ML072920178

From kanterella
Jump to navigation Jump to search
Draft & Final-Section B Operating Exam Hope Creek (Folders 2/3)
ML072920178
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/04/2007
From: D'Antonio J
NRC Region 1
To:
Public Service Enterprise Group
D'Antonio J
Shared Package
ML062050204 List:
References
50-354/07-301
Download: ML072920178 (108)


Text

NRC ILT EXAM JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control Rod TASK NUMBER: 4000040401 JPM NUMBER: NRC-JPM-001 (Source: Direct HC Exam Bank 305H-JPM.BF011-00)

ALTERNATE PATH: Ix( KIA NUMBER: 201003 A2.02 IMPORTANCE FACTOR: 3.7 3.8 APPLICABILITY: RO SRO EO= RO(XIS T A ~SRO(X EVALUATION SElTlNGIMETHOD: SimulatorlPerform

REFERENCES:

HC.OP-ST.BF-0001 Rev 27 HC.OP-AB.IC-0001 Rev 4 TOOLS, EQUIPMENT AND PROCEDURES:

OD-7 print out of rod positions, Signed on copy of HC.OP-ST.BF-0001 for rod 10-15 ONLY.

VALIDATED JPM COMPLETION TIME: (11) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: NIA APPROVAL:

NRC Exam Author NRC Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the SM or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

~~~~

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: Minutes JPM PERFORMED BY: GRADE: U S A T DUNSAT REASON, IF UNSAT1SFACTORY:

EVALUATORS SIGNATURE: DATE:

1 Of 17

NRC ILT EXAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control Rod TASK NUMBER: 4000040401 INITIAL CONDITIONS:

1. The Plant is operating at 100% power.
2. Maintenance was performed on the position indication circuit of rod 10-15
3. The maintenance is complete.
4. As part of the retest requirements, performance of HC.OP-ST.BF-0001 Contrc Rod Drive Exercise - Weekly is required for control rod 10-15 only.
5. The ON DUTY Reactor Engineer has been notified that control rod 10-15 will be exercised IAW HC.OP-ST.6F-0001 .
6. The Reactor Engineer has approved exercising rod 10-15 at 100% power.
7. An OD-7 printout of current control rod positions has been generated.
8. Stall flows are NOT required.

INITIATING CUE:

Exercise control rod 10-15 IAW HC.OP-ST.BF-0001, Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 17

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod and Drive Mechanism q-Gg TASK: iond To An Uncoupled Control Rod STEP

(*Denotes a Critical Step)

(#Denotes a Sequential Step) ~~~~

~~~

STANDARD

~

COMMENTS (Required for UNSAT evaluation Operator obtains procedure Examiner Cue: PROVIDE the HC.OP-ST.BF-0001. Operator with the mark-up copy of HC.OP-ST.BF-0001.

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

Examiner Cue: If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 5.1.

LOG test start time in the Control Operator requests the procedure be Room log@). logged in the Control Room log.

Examiner Cue: The start time for HC.OP-ST.BF-0001 for retest of rod 10-15 only, has been logged in the Control Room log.

Operator then initials the step.

Examiner Note: It is not critical to initial the Drocedure stem.

~~~~ ~

ENSURE all prerequisitesof Section Operator ensures that all prerequisites 2.0 are satisfied. have been satisfied.

Examiner Cue: If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.

Ooerator then initials the steD.

Page 3 of 17

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod and Drive Mechanism TA ,.r . R Jond To An Uncoupled Control Rod STEP STEP

(*Denotes a Critical Step) (Required for UNSAT NO.

(#Denotes a Sequential Step) STANDARD evaluation) 5.3 ENSURE Attachment 1, Section 1.O Operator observes Attachment 1, has been completed Section 1.O has been completed AND Regular Surveillance AND Retest is indicated.

Retest is indicated.

Operator then initials the step.

5.4 OBTAIN a computer printout of the Operator observes an OD-7 printout current Control Rod positions. (e.g. has been generated.

OD-7) Operator then initials the step.

5.5 OBSERVE proper response of the Operator reviews the requirement to Nuclear Instrumentation while observe proper response of the Nuclear withdrawing Instrumentation while withdrawing OR inserting all Control Rods. -

OR inserting all Control Rods.

Operator then initials the step.

5.6 START TIME: Operator presses ROD SELECT SELECT a withdrawn Control Rod MODULE 10-15 pushbutton and AND RECORD the initial Control Rod records the initial rod position of 48 on Attachment 2.

position on Attachment 2.

The operator then initials the appropriate procedure step.

5.7 OBSERVE approximately 6 gpm total Operator observes approximately 6 flow through both the insert gpm total flow through both the insert AND withdraw Stabilizing Valves as -

AND withdraw Stabilizing Valves as indicated on CRID's point 82117. indicated on CRID's point B2117.

roo441991 The operator then initials the appropriate procedure step.

Page 4 of 17

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod and Drive Mechanism bond To An Uncoupled Control Rod STEP COMMENTS STEP (*Denotes a Critical Step) EVAL (Required for UNSAT

  1. NO. STANDARD evaluation)

(#Denotes a Sequential Step) SIU 5.8 INSERT the selected Control Rod one Operator mometarily presses the ROD notch (or as directed by Reactor MOTION CONTROLS INSERT Engineeringh pushbutton.

AND PERF RM the following: [TIS 4.1.3.1.2, TIS 4.1.3.7 5.8.1 ENSURE proper operation of the Operator observes the CONTROL ROD RPIS. POSITION FOUR ROD DISPLAY, RWM. or CRlDS indicates control rod movement to position 46.

The operator then initials the appropriate procedure steps.

5.8.2 -

IF a Control rod is inadvertently Examiner Cue: IF the Operator positioned at other than the desired requests Reactor Engineering

-IMPLEMENT the position, THEN guidance, THEN instruct the associated guidance contained in the Operator to return the control rod to Reactor Engineering Weekly position 48.

Guidance & J CONTACT Reactor Engineering.

Page 5 of 17

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod and Drive Mechanism TASK: jond To An Uncoupled Control Rod STEP COMMENTS

(*Denotes a Critical Step) EVAL (Required for UNSAT STANDARD evaluation)

(#Denotes a Sequential Step) SIU 5.8.3 -

IF the control rod does not insert to The Operator should not need to the next notch after one attempt, execute this action, and marks the step PERFORM the following: as NIA (not applicable). If the Operator A. HOLD the INSERT PB until the does need to perform the step, then the control rod reaches the desired step is initialed.

position. THEN RELEASE INSERT PB.

6. RECORD the control rod AND problem description in Remarks Section of Attachment 1.

INDICATE the condition of RPlS Operator then indicates the RPlS indication on Attachment 2. indication is SAT on Attachment 2.

The operator then initials the appropriate procedure step.

-IF the position recorded in Step 5.6 is Operator determines the position an intermediate position, recorded in Step 5.6 is NOT an THEN PERFORM Step 5.9.1, intermediate position, continues at step otherwise, GO TO Step 5.9.2 to return 5.9.2 to return the control rod to its the control rod to its original position: original position.

The operator then initials the appropriate procedure step.

WITHDRAW the control rod to Operator simultaneously presses AND position 48 holds both the WITHDRAW pushbutton AND PERFORM the following while aivina the selected Control AND the CONTINUOUS WITHDRAW pushbutton.

Rod 5 continuous withdraw signal:

[T!S 4.1.3.6, TIS 4.1.3.71 Page 6 of 17

NRC ILT EXAM NAME:

JOB PERFORMANCEMEASURE DATE:

SYSTEM: Control Rod and Drive Mechanism TASK: lond To An Uncoupled Control Rod II STEP (Denotes a Critical Step)

(#Denotes a Sequential Step)

A. OBSERVE the followin as B

indication of the Contro Rod being coupled:

1. ROD OVERTRAVEL alarm does STANDARD Operator observes OHA C6-F3 ROD OVERTRAVEL DOES annunciate.

(Required for UNSAT evaluation)

~~~

NOT annunciate.

~ ~ ~

2. Red Full Out light illuminates on Operator observes the red FULL OUT the Full Core Display. light on the Full Core Display EXTINGUISHES.
3. RPlS indicates the Control Rod Operator observes RPlS does NOT is full out (48). indicate oosition 48.
4. Proper response of the Nuclear Operator recognizes the expected Instrumentation while response of the Nuclear withdrawing the Control Rod. Instrumentationwhile withdrawing the Control Rod.

Examiner Note: The expected response for a rod from 46 to 48 is negligible.

B. INDICATE on Attachment 2 the Operator indicates the coupling check condition of Coupling Check. is UNSAT on Attachment 2.

The operator then initials the aDoroDriate Drocedure s t e m Page 7 of 17

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod and Drive Mechanism TASK: )and To An Uncoupled Control Rod STEP

- COMMENTS (Denotes a Critical Step) EVAL (Required for UNSAT

(#Denotes a Sequential Step)

C. PERFORM the following for stall STANDARD Based on the Initial Conditions,

-SIU evaluation) flow: Operator determines Stall Flow is NOT required. Operator marks the step NIA.

Examiner Note: Due to the failed coupling check, this step may not be performed until later, or may not be performed at all.

D. the CRD over travels, Operator informs the CRS of uncoupled THEN IMPLEMENT control rod and entry condition into HC.OP-AB.IC-0001(a), HC.OP-AB.IC-0001.

Control Rod. Examiner Cue: Acknowledge the report and DIRECT the Operator to implement Condition D of HC.OP-AB.IC-0001.

Examiner Note: Repeating back the order is NOT critical.

~~~~~~ ~~

HC.OP-AB.IC-0001Symptoms Operator recognizes uncoupled rod and Rod Travels Past Position 48 informs CRS.

OHA C6-F3 ROD OVERTRAVEL Examiner Cue: Repeat back the report from the Operator and direct the Operator to implement Condition D of HC.OP-AB.IC-0001 Control Rod Operator repeats back the order.

Examiner Note: Repeating back the order is NOT critical.

Page 8 of 17

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod and Drive Mechanism

- RE )and To An Uncoupled Control Rod STEP

- COMMENTS STEP ('Denotes a Critical Step) EVAL (Required for UNSAT NO. (#Denotesa Sequential Step)

HC.OP-AB.IC-0001 STANDARD NIA

-SIU NIA evaluation)

NIA Condition D Uncoupled Rod and Movement Permitted by RWM

~~~~

D.l OBTAIN Reactor Engineering Operator request Reactor Engineering guidance to recouple the Control Rod. guidance to recouple the Control Rod.

Examiner Cue: INFORM the Operator that Reactor Engineer is direction is to INSERT control rod 10-15 to position 44 using single notch insertions.

Operator repeats back the order.

~

D.2 -IF Reactor En ineering guidance Operator determines step D.2 is NOT 3,

CANNOT be o tained, THEN RECOUPLE the Control Rod applicable.

as follows: ~ ~~~~ ~~ ~~

a. INSERT the CRD no more than 2 Operator inserts rod 10-15 to position notches from the point of 44 using single notch insertion.

discovey. Examiner Note: Due to the rod being at Overtravel, it will take three single notch insertions to insert the rod to 44.

The first insertion will settle the rod at 48 and may bring in OHA C6-E3.

Examiner Cue: E necessary, THEN DIRECT the Operator to c o n t i n u e single notch insertions until rod 10-15 is at position 44.

Page 9 of 17

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod and Drive Mechanism TA! Respond To An Uncoupled Control Rod STEP COMMENTS STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT NO.

1

(#Denotes a Sequential Step)

b. WITHDRAW the Control Rod to its STANDARD

~ ~~

Operator withdraws rod 10-15 to

~ -SIU evaluation) original position position 48, verifying expected AND VERIFY expected response. response.

Examiner Note: The expected response for a rod from 44 to 48 is negligible.

Examiner Cue: the Operator requests whether to use single notch or continuous withdraw, THEN DIRECT the Operator to use single notch withdraw.

I c. PERFORM a coupling coudina check on Operator performs coupling check IAW the associated control rod IAW HC.OP-ST.BF-0001.

ST.BF-0001.

Examiner Cue: PROVIDE the Operator with a second copy of HC.OP-ST.BF-0001 to refer to for the second coupling check.

I HC.OP-ST.BF-0001 N/A N/A NIA 5.9.2 WITHDRAW the control rod to Operator simultaneously presses & J J

position 48 holds both the WITHDRAW pushbutton AND PERFORM the following while AND

-the CONTINUOUS WITHDRAW giving the selected Control pushbutton.

Rod a continuous withdraw signal:

[T/S 4.1.3.6, TIS 4.1.3.71 Page 10 of 17

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod and Drive Mechanism TASK. Respond To An Uncoualed Control Rod

  • STEP STEP COMMENTS

(*Denotes a Critical Step) EVAL (Required for UNSAT

  1. NO. STANDARD

(#Denotes a Sequential Step) SN evaluation)

A. OBSERVE the following as Operator observes OHA C6-F3 ROD indication of the Control Rod OVERTRAVEL does NOT annunciate.

being coupled:

1. ROD OVERTRAVEL alarm does NOT annunciate.
2. Red Full Out light illuminates on Operator observes the red FULL OUT the Full Core Display. light on the Full Core Display illuminates.
3. RPlS indicates the Control Rod Operator observes RPlS indicates the is full out (48). Control Rod is full out (48).
4. Proper response of the Nuclear Operator recognizes the expected Instrumentation while response of the Nuclear withdrawing the Control Rod. Instrumentation while withdrawing the Control Rod.

Examiner Note: The expected response for a rod at 48 is negligible.

Page 11 of 17

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod and Drive Mechanism TA! ~

STEP Respond To An Uncoupled Control Rod STEP COMMENTS

(*Denotes a Critical Step) EVAL (Required for UNSAT NO.

1 (#Denotes a Sequential Step)

STANDARD

- S/U evaluation)

B. INDICATE on Attachment 2 the condition of Coupling Check. I Operator indicates the coupling check is SAT on Attachment 2.

The operator then initials the appropriate procedure steps.

Examiner Note: The Operator may either transition back to HC.OP-AB.IC-0001 step D.3 at this point the Operator may mark HC.OP-ST.BF-OOO1 steps 5.9.2.C & D as N/A (not applicable) and then complete steps 5.9.2.E & F prior to transitioning back to HC.OP-AB.IC-0001 step D.3. Either course of action is acceptable.

HC.OP-ABK-0001 NIA N/A NIP.

Condition D Uncoupled Rod and Movement Permitted by RWM D.3 RESTRICT all further withdrawals of Operator informs the CRS that all this rod to Single Notch movement further withdrawals of this rod should be until repairs have been completed. restricted to Single Notch movement STOP TIME:

until repairs have been completed.

Examiner Cue: Repeat back report from Operator and give the Terminating Cue.

is complt Page 12 of 17

NRC ILT EXAM EVALUATOR FOLLOWUPQUESTION DOCUMENTATION NAME: ~

DATE:

SYSTEM: Control Rod and Drive Mechanism TASK Respond To An Uncoupled Control Rod TASK NUMBER: 4000040401 QUESTION:

RESPONSE

RESULT: I 1 -SAT 1-1 -UNSAT QUESTION:

RESPONSE

RESULT: 1 -SAT Page 13 of 17

NRC ILT EXAM JOB PERFORMANCE MEASURE INITIAL CONDITIONS

1. The Plant is operating at 100% power.
2. Maintenancewas performed on the position indication circuit of rod 10-15
3. The maintenance is complete.
4. As part of the retest requirements, performance of HC.OP-ST.BF-0001 Control Rod Drive Exercise - Weekly is required for control rod 10-15 only.
5. The "ON DUTY Reactor Engineer has been notified that control rod 10-15 will be exercised IAW HC.OP-ST.BF-0001.
6. The Reactor Engineer has approved exercising rod 10-15 at 100% power.
7. An OD-7 printout of current control rod positions has been generated.
8. Stall flows are NOT required.

INITIATING CUE Exercise control rod 10-15 IAW HCOP-ST.BF-0001.

Page 14 of 17

NRC ILT EXAM JOB PERFORMANCE MEASURE JPM/SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

/Mal INITIALIZE the simulator to IC#95.

SELECT rod 34-03 (or any rod except 10-15) on the Rod Select Module.

Initial Description ENSURE two copies of HC.OP-ST.BF-0001 are available, marked up for rod 10-15 ONLY, and with Step 5.1 initialed.

ENSURE OD-7 for IC#95 is available.

COMPLETE Attachment 2 "Simulator Ready-for-Training/ExaminationChecklist" of NC.TQ-DG.ZZ-WOZ(Z).

Initial ET # Description EVENT ACTION: I C V P O S ~z(770

~ ~ )// Rod 10-15 Overtravel 1 COMMAND:

PURPOSE: Senses 10-15 withdrawn past 48.

EVENT ACTION: et-arrey(1) >= 1.O && Icvposx(Z9) < 740 // Rod 10-15 Overtravel and inserted 2 COMMAND: dmf cd041015 PURPOSE: Deletes uncoupled rod after it has been insetted more than one notch IAW AB Page 15 of 17

NRC ILT EXAM JOB PERFORMANCE MEASURE JPM/SIMULATOR SETUP INSTRUCTIONS (OPTIONAL) lnitial Description Delay Ramp Trigger init Val Final Val CD041015 Rod 10-15 Uncoupled ___ __- NONE _-_ .--

I lnifial Description Delay Ramp Trigger lnit Val Final Val lnifial Description Delay Ramp Trigger init Val Final Val NONE Page 16 of 17

NRC ILT EXAM JOBPERFORMANCEMEASURE 59 48 48 48 48 4a 48 48 55 4a 48 24 48 48 4a 24 48 48 51 48 48 48 48 4a 4a 48 48 4a 4a 48 47 48 48 14 48 48 4a Q 48 4a 48 14 48 48 43 48 48 48 48 48 48 48 4a 48 48 48 48 48 48 48 39 48 24 48 48 48 Q 48 48 4a Q 48 4a 48 24 48 35 4a 48 48 4a 48 4a 48 48 48 4a 48 4a 48 48 48 31 48 48 48 o 48 4a 4a o 48 4a 48 Q 4a 48 4a 27 48 48 48 48 4a 48 48 4a 48 4a 48 48 48 48 48 23 48 24 48 4a 4a o 4a 4a 4a o 4a 48 48 24 4a 19 48 48 4a 48 48 48 48 48 48 4a 48 4a 48 48 48 15 48 48 14 48 48 48 Q 48 48 48 14 48 4a 11 48 48 48 4a 48 4a 48 4a 48 48 48 07 48 48 24 4a 4a 48 24 48 48 03 48 4a 48 48 48 48 48 02 06 10 14 18 22 26 30 34 38 42 46 50 54 58 DISABLE FULL OUT DISPLAY Page 17 of 17

NRC ILT EXAM JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Residual Heat Removal I LPCl Injection Mode TASK: Respond to RPV level unknown / RPV Flooding TASK NUMBER:

JPM NUMBER: NRC-JPM-002(New JPM)

ALTERNATE PATI ._ KIA NUMBER: 20300 K5.02 IMPORTANCE FACTOR: 3.5 3.7 APPLICABILITY: RO SRO EO( ROO S T A ~S R O ~

EVALUATION SETTINGIMETHOD: Simulator/Perform

REFERENCES:

HC.OP-EO.ZZ-0101 Rev 10 & HC.OP-EO.ZZ-0206 Rev 6 TOOLS, EQUIPMENT AND PROCEDURES: HC.OP-EO.ZZ-0101 & HC.OP-EO.ZZ-0206 VALIDATED JPM COMPLETION TIME: 20 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

APPROVAL NRC Exam Autho NRC Chief Examiner CAUTION. No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the SM or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: Minutes JPM PERFORMED BY: GRADE: U S A T UUNSAT REAS0 N IF UNSAT1SFACTORY:

EVALUATORS SIGNATURE: DATE:

Page 1 of 13

NRC ILT EXAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: Residual Heat Removal / LPCl Injection Mode TASK Respond to RPV level unknown / RPV Flooding TASK NUMBER:

INITIAL CONDITIONS:

1. The simulator is currently in FREEZE.
2. The plant was operating at 100% power.
3. A small break LOCNLOOP just occurred.
4. The reactor automatically scrammed as required and all control rods fully inserted.
5. Initial SCRAM actions are complete and the mode switch is in shutdown.
6. All Emergency Diesel Generators automatically started and energized their respective 4 kV bus.
7. Reactor pressure is about 800 psig and lowering very slowly through the break.
8. Drywell pressure is about 5 and rising.
9. HPCI, RCIC, SLC, & CRD are unavailable and NOT recoverable.

10.There is currently NO injection to the RPV.

11.The RHR & CS systems are the ONLY systems available for injection.

12.EOP-0101 has been entered and the Reactor Level Control Leg (RC/L) is being executed.

13. EOP-0101 step RC/L-l was just checked off and ALL of the RPV level indications are behaving erratically with some level indicators showing a rising trend while others are showing a lowering trend.

INITIATING CUE:

You are the CRS and you have just been informed that ALL RPV level instruments have failed and that RPV level is UNKNOWN. Continue in the RPV Level Control Leg of EOP-0101 beginning at step RCIL-2, AND take action as needed to assure adequate core cooling.

Take a few minutes to orient yourself in the simulator & determine the procedural actions that need to be taken. WHEN you state that you are ready, THEN the simulator will be taken out of FREEZE and you will execute the required procedural actions as the Reactor Operator.

Notify me when you are ready to take the simulator out of FREEZE.

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Residual Heat Removal I LPCl Injection Mode TA <: Res; lnd to RPV level unknown I RPV Floodir; STEP STEP (Denotes a Critical Step) (Required for UNSAT NO. (#Denotes a Sequential Step) STANDARD START TIME: Start time should be logged after the operator has reviewed the initial conditions and repeated the task back.

Examiner Cue: WHEN the Operator has had a chance to get oriented in the simulator & procedures AND is ready to proceed, THEN notify the simulator operator to take the simulator out of freeze.

Examiner Note: It is not critical to initial or check off the procedure s t e m I EOP-0101 -

IF while executing the following Critical step:

RCIL-2 step: This override step applies all the RPV level CANNOT be determined, time while executing EOP-0101.

THEN EXIT RC/L AND ENTER Once the Operator reads this step, EOP-0206. then the Operator must exit EOP-0101 and enter EOP-0206 to flood the RPV. With RPV level unknown, RPV flooding is required to assure adequate core cooling.

Page 3 of 13

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Residual Heat Removal I LPCl Injection Mode c Res ind to RPV level unknown I RPV Floodir STEP STEP

(*Denotes a CriticalStep) (Required for UNSAT NO. STANDARD

(#Denotes a Sequential Step)

EOP-0206 -

IF while executing the following The Operator reads this override step RF-1 steps: and continues in EOP-206.

The reactor is NOT shutdown Examiner note: None of the conditions under all conditions without apply at this time. The override step boron, THEN EXIT this remains in force throughout the procedure; however, none of the procedure AND ENTER EOP-conditions in the override should occur 0206A. during the JPM.

RPV level can be determined AND the reactor is shutdown under all conditions without boron, T U EXiT this procedure AND ENTER EOP-0101.

Drywell pressure CANNOT be maintained below 65 psig Containment water level CANNOT be maintained below 67 ft, THEN TERMINATE RPV injection from sources outside primary containment NOT required for adequate core cooling.

- ~~

EOP-0206 Is Supp Level above 0 in.? The Operator answers YES and RF-2 continues to RF-3.

Page 4 of 13

NRC ILT EXAM NAME:

JOBPERFORMANCEMEASURE DATE:

SYSTEM: Residual Heat Removal I LPCl Injection Mode

<: i Res1 nd to RPV level unknown RPV Floodii STEP NO.

STEP (Denotes a Critical Step)

(#Denotes a Sequential Step) ~ ~

STANDARD I EVAL sn I COMMENTS (Required for UNSAT evaluation)

EOP-0206 Irrespective of cooldown rate, OPEN The Operator will attempt to open 5 RF-3 5 ADS valves, DEFEAT PClG ADS valves; however, C ADS valve isolation interlocks if necessary. will fail to open. The Operator recognizes that the C ADS valve failed to open and continues to step RF-4. The operator should check that RPV pressure is dropping. The Operator may call out to defeat the isolation, but this may be done later and is not critical for this JPM if not called out.

Examiner note: The Operator must verify 5 ADS valves are open by observing the acoustic position indication on the PAMS panel. The RED light indications right next to the control switches ONLY monitors power to the solenoids NOT valve position.

Examiner note: The Operator may immediately open a non-ADS SRV without reference to EOP-0206, which satisfies RF-4 & RF-5, and this is SATlSFACTORY.

EOP-0206 Can 5 ADS valves be opened? The Operator will answer NO and RF-4 proceed to step RF-5.

EOP-0206 RF-5 OPEN SRVs open.

5 SRVs are The Operator will open NON-ADS SRVs until 5 SRVs are open.

I Page 5 of 13

  • STEP COMMENTS STEP EVAL (Required for UNSAT

(*Denotes a Critical Step) STANDARD

  1. NO. SIU evaluation)

(#Denotes a Sequential Step)

  1. ~op-0206 Can at least 5 SRVs be opened? The Operator will answer YES and proceed to RF-7.

RF-6

  1. EOP-0206 CLOSE the following valves: The Operator verifies that the valves RF-7 MSlVs are closed. The valves should already be closed due to RPV level below -129 MSL Drains inches.

RClC Steam Line Isolation Valves Page 6 of 13

NRC ILT EXAM NAME:

JOBPERFORMANCEMEASURE DATE:

SYSTEM: Residual Heat Removal ILPCl Injection Mode c Res, Ind to RPV level unknownIRPV Floodir STEP STEP COMMENTS

(*Denotes a Critical Step)

NO.

EOP-0206

(#Denotes a Sequential Step)

COMMENCE AND irrespective of Critical Step:

STANDARD EVAL SIU (Required for UNSAT evaluation)

  • RF-8 pump NPSH limits: RAISE injection The Operator ensures that ALL Low into the RPV UNTIL: Pressure ECCS Pumps start and At least 5 SRVs are open inject at the MAXIMUM flow rate AND w:

RPV press is not lowering At least 5 SRVs are open AND -

AND RPV press is at least 50 psig above RPV press is not lowering Supp Chamber Press -

AND RPV press is at least 50 psig above Supp Chamber Press Examiner note: The Operator may either manually start and inject or verify automatic start and inject. Once the RF-8 step conditions are met, then, and only then, is adequate core cooling assured. Reducing ECCS flow before the stated conditions are met is

- UNSATISFACTORY.

Page 7 of 13

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Residual Heat Removal I LPCl Injection Mode

- COMMENTS EVAL (Required for UNSAT Critical Step:

STANDARD

-SIU evaluation)

RF-9 The Operator answers YES and proceeds to RF-10. It would be UNSATISFACTORY to enter NO since that would require the unnecessary entry into SAG (Severe Accident Guidelines). In addition, if the Operator has NOT opened 5 SRVs at this point, then that would also be UNSATISFACTORY since adequate core cooling is NOT assured.

EOP-0206 I Can RPV Press be maintained at Critical step:

RF-10 least 50 psig above Supp Chamber The Operator answers YES and Press? proceeds to step RF-12. Once again, it would be UNSATISFACTORY to enter NO since that would require I the unnecessary entry into SAG (Severe Accident Guidelines).

Page 8 of 13

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Residual Heat Removal I LPCl Injection Mode

c. Res1 ndto RPV level unknown i RPV Floodii

~~ ~

STEP STEP I I COMMENTS (Denotes a Critical Step) (Required for UNSAT NO. (#Denotes a Sequential Step) STANDARD evaluation)

~

EOP-0206 CONTROL injection to maintain at RF-12 least 5 SRVs open Once adequate core cooling is AND achieved, THEN the Operator should RPV Press at least 50 psig above begin to throttle or otherwise control Supp Chamber Press BUT as low injection flow to maintain 5 SRVs open AND RPV Press at least 50 psig as practicable. above Supp Chamber Press BUT as low as practicable. Failure to reduce flow to as low as practicable will expose the SRVs and downstream tailpipes to unnecessary and potentially damaging hydraulic loads. It is acceptable to reduce flow with less than 5 SRVs open or have RPV e

pressure dro to less than 50 psig above Supp hamber Press for short periods of time while reducing injection flow to as low as practicable providedthat the Operator PROMPTLY recognizes the condition and increases injection flow to reestablish adequate core cooling. UNSATISFACTORY performance would include failing to take any action to reduce flow to as low as practicable, OR allowing injection flow to be reduced such that adequate core cooling is not assured without taking PROMPT action to restore adequate core cooling.

Page 9 of 13

NAME:

DATE:

  • STEP STEP

- COMMENTS

(*Denotes a Critical Step) EVAL (Required for UNSAT

  1. NO.

(#Denotes a Sequential Step)

Examiner Cue:

STANDARD

- SIU evaluation)

STOP TIME: The JPM may be terminated when injecting AND:

At least 5 SRVs are open AND RPV press is not lowering AND RPV press is at least 50 psig above Supp Chamber Press AND The Operator attempts to maintain injection flow as low as practicable while maintaining the conditions above.

Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete" Page 10 of 13

NRC ILT EXAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

SYSTEM: Residual Heat Removal / LPCl Injection Mode TASK Respond to RPV level unknown / RPV Flooding TASK NUMBER:

QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION

RESPONSE

RESULT: I SAT 1-r UNSAT Page 11 of 13

NRC ILT Exam JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Simulator Setup:

Per JPM initial conditions.

C ADS valve fail to open.

Override auto ADS.

In freeze to start.

Page 12 of 13

NRC ILT Exam JOBPERFORMANCEMEASURE INITIAL CONDITIONS:

1. The simulator is currently in FREEZE.
2. The plant was operating at 100% power.
3. A small break LOCNLOOP just occurred.
4. The reactor automatically scrammed as required and all control rods fully inserted.
5. Initial SCRAM actions are complete and the mode switch is in shutdown.
6. All Emergency Diesel Generators automatically started and energized their respective 4 kV bus.
7. Reactor pressure is about 800 psig and lowering very slowly through the break.
8. Drywell pressure is about 5 and rising.
9. HPCI, RCIC, SLC, & CRD are unavailable and NOT recoverable.

10.There is currently NO injection to the RPV.

11,The RHR & CS systems are the ONLY systems available for injection.

12. EOP-0101 has been entered and the Reactor Level Control Leg (RC/L) is being executed.

13.EOP-0101 step RC/L-1 was just checked off and ALL of the RPV level indications are behaving erratically with some level indicators showing a rising trend while others are showing a lowering trend.

INITIATING CUE:

You are the CRS and you have just been informed that ALL RPV level instruments have failed and that RPV level is UNKNOWN. Continue in the RPV Level Control Leg of EOP-0101 beginning at step RCIL-2, AND take action as needed to assure adequate core cooling.

Take a few minutes to orient yourself in the simulator & determine the procedural actions that need to be taken. WHEN you state that you are ready, THEN the simulator will be taken out of FREEZE and you will execute the required procedural actions as the Reactor Operator.

Notify me when you are ready to take the simulator out of FREEZE.

Page 13 of 13

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Main Turbine TASK Roll The Main Turbine To Rated Speed TASK NUMBER: 2450100101 JPM NUMBER: NRC-JPM-003 (Source: Direct HC Bank 305H-JPM.AC-004-00)

ALTERNATE PATH: WA NUMBER: 241000A3.18 IMPORTANCE FACTOR: 3.0 3.0 APPLICABILITY: RO SRO EO= RO(X~ S T A ~S R O ~

EVALUATION SETTINGIMETHOD: Simulator/Perform

REFERENCES:

HC.OP-SO.AC-0001 Rev 54 TOOLS, EQUIPMENT AND PROCEDURES:

VALIDATED JPM COMPLETION TIME: 20 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: NIA APPROVAL -

NRC Exam Author

/

CAUTION- No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the SM or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the "as left" condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: NIA JPM PERFORMED BY: GRADE: U S A T UUNSAT REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

1 Of 16

NRC ILT EXAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: Main Turbine TASK Roll The Main Turbine To Rated Speed TASK NUMBER: 2450100101 INITIAL CONDITIONS:

1. The plant is operating at about 19% power. A Reactor startup is in progress
2. Preparations are complete to roll the main turbine.
3. The System Load Dispatcher has been notified of the impending roll.
4. The Plant Historian is available to monitor temperatures required in step 5.3.7.
5. No checks at 800 rprn are required.
6. Main Turbine has been on the Turning Gear with condenser pressure z 1.5 HgA for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
7. The TBEO has been briefed and is standing by at the Front Standard.

INITIATING CUE:

You are an Extra NCO.

Roll the Main Turbine to 1800 RPM in accordance with HC.OP-SO.AC-0001.

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

~~

Page 2 of 16

NRC ILT EXAM NAME:

--+

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Main Turbine Ro The Main Turbine To Rated Speed STEP STEP I COMMENTS

(*Denotes a Critical Step) (Required for UNSAT NO. STANDARD evaluation

(#Denotes a Sequential Step)

Operator obtains procedure HC.OP- Operator obtains the correct procedure.

SO.AC-0001.

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

Examiner Cue: If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.

Examiner Note: It is not critical to initial the procedure steps, nor complete Attachment 1.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 5.3.1.

5.3.1 ENSURE that all rerequisites have Operator ensures that all prerequisites been satisfied IA Section 2.3. have been satisfied.

Examiner Cue: If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.

5.3.2 START TIMF. Operator observes the TURNING GEAR OP111 START, MOTOR ENSURE that the lift pumps, Turning SUCTION OP108 START, and LIFT Gear Oil and Motor Suction Pump PUMPS AP110 START through JP110 are running. START lights are illuminated and associated STOP lights are extinguished.

The operator then initials the appropriate procedure step.

Page 3 of 16

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

  • STEP COMMENTS STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  1. NO. (#Denotes a Sequential Step) STANDARD SIU evaluation) 5.3.3 AFTER observing XR7052 TURBINE Operator observes Point #4 on XR7052 TEMPERATURE- EXPANSION TURBINE TEMPERATURE-recorder (Point #4 - FIRST STAGE EXPANSION recorder reads between SHELL-LOWER INNER SURFACE) 250-350 degF.

on 10C650E SELECT turbine startup rate based on the following criteria:

A. For starting Operator determines this step applies AND loading a warm turbine - (first based on observed First Stage temperature.

stage shell temp between 250-350°F),

Operator selects (Controll, JSpeed-Load on the DEHC HMI.

The operator then initials the appropriate procedure step.

SELECT Speed Control, Operator selects S Acceleration RPM/Min Acceleration RPM/

)Medj 1-The operator then initials the appropriate procedure steo.

Page 4 of 16

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Main Turbine TASK: Roll The Main Turbine To Rated Speed STEP COMMENTS

(*Denotes a Critical SteD)

STANDARD EVAL (Required for UNSAT SI0 evaluation)

-or starting Operator determines this step does not AND loading a hot turbine - (first apply, marks step N/A.

1 stage shell temp is greater than 350°F),

SELECT ,1-SELECT SDeed Control Acceleration RPWMin jTiqG7j 5.3.4 NOTIFY System Load Dispatcher of Based on Initial Conditions, Operator pending Turbine roll. determined this step is already complete.

Examiner Cue: the Operator contacts the System Load Dispatcher, THEN ACKNOWLEDGE the communication.

The operator then initials the appropriate procedure step.

Page 5 of 16

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Main Turbine f

TASK: The Main Turbine To Rated Speed STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT STANDARD evaluation)

(#Denotes a Sequential Step) Sfll 5.3.5 CHECK the following indicators at Operator contacts TBEO to complete Turbine and Front Standard (local): this step.

Bearing Header (ICB-PI-3128) - Examiner Cue: REPORT the approximately 25 psig, following as TBEO:

minimum pressure 20 psig. Bearing Header pressure is 25 Main Pump Suction (1CB-PI-3070) - 15 to 25 psig. Psig CHECK for oil flow at all 14 Main Pump Suction pressure is bearing drain sightglasses. 20 psig Have oil flow at all 14 bearing-draln sightglasses The operator then initials the appropriate procedure step.

ADJUST TIC2423 MAIN TURBINE Operator directs TBEO adjust TIC-2423 LUBE OIL TEMP CONTROLLER to to maintain temperature between maintain oil temperature between 110-120 degF.

110-120°F for rated speed operation Examiner Cue: TRIGGER ET-2, (Local Panel 1OC105). THEN REPORT TIC-2423 has been set to maintain 115 degF.

The operator then initials the appropriate procedure step.

IF CRIDS Historian is NOT available Operator determines CRlDS Historian THEN PREPARE the CRIDS IS available based on given Initial computer to trend the following Conditions, marks step N/A.

parameters:

(Use Group Display Mode)

Page 6 of 16

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

TASK: Roll The Main Turbine To Rated Speed STEP COMMENTS

  • STEP (*Denotes a Critical Step) EVAL (Required for UNSAT
  1. NO. STANDARD

(#Denotes a Sequential Step) SIU evaluation) 5.3.8 MONITOR Turbine Bearing Operator ensures CRlDS page #40 is temperatures and vibration during displayed on at least one CRT.

Turbine roll by referring to CRlDS The operator then initials the page #40 TURB/GEN BRG & appropriate procedure step, LUBE OIL, which should be displayed on one CRT Screen. [CD-O53B]

5.3.9 WHILE rolling the Main Turbine from Operator reads this step.

turning gear to 1800 rpm in the following steps The operator then initials the CLOSELY MONITOR all Main appropriate procedure step.

Turbine parameters in the CR AND DIRECT field operator(s) to listen for rubbing or unusual noises, and check for steam leaks and bearing oil flows.

5.3.10 AFTER obsewing the parameters and Operator reviews Attachment 1.

operational requirements listed in Attachment 1 ROLL the Main Turbine as follows:

A. SELECT ( C q ,JValve] o erator selects kontrol, 1- on DEHC HMI.

The operator then initials the appropriate procedure step.

B. VERIFY the following: Operator verifies that all Cv's, Iv's, and All Cv's, Iv's and MSVs are MSV's are closed.

CLOSED The operator then initials the aDproDriate procedure step.

Page 7 of 16

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Main Turbine TA STEP Roll The Main Turbine To Rated Speed STEP

~ ~ ~~~ ~ - COMMENTS (Denotes a Critical Step) EVAL (Required for UNSAT NO.

(#Denotesa Sequential Step)

Valves are properly positioned STANDARD Operator verifies that the first valve

-SN evaluation) listed in Attachment 7 is ositioned per Attachment 7.

l properly for a TURB RE ET on the plant computer. THEN:

Examiner Cue: Once the Operator demonstrates the ability to verify correct valve position, THEN cue the Operator that all other valves are in the required position.

I The operator then initials the aDDroDriate Drocedure stem Operator verifies Valve Position Limiter -

Valve Position Limiter - NOT LIMITING is displayed. NOT LIMITING is displayed The operator then initials the aDDroDriate arocedure steD.

~~ ~~~

Annunciator D3-D5, EHC Panel Operator verifies Annunciator D3-D5, 1OC363 is extinguished. EHC Panel 1OC363 is extinguished.

Examiner Cue: IF the Operator questions the red stripe on the alarm window, THEN cue the Operator that the alarm is correctly reflecting plant conditions.

The operator then initials the appropriate procedure step.

Page 8 of 16

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Main Turbine Roll The Main Turbine To Rated Speed STEP COMMENTS STEP (Denotes a Critical Step) EVAL (Required for UNSAT NO.

C.

(#Denotes a Sequential Step)

If EITHER of the following occur Operator reads this step.

-SIU evaluation) during the performance of the following step, The operator then initials the THEN IMMEDIATELY TRIP the appropriate procedure step.

turbine:

Turbine speed increases rapidly beyond the 100 rpm hold point CVs open before the IVs D. SELECT (Controll, (Speed-Loadj Operator selects1 - , ISpeed-Load on DEHC HMI.

The operator then initials the appropriate procedure step.

Page 9 of 16

NRC ILT EXAM NAME:

JOB PERFORMANCEMEASURE DATE:

SYSTEM:

Main Turbine RC The Main Turbine To Rated Speed STEP

- COMMENTS STEP (*Denotes a Critical Step) EVAL (Required for UNSAT

- NO. (#Denotes a Sequential Step)

E. SELECT S eed Cmd RPM STANDARD 0 erator selects Speed Cmd RPM 7

SRI evaluation) 7-trAND OBSERVE the following: f n l Low 100 while observing the following:

MSV #2 opens immediately MSV #2 opens immediately AND WHEN MSV #2 is full open, AND WHEN MSV #2 is full open, MSV #I, #3 and #4 open slowly. MSV #l , #3 and #4 open slowly.

IV # I , #3, and #5 open slowly IV #1, #3, and #5 opens slowly AND WHEN IV #1, #3 and #5 are AND WHEN IV #I, #3 and #5 are full open, full open, IV #4, #2 and #6 IV #4, #2 and #6 (respectively)

(respectively) open.

open.

Turbine Speed (RPM) is SPEED INCREASING is ON as increasing as the Turbine the Turbine accelerates.

accelerates. Turbine rolls off of turning gear Turbine rolls off of turning gear (TURNING GEAR -

(TURNING GEAR - ENGAGED is OFF).

DISENGAGED).

Examiner Note: It is critical to select Speed Cmd RPM [Low].

F. WHEN Turbine Speed indicates Operator checks for any abnormal 90-100 rpm at Digital EHC HMI vibration, expansion, bearing panel, CHECK for any abnormal temperatures.

vibration, expansion, bearing Examiner Cue: REPORT as TBEO temperatures, etc. 100 rpm checks are SAT in the field.

~ ~ ~~

Page 10 of 16

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Main Turbine TASK: I: I The Main Turbine To Rated Speed STEP STEP

(*Denotes a Critical Step) COMMENTS

  1. NO. STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step) s/u evaluation)

G. PERFORM the following:

1. OBSERVE Point #4 FIRST Operator checks Point #4 temperature.

STAGE SHELL - LOWER INNER SURFACE TEMPERATURE.

I I

2. OBSERVE the following points are NOT in the "RED BAND" Examiner Note: Red Band areas are:

area: Point 15: 0.00 - 0.30 AND 0.70 - 1.00 a) Point #15 DIFFERENTIAL Point 16: 0.00 - 0.15 AND 1.81 - 2.00 EXPANSION ROTOR LONG (CRIDS PT A2531- MN Operator recognizes Point 15 and/or TURB DlFF EXPN value CRIDS point A2531 are in the "RED can be used using point BAND.

  1. 15's acceptance band).

b) Point #16 ROTOR Examiner Cue: ACKNOWLEDGE any EXPANSION ROTOR LONG report of Point 15 being in the RED BAND.

(field measurements may be used in lieu of point 16 if approved by Production Engineering).

Page 11 Of 16

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Main Turbine

  • STEP STEP I I COMMENTS I (Denotes a Critical Step) EVAL
  1. NO.

(#Denotes a Sequential Step) STANDARD SIU

3. the First Stage Shell Operator determines need to trip the temperature is less than 250°F turbine and informs the CRS.

OR .IF expansion detector Examiner Cue: EOperator reports XR7052, Points #15 & #16, are in the Red Band area the need to trip the turbine, THEN DIRECT the operator to follow the while Rolling the Turbine, procedural guidance.

THEN TRIP the turbine AND PREWARM the HP Operator trips the main turbine.

Turbine Shell, Examiner Note: Tripping the Main IAW section 5.2 of this Turbine is the critical portion.

procedure.

STOP TIME:

Page 12 of 16

NRC ILT EXAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION DATE:

SYSTEM: Main Turbine TASK: Roll The Maln Turbine To Rated Speed TASK NUMBER 2450100101 QUESTION:

RESPONSE

RESULT: T I SAT 1 I UNSAT QUESTION:

RESPONSE

RESULT: 1-1 SAT UNSAT Page 13 of 16

NC.TQ-WB.22-031O(2)

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The plant is operating at about 19% power. A Reactor startup is in progress
2. Preparations are complete to roll the main turbine.
3. The System Load Dispatcher has been notified of the impending roll.
4. The Plant Historian is available to monitor temperatures required in step 5.3.7.
5. No checks at 800 rpm are required.
6. Main Turbine has been on the Turning Gear with condenser pressure > 1.5 HgA for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
7. The TBEO has been briefed and is standing by at the Front Standard.

INITIATINGCUE You are an Extra NCO.

Roll the Main Turbine to 1800 RPM in accordance with HC.OP-SO.AC-0001.

Page 14 of 16

NRC ILT EXAM JOB PERFORMANCE MEASURE JPWSIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

Mia/

ESTABLISH a simulator IC ready to roll the Main Turbine and & 41/2 bypass valves open.

ENSURE Main Turbine First Stage Temp 250-350 degF.

PERFORM SO.AC-0001 Up to 5.3.1.

INITIAL SO.AC-0001 COMPLETE Attachment 2 Simulator Ready-for-Training/ExaminationChecklist of NC.TO-DG.ZZ-O002(Z).

Initial ET # Description EVENT ACTION: tuns >= 90 // Main Turbine >90rpm 1 COMMAND:

PURPOSE:

Page 15 of 16

NRC ILT EXAM JOB PERFORMANCE MEASURE JPWSIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

Initial Description Delay Ramp I Trigger lnit Val Final Val 1 NM204033B LPRM Failed Downscale 1 -__ __- 1 NONE 1 --_ I 0%

I 1 TU02 Main Turbine Difi ExDansion I --- I --- 1 ET-1 I 40% 1 20% 1 Initial Description Delay Ramp Trigger Init Val Final Val I TU03 Main Turbine Lube Oil temp --_ __- I ET-2 I --_ I 115 Initial Description Delay Ramp Trigger Init Val Final Val

  • Maintains LPRM DOWNSCALE OHA locked in to prevent distracting operator with nuisance alarms.

Page 16 of 16

NRC ILT EXAM JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Residual Heat Removal TASK: Respond To A Loss Of Shutdown Cooling TASK NUMBER: 4000400401 JPM NUMBER: NRC-JPM-0004 (Source: Direct HC Bank 305H-JPM.BC-003-03)

ALTERNATE PATH: WA NUMBER: 205000 A2.06 IMPORTANCE FACTOR: 3.4 3.5 APPLICABILITY: RO SRO EO 0 RO(XI S T A ~S R O ~

EVALUATION SETTINGIMETHOD: Simulator/Perforrn

REFERENCES:

HCOP-ABRPV-0009, Rev 05 TOOLS, EQUIPMENTAND PROCEDURES:

VALIDATED JPM COMPLETION TIME: 8 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: NIA APPROVAL:

NRC Exam Author NRC Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the SM or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: Minutes JPM PERFORMED BY: GRADE: U S A T DUNSAT REASON, IF UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

Page 1 of 7

NRC I11 EXAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: Residual Heat Removal TASK: Respond To A Loss Of Shutdown Cooling TASK NUMBER: 4000400401 INITIAL CONDITIONS:

1. The plant was is OPCON 4.
2. The reactor has been shutdown for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />.
3. 8RHR pump was in shutdown cooling at 10,000 gpm for several days.
4. RCS temperature was 100 degF.
5. RHR pump breaker locally.

A worker inadvertently tripped the 6

6. The breaker has been inspected and is undamaged.
7. The Shutdown Cooling suction line did NOT isolate.
8. The pump has been tripped for 15 minutes.
9. HC.OP-AB.RPV-0009 Shutdown Cooling is being implemented.

INITIATING C U E Perform Condition A of HC.OP-AB.RPV-0009.

The required shutdown cooling flow for the 8RHR pump is between 9500 -10,000 gpm.

~ Successful Completion Criteria:

, 1. All critical steps completed.

l 2. All sequential steps completed in order.

I 3. All time-critical steps completed within allotted time.

1 4. JPM completed within validated time. Completion time may exceed the validated time 1 if satisfactory progress is being made.

I Page 2 of 7

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Residual Heat Removal TASK Ri pond To A Loss Of Shutdown Coolin!

STEP COMMENTS

  1. STEP
  • (*Denotes a Critical Step) VAL (Required for UNSAT NO. STANDARD

(#Denotes a Sequential Step) s/u evaluation Operator obtains procedure Operator obtains the correct procedure.

HC.OP-AB.RPV-0009.

Operator determines beginning step Operator determines beginning step to be of the procedure A.1.

START TIME:

A.l -IF below 2OO0F, Operator determines step A.l appiies.

THEN PERFORM the following:

_________I A.l .a ESTIMATE time to reach 200'F IAW Examiner Cue: Inform the Operator that Figure 1. "another Operator has determined that time to reach 200 F is between 2.25 and 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />".

A.l .b -IF RCS temperature is expected to Operator determines RCS temRerature is rise above 2OO0F, not expected to rise above 200 F.

THEN IMPLEMENT Condition D.

A.2 -IF the Shutdown Cooling suction line Operator determines step A.2 does not was isolated, apply.

THEN PERFORM the following:

A.3 -IF necessary, dispatch operators to Operator determines it is NOTnecessary to manually open HV-F008 and/or dispatch operators to manually open HV-FOO9. [CD-O65X] HV-FOO8 and/or HV-FOOS.

  1. A.4.a Restore the tripped RHR pump as Operator presses the HV-F015B DECR follows: pushbutton until the OPEN light
a. CLOSE F015A(B). extinguishes.

Page 3 of 7

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Residual Heat Removal TASK:

STEP COMMENTS

(*Denotes a Critical Step) EVAL (Required for UNSAT

(#Denotes a Sequential Step) STANDARD SAJ evaluation)

b. RESTART RHR Pump A(B). Operator presses the BP202 START pushbutton and observes the RUNNING indicator illuminates and the STOPPED indicator extinguishes.
c. IMMEDIATELY THROlTLE Operator presses HV-F015B INCR OPEN F015A(B) to establish pushbutton until Shutdown Cooling flow is Shutdown Cooling flow between 9500 gpm and 10,000 gpm.

between 3000 gprn and 10,000 gpm.

STOP TIME I I I

'erminating Cue: Repeat back message from the operator on the status of the JPM, and then state "ThisJPM is complete" Page 4 of 7

NRC ILT EXAM EVALUATOR FOLLOWUPQUESTION DOCUMENTATION NAME: __

DATE:

SYSTEM: Residual Heat Removal TASK Respond To A Loss Of Shutdown Cooling TASK NUMBER: 4000400401 QUESTION:

RESPONSE

RESULT: 1 -SAT -UNSAT QUESTION:

RESPONSE

RESULT: -SAT 1- -UNSAT Page 5 of 7

NRC ILT EXAM JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The plant was is OPCON 4.
2. The reactor has been shutdown for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />.
3. 6 RHR pump was in shutdown cooling at 10,000 gpm for several days.
4. RCS temperature was 100 degF.
5. A worker inadvertently tripped the B RHR pump breaker locally.
6. The breaker has been inspected and is undamaged.
7. The Shutdown Cooling suction line did NOT isolate.
8. The pump has been tripped for 15 minutes.
9. HC.OP-AB.RPV-0009 Shutdown Cooling is being implemented.

INITIATING CUE:

Perform Condition A of HC.OP-AB.RPV-0009.

The required shutdown cooling flow for the B RHR pump is between 9500 -10,000 gpm.

Page 6 of 7

NRC ILT EXAM JOB PERFORMANCE MEASURE JPM/SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

Initial INITIALIZE the simulator to IC-16; Condition 4, Shutdown Cooling in service, RCS temp 103 degF.

ENSURE 8RHR pump is in shutdown cooling at 10,000 gpm IAW S0.BC-0002.

SET Monitor Item rh:bkr(2) = f to trip the 6RHR pump.

PLACE red bezel covers on the BC-HV-F027B AND the BC-HV-F007B.

COMPLETE Attachment 2 Simulator Ready-for-Training/ExaminationChecklist of NC.TQ-DG.ZZ-O002(2).

Page 7 of 7

NRC ILT EXAM JOB PERFORMANCE MEASURE:

STATION: Hope Creek SYSTEM: Feedwater TASK: Place A Water Seal On The A & B Feedwater Headers TASK NUMBER: 4000510401 JPM NUMBER: NRC-JPM-005 (Direct HC Bank 305H-JPM.AE004-00)

ALTERNATE PATH: WA NUMBER: 223001 A2.01 IMPORTANCE FACTOR: 4.3 4.4 APPLICABILITY: RO SRO EO= RO)XIS T A ~S R O ~

EVALUATION SETnNGIMETHOD: Simulator/Perform

REFERENCES:

HC.OP-AB.CONT-0001, Rev 0 HC.OP-SO.AE-0001, Rev 48 TOOLS, EQUIPMENT AND PROCEDURES:

Keys for RClC HVF013 and HPCl HV8278 VALIDATED JPM COMPLETION TIME (8) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: NIA APPROVAL:

NRC Exam Author CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the SM or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: Minutes JPM PERFORMED BY: GRADE: O S A T OUNSAT REASON. IF UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

Page 1 of 11

NRC ILT EXAM JOB PERFORMANCE MEASURE:

NAME:

DATE:

SYSTEM: Feedwater TASK: Place A Water Seal On The " A & " B Feedwater Headers TASK NUMBER: 4000510401 INITIAL CONDITIONS:

1. The plant was at 100% power when a LOCA with indications of major fuel failure occurred.
2. The plant is depressurized.
3. The HPCl and RClC jockey pumps are available.
4. RPV water level is being maintained with Core Spray pumps by another operator.
5. HC.OP-AB.CONT-0001 Condition D is being implemented.

INITIATING C U E Place a water seal on both the 'A' &

NJ '8'feedwater headers IAW HC.OP-SO.A-0001.

Successful Completion Criteria:

1, All critical steps completed.

2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 11

NRC ILT EXAM NAME:

JOBPERFORMANCEMEASURE DATE:

SYSTEM: Feedwater TA!

STEP Place A Water Seal On The A & B Feedwater Headers STEP COMMENTS (Denotes a Critical Step) VAL (Required for UNSAT NO. (#Denotes a Sequential Step) 1 STANDARD

-SN evaluation)

I Operator obtains procedure HC.OP-SO.AE-0001.

Operator reviews precautions and Operator obtains the correct procedure.

Operator reviews precautions and limitations. limitations.

Examiner Cue: I f excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 5.16.1.

Operator ensures that all prerequisites have been satisfied.

Examiner Note: The procedural flow can be confusing. The Initial Conditions state that the HPCl and RClC jockey pumps are available, and the initial cue directs the Operator to place a seal on the A & B Feedwater headers, so the correct procedural sequence would be to perform step 5.16.2 followed by 5.16.3 based on this information. However, while executing step 5.16.2.8, the HPCl jockey pump will become unavailable. This will require that the Operator transition directly to step 5.16.4 to seal the A &

B headers using the RClC jockey

, Pump.

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Feedwater

- STEP Pli e A Water Seal On The A & 6 Feedwater Headers STEP

- COMMENTS NO.

5.1 6.2

(*Denotes a Critical Step)

(#Denotes a Sequential Step)

START TIME:

~~~ ~ ~ ~ ~

Based on the Initiating Cue, Operator VAL SIU (Required for UNSAT evaluation)

IF a water seal is to be maintained on determines a water seal to be maintained on the A Feedwater line.

the A Feedwater line, THEN PERFORM the following:

A. ENSURE HV-F074A, FW OUTBD Operator observes the FW SPLY LINE ISLN CHK VLV, is closed. A OUTBD ISLN CHK VLV CLOSE light is illuminated and HVF074A OPEN light is extinguished.

Examiner Note: Operator may press the CLOSE pb to remove the open assist from the check valve.

B. ENSURE HV-F032A, FW INLET Operator presses the FW SPLY LINE A CHK VLV, is closed. INLET CHK V CLOSE pb and observes the CLOSE light illuminates and the HVF032A OPEN light extinguishes.

Operator recognizes HPCl Jockey Pump trip by OHAs and OVLD/PWR FAIL indication.

Operator informs CRS of HPCl Jockey pump trip.

Examiner Cue: Direct the Operator to place a water seal on the A & B Feedwater lines using the RClC jockey pump.

Operator determines beginning step Operator determines that a transition to of the orocedure. ster, 5.16.4 is reauired.

Page4of 11

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Feedwater TA.

STEP Pli e A Water Seal On The A & EFeedwa r Headers STEP COMMENTS

(*Denotes a Critical Step) EVAL (Required for UNSAT NO.

5.16.4 -

(#Denotes a Sequential step)

IF a water seal is to be maintained on STANDARD N/A

-SRI N/A evaluation)

NIA the A & B Feedwater lines AND the HPCl Jockey Pump is unavailable.

THEN PERFORM the following:

A. ENSURE HV-F074A, FW Operator observes the FW SPLY LINE OUTBD ISLN CHK VALVE, A OUTBD ISLN CHK VLV green AND HV-F074B, FW OUTBD ISLN CLOSE light is illuminated and CHK VALVE, are closed. HVF074A red OPEN light is extinguished.

Operator Observes the FW SPLY LINE B OUTBD ISLN CHK VLV green CLOSE light is illuminated and HVF074B red OPEN light is extinguished.

Examiner Note: Operator may press the CLOSE pb to remove the open assist from the check valve B. ENSURE HV-F032A, FW INLET Operator observes the FW SPLY LINE CHK VALVE, A INLET CHK V green CLOSE light is AND HV-F032B, FW INLET CHK illuminated and the red HVF032A VALVE, are closed. OPEN light is extinguished.

Examiner Note: The F032A was previously closed.

Operator presses the FW SPLY LINE B INLET CHK V CLOSE pushbutton and observes the green CLOSE light illuminates and the red HVF032B OPEN light extinauishes.

Page 5 of 11

NRC ILT EXAM NAME:

JOBPERFORMANCEMEASURE DATE:

SYSTEM: Feedwater STEP STEP

- COMMENTS

(*Denotes a Critical Step) EVAL (Required for UNSAT NO.

(#Denotes a Sequential Step)

C. PLACE the keylock switch for STANDARD Operator inserts key and places the

-Slll evaluation)

HV-4144, FW LINE Keylock switch for the HV-4144, FW CROSS-TIE ISLN VLV, in the CROSS TIE LINE ISLN, in the ON OPEN position to arm position the control switch. Examiner Note: OHA B3-D2 FEEDWATER LINE FILL ALT MODE will alarm.

D. OPEN HV-4144, FW LINE Operator presses the W CROSS TIE CROSS-TIE ISL VLV. LINE ISLN HV4144 OPEN pushbutton and observes the red OPEN light illuminates and the green CLOSED light extinauishes.

E. PLACE the NORMIBYPASS Operator inserts key and places the Keylock Switch tor Keylock switch for the RClC HVFOl3 in BD-HV-FOl3, RClC PUMP DSCH the BYPASS position.

TO FW, in the Examiner Note: OHA B3-D2 BYPASS position to arm the FEEDWATER LINE FILL ALT MODE Control Switch. will alarm.

F. OPEN BD-HV-F013, RClC PUMP Operator presses the RClC HVF013 DSCH TO FW. OPEN ushbutton and observes the E

red OP N light illuminates and the green CLSD light extinguishes.

G. OPEN BD- HV-F012, RClC Operator observes the RClC HVF012 PUMP DSCH VLV. red OPEN light is illuminated and green CLSD light is extinguished.

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Feedwater TASK: e A Water Seal On The "A" & " B Feedws r Headers STEP I I COMMENTS

(*Denotes a Critical Step) EVAL (Required for UNSAT

(#Denotes a Sequential Step) STANDARD SIU evaluation)

H. W H E N required, Operator observes the RClC JOCKEY THEN START BP228, RClC PUMP red RUNNING light is JOCKEY PUMP. illuminated and areen STOPPED liaht is extinguished.

I -

5.1 6.5 -

IF a water seal is to be maintained on Based on current conditions, Operator the A & B Feedwater lines determines that this step does not AND the RClC Jockey Pump is apply.

unavailable, THEN PERFORM the following:

STOP TIME:

Page 7 of 11

NRC ILT EXAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME -

DATE:

SYSTEM: Feedwater TASK Respond To Rising Drywell Pressure TASK NUMBER: 4000510401 QUESTION:

RESPONSE

RESULT: 1 1 -SAT I I -UNSAT QUESTION:

RESPONSE

RESULT: I ]

-UNSAT Page 8 of 11

NRC ILT EXAM JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The plant was at 100% power when a LOCA with indications of major fuel failure occurred.
2. The plant is depressurized.
3. The HPCl and RClC jockey pumps are available.
4. RPV water level is being maintained with Core Spray pumps by another operator.
5. HC.OP-ABCONT-0001 Condition D is being implemented.

INITIATING CUE:

Place a water seal on both the A AND B feedwater headers IAW HC.OP-SO.AE-0001.

Page 9 of 11

NRC ILT EXAM JOBPERFORMANCEMEASURE JPM/SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

Initial INITIALIZE the simulator to 100% power, MOL.

INSERT Malfunction CROl at 100%.

WHEN MSL Radiation levels reach 3xNFPB, THEN INSERT Malfunction MSOl at 100%.

IMPLEMENT EOP-101 and EOP-102.

ENSURE MSlVs are closed.

TRIP all PCPs and SCPs.

ESTABLISH RPV water level control with Core Spray.

Initial Description ENSURE a copy of HC.OP-SO.AE-0001 is available.

ENSURE Mode Switch key is removed.

COMPLETE Attachment 2 Simulator Ready-for-Training/ExaminationChecklis? of NC.TQ-DG.U-0002(2).

Initial ET # Description WENT ACTION: fwvspckx(1) cc 0.0 // F032A Closed 1 COMMAND:

PURPOSE: Triggers loss of HPCl Jockey pump EVENT ACTION:

2 COMMAND:

PURPOSE:

Page 10 of 11

NRC ILT EXAM JOB PERFORMANCE MEASURE JPMlSlMULATOR SETUP INSTRUCTIONS (OPTIONAL)

Initial I Description Delay I Ramp 1 Trigger I lnit Val Final Val I CROl Fuel Cladding Failure ___ _-_ I NONE I -_- I 100%

I 1 MSOl Steam Line Break Inside Containment I --- 1 --- 1 NONE 1 --- I 100% I RM9635 DAPA A --_ _-- NONE ___ 521 1 RM9636 DAPA 73 ___ ___ NONE --_ 5185 AN-BlE4 Cry Wolf HPCl JOCKEY PUMP TRBL _-_ -_- ET-I --- -__

AN-B1F3 Cry Wolf HPCl COMPONENT OlPF .-- -_- ET-1 __- ___

Initial Description Delay Ramp I Trigger lnit Val Final Val 1 I A l 0 Temporary Air Compressor ___ -_. I NONE I __- I RUN Initial Description Delay Ramp Trigger Init Val Final Val I

98138 A LO AP228 OVLD/PWR FAIL -__ --_ ET01 --- ON 9DS111 B LO AP228 STOP light --- --_ ET-1 __- OFF 9M6 R A 0 HPCl Jockey Pump Disch Press --- _-- ET-1 ___ 0 Page 11 of 11

NRC ILT EXAM JOB PERFORMANCE MEASURE:

STATION: Hope Creek SYSTEM: Reactor Protection System TASK: Respond To A Reactor Protection System Malfunction TASK NUMBER: 40001 10401 JPM NUMBER: NRC-JPM-006 (Direct HC Bank 305H-JPM.SB-010-03)

ALTERNATE PATH: 0 K/A NUMBER: 212000 A2.01 IMPORTANCE FACTOR: 3.7 3.9 APPLICABILITY: RO SRO EO= RO(XIS T A ~S R O ~

EVALUATION SElTING/METHOD: Sirnulator/Perform

REFERENCES:

HC.OP-AB.IC-0003, Rev 01 TOOLS, EQUIPMENT AND PROCEDURES:

VALIDATED JPM COMPLETION TIME: 5 Minutes TIME PERIOD IDENTIFIED FOR TIME GRlTlCAL STEPS NIA APPROVAL: /I NRC Exam Author -1 NRC Chief Examiner CAUTION. No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the SM or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the "as left" condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: Minutes JPM PERFORMED BY: GRADE: O S A T UUNSAT REASON. IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 1 of 9

NRC ILT EXAM JOB PERFORMANCE MEASURE:

NAME:

DATE:

SYSTEM: Reactor Protection System TASK: Respond To A Reactor Protection System Malfunction TASK NUMBER: 4000110401 INITIAL CONDITIONS:

1. The plant was operating at 100% power when the ARPS MG set tripped due to a bearing problem.
2. Restoration of the ARPS MG set is not possible at this time.
3. There is no damage to the A RPS bus.

INITIATING CUE:

Perform Condition A of HC.OP-AB.IC-0003.

Restoration of isolated equipment is not necessary at this time.

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 9

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Protection System STEP Respond To A Reactor Protection System Malfunction STEP

- COMMENTS NO.

1

('Denotes a Critical Step)

(#Denotes a Sequential Step)

ODerator obtains procedure STANDARD ODerator obtains the correct DrOCedUre.

EVAL SIU (Required for UNSAT evaluation)

Operator determines beginning step Operator determines correct beginning of the procedure. step to be A.l.

A. 1 START TIME: Operator determines restoration of Normal RESTORE Normal Power to the Power to the bus is not possible IAW Initial Conditions provided.

affected Bus.

. possible)

(if .

CAUTIONS: Operator reviews Caution 1.

1. The RPS MG Set Transfer Switch is a "Break before Make" type switch.

Positioning it to the wrong position will result in a full scram.

A.2 -

IF Normal Power cannot be restored: Operator verifies Alternate Power is

a. VERIFY Alternate Power is available by observing the ALTERNATE A FEED light on 10C610 is illuminated.

available.

Examiner Cue: If contacted as the NE0 to verify Alternate power is available, REPORT Alternate power appears to be available.

Page 3 of 9

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Protection System TASK: Rc Dond To A Reactor Protection System STEP COMMENTS

  1. STEP (Denotes a Critical Step) EVAL (Required for UNSAT
  • NO. STANDARD

(#Denotes a Sequential Step) SIU evaluation)

  1. b. TRANSFER Power to the Operator turns the RPS MG SET
  • Alternate Power Supply by TRANSFER SWITCH to the ALT A POSITIONING the RPS MG SET position.

TRANSFER SWlTCH to the Alternate position.

[CD324X]

  1. A.3 RESET the 1/2 Scram as follows: Operator turns the key for the RPS A1 Trip Logic to RESET and back to NORMAL.
a. TURN the key for the Affected RPS channel@) to the RESET Operator turns the key for the RPS A2 Trip position. Logic to RESET and back to NORMAL.
b. TURN the key BACK to NORMAL. Examiner Note: This step must be performedAFTER the A RPS bus is transferred to Alternate.

- ~ ~ ~ ~ ~~~ ~~

c. VERIFY the Scram is reset. Operator verifies the scram is reset by observing the following:

RPS TRIP LOGIC A1 and A2 NORMAURESET lights are illuminated All four PILOT SCRAM VALVE SOLENOID LOGIC A NORMAL lights are illuminated REACTOR SCRAM TRIP LOGIC I I A I and A2 OHAs are no longer illuminated Page 4 of 9

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor ProtectionSystem TASK:

STEP I I COMMENTS

('Denotes a Critical Step) EVAL (Required for UNSAT STANDARD s/u evaluation)

(#Denotes a Sequential Step)

I IF t h e MSIV's are OPEN

-7 RESET the tripped NSSSS Logic as follows:

Operator presses the NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC A II

a. PRESS the NUCLEAR STEAM and NUCLEAR STEAM SUPPLY SUPPLY SHUTOFF SYSTEM SHUTOFF SYSTEM TRIP LOGIC C TRIP LOGIC A(B,C,D) RESET Pb. RESET pushbuttons.

Examiner Note: This step must be performed AFTER the 'A' RPS bus is transferred to Alternate.

b. VERIFY MSlV TRIP LOGIC Operator verifies the MSlV TRIP LOGIC TRIPPED goes off. TRIPPED lights for LOGIC A and LOGIC C are extinguished.

STOP TIME:

L I I Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete" Page 5 of 9

OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUPQUESTION DOCUMENTATION NAME: __

DATE:

SYSTEM: Reactor Protection System TASK Respond To A Reactor Protection System Malfunction TASK NUMBER: 4000110401 QUESTION:

RESPONSE

RESULT I-[ -SAT 1 r -UNSAT QUESTION:

RESPONSE

RESULT: I -SAT ] T I -UNSAT Page 6 of 9

NRC ILT EXAM JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The Dlant was ooerating.at 100% power when the A RPS MG set tripped due to a bearing probiem.
2. Restoration of the A RPS MG set is not possible at this time.
3. There is no damage to the A RPS bus.

INITIATING CUE:

Perform Condition A of HC.OP-AB.IC-0003.

Restorationof isolated equipment is not necessaly at this time.

Page 7 of 9

NRC ILT EXAM JOB PERFORMANCE MEASURE JPM/SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

~~ ~ ~~

INITIALIZE the simulator to 10Oo/. power, MOL.

INSERT malfunction AP02A.

AFTER RWCU trips and conditions stabilize, ACKNOWLEDGE all overhead and R M l l alarms I Initial I newriotinn I COMPLETE Attachment 2 Simulator Ready-for-TraininglExaminationChecklisl of NC.TQ-DG.ZZ-O002(Z).

-ET # Description EVENT ACTION:

1 COMMAND:

PURPOSE:

EVENT ACTION:

2 COMMAND:

PURPOSE:

I Page 8 of 9

NRC ILT EXAM JOB PERFORMANCE MEASURE JPM/SIMULATOR SETUP INSTRUCTIONS (OPTIONAL) lnitial Description Delay Ramp Trigger lnit Val Final Val RPOPA RPS MG set A failure ___ ___ NONE _-- ___

Initial Description Delay Ramp Trigger Init Val Final Val I AN17 A4-F.7 Off Gas Recomb Pnl OOC327

~ ~ ~ ~

I 0O:OO:OO

~~ ~~ I 0O:OO:OO

~~ 1

~. ~. NONE I NORM I I

NORM I NM04 APRM A gain (Range: 0,800 -1.30) I 0O:OO:OO 1 0O:OO:OO I NONE 1 1.178 1 1.2 Initial Description Delay Ramp Trigger Init Val Final Val Page 9 of 9

NRC ILT EXAM JOBPERFORMANCEMEASURE STATION: HOPE CREEK SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)

TASK: Manually Place FRVS In Service TASK NUMBER: 2610030101 JPM NUMBER: NRC-JPM-007 (Source: Modified HC Bank 305H-JPM.GU-001-09)

ALTERNATE PATH: WA NUMBER: 288000.A2.05 IMPORTANCE FACTOR: 2.6 2.7 APPLICABILITY: RO SRO EO= R O S~ T A ~SROJX EVALUATION SETTINGIMETHOD: Simulator / Perform

REFERENCES:

HC.OP-SO.GU-0001, Rev. 23 TOOLS AND EQUIPMENT VALIDATED JPM COMPLETIONTIME: 9 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A APPROVAL:

NRC Exam Author NRC Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETIONTIME: Minutes ACTUAL TIME CRITICAL COMPLETION: N/A JPM

~. PERFORMED GRADE: U S A T UUNSAT REASON, IF UNSATISFACTORY:

1 EVALUATORS SIGNATURE: DATE:

Page 1 of 13

NRC ILT EXAM JOB PERFORMANCE MEASURE NAME DATE:

SYSTEM: Filtration, Recirculationand Ventilation System (FRVS)

TASK Manually Place FRVS In Service TASK NUMBER: 2610030101 INITIAL CONDITIONS:

1. The plant is operating at 100%power.
2. Heating steam has been lost to the power block.
3. Outside air temperature is <3Z°F.
4. To prevent freezing the heating coils, Rx Building ventilation must be removed from service.
5. FRVS is in standby.
6. Radiation Protection has been notified that FRVS will be placed in service.

INITIATING CUE:

Manuall place FRVS in service using the A, B, C & DV213 FRVS Recirculation Fans, and the AV206 PRVS Vent Fan.

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

I I I Page 2 of 13

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM:

STEP

- COMMENTS STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT NO.

(#Denotes a Sequential Step)

Operator obtains/locates procedure STANDARD Operator locates the proper procedure.

-s/u evaluation)

HCOP-SO.GU-0001.

Operator reviews precautions and limitations and initials each Precaution and Limitation in the space provided in the procedure.

Examiner Cue: If excessive time is taken reviewing Precautions and Limitations, inform operator that all are satisfied.

Examiner Note: It is NOT critical to initial Atttachment 1 or the procedure steps.

Operator determines beginning step Operator determines correct beginning of the orocedure. steo to be 5.3.1.

~

5.3.1 ENSURE that all prerequisites have Operator reviews Prerequisites, been satisfied IAW Section 2.3. completes Section 2 of Attachment 1, and initials each Prerequisite in the space provided in the procedure.

Examiner Cue: If excessive time is taken reviewing Prerequisites, inform oDerator that all are satisfied.

Page 3 of 13

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM:

TASK:

STEP COMMENTS

(*Denotes a Critical Step) EVAL (Required for UNSAT STANDARD

(#Denotes a Sequential Step) SIU evaluation)

START TIME:

5.3.2 VERIFY AUTO Mode for the following Operator observes that the AUTO indicator FRVS Recirculation Fans: is illuminated and the LOCKOUT indicator is extinguished for the following FRVS FRVS Recirculation Fan AV213 Recirculation Fans:

FRVS Recirculation Fan BV213 F R V S RECIRCULATION FAN AV213 F R V S RECIRCULATION FAN BVZ13 FRVS Recirculation Fan CV213 F R V S RECIRCULATION FAN CVZ13 FRVS RECIRCULATION FAN DV213 FRVS Recirculation Fan DV213 FRVS RECIRCULATION FAN EV213 FRVS RECIRCULATION FAN FV213 FRVS Recirculation Fan EV213 The operator then initials the FRVS Recirculation Fan FV213 atmrooriate Drocedure steos.

START 1 FRVS Vent Fan as follows: Operator depresses the MAN PB for AV206 FRVS Vent fan and observes the A. Momentarily PRESS the MAN MAN indicator is illuminated.

push-buttonfor A(B)V206 FRVS Vent Fan. The operator then initials the appropriate procedure step.

B. OBSERVE alarm BOP SAFETY Operator observes annunciator Dl-A4 SYS OUT OF SVCE. alarm state and acknowledges alarm.

The operator then initials the appropriate procedure step.

Page 4 of 13

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

  1. STEP
  • (*DenotesSTEP a Critical Step) EVAL COMMENTS (Required for UNSAT NO. (#Denotes a Sequential Step) STANDARD SIU evaluation)
  1. C. Momentarily PRESS the A(B)V206 Operator depresses the AV206 START PB START push-button for A(B)V206 and observes the AV206 START indicator FRVS Vent Fan. is illuminated and the STOP indicator is extinguished.

The operator then initials the appropriate procedure step.

Page 5 of 13

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM:

TA - COMMENTS

  1. STEP EVAL (Required for UNSAT
  • (Denotes a Critical Step)

NO.

(#Denotes a Sequential Step)

D. OBSERVE an indicated flow of STANDARD Operator observes FR-9426A for indication

-SIU evaluation)

  • approximately 9000 cfm on of flow (10C650E). The Operator should FR-9426A(B) for the running report that flow is too low.

FRVS Vent Fan.

Examiner Cue: IF the Operator reports that the fan flow is too low without a recommendation, THEN ask the Operator for a recommendation and record the response in the comments section of this JPM record.

IF the Operator recommends that the A fan be secured, THEN cue the Operator to secure the A FRVS Vent Fan AND continue to place FRVS in service. This is the SATISFACTORY action to take.

IF the Operator recommends continuing in the procedure despite the low flow condition, THEN cue the Operator to continue in the procedure. This course of action is UNSATlSFACTO RY.

In addition, IF the Operator fails to recognize the low flow condition or otherwise continues in the procedure despite the low flow condition, THEN this is

- UNSATISFACTORY.

Page 6 of 13

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM:

TA! r\..

  1. STEP STEP

- COMMENTS NO. (fDenotes a Critical Step)

(#Denotes a Sequential Step)

The Operator secures the A FRVS STANDARD The Operator depresses the AV206 STOP EVAL SRI (Required for UNSAT evaluation)

Vent Fan, THEN returns to step PB. The Operator may refer to step 5.4.3 B 5.3.3.A & C to shutdown the fan or the Operator may just take the action. Either course of action is acceptable.

Examiner Cue: IF the Operator asks if the (A FRVS Vent Fan should be placed in automatic mode, THEN cue the Operator to leave the fan in manual for now. IF the Operator places the fan in automatic at this point without asking, THEN that action is NOT critical.

Critical Step: The critical aspect is to shutdown the AFRVS Vent Fan.

The Operator should then return to step 5.3.3.A to continue placing FRVS in service using the B FRVS Vent Fan.

  1. 5.3.3 START 1 FRVS Vent Fan as follows: Operator depresses the MAN PB for
  • BV206 FRVS Vent fan and observes the A, Momentarily PRESS the MAN MAN indicator is illuminated.

push-button for A(B)V206 FRVS Vent Fan. The operator then initials the

- appropriate procedure step.

Page 7 of 13

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM:

TASK:

COMMENTS STEP EVAL (Required for UNSAT

(*Denotes a Critical Step) STANDARD NO. (#Denotes a Sequential Step) SIU evaluation)

B. OBSERVE alarm BOP SAFETY Operator observes annunciator D1-A4 SYS OUT OF SVCE. alarm state and acknowledges alarm.

Examiner Note: This alarm may already be in due if A Fan was previously left in manual mode.

The operator then initials the appropriate procedure step.

C. Momentarily PRESS the A(B)V206 Operator depresses the BV206 START PB START push-button for A(B)V206 and observes the BV206 START indicator FRVS Vent Fan. is illuminated and the STOP indicator is extinguished.

The operator then initials the appropriate procedure step.

D. OBSERVE an indicated flow of Operator observes FR-9426B for indication approximately 9000 cfm on of flow (lOC650E).

FR-9426A(B)for the running FRVS Vent Fan.

E. PRESS the AUTO LEAD PB for Operator depresses BV206 AUTO LEAD the inselvice FRVS Vent Fan AND PB and observes the AUTO LEAD INITIAL Attachment 1. indicator is illuminated.

The operator then initials Attachment 1 and the appropriate procedure step.

Page 8 of 13

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM:

TA \.

STEP 7

COMMENTS

  1. STEP
  • (Denotes a Critical Step) EVAL (Required for UNSAT

- NO. (#Denotes a Sequential Step)

F. PRESS the AUTO PB for the out STANDARD Operator depresses AV206 AUTO PB and

-SIU evaluation) of service FRVS Vent Fan AND observes the AUTO indicator is INITIAL Attachment 1. illuminated.

Examiner Cue: IF the Operator asks if AV206 should be placed in AUTO, THEN cue the Operator to place AV206 in AUTO. IF the Operator leaves the AV206 in MANUAL without asking for direction, THEN that action is SATISFACTORY.

The ooerator then initials Attachment 1 and the appropriate procedure step.

  1. 5.3.4 PERFORM the following to remove EXAMINER NOTE: Step 5.3.4.A is the Reactor Building Ventilation performed at local Aux. Bldg. W A C Panel System from service: 1OC382.

Operator directs the Building Operator to remove RBVS in accordance with Step 5.3.4.

EXAMINER CUE: Report as Equipment Operator that Reactor Building Ventilation is secured.

The operator then initials the

- I appropriate procedure steps.

Page 9 of 13

NAME:

DATE:

  1. STEP STEP COMMENTS
  • (*Denotes a Critical Step)

NO. (#Denotes a Sequential Step) STANDARD B. CLOSE the following dampers at Operator depresses the CLOSE PB for Panel 1OC651E: HD9370A and observes the CLOSE indicator is illuminated and the OPEN HD93704 REACTOR BLDG indicator is extinguished.

OUTBD SPLY The operator then initials the appropriate procedure step.

Operator depresses the CLOSE PB for HD9414A and observes the CLOSE indicator is illuminated and the OPEN indicator is extinguished.

The operator then initials the appropriate procedure step.

HD9370B, REACTOR BLDG Operator depresses the CLOSE PB for INBD SPLY . ..

HD9370B and observes the CLOSE

~ __

indicator is illuminated and the OPEN I indicator is extinguished.

The operator then initials the appropriate procedure step.

HD9414B, REACTOR BLDG Operator depresses the CLOSE PB for OUTBD EXCH HD9414B and observes the CLOSE indicator is illuminated and the OPEN indicator is extinguished.

The operator then initials the appropriate procedure step.

Page 10 of 13

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM:

TA! r.

L.

STEP

- COMMENTS STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

- NO.

5.3.5

(#Denotes a Sequential Step)

START 4 FRVS Recirculation Fans STANDARD One at a time, the Operator depresses the

-SIU evaluation) as follows: START PB for A, B, C, and D recirc fans and observes the START indicator is A. MOMENTARILY PRESS illuminated and the STOP indicator is A(B,C,D,E,F)V213 START PB for extinguished.

the desired fans.

Examiner Note: The initiating cue calls specifically for the A, B, C, and D Recirculation fans to be placed in service.

The operator then initials the appropriate procedure steps.

6. OBSERVE an indicated flow of After the starting each recirc fan, the approximately 30,000 cfm on FR- Operator observes that each recirc fan 9377 for each of the running fans. started indicates 30,000 CFM, on FR-9377 A@, C, D)

The operator then initials the aoorooriate orocedure stso.

C. MONITOR the following: Operator observes that each PDR-9317A (B, C, D) indicates 5 6.0" W.G. for each PDR-9377 FRVS DlFF PRESS operating A r Filter unit.

for indication of c 6.0" W.G.for each operating A r Filter Unit The operator then initials the appropriate procedure step.

PDR-9425A(B) FRVS-VENT Operator observes that each PDR-9425A, System Filter D/P 5 3.0" W.G. FRVS-VENTSystem Filter D/P 5 3 . 0 W.G.

The operator then initials the aopropriate orocedure stem Page 11 of 13

STEP COMMENTS

  1. STEP
  • EVAL (Required for UNSAT NO. (*Denotes a Critical Step) STANDARD

(#Denotes a Sequential Step) SRI evaluation) 5.3.6 PERFORM independent verification Operator requests an independent that the system is aligned IAW verification of the system alignment.

Attachment 1.

STOP TIME:

Page 12 of 13

NRC ILT EXAM JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The plant is operating at 100% power.
2. Heating steam has been lost to the power block.
3. Outside air temperature is <32"F.
4. To prevent freezing the beating coils, Rx Building ventilation must be removed from service.
5. FRVS is in standby.
6. Radiation Protection has been notified that FRVS will be placed in service.

INITIATING CUE:

Manually place FRVS in service using the A, B, C & DV213 FRVS Recirculation Fans, and the AV206 FRVS Vent Fan.

Page 13 of 13

NRC ILT EXAM JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Primary Containment Instrument Gas TASK: Defeat The PClS Isolation Of The Non-1E Instrument Gas Header TASK NUMBER: 2000510504 JPM NUMBER: NRC-JPM-008 (Source: Direct HC Bank 305H-JPM.KL002-08)

ALTERNATE PATH: a KIA NUMBER:

IMPORTANCE FACTOR:

223002.K4.08 3.3 3.7 APPLICABILITY RO SRO E O 0 R O m S T A a S R O m EVALUATION SElTlNGIMETHOD: Auxiliary Building /Simulate

REFERENCES:

HC.OP-EO.ZZ-0311, Revision 6 TOOLS, EQUIPMENT AND PROCEDURES:

EOP-311 Implementation Kit, Key(s) specified in section 4.0 of HC.OP-EO.ZZ-0311 VALIDATED JPM COMPLETION TIME: 8 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A APPROVAL:

NRC Exam Author CAUTION: No plant equipment shall be operated during the performance of a JPM without the fallowing:

1. Permission from the SM or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: Minutes JPM PERFORMED BY: GRADE: O S A T UUNSAT REASON. IF UNSATISFACTORY:

EVALUATORS SIGNATURE DATE:

Page 1 of 8

NRC ILT EXAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: Primary Containment Instrument Gas TASK: Defeat The PClS Isolation Of The Non-1E Instrument Gas Header TASK NUMBER: 2000510504 INITIAL CONDITIONS:

I. The plant has experienced an ATWS.

2. RPV water level is stabilized at -150 inches.
3. HC.OP-E0.Z-0101 A, ATWS-RPV Control, is being implemented.
4. Implementation of HC.OP-EO.ZZ-0311, Defeating Primary Containment Instrument Gas Isolation Interlocks is required.
5. The Control Room has completed Section 5.1 of HCOP-EO.ZZ-0311.

INITIATING CUE:

Defeat the PClS Isolation of the Non-1E Instrument Gas Header IAW HC.OP-EO.ZZ-0311.

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 8

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Primary Containment Instrument Gas TASK: Defeat The PClS Isolation Of The Non-1E Instrument Gas Header STEP I COMMENTS CDenotes a Critical Step) (Required for UNSAT STANDARD evaluation)

(#Denotes a Sequential Step)

Operator obtains procedure HC.OP-E0.Z-0311.

Operator obtains the correct procedure.

I Operator reviews precautions and Operator reviews precautions and limitations. limitations.

Examiner Cue: If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.

Eauipment Required Operator obtains the following required equipment:

Key #9 for EOP locker in OSC lOBTAlN from OS office or break red 1. Key #9 for EOP locker in OSC key holder glass in OSC) (obtain from SM office or break red key holder glass in OSC)

EOP-311 implementation kit (EOP 2. EOP-311 implementation kit from locker in OSC) EOP locker in OSC Contents: 2 Banana plug jumpers Examiner Note: After operator has 2 Lugged jumpers (if demonstrated ability to obtain required banana jacks are equipment, ensure that the equipment unavailable) is returned to its appropriate storage 1 Screwdriver location.

1 Flashlight 2 Bags for Relays Key #177 for cabinets in lower relay room Operator determines beginning step Operator determines correct beginning of the procedure. step to be 5.2.

Page 3 of 13

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Primarv Containment Instrument Gas STEP COMMENTS STEP EVAL (Required for UNSAT NO. (*Denotes a Critical Step) STANDARD SIU evaluation)

(#Denotes a Sequential Step) 5.2.1 ENSURE all prerequisites have been Operator determines from Initial satisfied IAW section 2.2. Conditions that Prerequisites are complete.

Examiner Cue: If excessive time is taken reviewing Prerequisites, inform oDerator that all are satisfied.

__ ~ _ _ ~~ ~

START TIME: Operator locates cabinet 1C-C-652 Bay REMOVE relay 11-14-1 from cabinet 11 and removes relay 11-14-1 (relay 5.2.2 group 14, Relay l).

1C-C 652 Bay 11, Front (Lower Relay Rm El 102, Relay group Examiner Cue: The relay you 14, relay 1 - see Attachment 3). identified is removed.

5.2.3 INSTALL jumper from terminal Operator locates terminals 4-2-1-5 and 4-2-1-5 to terminal 4-2-1-4 4-2-1-4 in cabinet 1C-C-657-Bay4 and (Cabinet 1C-C 657 Bay 4, Front, installs a jumper.

second group of terminal blocks from Examiner Cue: A jumper has been the top, terminal block 1, terminals 4 installed bemeen the terminals you and 5) (see Attachment 4). indicated.

5.2.4 REMOVE relay 11-4-3 from cabinet Operator locates cabinet 1D-C-652 Bay 1D-C 652 Bay 11, Rear 11 and removes relay 11-4-3 (relay (Lower Relay Rm El 102, Relay group group 4, relay number 3).

4, relay number 3 - see Attachment 5) Examiner Cue: The relay you identified is removed.

Page 4 of 8

  1. STEP STEP COMMENTS
  • ('Denotes a Critical Step) EVAL (Required for UNSAT NO. STANDARD

(#Denotes a Sequential Step) SIU evaluation)

  • 5.2.5 INSTALL jumper from terminal Operator locates terminals 4-2-2-17 4-2-2-17 to terminal 4-2-2-16 (Cabinet and 4-2-2-16 in cabinet 1DC-657-Bay4 1D-C 657 Bay 4, Front, second group and installs a jumper.

of terminal blocks from the top, terminal block 2, terminals 16 and 17 Examiner Cue: A jumper has been

- see Attachment 6). instal,ed between the you indicated.

I I STOPTIME: I I I Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete" Page 5 of 8

OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME: ~

DATE:

SYSTEM: Primary Containment Instrument Gas TASK: Defeat The PClS Isolation Of The Non-lE Instrument Gas Header TASK NUMBER: 2000510504 QUESTION:

RESPONSE

RESULT: 1-1 -SAT -UNSAT QUESTION:

RESPONSE

RESULT: -SAT I 1 -UNSAT Page 6 of 8

NRC ILT EXAM JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The plant has experienced an ATWS.
2. RPV water level is stabilized at -150 inches.
3. HC.OP-E0.Z-0101A, ATWS-RPV Control, is being implemented.
4. Implementation of HC.OP-EO.ZZ-0311, Defeating Primary Containment Instrument Gas Isolation Interlocks is required.
5. The Control Room has completed Section 5.1 of HC.OP-EO.ZZ-0311.

INITIATING CUE:

Defeat the PClS Isolation of the Non-1E Instrument Gas Header IAW HC.OP-EO.=-0311.

Page 7 of 8

NRC ILT EXAM JOB PERFORMANCE MEASURE JPWSIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

Page 8 of 8

NRC ILT EXAM JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: DC Electrical Distribution TASK: Perform a DC Load shed during Station Blackout TASK NUMBER:

JPM NUMBER: NRC-JPM-009 (New JPM)

ALTERNATE PATI .- 0 KIA NUMBER:

IMPORTANCE FACTOR:

295.,-3.AA1.04 3.6 3.7 APPLICABILITY: RO SRO EO= R O S~ T A ~S R O ~

EVALUATION SElTINGIMETHOD: Field/Perform

REFERENCES:

HC.OP-AB.ZZ-0135 Rev 26 TOOLS, EQUIPMENT AND PROCEDURES: HC.OP-AB.=-0135 VALIDATED JPM COMPLETION TIME: 10 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

APPROVAL: A CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the SM or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: Minutes JPM PERFORMED BY: GRADE: O S A T OUNSAT REASON, IF UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

Page 1 of 6

NRC ILT EXAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: DC Electrical Distribution TASK: Perform a DC Load shed during Station Blackout TASK NUMBER:

INITIAL CONDITIONS:

1. The plant is in OPCON 3.
2. A loss of all offsite and onsite AC power occurred 15 minutes ago.
3. HC.OP-AB.ZZ-0135, STATION BLACKOUT//LOSS OF OFFSITE POWEW/DIESEL GENERATOR MALFUNCTION has been completed through step 4.5.6.

INITIATING CUE:

Perform a DC load shed IAW Attachment 3 of HC.OP-AB.ZZ-0135.

I R Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 6

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: DC Electrical Distribution Perform a DC Load shed during Station Black I t STEP COMMENTS STEP CDenotes a Critical Step) (Required for UNSAT NO. STANDARD evaluation)

(#Denotes a Sequential Step)

I ~

Operator obtains a copy of procedure HC.OP-AB.ZZ-0135.

START TIME:

Operator obtains the correct procedure.

Start time should be logged after the operator has reviewed the initial conditions and repeated the task back.

Examiner Note: It is not critical to initial the procedure steps.

The operator then initials the appropriate procedure step.

4.5.7. IMPLEMENT Attachment 3, The Operator simulates performance of Radwaste Building Actions. Attachment 3 of HCOP-AB.ZZ-0135 (see attached facsimile).

The critical component of this task is to locate and simulate opening of the breakers listed on Attachment 3 of HC.OP-AB.22-0135.

Examiner Cue:

STOP TIME: The JPM may be terminated when the Operator reports that Attachment I 3_of_HC.OP-AB.22-0135

_ ~

is complete.

Page 3 of 6

NRC ILT EXAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

SYSTEM: DC Electrical Distribution TASK: Perform a DC Load shed during Station Blackout TASK NUMBER: ??????

QUESTION:

RESPONSE

RESULT: SAT I I UNSAT QUESTION:

RESPONSE

RESULT: SAT UNSAT Page 4 of 6

TRAINING ONLY ATTACHMENT 3 RAD WASTE BUILDING ACTIONS [CD-675F]

Page 1 of 1 DC LOAD SHEDDING

1. OPEN the circuit breakers identified in the following tables. All are ARC Flash Category 0.

LOCATION PANEL # CIRCUIT # LOAD (840 W) 12 STA SERV XFMR A PROT 1BC654 124' Radwaste 19 TACS SOLV 1AC658A 1BD318f RM 3449 24 PNL,BUS PROT 1DC654D 27 STA SERV XFMR PROT PNL 1EC654A LOCATION PANEL #

124' Radwaste RM 3449 1AD318 . CIRCUIT #

12 27 LOAD (580 W)

STA SRV XFMR A PROT PNL 1BC654 STA SERV C PROT RLY 1EC654B 28 PNL,BUS PROT 1DC654C RLY LOCATION PANEL # CIRCUIT # LOAD (840 W) 11 PNL,BUS PROT 1DC654B B/U 124' Radwaste 1DD318 ' 12 STA SERV XFMR PROT PNL 1CC654B RM 3432 14 PROCESS INST CAB 10C613 27 STA SERV XFMR PROT PNL 1FC654A LOCATION PANEL # CIRCUIT # LOAD (570 W) 11 PNL,BUS PROT 1DC654A 124 Radwaste 1CD318. 12 XFMR B PROTECT REC PNL 1CC654A RM 3432 14 CAB,FDWTR & RECIRC INST 10C612 27 STA SERV XFMR D PNL 1FC654B Page 5 of 6

NRC ILT Exam JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The plant is in OPCON 3.
2. A loss of all offsite and onsite AC power occurred 15 minutes ago.
3. HC.OP-AB.=-0135,STATION BLACKOUT //LOSS OF OFFSITE POWEW/DIESEL GENERATOR MALFUNCTION has been completed through step 4.5.6.

INITIATING C U E Perform a DC load shed IAW Attachment 3 of HC.OP-AB.ZZ-0135.

Page 6 of 6

NRC ILT EXAM JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Safety Auxiliaries Cooling Water TASK: Respond To A SACS Malfunction TASK NUMBER: 4000780401 JPM NUMBER: NRC-JPM-010 ( Source: Direct HC Bank 305H-JPM.EG-003-12)

ALTERNATE PATH: 0 WA NUMBER: 400000 A2.01 IMPORTANCE FACTOR: 3.3 3.4 APPLICABILITY: RO SRO EO= R O ~

STA) S R O ~

EVALUATION SETTINWMETHOD: In PlanVSimulate

REFERENCES:

HC.OP-AB.COOL-0002, Rev 1 HC.OP-SO.EG-0001, Rev 38 TOOLS, EQUIPMENT AND PROCEDURES:

Annotated copy of HC.OP-SO.EG-0001, valve locking devices.

VALIDATED JPM COMPLETION TIME: 11 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A APPROVAL: A NRC Exam Author CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the SM or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the "as left" condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: Minutes JPM PERFORMED BY: GRADE: O S A T UUNSAT REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 1 of 7

NRC ILT EXAM JOB PERFORMANCEMEASURE NAME:

DATE:

SYSTEM: Safety Auxiliaries Cooling Water TASK: Respond To A SACS Malfunction TASK NUMBER: 4000780401 INITIAL CONDITIONS:

1. SACS Loop B has been dec red inoperable.
2. HC.OP-AB.COOL-0002, Safetynurbine Auxiliaries Cooling System, is being implemented.
3. Components are being realigned IAW Section 5.12 of HC.OP-SO.EG-0001.
4. The D EDG Coolers AND Room Coolers have been cross tied to the A SACS loop IAW HC.OP-SO.EG-0001 Attachment 3 Part A.

INITIATING CUE Cross Tie the D FRVS Recirculation Unit to the A SACS Loop in the sequence presented in HC.OP-SO.EG-0001 Attachment 3 Part B.

WCM update and tagging will be performed by another operator.

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 7

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Safety Auxiliaries Cooling Water Respond To A SACS Malfunction STEP COMMENTS

  1. STEP EVAL

(*Denotes a Critical Step) (Required for UNSAT

- NO.

(#Denotesa Sequential Step)

I STANDARD

-S/U evaluation)

I Operator obtains/locates procedure HC.OP-SO.EG-0001.

Operator locates the proper procedure.

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

Examiner Cue: If excessive time is taken reviewing Precautions and Limitations, inform operator that all

- are satisfied.

  1. ATT.3 START TIME: Examiner Note: The sequence critical 10 FRVS CLG COIL DVH-213 LP B SUP portion of the following steps is to close the 1-EG-V689 AND 1-EG-V692 1-EG-V689 BEFORE o p e n i n g e 1-EG-V703 1-EG-V702.

LOCKED CLOSED Locking the valves is critical.

Operator unlocks and closes I-EG-V689, reinstalls a locking device on valve.

Examiner Cue: The lock has been removed from the valve indicated.

The valve indicated has been rotated in the direction stated and has come to hard stop. The lock is installed on the valve indicated.

Examiner Note: Support operator's

- requests for Verifier.

Page 3 of 7

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Safety Auxiliaries Cooling Water STEP ResDond To A SACS Malfunction STEP

- COMMENTS NO.

ATT.3

(*Denotes a Critical Step)

(#Denotes a Sequential Step)

FRVS CLG COIL DVH-213 LP B RTN STANDARD Operator unlocks and closes I-EG-V692, EVAL SRI (Required for UNSAT evaluation) 11 1-EG-V692 reinstalls a locking device on valve.

Examiner Cue: The lock has been LOCKED CLOSED removed from the valve indicated.

The valve indicated has been rotated in the direction stated and has come to hard stop. The lock is installed on the valve indicated.

Examiner Note: Support operators requests for Verifier.

ATT.3 FRVS CLG COIL DVH-213 LP A SUP Operator unlocks and opens 1-EG-V703, 12 reinstalls a locking device on valve.

1-EG-V703 Examiner Cue: The lock has been LOCKEDOPEN removed from the valve indicated.

The valve indicated has been rotated in the direction stated and has come to hard stop. The lock is installed on the valve indicated.

Examiner Note: Support operators requests for Verifier.

Page 4 of 7

NRC ILT EXAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Safety Auxiliaries Cooling Water STEP COMMENTS

  1. STEP ('Denotes a Critical Step) EVAL (Required for UNSAT
  • NO. STANDARD

(#Denotes a Sequential Step) SIU evaluation)

ATT.3 FRVS CLG COIL DVH-213 LP A RET Operator unlocks and opens 1-EG-V702, reinstalls a locking device on valve.

13 1-EG-V702 Examiner Cue: The lock has been LOCKED OPEN removed from the valve indicated.

STOP TIME: The valve indicated has been rotated in the direction stated and has come to hard stop. The lock is installed on the valve indicated.

Examiner Note: Support operator's requests for Verifier.

Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete" Page 5 of 7

NRC ILT EXAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME: -

DATE:

SYSTEM: Safety Auxiliaries Cooling Water TASK: Respond To A SACS Malfunction TASK NUMBER: 4000780401 QUESTION:

RESPONSE

RESULT T I -SAT T I -UNSAT QUESTION:

RESPONSE

RESULT: -SAT Page 6 of 7

NRC ILT EXAM JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. SACS Loop B has been declared inoperable.
2. HC.OP-ABCOOL-0002, Safetynurbine Auxiliaries Cooling System, is being implemented.
3. Components are being realigned IAW Section 5.12 of HC.OP-SO.EG-0001.
4. The D EDG Coolers AND Room Coolers have been cross tied to the A SACS loop IAW HC.OP-SO.EG-0001 Attachment 3 Part A.

INITIATING CUE:

Cross Tie the D FRVS Recirculation Unit to the A SACS Loop in the sequence presented in HC.OP-SO.EG-0001 Attachment 3 Part 6.

WCM update and tagging will be performed by another operator.

Page 7 of 7