MONTHYEARML0708904632007-03-29029 March 2007 Draft RAI on D. C. Cook Risk-Informed ISI Program Project stage: Draft RAI ML0711604152007-04-25025 April 2007 Additional Issues to Discuss in the 5/7/07 Meeting Project stage: Meeting ML0712300182007-05-0202 May 2007 Internal Flooding Study, Encl 3, for D.C. Cook, Units 1 and 2 Project stage: Other ML0712300142007-05-0202 May 2007 Report Regarding Overview of Each Portion of the 2006 Update to the Cook Plant Internal Flooding PRA Model Project stage: Other ML0712300132007-05-0202 May 2007 Response to NRC Request for Additional Information on DC Cook Nuclear Plant (CNP) Risk Informed ISI Application Per ASME Section XI Code Case N-716 Project stage: Response to RAI ML0712300122007-05-0202 May 2007 5/2/2007 E-mail from Robert Vasey, American Electric Power, Licensee for D.C. Cook, Units 1 and 2, to B. Vaidya, NRC/NRR/DORL/LPL4, Re May 7, 2007 Code Case N-716 Meeting Project stage: Meeting ML0712902032007-05-17017 May 2007 Summary of Meeting with Entergy Operations, Inc. & Indiana Michigan Power Co. Risk-informed Inservice Inspection Program/Code Case N-716 at Grand Gulf Ns & Donald C. Cook Np, Units 1 & 2 (TAC MD3044, MD3137 & MD3138) Project stage: Meeting ML0725600142007-09-0505 September 2007 Proposed Risk-Informed Inservice Inspection Program Request for Additional Information Project stage: Request ML0726904242007-09-18018 September 2007 Supplemental Information for the Proposed Risk-Informed Inservice Inspection Program Project stage: Supplement ML0726205532007-09-28028 September 2007 Approval of Risk-Informed Safety-Based Inservice Inspection Program for Class 1 and 2 Piping Welds Project stage: Other 2007-05-02
[Table View] |
Similar Documents at Cook |
|---|
|
Text
Internal Flooding Study The DC Cook internal flooding study was developed to meet the ASME PRA Standard.
Overall it meets Category II of the Standard with a number of supporting requirements meeting Category III (e.g. IF-C6). While the internal flooding study has not gone through a formal peer review, it was developed in accordance with internal DC Cook calculation procedures, which include an independent review function.