May 17, 2007 LICENSEE:
Entergy Operations, Inc. and Indiana Michigan Power Company FACILITY:
Grand Gulf Nuclear Station, Unit 1 and Donald C. Cook, Units 1 and 2
SUBJECT:
SUMMARY
OF MAY 7, 2007, MEETING WITH ENTERGY OPERATIONS, INC.
AND INDIANA MICHIGAN POWER COMPANY ON THE METHODOLOGY FOR APPLYING AND IMPLEMENTING THE RISK-INFORMED INSERVICE INSPECTION PROGRAM VIA ASME CODE CASE N-716 AT GRAND GULF NUCLEAR STATION, UNIT 1, AND DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. MD3044, MD3137, AND MD3138)
On May 7, 2007, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Operations, Inc. (Entergy)/Grand Gulf Nuclear Station, Unit 1 (GGNS) and Indiana Michigan Power Company (I&M)/ Donald C. Cook Nuclear Plant, Units 1 and 2 (CNP), at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the draft responses received from GGNS and CNP to the Requests for Additional Information (RAIs) from the NRC staff, in reference to their requests for the alternative to implement the methodology for applying and implementing the Risk-Informed Inservice Inspection Program via American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-716 at GGNS and CNP. A list of attendees is provided as an enclosure.
There are two sets of RAIs for each submission from GGNS and CNP. The NRC staff discussed the draft response to each RAI question, asked for verbal explanations and clarifications for some draft responses from the GGNS and CNP, and indicated whether any of the draft responses need to be revised to include the explanations and clarifications. All RAI questions were discussed. The table below summarizes the discussion:
Item No.
GGNS Item No.
CNP 1
Set 1, Q 1(b): Identify which change in risk estimate is the baseline estimate.
1 Set 1, Q 1(b): Identify which change in risk estimate is the baseline estimate.
2 Set 1, Qs 2(a) and 2(b): Provide revised response addressing the use of core damage frequency (CDF) guidelines of 1.0E-6/year and the absence of large early release frequency (LERF) guidelines.
2 Set 1, Q 6(a) and 6(b): Provide revised response addressing the use of CDF guidelines of 1.0E-6/year and the absence of LERF guidelines.
3 Set 1, Add Q 4(e): How did GGNS evaluate Interfacing System LOCA (loss-of-coolant accident)?
4 Set 2, Qs 8(a), (b), and (c): May revise the response to adopt CNP Set 2, Qs 5(a), (b), and (c) response.
Item No.
GGNS Item No.
CNP 5
Set 1, Q 3(b): Add CNP words about 1.0E-4.
RAI Set #1, RAI 3b. Grand Gulf should confirm that their internal flooding analysis indicated that the conditional core damage probability (CCDP) values of 1E-4 are indeed bounding estimates as used in the analysis in the submittal.
6 Set 2, Q 6: Provide additional figures/sketches in the response. Revise to address socket welds. However, the NRC staff would continue its review of the response and provide its feedback.
3 Set 2, Q 3: Provide additional figures/sketches in the response. Revise to address socket welds. However, the NRC staff would continue its review of the response and provide its feedback.
Entergy and CNP stated that they will submit the revised draft responses for Item No. 2 in the above table, in about 2 weeks. The NRC staff indicated that GGNS and CNP can submit their final supplemental responses for all RAIs, except for Item No. 2 in the above table.
There were no handouts or presentation material at the meeting.
A member of the public was in attendance. Completed Public Meeting Feedback forms were not received during the meeting. There were no comments or suggestions from the public during the meeting.
Please direct any inquiries to me at 301-415-3308, or bkv@nrc.gov.
/RA/
Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416, 50-315, and 50-316
Enclosure:
List of Attendees cc w/encl: See next page
Pkg ML071290193 (Mtg Notice/Agenda ML070960441, Mtg Summary ML071290203)
OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME BVaidya JBurkhardt THiltz DATE 5/17/07 5/16/07 5/17/07
Entergy Corporation/Grand Gulf Nuclear Station, Unit 1 Indiana Michigan Power Company/Donald C. Cook Nuclear Plant, Units 1 and 2 ASME Code Case N-716 Meeting May 7, 2007 Attendees NAME ORGANIZATION Steve Scott Entergy Guy Davant Entergy Kevin Hall Entergy Steve Lewis Entergy Gary Smith Entergy Patrick O'Ragan EPRI Biff Bradley NEI, Representing Entergy Richard Fougerousse J. H. Moody Consulting, Contractor for Entergy Susan Simpson AEP/I&M Paul Donavin AEP/I&M Bhalchandra Vaidya NRC/NRR/DORL Stephen Dinsmore NRC/NRR/DRA Andrea Keim NRC/NRR/DCI Wallace Norris NRC/RES/DFGRR/FAIT Mahesh Chawla NRC/NRR/DORL Yeon-KT Chung NRC/NRR James C. Pak (*)
Dominion
(*) - Members of Public
November 2006 Grand Gulf Nuclear Station cc:
Executive Vice President
& Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Chief Energy and Transportation Branch Environmental Compliance and Enforcement Division Mississippi Department of Environmental Quality P.O. Box 10385 Jackson, MS 39289-0385 President Claiborne County Board of Supervisors P.O. Box 339 Port Gibson, MS 39150 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 399 Port Gibson, MS 39150 General Plant Manager Operations Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA 70804-9005 State Health Officer State Board of Health P.O. Box 139 Jackson, MS 39205 Office of the Governor State of Mississippi Jackson, MS 39201 Attorney General Asst. Attorney General State of Mississippi P.O. Box 22947 Jackson, MS 39225-2947 Vice President, Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Director Nuclear Safety Assurance Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Director Nuclear Safety & Licensing Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213-8298 Manager, Licensing Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russsell Hall, Room 201 Natchitoches, LA 71497 Mr. William R. Brian Vice President of Operations Grand Gulf Nuclear Station Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150
Donald C. Cook Nuclear Plant, Units 1 and 2 cc:
Regional Administrator, Region III U.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4351 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, MI 48913 Township Supervisor Lake Township Hall P.O. Box 818 Bridgman, MI 49106 U.S. Nuclear Regulatory Commission Resident Inspector's Office 7700 Red Arrow Highway Stevensville, MI 49127 Kimberly Harshaw, Esquire Indiana Michigan Power Company One Cook Place Bridgman, MI 49106 Mayor, City of Bridgman P.O. Box 366 Bridgman, MI 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, MI 48909 Susan D. Simpson Regulatory Affairs Manager Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Michigan Department of Environmental Quality Waste and Hazardous Materials Div.
Hazardous Waste & Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P. O. Box 30241 Lansing, MI 48909-7741 Lawrence J. Weber, Plant Manager Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Mark A. Peifer, Site Vice President Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Mr. Mano K. Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106