI/RCIC/SSMUP as necessary to maintain RPV level and pressure.

BOP/ATC Verifies RB ventilation is isolated.

BOP/ATC Verifies Gen H2 Main seal oil pump or emergency H2 seal oil pump is running.

SRO Notifies U-2 SRO to restore power to both SBO 125 VDC battery chargers within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per QCOA 6100-17.

SIMOP: When 23-1 to 13-1 crosstie is requested then close the breaker on 23-1 with the command:

irf ed56r close NOTE: Energizing either 13-1 OR 14-1 will provide AC power to one safety-related division. Therefore, completing either Critical Task (CT) would suffice.

CT BOP/ATC Places the following breakers/control switches in PTL and restores Bus 13-1 from Bus 23-1 IAW QCOP 6500-08, if 1/2 DG is not available.

B13-1 & B61 1/2 DG to B13-1 B13 to B13-1 A CS pump A & B RHR pumps BOP/ATC Verifies Bus 18 is energized Formatted Table Deleted: 6

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 7 Page 3 of 4 Event

Description:

Station Blackout occurs. Take actions to monitor plant parameters and restore electrical power IAW QCOA 6100-04, QCOA 6100-03 and/or QCOP 6500-

08.

Time Position Applicants Actions or Behavior SIMOP: When 24-1 to 14-1 crosstie is requested then close the breaker on 24-1 with the command:

irf ed34r close BOP/ATC Cross connect buses 18 and 19 OR may wait and verify bus 19 is energized after bus 14-1 is crosstied.

CT BOP/ATC Places the following breakers/control switches in PTL and restores Bus 24-1 IAW QCOP 6500-08, if Unit One DG is not available:

B14 & B61 U1 DG to B14-1 B14 to B14-1 B CS pump C & D pumps BOP/ATC Verifies Bus 19 is energized (if not cross connected earlier)

SRO Directs Operators to backfeed Bus 13 from 13-1 and Bus 14 from 14-1 IAW QCOA 6100-03 when AC power is available.

BOP/ATC Places the following breakers/control switches in PTL:

A, B, & C circulating water pumps A, B, C, & D condensate pumps A & B CRD pumps A, B, C, & D RHR SW pumps A, B, & 1/2 SW pumps Deleted: 6

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 7 Page 4 of 4 Event

Description:

Station Blackout occurs. Take actions to monitor plant parameters and restore electrical power IAW QCOA 6100-04, QCOA 6100-03 and/or QCOP 6500-

08.

Time Position Applicants Actions or Behavior BOP/ATC Energizes 480 VAC busses as necessary.

BOP/ATC Restarts RBCCW system as soon as possible.

BOP/ATC Starts drywell coolers and booster fans as load will permit (unless off due to DW spray initiation)

BOP/ATC Completes the actions of QCOA 6100-3.

SRO Reviews GSEP MS1 Loss of ALL AC Power for $15 minutes if neither B13-1 nor B14-1 is energized within 15 minutes OR MA1 if either B13-1 or B14-1 is energized within 15 minutes. (At direction of Lead Examiner, may ask as follow-up if busses are not de-energized > 15 minutes)

CUE End of Event 7.

Deleted: 6 Deleted: 6

Appendix D Scenario Outline Form ES-D-1 Facility: Quad Cities Unit 1 & 2 Scenario No.: 3 Time Start: _______

Examiners: ____________________________ Operators: (SRO)_______________________

(ATC)_______________________

(BOP)_______________________

Initial Conditions: Reactor power is at 48%.

Turnover: The shift will start the B SBGT system perform its monthly Operability Surveillance.

Event No.

Malf. No.

Event Type*

Event Description 1

N/A N (BOP)

Start the Standby Gas Treatment System for QCOS 7500-05 2

N/A TS (SRO) 1C RHRSW Inoperable (All oil has leaked out of bearing)

TS 3.7.1 3

rd07a I/C (ATC)

Control Rod Drive Pump Failure.

4 rd04r3023 I/C (ATC)

Rod drift from 00 to 02 after CRD pump start.

5 I/C (BOP/ATC)

TS (SRO)

Loss of Power to Bus 13-1 with a failure of the EDG to start.

TS 3.8.1.A, 3.8.1.B, 3.8.1.D, and 3.8.1.B (Unit 2) 6 eg07a I/C (BOP)

I/C (ATC)

R (ATC)

Turbine Generator slowly loses stator water cooling. Both ATC and BOP need to take actions IAW QCOA 5300-01.

Emergency down power by inserting control rods.

7 ms09d M (all)

I/C (all)

MSL break with a failure to receive a Group 1 isolation on low steam pressure, close the MSIVs to limit plant cooldown to less than 100 degrees per hour, and recognize that a TS Safety Limit has been violated if pressure drops below 785 psig with power above 25%.

(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (T)echnical Specification Formatted: Font: (Default) Arial Formatted: Font: (Default) Arial Formatted: Font: (Default) Arial Formatted: Font: (Default) Arial Formatted: Font: (Default) Arial Formatted: Font: (Default) Arial Formatted: Font: (Default) Arial

Simulator Setup and Turnover Information The simulator setup is contained in IC #132, which MUST be copied onto the S: drive iaw special instructions (see M. Jensen or J. Swain)

Commands to be utilized DURING the scenario are contained in the CAEP file nrc scenario 3.cae LOAD the DEFAULT RWM sequence for Unit Shutdown:

LOAD0601SU2957 (verify RWM load name is U1SUSI)

Verify the following commands / overrides are inserted as part of the IC:

dg04b true (1/2 EDG auto start failure) rp06a (Group I isolation failure) rp06b (Group I isolation failure) rp06c (Group I isolation failure) rp06d (Group I isolation failure) ms02d (1D MSIV failure to close) ms02H (2D MSIV failure to close) rd02r3023 02 (Rod H6 stuck at position 02) dihs15300cpb trip (1B Stator CW pump c/s overridden to trip)

Turnover INFO Reactor Power is at 48%

FCL is 69%

Rod step 32 is at Target Out.

Online Risk is GREEN.

Protected Systems include: None.

Direction for the oncoming shift:

QCOS 7500-05 is due for the 1/2 B SBGT train.

Holding power for QNE to adjust rod sequence.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 1 Page 1 of 1 Event

Description:

Start the Standby Gas Treatment System for QCOS 7500-05.

Time Position Applicants Actions or Behavior BOP Verifies U-1 RB INLET DMPR TO SBGT AND/OR U-2 RB INLET DMPR TO SBGT, 1-7503 AND 2-7503, are open.

BOP Starts B SGTS by positioning B train mode selector switch to START.

BOP Verifies 1-7504B closed.

BOP Verifies 1-7505B and 1-7507B open..

BOP Verifies the SBGT fan and air heater are ON.

US Directs start and supervises.

ATC Monitors panels and assists as directed.

CUE Crew can proceed to event 2.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 2 Page 1 of 1 Event

Description:

1C RHRSW Inoperable (All oil has leaked out of bearing) TS 3.7.1 Time Position Applicants Actions or Behavior SIMOP: To add realism, call as the NLO on rounds and inform the ATC/BOP that you will be entering the RHRSW vaults. THEN insert alarm, imf ano9017a8 ON (and delete same) twice prior to making the call below.

CUE Operator reports that the outboard bearing sight glass for the 1C RHRSW high pressure pump is broken and all the oil has drained out.

SRO Orders the BOP to place the control switch for 1C RHRSW pump in PTL BOP May place the control switch for the 1C RHRSW pump in PTL SRO Recognize that entry into LCO 3.7.1 is required and Action A.1 taken. 30 day LCO.

CUE Crew can proceed to event 3.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 3 Page 1 of 2 Event

Description:

Control Rod Drive Pump Failure (A Pump).

Time Position Applicants Actions or Behavior SIMOP: At the direction of the Lead Examiner, trip the 1A CRD pump.

imf rd07a ATC Report that A CRD Pump has tripped.

ATC Verify MO 1(2)-301-2B, 1(2) B PMP DISCH VLV is closed.

NOTE TS 3.1.5 may be referred to if accumulator pressure falls below 940 psig.

ATC Start B CRD pump.

ATC Throttle MO 1(2)-301-2B is to maintain 1400-1500 psig discharge pressure.

CUE 1A CRD Pump tripped on overcurrent.

ATC Close MO 1(2)-301-2A, 1(2) A CRD PMP DSCH VLV.

ATC/SRO Dispatch an operator to verify proper operation of the running pump. AND to determine cause for the 1A CRD pump trip ATC / SRO Dispatch an operator to the breaker for 1A CRD pump to investigate cause of trip ATC Directs NLO to Close 1(2)-301-254A, 1(2)A CRD PUMP MIN FLOW ISOLATION VLV.

Formatted Table

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 3 Page 2 of 2 Event

Description:

Control Rod Drive Pump Failure (A Pump).

Time Position Applicants Actions or Behavior ATC Directs NLO Open 1(2)-301-254B, 1(2)B CRD PUMP MIN FLOW ISOLATION VLV.

BOP Monitor panels and assist as directed.

NOTE It may take approximately 10 minutes for CRD parameters to return to normal.

CUE Crew can proceed to event 4.

Formatted Table

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 4 Page 1 of 1 Event

Description:

Rod drift from 00 to 02 after CRD pump start.

Time Position Applicants Actions or Behavior SIMOP: At the direction of the Lead Examiner, cause Control Rod H-6 to drift outward (note, it will stick at position 02) imf rd04r3023 ATC Reports rod drift / misposition.

ATC References QCOA 0300-04 to respond to rod misposition.

SIMOP: After Control Rod H6 stops at position 02, then delete the drift and stuck rod (IN THAT ORDER) dmf rd04r3023 AND dmf rd02r3023 ATC Inserts the mispositioned control rod to its targeted position.

ATC/SRO Notifies QNE of the rod mispositioning.

SRO Directs actions/procedure.

BOP Monitors and assists.

CUE Crew can proceed to Event 5.

Formatted Table Deleted: as

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 5 Page 1 of 3 Event

Description:

Loss of Power to Bus 13-1 with a failure of the EDG to start.. TS 3.8.1.A, 3.8.1.B, 3.8.1.D, and 3.8.1.B (Unit 2)

CT denotes Critical Task Time Position Applicants Actions or Behavior SIMOP: When directed by the Lead Examiner, trip the feed breaker from 13 to 13-1 by inserting the following commands simultaneously in rapid succession:

ior loil1650013122 ON ior lohs1650013272 ON ior dihs165001327 trip BOP Reports that power has been lost to Bus 13-1.

BOP Reports that the 1/2 DG failed to start and energize Bus 13-1.

CT BOP Manually starts the 1/2 DG and energizes Bus 13-1 IAW QCOA. 6600-02.

BOP Reports that the 1/2 DG was manually started and 13-1 is energized.

BOP Verifies Bus 18 is energized.

SRO Recognize that entry into TS LCO 3.8.1, Conditions A, B, and D is required. Also, entry into TS 3.8.1, Condition B, for Unit 2 is required.

BOP/SRO Dispatches operator to evaluate status of the 1/2 DG and the feeder breaker to 13-1.

BOP/ATC Reports Loss of Feedwater Heating. Increases reactor power IAW QCOA 3500-01 Formatted Table

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 5 Page 2 of 3 Event

Description:

Loss of Power to Bus 13-1 with a failure of the EDG to start. TS 3.8.1.A, 3.8.1.B, 3.8.1.D, and 3.8.1.B (Unit 2)

Time Position Applicants Actions or Behavior BOP Restarts Instrument Air Compressors.

BOP Restore power to RPS.

BOP Dispatches operator to locally open FW heating normal drains.

ATC Monitors panels and assists as directed.

US Directs entry into procedure.

BOP/SRO Reopens Drywell O2 analyzer valves.

BOP Restarts the Drywell unit coolers.

ATC Re-energizes RPS.

BOP Reports loss of 1/2 IAC due to Loss of Power. Air header pressure is lowering.

BOP Starts Unit 2 IAC and Unit 1B IAC.

ATC Resets 1/2 scram and reports all rods in.

Formatted Table

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 5 Page 3 of 3 Event

Description:

Loss of Power to Bus 13-1 with a failure of the EDG to start. TS 3.8.1.A, 3.8.1.B, 3.8.1.D, and 3.8.1.B (Unit 2)

Time Position Applicants Actions or Behavior SIMOP: As directed by the candidates, the following commands will be utilized during the recovery from the loss of RPS. Not all commands may be requested or used.

irf rp29r reset (A RPS to normal) irf rp02r alt (A RPS to alt power) irf rp30r reset (A RPS reset)

Feedwater Heater Latching (as indicated in CAEP file) Wait one minute between heater latch-ups Restart ECCS Keep-Fill irf cs04r norm If additional actions requested, discuss with Lead Examiner to determine proper response.

BOP/ATC Recognizes loss of feedwater heating and references QCOA 3500-01.

CUE Crew can proceed to event 6.

Formatted Table

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 6 Page 1 of 2 Event

Description:

Turbine Generator slowly loses stator water cooling. Both ATC and BOP need to take actions IAW QCOA 5300-01.

CT denotes Critical Task Time Position Applicants Actions or Behavior SIMOP: At the direction of the Lead Examiner insert slow-failure of the 1A stator water pump over 10 minutes imf eg07a 100 10:

ATC/BOP Reports GEN STATOR COOLING PANEL TROUBLE alarm and refers to the annunciator procedure.

BOP/SRO Immediately dispatches an operator to the stator cooling water panel and the pumps.

CUE A stator pump grinding sound.

BOP Checks Load Set for runback.

SRO Directs the actions of QCOA 5300-01.

ATC/BOP Reports unable to start standby stator cooling water pump.

CT BOP/ATC Initiates emergency power reduction per QCGP 3-1. Inserts all CRAM rods.

ATC Checks power/flow curve.

BOP Reduces VARS on generator to zero.

Formatted Table

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 6 Page 2 of 2 Event

Description:

Turbine Generator slowly loses stator water cooling. Both ATC and BOP need to take actions IAW QCOA 5300-01.

Time Position Applicants Actions or Behavior SRO Sets scram criteria:

9th bypass valve open; or reactor pressure increasing; or oscillations on neutron monitoring CUE Stator cooling flow is decreasing.

BOP/SRO Dispatches an operator to the stator cooling panel to check stator cooling water conductivity.

CUE Conductivity is 0.1 umho.

NOTE: Per QCOA 5300-01, the turbine generator must be tripped within 1 hr.

ATC Continues to insert in-sequence CRDs.

BOP Checks stator amps < 7380 after runback.

ATC Reduces reactor power with recirculation flow and rods to

<33.5% core thermal power in prep for taking off the generator.

CUE Crew can proceed to event 7.

Formatted Table

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 7 Page 1 of 3 Event

Description:

MSL break with a failure to receive a Group 1 isolation on low steam pressure, close the MSIVs to limit plant cooldown to less than 100 degrees and recognize that a TS Safety Limit has been violated if pressure drops below 785 psig with power above 25%.

Time Position Applicants Actions or Behavior SIMOP: At the direction of the Lead Examiner, insert a large (10%) MSL break in the steam tunnel imf ms09d 10 0:

ATC Reports that pressure is decreasing.

ATC/BOP Reports high area temperature in the MSIV Room.

SRO Orders the reactor to be scrammed.

ATC/BOP Reports that reactor has been scrammed and all rods are in.

Note: IF the Operators promptly order the scram and move the Reactor Mode Switch to Shutdown, the Group 1 signal will be bypassed (and will not have failed). Likewise, the safety limit may never be violated, if power is reduced to <

25% by the scram, prior to pressure lowering to 785 psig..

BOP Reports there is a Group I failure to isolate.

SRO Recognizes a safety limit has been violated if power is >25%

with reactor pressure <785 psig.

CT SRO Orders BOP to close the MSIVs Formatted Table Deleted:

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 7 Page 2 of 3 Event

Description:

MSL break with a failure to receive a Group 1 isolation on low steam pressure, close the MSIVs to limit plant cooldown to less than 100 degrees and recognize that a TS Safety Limit has been violated if pressure drops below 785 psig with power above 25%.

Time Position Applicants Actions or Behavior CT BOP Attempts to close MSIVs using QCOA 0250-02:

Attempts to close MSIVs from control switch on 901-3 panel CT BOP Reports that the Inboard AND Outboard MSIVs on the D Main Steam line FAILED to close.

BOP Dispatches NLO to close 1-4799-35 INST AIR TO OUTBD MSIVs, RCIC AND HPCI SHUTOFF VALVE to isolate Instrument Air to close MSIVs; Dispatches operators to remove fuses for MSIVs at Panels 901-40 and 901-41.

SRO Enters into QGA-100 at 0 inches.

ATC Maintains reactor water level between 0 and 48 inches.

BOP Reports that MSIV Room temperatures are greater than Max Safe.

SRO Enters into QGA 300.

NOTE:

If a 2nd Max Safe is reached (in RCIC/HPCI Rooms), SRO will enter into QGA 500-1, Blowdown.

Formatted Table

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 7 Page 3 of 3 Event

Description:

MSL break with a failure to receive a Group 1 isolation on low steam pressure, close the MSIVs to limit plant cooldown to less than 100 degrees and recognize that a TS Safety Limit has been violated if pressure drops below 785 psig with power above 25%.

Time Position Applicants Actions or Behavior SRO Refers to QCOA 0201-05, Leaks Outside Primary Containment.

SRO Enters QGA 200 on Low Torus Level.

CUE End of Event 7. End of Scenario 3.

Formatted Table

Appendix D Scenario Outline Form ES-D-1 Facility: Quad Cities Unit 1 & 2 Scenario No.: 4 Time Start: _______

Examiners: ____________________________ Operators: (SRO)_______________________

(ATC)_______________________

(BOP)_______________________

Initial Conditions: Reactor Power is 29%. 1B Recirculation Pump is tripped, but it is ready to be started. 1/2 SW pump is running.

Turnover: Unit Supervisor has directed the restart of 1B Recirculation Pump.

Event No.

Malf. No.

Event Type*

Event Description 1

N/A R (ATC)

Lower A Recirculation pump speed.

2 N/A N (BOP)

Start 1B recirculation pump and monitor parameters IAW QCOP 0202-02.

3 N/A TS (SRO)

OPRM Part 21 Inoperability. TS 3.3.1.3.A and 3.3.1.3.B 4

imf rd03r2227 I/C (ATC)

TS (SRO)

Rod drifts from position 48 to 46. Upon return to 48, rod is found uncoupled and over-travels to position 49. Rod F-7 (22-27).

TS 3.1.3 5

sw01c I/C (BOP)

Trip of 1/2 Service Water Pump. 1B fails to start. Manual start 1A or 2A Service Water Pump.

6 imf fw17c I/C (ATC)

C Condensate / Condensate Booster Pump trip with a failure of the standby to start.

7 mc08 M (all)

Loss of condenser vacuum leads to ATWS. Bypass valves eventually close due to lowering vacuum. SRVs used for pressure control.

Simulator Setup and Turnover Information The simulator setup is contained in IC #133, which MUST be copied onto the S: drive iaw special instructions (see M. Jensen or J. Swain)

Commands to be utilized DURING the scenario are contained in the CAEP file nrc scenario 4.cae LOAD the DEFAULT RWM sequence for Unit Shutdown:

LOAD0601SU2957 (verify RWM load name is U1SUSI)

Verify the following commands / overrides are inserted as part of the IC:

sw01b (1B SW pump tripped) rd13a 100 (North Scram Discharge volume hydraulic lock) rd13b 100 (South Scram Discharge volume hydraulic lock) imf rd02r2227 46 (CONTROL ROD F-7 STUCK AT 46) imf rd01r2227 (CONTROL ROD F-7 UNCOUPLED) ior lohs13302d4 on (overrides D condensate pump standby light ON) ior dihs13302 p2d_off (prevents auto-start of D standby condensate pump irf sw19r 0 (Service Water isolated to the 1B MG-Set oil cooler)

Turnover INFO Reactor Power is at 29%

FCL is 49%

Rod step 29 is at Target Out.

1B Reactor Recirc pump tripped due to field breaker failure 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> ago. All repairs and testing have been completed. Adjustments for Single Loop operation have all been implemented. TS LCO 3.4.1 is met. QCOP 0202-02 steps through F.6 are completed for the startup of the 1B Recirc pump.

Online Risk is GREEN.

Protected Systems include: None.

NOTE: Because the 1B RFP is an assumed running pump, the proper risk color is obtained by taking out the 1A Rx Feed Pump.

Direction for the oncoming shift:

Hold power constant for QNE to adjust rod sequence.

Start the 1B Recirculation Pump.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 1 Page 1 of 1 Event

Description:

Lower A Recirculation pump speed.

Time Position Applicants Actions or Behavior SRO Directs the restart of the 1B recirculation pump per QCOP 0202-

02.

ATC Verifies on the speed controller it is in Manual and start permissive is not met as indicated by speed demand set.

ATC Lowers 1A recirculation pump speed.

CUE Crew can proceed to event 2.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 2 Page 1 of 3 Event

Description:

Start 1B recirculation pump and monitor parameters IAW QCOP 0202-02.

Time Position Applicants Actions or Behavior BOP Performs steps F.7 and F.9 of QCOP 0202-02.

SRO Verifies acceptance criteria in steps F.7.e and F.9.d.

BOP Starts the MG set by closing the drive motor breaker and verifies the speed controller indication increases to a peak of 80 percent speed, then decreases to minimum speed.

SIMOP: As soon as the MG set is started, OPEN the SW isolation valve to the oil cooler. mrf sw19r 100 BOP Verifies the generator field breaker closes as indicated by the red GEN FIELD BKR A/B indicating light.

BOP Records the time the recirculation pump starts.

BOP Opens the MO 1-202-5B Pump Discharge Valve until flow is seen or dual valve position.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 2 Page 2 of 3 Event

Description:

Start 1B recirculation pump and monitor parameters IAW QCOP 0202-02.

Time Position Applicants Actions or Behavior BOP If dual valve position indication or flow response is not observed in 2 minutes, the ATC trips the pump. (not expected)

BOP Jogs the discharge valve open for 1/2 second intervals until pump flow reaches 8000 gpm. After each jog, observes APRM and flow response.

BOP Jogs the discharge valve open for 1 second intervals from 8000 gpm to 12000 gpm. After each jog, observes APRM and flow response.

BOP Jogs the discharge valve open for 3 second intervals from 12000 gpm to 16000 gpm or until no further flow response is seen. After each jog, observes APRM and flow response.

BOP Fully opens discharge valve MO 1-202-5B ensuring control switch is left in the STOP position.

ATC/BOP Verifies instrumentation readings per QCOP 0202-02, step F.13.

BOP Performs step F.14 of QCOP 0202-02.

BOP Reference performing jet pump operability per QCOS 0202-07 and QCOS 0202-05 or QCOS 0202-06 within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 2 Page 3 of 3 Event

Description:

Start 1B recirculation pump and monitor parameters IAW QCOP 0202-02.

Time Position Applicants Actions or Behavior ATC Balance loop flows per QCOP 0202-03.

CUE Crew can proceed to event 3.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 3 Page 1 of 1 Event

Description:

Engineering reports that a Part 21 has been issued on OPRMs that renders all the OPRMs inoperable. TS 3.3.1.3.A, 3.3.1.3.B Time Position Applicants Actions or Behavior CUE As the Engineering manager, report that a Part 21 notification was just issued on OPRMs that renders all the OPRMs incapable of causing an automatic reactor scram.

SRO Recognizes that entry into TS 3.3.1.3.A and 3.3.1.3.B is required.

CUE Crew can proceed to event 4.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 4 Page 1 of 3 Event

Description:

Rod drifts from position 48 to 46. Upon return to 48, rod is found uncoupled and over-travels to position 49. Rod F-7 (22-27). TS 3.1.3 Time Position Applicants Actions or Behavior SIMOP: When directed by the Lead Examiner, insert a rod drift on Control Rod F-7 imf rd03r2227 ATC Reports that rod F-7 is drifting in, and stops at position 46.

ATC Enters QCOA 0300-11 Rod Drift and determines that Control Rod F-7 has latched at a known position (46). Exits QCOA 0300-11 and enters QCOA 0300-04.

CUE If Operator dispatched to investigate rod drift, report that HCU appears normal, fuses are normal, and there are no hot pipes.

CUE IF requested, as QNE, provide a Special Maneuver sheet ATC Disables RWM Blocks IAW QCOP 0207-01, Step F.16 ATC Uses QCOA 0300-04 returns Control Rod F-7 to position 48.

ATC Determines that Control Rod is uncoupled (withdraws past 48 and goes to over-travel. (Annunciator 901-5 A2 Rod Overtravel alarms.

ATC Enters QCOA 0300-03 uncoupled control rod CUE:

AS QNE, report that Control Rod F-7 has NOT previously uncoupled during this operating cycle.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 4 Page 2 of 3 Event

Description:

Rod drifts from position 48 to 46. Upon return to 48, rod is found uncoupled and over-travels to position 49. Rod F-7 (22-27). TS 3.1.3 Time Position Applicants Actions or Behavior ATC Disables RWM blocks to full or bypasses RWM and unsuccessfully attempts to re-couple control rod by inserting to 46 and withdrawing to 48 per QCOP 0207-02.

SRO Contacts QNE to determine if attempt should be made to re-couple at a position other than 46.

CUE:

As QNE, direct the SRO to attempt to re-couple ONE TIME at position 44.

CUE IF requested, as QNE, provide a Special Maneuver sheet ATC Unsuccessfully attempts to re-couple control rod by inserting to 44 and withdrawing to 48. Determines that rod is still uncoupled.

SRO Recognize that entry into TS LCO 3.1.3, Condition C requires Control Rod F-7 to be inserted to position 00 within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and disarmed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

CUE As QNE, provide a Special Maneuver sheet SRO Directs ATC to insert Control Rod F-7 to position 00 ATC Takes Control Rod F-7 OOS on the RWM per QCOP 0207-01

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 4 Page 3 of 3 Event

Description:

Rod drifts from position 48 to 46. Upon return to 48, rod is found uncoupled and over-travels to position 49. Rod F-7 (22-27). TS 3.1.3 Time Position Applicants Actions or Behavior ATC Inserts Control Rod F-7 to position 00.

BOP Dispatches NLOs to locally disarm Rod F-7 per QCOP 0300-07 CUE Crew can proceed to event 5.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 5 Page 1 of 1 Event

Description:

Trip of 1/2 Service Water Pump. 1B fails to start. Manual start 1A or 2A Service Water Pump.

Time Position Applicants Actions or Behavior SIMOP: When directed by the Lead Examiner, trip the 1/2 Service water pump.

imf sw01c.

BOP Report that 1/2 Service Water Pump has tripped and 1B Service Water Pump did not auto start.

BOP May attempt to start 1B SW pump. Determines that 1B SW pump will not start.

BOP Start Service Water Pump 1A or 2A.

BOP Verifies adequate Service Water pressure.

SIMOP: Use command bat fire to acknowledge the fire alarm.

Report that the 1/2 A and B Fire Diesels are running.

BOP/SRO Dispatches Operator to tripped motor to check for high temperature or shaft binding.

BOP/SRO Dispatches Operator to Service Water Pump 1B breaker to check relay targets for cause of trip.

BOP If Service Water Pump trip resulted in auto-start of Fire Pumps, return Fire Pumps to Standby Lineup per QCOP 4100-03.

CUE Crew can proceed to event 6.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 6 Page 1 of 1 Event

Description:

C Condensate / Condensate Booster Pump trip with a failure of the standby to start.

Time Position Applicants Actions or Behavior SIMOP: When directed by the Lead Examiner, trip the 1C Condensate Pump.

imf fw17C ATC Reports that 1C Condensate / Condensate Booster Pump has tripped.

ATC Recognizes that standby Condensate / Condensate pump fails to start.

ATC Starts 1B or 1D Condensate / Condensate Booster Pump.

SRO Recognizes scram criteria and orders scram IF reactor water level is below 11 inches or above 44 inches ATC Monitors RWL.

CUE Crew can proceed to event 7.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 7 Page 1 of 4 Event

Description:

Loss of condenser vacuum leads to ATWS. Bypass valves eventually close due to lowering vacuum. SRVs used for pressure control.

CT denotes Critical Task Time Position Applicants Actions or Behavior SIMOP When directed by the Lead Examiner, insert air-inleakage into the main condenser. Leakage starts at 25% and is immediately modified to 50% over 5 minutes.

imf mc08 25 mmf mc08 50 5:

BOP Reports that condenser vacuum is lowering.

SRO Directs emergency power reduction.

ATC/BOP Reduces recirculation pumps to minimum speed.

ATC Reduces power by rod insertion or Recirc speed reduction SRO Directs a manual scram prior to condenser vacuum reaching automatic scram setpoint (6.5 inches).

ATC Inserts manual scram and reports that the Mode Switch is in Shutdown.

CT ATC Reports that a manual scram is inserted but rods are NOT in.

SRO Enter QGA 101.

ATC Actuates ARI pushbuttons.

CT SRO Directs that ADS is inhibited and prevent Core Spray Injection.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 7 Page 2 of 4 Event

Description:

Loss of condenser vacuum leads to ATWS. Bypass valves eventually close due to lowering vacuum. SRVs used for pressure control.

Time Position Applicants Actions or Behavior CT BOP Inhibits ADS.

CT ATC/BOP Places Core Spray Pumps in PTL.

SRO Directs the tripping of both Recirculation Pumps.

ATC/BOP Trips both recirculation pumps.

SIMOP When requested to close the 0301-25 valve use command:

irf rd04r close When requested to bypass all RPS scram signals use command irf qg08r activate SRO Orders ATC/BOP (and/or U2 ANSO) to perform QCOP 0300-28 to insert Control Rods ATC Attempts rod insertion IAW QCOP 0300-28.

SRO Directs initiation of Torus Cooling on both loops.

BOP Initiates Torus Cooling on both loops per QCOP 1000-30.

SIMOP: When requested to perform QCOP 0250-02 to bypass -59 isolation, use command irf qg09r activate SRO Dispatches operator to bypass isolations IAW QCOP 0250-02.

CUE Reports that isolations are bypassed.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 7 Page 3 of 4 Event

Description:

Loss of condenser vacuum leads to ATWS. Bypass valves eventually close due to lowering vacuum. SRVs used for pressure control.

Time Position Applicants Actions or Behavior CT SRO Directs crew to terminate and prevent all injection sources.

CT ATC/BOP Trip-Latches HPCI to prevent injection CT ATC/BOP Places A and B FWRV and the Low Flow FRVs in manual and closed position.

ATC/BOP Shuts FRV MO isolation valves.

SRO Orders level reduction for power control.

ATC/BOP Reduces reactor water level.

NOTE:

Turbine will trip at 10 inches condenser backpressure and bypass valves will close at 23 inches.

SRO Orders transition to ADS valves for pressure control as pressure continues to drop.

CT SRO Directs ATC to record SBLC tank level and inject SBLC.

CT ATC Records tank level and injects SBLC.

Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 7 Page 4 of 4 Event

Description:

Loss of condenser vacuum leads to ATWS. Bypass valves eventually close due to lowering vacuum. SRVs used for pressure control.

Time Position Applicants Actions or Behavior SRO Enters QGA 100 at 0 inches and enters back into QGA 101.

SRO Establishes level band of -35 to -166 inches. IF ADS valve open prior to reaching -35 inches, SRO will allow level to continue to drop until power < 5% or RWL reaches -142 and then establishes level band of -166 to -142 or the value it was when power went below 5%

ATC/BOP

/SRO Dispatches operator to close the Charging Header isolation valve 1-0301-25 SRO Monitors Torus temperature.

CT ATC/BOP Maintains reactor water level in band directed by the SRO using any combination of:

Feedwater, RCIC, SSMP, HPCI, ATC Continues to drive rods in to reduce power.

CUE End of Event 7. End of scenario 4.