Letter Sequence Meeting |
---|
|
|
MONTHYEARML0633203662006-11-28028 November 2006 Revised Notice of Meeting with Entergy Operations, Inc./Grand Gulf Nuclear Station, Unit 1 to Present Methodology for Applying and Implementing Risk-Informed Inservice Inspection Program Via American Society of Mechanical Engineers Project stage: Meeting ML0634500682006-12-0505 December 2006 12/5/06 Public Meeting Handout from Entergy/Epri Re GGNS Application of N-716 Project stage: Meeting ML0634605652006-12-19019 December 2006 12/5/2006 Summary of Meeting W/Entergy Operations, Inc. & GGNS, Unit 1 Methodology for Applying & Implementing the Risk-informed Inservice Inspection Program Via ASME Code Case N-716 at GGNS Project stage: Meeting ML0703102402007-02-0707 February 2007 Acceptance Review Request for Alternative GG-ISI-002 (Pilot Request), Request to Use ASME Code Case N-716 Project stage: Acceptance Review ML0708904632007-03-29029 March 2007 Draft RAI on D. C. Cook Risk-Informed ISI Program Project stage: Draft RAI ML0711702612007-04-12012 April 2007 Set 2 of Response to Request for Information Re GG-ISI-002 Code Case N-716 - Enclosure to 4/12/07 to E-Mail from G. Davant, Entergy Operations, Inc. to B. Vaidya, NRR/DORL/LPL4 Project stage: Response to RAI ML0711702542007-04-12012 April 2007 Set 1 of Response to Request for Information Re GG-ISI-002 Code Case N-716 - Enclosure to 4/12/07 to E-Mail from G. Davant, Entergy Operations, Inc. to B. Vaidya, NRR/DORL/LPL4 Project stage: Response to RAI ML0711702462007-04-12012 April 2007 E-Mail from G. Davant, Entergy Operations, Inc. to B. Vaidya, NRR/DORL/LPL4, Enclosing Two Sets of Responses to Request for Information Re GG-ISI-002 (TAC No. MD3044) - E-Mail Project stage: Response to RAI ML0709604412007-04-20020 April 2007 Notice of Meeting with Indiana Michigan Power Co & Entergy Operations, Inc. to Discuss Risk-Informed Inservice Inspection Program Via ASME Code Case N-716 Project stage: Meeting ML0711604152007-04-25025 April 2007 Additional Issues to Discuss in the 5/7/07 Meeting Project stage: Meeting ML0712300122007-05-0202 May 2007 5/2/2007 E-mail from Robert Vasey, American Electric Power, Licensee for D.C. Cook, Units 1 and 2, to B. Vaidya, NRC/NRR/DORL/LPL4, Re May 7, 2007 Code Case N-716 Meeting Project stage: Meeting ML0712300132007-05-0202 May 2007 Response to NRC Request for Additional Information on DC Cook Nuclear Plant (CNP) Risk Informed ISI Application Per ASME Section XI Code Case N-716 Project stage: Response to RAI ML0712300142007-05-0202 May 2007 Report Regarding Overview of Each Portion of the 2006 Update to the Cook Plant Internal Flooding PRA Model Project stage: Other ML0712300182007-05-0202 May 2007 Internal Flooding Study, Encl 3, for D.C. Cook, Units 1 and 2 Project stage: Other ML0712902032007-05-17017 May 2007 Summary of Meeting with Entergy Operations, Inc. & Indiana Michigan Power Co. Risk-informed Inservice Inspection Program/Code Case N-716 at Grand Gulf Ns & Donald C. Cook Np, Units 1 & 2 (TAC MD3044, MD3137 & MD3138) Project stage: Meeting CNRO-2007-00022, Request for Alternative GG-ISI-002, Response to Requests for Additional Information2007-05-23023 May 2007 Request for Alternative GG-ISI-002, Response to Requests for Additional Information Project stage: Response to RAI ML0716504412007-06-14014 June 2007 6/14/2007 E-mail from W. Brice, Entergy Operations, Inc. to B. Vaidya, NRR/DORL/LPL4 - Draft Responses to Requests for Additional Information, Questions 2a and 2b, for Relief Request GG-ISI-002 Project stage: Draft Response to RAI ML0716504462007-06-14014 June 2007 6/14/2007 Draft Responses to Requests for Additional Information, Questions 2a and 2b, for Relief Request GG-ISI-002 from W. Brice, Entergy Operations, Inc. Project stage: Draft Response to RAI ML0717200182007-06-20020 June 2007 6/20/07 E-Mail from G. Davant, Entergy, to B. Vaidya, NRR/DORL/LPL4 - Enclosing Draft Response to NRC Request for Additional Information Re GG-ISI-002, Code Case N-716 Project stage: Draft Response to RAI ML0717200252007-06-20020 June 2007 Draft Response to NRC Request for Additional Information Re GG-ISI-002, Code Case N-716 Project stage: Draft Response to RAI CNRO-2007-00026, Request for Alternative GG-ISI-002, Response to Request for Additional Information2007-07-0202 July 2007 Request for Alternative GG-ISI-002, Response to Request for Additional Information Project stage: Response to RAI CNRO-2007-00034, Request for Alternative GG-ISI-002, Response to Request for Additional Information2007-08-27027 August 2007 Request for Alternative GG-ISI-002, Response to Request for Additional Information Project stage: Response to RAI ML0725600142007-09-0505 September 2007 Proposed Risk-Informed Inservice Inspection Program Request for Additional Information Project stage: Request ML0726904242007-09-18018 September 2007 Supplemental Information for the Proposed Risk-Informed Inservice Inspection Program Project stage: Supplement ML0724300052007-09-21021 September 2007 Request for Alternative GG-ISI-002 - to Implement Risk-Informed Inservice Inspection Program Based on the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Code Case N-716 Project stage: Other ML0726205532007-09-28028 September 2007 Approval of Risk-Informed Safety-Based Inservice Inspection Program for Class 1 and 2 Piping Welds Project stage: Other 2007-05-02
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24289A1442024-10-15015 October 2024 NRR E-mail Capture - Acceptance Review - Entergy (Grand Gulf Nuclear Station and River Bend Station) - CNRO2024-00017 - Adopt TSTF-592 - CLIIP (L-2024-LLA-0133) ML24221A4172024-08-0101 August 2024 DC Cook 2024 PI&R Inspection Request for Information ML24178A0432024-06-26026 June 2024 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML24156A0072024-05-30030 May 2024 NRR E-mail Capture - Final RAI - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - License Amendment Request Regarding Reserve Feed Enclosure ML24156A0052024-05-22022 May 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Reserve Feed Enclosure ML24137A2702024-05-16016 May 2024 NRR E-mail Capture - Entergy Fleet - Acceptance Review of License Amendment Request to Remove Obsolete License Conditions from Operating Licenses for GGNS, RBS, and WF3 (L-2024-LLA-0062) ML24108A1142024-04-17017 April 2024 June 2024 Emergency Preparedness Program Inspection - Request for Information ML24103A1392024-04-12012 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of 10 CFR 50.69 ML24096A1132024-04-0505 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Delay in Issuance of License Amendment Regarding Neutron Flux Instrumentation ML24093A0582024-04-0202 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Request Regarding Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23361A1022023-12-21021 December 2023 Security Rule Exemption Request - ISFSI Docket No. Reference ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23335A0652023-12-0101 December 2023 NRR E-mail Capture - GGNS - Audit Questions for LARs Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Init. 4b and 50.69, Risk-Informed Cat. and Treatment of SSCs for Nuclear Pwr Rx (L-2023-LLA-0081/0080) ML23321A1222023-11-17017 November 2023 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23191A2802023-07-10010 July 2023 NRR E-mail Capture - Grand Gulf - Acceptance Review for LAR Adopting TSTF-505, Rev. 2, Provide Risk-Informed Completion Times - RITSTF Initiative 4b ML23191A8662023-07-10010 July 2023 NRR E-mail Capture - Grand Gulf - Acceptance Review of LAR Adopting 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSCs for Nuclear Power Reactors ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23052A1502023-02-21021 February 2023 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Neutron Flux Instrumentation ML23009B6912023-01-0909 January 2023 NRR E-mail Capture - Grand Gulf, Unit 1 and River, Unit 1 - Acceptance of Requested Licensing Action Request to Update ASME Code RR SE with NRC-Approved Revision of BWRVIP Guidelines ML22353A6122022-12-19019 December 2022 March 2023 Emergency Preparedness Exercise Inspection - Request for Information ML22307A2532022-11-0303 November 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Verbal Authorization of Relief Request ISIR-5-06 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML22206A0152022-07-21021 July 2022 NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems ML22173A0372022-06-21021 June 2022 NRR E-mail Capture - Entergy (Grand Gulf and River Bend) - Acceptance Review of the License Amendment Request to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22122A0902022-04-29029 April 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-554, Revision 1 ML22110A1172022-04-19019 April 2022 (GG) 2022 Emergency Preparedness (EP) Program Inspection RFI Sdh 041922 ML22075A3692022-03-0303 March 2022 Email Grand Gulf 2022 PI&R Request for Information ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML21341A6252021-12-0707 December 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-577, Revision 1 ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21307A3352021-11-0303 November 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Final RAI - License Amendment Request Regarding Containment Water Level Instrumentation ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21236A0262021-08-23023 August 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21165A1352021-06-14014 June 2021 NRR E-mail Capture - Grand Gulf - Acceptance Review for Inserice Testing Program Relief Request VRR-GGNS-2021-1, Pressure Isolation Valve Testing Frequency ML21140A3052021-05-20020 May 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21113A2812021-04-23023 April 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Containment Water Level Instrumentation ML21109A2142021-04-19019 April 2021 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Rev. Est Hours for Review of Relief Request (RR) - ASME Code RR Safety Eval with NRC-Approved Rev of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML21089A0222021-03-24024 March 2021 DC Cook Power Operated Valves (POV) Preliminary Request for Information ML21109A2132021-03-23023 March 2021 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Relief Request (RR) Associated with ASME Code RR Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML21082A0262021-03-22022 March 2021 Acceptance of Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21068A4092021-03-0909 March 2021 NRR E-mail Capture - Entergy Fleet (GGNS and RBS) -Approval of TSTF-501 LAR, Relocate Sored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21049A2682021-02-16016 February 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Final RAI - License Amendment Request for One-Time Extension Containment Type a ILRT ML21026A3472021-01-26026 January 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML21015A3452021-01-14014 January 2021 NRR E-mail Capture - Grand Gulf and River Bend - Revised Estimated Hours for Relief Request Associated with ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML21008A4742021-01-0808 January 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Extension Containment Type a ILRT 2024-08-01
[Table view] |
Text
Accession No. ML071160415 From: Bhalchandra Vaidya To: FBURFOR@ENTERGY.COM; gdavant@entergy.com; MCRAWF1@entergy.com; mkscarpello@aep.com; rgvasey@aep.com; sdsimpson@aep.com Date: 04/25/2007 11:45:04 AM
Subject:
Fwd: Proposed Topic for discussion at May 7 RI-ISI meeting, Code Case N-716 Please see the attached e-mail from the staff reviewer. As he has suggested in the e-mail, please be prepared to discuss the subject matter. Also, if you can bring any additional evaluations, analyses, supporting information, etc. for the meeting (better yet, if you can send it to me ahead of the meeting ), the discussion would go smoother.
- Thanks, Bhalchandra Vaidya NRR/DORL/LPL-IV/PM 301-415-3308 M/S: O-7D1 bkv@nrc.gov CC: Peter Tam Mail Envelope Properties (462F7778.FBB : 10 : 35718)
Subject:
Fwd: Proposed Topic for discussion at May 7 RI-ISI meeting, Code Case N-716 Creation Date 04/25/2007 11:44:56 AM From: Bhalchandra Vaidya Created By: BKV@nrc.gov Recipients aep.com mkscarpello (mkscarpello@aep.com) rgvasey (rgvasey@aep.com) sdsimpson (sdsimpson@aep.com) entergy.com FBURFOR (FBURFOR@ENTERGY.COM)
GDAVANT (gdavant@entergy.com)
MCRAWF1 (MCRAWF1@entergy.com) nrc.gov TWGWPO02.HQGWDO01 PST CC (Peter Tam)
Post Office Route aep.com entergy.com TWGWPO02.HQGWDO01 nrc.gov Files Size Date & Time
MESSAGE 954 04/25/2007 11:44:56 AM Mail Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed
Subject:
No Security: Standard From: Stephen Dinsmore To: Andrea Keim; Bhalchandra Vaidya Date: 04/24/2007 4:47:29 PM
Subject:
Proposed Topic for discussion at May 7 RI-ISI meeting After further review of the draft responses to the second set of RAIs, I propose the following as a topic for discussion at the May 7, 2007 meeting.
In the response to RAI #1 in RAI set #2, the licensee stated, in general terms, why the proposed methodology is consistent with RG 1.178. Such generalities may not, however, be needed or sufficient. The method propose by the licensee effectively replaces the EPRI RI-ISI process with the generic categorization, supplemented by the IPE flooding analysis.
Licensee IPE flooding analysis have been reviewed against the ASME RAS-S-2000 standard (currently Addendum B has been issued). Rather than a discussion in general terms about consistency between the approved RI-ISI methodology and the proposed methods, it would be most productive to discuss the adequacy of the flooding evaluation with respect to a RI-ISI evaluation in terms of the specific supporting requirements (SRs) that characterize a licensees flooding analysis. The ASME standard includes three categories for each SR (Cat. I the lowest, Cat. III the highest) and the licensees analysis is placed into one of the three categories for each SR by a peer review group.
These SRs describe many of the characteristics of a flooding analysis relied upon in a RI-ISI evaluation For example, for discussion purposes, a rating of Cat. III for SR IF-C3 appears consistent with RI-ISI analysis requirements. Similarly, a Cat. II for SR IF-C6 and IF-C8 might be sufficient for RI-ISI analysis.
It would be useful to discuss the specific SR results of the peer review of GG and DC Cooks IPE flooding analyses at the meeting, and how these results compare to the characteristics of an acceptable evaluation for RI-ISI programs. It may be feasible to appropriately characterize the adequacy of GG and DC Cooks flooding analyst to support the RI-ISI evaluation in terms of the categories assigned to the flooding SRs. If the ASME standard will not identify an analysis equivalent to the RI-ISI analysis (perhaps because of the grouping in IF-C4 and screening in IF-D7), additional RI-ISI specific additions to the SRs (or the sufficiency of the SRs instead of the RI-ISI analysis) could be discussed.
steve
>>> Bhalchandra Vaidya 04/12/2007 1:05 PM >>>
This transmittal includes Draft RAI responses for the second set of RAIs from grand Gulf as well as those for first set again.
Let me know, if you have any comments or follow up questions that the licensee needs to prepare responses, and send those to us before the meeting.
- Thanks, Bhalchandra Vaidya NRR/DORL/LPL-IV/PM 301-415-3308 M/S: O-7D1 bkv@nrc.gov CC: Donald Harrison