MONTHYEARML0633203662006-11-28028 November 2006 Revised Notice of Meeting with Entergy Operations, Inc./Grand Gulf Nuclear Station, Unit 1 to Present Methodology for Applying and Implementing Risk-Informed Inservice Inspection Program Via American Society of Mechanical Engineers Project stage: Meeting ML0634500682006-12-0505 December 2006 12/5/06 Public Meeting Handout from Entergy/Epri Re GGNS Application of N-716 Project stage: Meeting ML0634605652006-12-19019 December 2006 12/5/2006 Summary of Meeting W/Entergy Operations, Inc. & GGNS, Unit 1 Methodology for Applying & Implementing the Risk-informed Inservice Inspection Program Via ASME Code Case N-716 at GGNS Project stage: Meeting ML0703102402007-02-0707 February 2007 Acceptance Review Request for Alternative GG-ISI-002 (Pilot Request), Request to Use ASME Code Case N-716 Project stage: Acceptance Review ML0711702462007-04-12012 April 2007 E-Mail from G. Davant, Entergy Operations, Inc. to B. Vaidya, NRR/DORL/LPL4, Enclosing Two Sets of Responses to Request for Information Re GG-ISI-002 (TAC No. MD3044) - E-Mail Project stage: Response to RAI ML0711702542007-04-12012 April 2007 Set 1 of Response to Request for Information Re GG-ISI-002 Code Case N-716 - Enclosure to 4/12/07 to E-Mail from G. Davant, Entergy Operations, Inc. to B. Vaidya, NRR/DORL/LPL4 Project stage: Response to RAI ML0711702612007-04-12012 April 2007 Set 2 of Response to Request for Information Re GG-ISI-002 Code Case N-716 - Enclosure to 4/12/07 to E-Mail from G. Davant, Entergy Operations, Inc. to B. Vaidya, NRR/DORL/LPL4 Project stage: Response to RAI ML0709604412007-04-20020 April 2007 Notice of Meeting with Indiana Michigan Power Co & Entergy Operations, Inc. to Discuss Risk-Informed Inservice Inspection Program Via ASME Code Case N-716 Project stage: Meeting ML0711604152007-04-25025 April 2007 Additional Issues to Discuss in the 5/7/07 Meeting Project stage: Meeting ML0712902032007-05-17017 May 2007 Summary of Meeting with Entergy Operations, Inc. & Indiana Michigan Power Co. Risk-informed Inservice Inspection Program/Code Case N-716 at Grand Gulf Ns & Donald C. Cook Np, Units 1 & 2 (TAC MD3044, MD3137 & MD3138) Project stage: Meeting CNRO-2007-00022, Request for Alternative GG-ISI-002, Response to Requests for Additional Information2007-05-23023 May 2007 Request for Alternative GG-ISI-002, Response to Requests for Additional Information Project stage: Response to RAI ML0716504412007-06-14014 June 2007 6/14/2007 E-mail from W. Brice, Entergy Operations, Inc. to B. Vaidya, NRR/DORL/LPL4 - Draft Responses to Requests for Additional Information, Questions 2a and 2b, for Relief Request GG-ISI-002 Project stage: Draft Response to RAI ML0716504462007-06-14014 June 2007 6/14/2007 Draft Responses to Requests for Additional Information, Questions 2a and 2b, for Relief Request GG-ISI-002 from W. Brice, Entergy Operations, Inc. Project stage: Draft Response to RAI ML0717200182007-06-20020 June 2007 6/20/07 E-Mail from G. Davant, Entergy, to B. Vaidya, NRR/DORL/LPL4 - Enclosing Draft Response to NRC Request for Additional Information Re GG-ISI-002, Code Case N-716 Project stage: Draft Response to RAI ML0717200252007-06-20020 June 2007 Draft Response to NRC Request for Additional Information Re GG-ISI-002, Code Case N-716 Project stage: Draft Response to RAI CNRO-2007-00026, Request for Alternative GG-ISI-002, Response to Request for Additional Information2007-07-0202 July 2007 Request for Alternative GG-ISI-002, Response to Request for Additional Information Project stage: Response to RAI CNRO-2007-00034, Request for Alternative GG-ISI-002, Response to Request for Additional Information2007-08-27027 August 2007 Request for Alternative GG-ISI-002, Response to Request for Additional Information Project stage: Response to RAI ML0724300052007-09-21021 September 2007 Request for Alternative GG-ISI-002 - to Implement Risk-Informed Inservice Inspection Program Based on the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Code Case N-716 Project stage: Other 2007-04-25
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24234A0072024-10-16016 October 2024 Summary of Partially Closed Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request Related to the Spent Fuel Pool Racks for the Grand Gulf Nuclear Station, Unit 1 ML24052A2572024-02-26026 February 2024 Summary of January 17, 2024, Partially Closed Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Entergy Fleet Regarding Implementation of an Online Monitoring Methodology ML23193A8412023-07-17017 July 2023 Summary of Entergy Operations, Inc. Regulatory Conference: GGNS, Calibration Failures of Drywell/Containment High Range Radiation Monitors Resulting in White Finding July 6, 2023 ML23125A0752023-05-0808 May 2023 May 3, 2023, Summary of Public Meeting with Entergy Operations, Inc., to Discuss Planned Submittals of 10 CFR 50.69 and TSTF-505 for Grand Gulf Nuclear Station, Unit 1 ML23047A3822023-03-21021 March 2023 Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting ML22167A0882022-06-24024 June 2022 Summary of June 14, 2022, Public Meeting with Entergy Operations, Inc. to Discuss Upcoming Relief Request to Use Code Case N-752 for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21323A0472021-12-0606 December 2021 Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors ML21285A1352021-10-13013 October 2021 Summary of Regulatory Performance Meeting with Entergy Operations, Inc. to Discuss the Results of the Nrc'S Supplemental 95002 Inspection of Grand Gulf Nuclear Station ML21181A3352021-07-0101 July 2021 June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21158A2232021-06-0808 June 2021 Meeting Summary for Ticap Workshop 3 ML21132A2952021-05-14014 May 2021 Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21131A0042021-05-11011 May 2021 May 10, 2021, Summary of Public Meeting with Entergy Operations, Incorporated to Discuss Upcoming Relief Request to Adopt Performance-Based Testing for Pressure Isolation Valves for Grand Gulf Nuclear Station, Unit 1 ML21092A1542021-04-0202 April 2021 GG 2020 EOC Public Meeting Summary of Public Meeting with Entergy Operations, Inc ML20353A4372020-12-18018 December 2020 Regulatory Conference Summary, December 10, 2020 ML20218A7512020-08-0707 August 2020 Summary of June 25, 2020 Teleconference with Grand Gulf Nuclear Station ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19122A4202019-05-0202 May 2019 Summary of Public Meeting with Entergy Operations, Inc ML18094A2632018-08-17017 August 2018 Summary of 01/18/2018, Public Meeting with Nuclear Energy Institute, Duke Energy, Southern Nuclear Operating Co., Entergy Operations, Inc. to Discuss Development of Tornado Missile Risk Evaluator Methodology ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML18092A4422018-03-28028 March 2018 Summary of Public Meeting with Entergy Operations, Inc. Regarding Results of the Annual Assessment of Safety Performance at Grand Gulf Nuclear Station ML17353A1542017-12-22022 December 2017 Summary of Public Meeting with Entergy Operations, Inc., on Proposed Changes to Emergency Plans to Revise Emergency Action Levels for Arkansas; Grand Gulf; River Bend; and Waterford (EPID-L-2017-LRM-0060) ML17340A0612017-12-0808 December 2017 11/8/17 Summary of Teleconference with Entergy Operations, Inc., Tornado Missile Risk Evaluator with Applicability to Submittals from Duke Energy and Southern Nuclear Operating Co, Inc. ML17244A0742017-09-28028 September 2017 8/17/2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 ML17257A0992017-09-26026 September 2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 ML17101A4402017-04-11011 April 2017 Summary of Public Meeting with Entergy Operations, Inc. to Discuss Results of the Annual Assessment of Safety Performance at Grand Gulf Nuclear Station for 2016 ML16280A5062016-10-19019 October 2016 Summary of Teleconference Held on September 28, 2016, Between the NRC and Entergy Co. Concerning Containment Leak Rate Program Pertaining to the Grand Gulf Nuclear Station Unit 1 ML16286A6222016-10-14014 October 2016 Report on the Safety Aspects of the License Renewal Application of the Grand Gulf Nuclear Station, Unit 1 ML16179A3852016-06-27027 June 2016 U.S. Nuclear Regulatory Commission Public Meeting Summary - Open House Meeting with Members of the Public - Grand Gulf Nuclear Station ML15355A0342016-01-12012 January 2016 12/8/2015 Summary of Teleconference for GGNS Set 53 RAI Responses ML15215A0412015-10-14014 October 2015 Summary of Conference Call for GGNS Fire Water System RAI Responses ML14258A1452015-02-19019 February 2015 August 21, 2014, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning RAI Set 51 for the Grand Gulf, Unit 1, License Renewal Application ML14184B1832014-07-10010 July 2014 Summary of Telephone Conference Call Held on June 18, 2014, Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Draft RAI 3.0.5-1E (Operating Experience Follow-Up) for the Grand Gulf, Unit 1, License Rene ML14156A3782014-06-25025 June 2014 Summary of Meeting Between Representatives of the Nuclear Regulatory Commission and Entergy Operations Inc. to Discuss Flooding Analysis Associated with Grand Gulf Nuclear Station Unit 1 ML14043A1102014-02-28028 February 2014 01/29/2014 Summary of Public Meetings to Discuss Draft Supplement 50 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Grand Gulf, Unit 1, (TAC Nos ME7385 and ME7386) ML13064A0582013-04-0303 April 2013 Summary of Telephone Conference Call Held on February 19, 2013, Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, Licens ML12338A6502013-01-14014 January 2013 LRA RAI Telecon 2012-10-26 ML12334A3472013-01-0303 January 2013 Summary of Telephone Conference Call Held on September 28, 2012, Between the NRC and Entergy, Concerning RAI Pertaining to the Grand Gulf Nuclear Station, LRA ML12264A6492012-11-15015 November 2012 Summary of Telephone Conference Call Held on August 29, 2012, Between the NRC and Entergy, Concerning RAI Pertaining to the Grand Gulf Nuclear Station, LRA ML12271A2522012-11-0909 November 2012 Summary of Telephone Conference Call Held on 08/22/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA ML12250A1052012-10-31031 October 2012 Summary of Telephone Conference Call Held on 8/15/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA ML12264A3872012-10-31031 October 2012 Summary of Telephone Conference Call Held on 8/21/12, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML12214A5482012-09-14014 September 2012 7/18/12 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA ML12209A1482012-08-28028 August 2012 6/8/12 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA ML12201B5452012-08-28028 August 2012 Summary of Telephone Conference Call Held on 6/5/12, Between NRC and Entergy, Concerning RAI Pertaining to the Grand Gulf Nuclear Station, LRA ML12240A4162012-08-27027 August 2012 Public Meeting with Entergy Operations, Inc to Discuss the Performance of the Subject Facilities and Current Regulatory Issues ML12202A2142012-08-15015 August 2012 5/30/12 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA ML12193A0712012-08-15015 August 2012 Summary of Telephone Conference Call Held on 5/15/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA 2024-02-26
[Table view] |
Text
December 19, 2006 LICENSEE: Entergy Operations, Inc.
FACILITY: Grand Gulf Nuclear Station, Unit 1
SUBJECT:
SUMMARY
OF DECEMBER 5, 2006, MEETING WITH ENTERGY OPERATIONS, INC., AND GRAND GULF NUCLEAR STATION, UNIT 1, ON THE METHODOLOGY FOR APPLYING AND IMPLEMENTING THE RISK-INFORMED INSERVICE INSPECTION PROGRAM VIA AMERICAN SOCIETY OF MECHANICAL ENGINEERS BOILER AND PRESSURE VESSEL CODE CASE N-716 AT GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. MD3044)
On December 5, 2006, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Operations, Inc., and Grand Gulf Nuclear Station, Unit 1 (GGNS, the licensee) at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to present to the NRC staff, in reference to Relief Request number GG-ISI-002, the methodology for applying and implementing the Risk-Informed Inservice Inspection Program via American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-716 at GGNS. A list of attendees is provided as an enclosure.
The licensee presented information (see the Agencywide Documents Access and Management System Accession Number ML063450068).
The presentation provided an introduction to Code Case N-716, whose purpose is to provide a streamlined process for Risk-Informed Inservice Inspection programs. The licensee also gave some background on Code Case N-716, describing the status of similar submissions by other plants and the results of the NRC's review of those submittals. The licensee went on to describe how Code Case N-716 would be applied at GGNS by using a series of tables that dealt with Code Case N-716 Safety Determination at GGNS and a comparison of the inspection locations between ASME Code,Section XI, and the ASME Code Case N-716.
The NRC staff queried the licensee on various topics. The NRC staff emphasized that the clarity of the tables illustrating the licensee's proposed use of Code Case N-716 would be very important for the reviewers of the application due to the fact that this information would be the most pertinent to the reviewer.
The licensee indicated that the insights provided from the NRC were very valuable and they would pursue providing more clarity in their submission.
Members of the public were in attendance. Public Meeting Feedback form was received only from Mr. Richard Haessler, Westinghouse Electric, indicating his satisfaction. He did not have any comments or suggestions.
Please direct any inquiries to me at 301-415-3308, or bkv@nrc.gov.
/RA/
Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosure:
List of Attendees cc w/encl: See next page
Package ML063460562 (REVISED Meeting Notice - ML063320366 Meeting Summary - ML063460565, Licensee Handouts - ML063450068)
OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME BVaidya LFeizollahi DTerao DATE 12/19/06 12/19/06 12/19/06 Entergy Corporation Grand Gulf Nuclear Station, Unit 1 ASME Code Case N-716 Meeting December 5, 2006 Attendees NAME ORGANIZATION Steve Scott Entergy Guy Davant Entergy Kevin Hall Entergy Steve Lewis Entergy Patrick O'Reagan EPRI David Terao NRC/NRR/DORL Ronald Cureton NRC/NRR/DORL Stephen Dinsmore NRC/NRR/DRA Andrea Keim NRC/NRR/DCI Wallace Norris NRC/RES/DFGRR/FAIT Richard Haessler (*) Westinghouse Mark Pyne (*) via phone Duke Energy Roy E. Hall (*) Constellation Energy Group
(*) - Members of Public
Grand Gulf Nuclear Station cc:
Executive Vice President Office of the Governor
& Chief Operating Officer State of Mississippi Entergy Operations, Inc. Jackson, MS 39201 P.O. Box 31995 Jackson, MS 39286-1995 Attorney General Asst. Attorney General Chief State of Mississippi Energy and Transportation Branch P.O. Box 22947 Environmental Compliance and Jackson, MS 39225-2947 Enforcement Division Mississippi Department of Environmental Vice President, Operations Support Quality Entergy Operations, Inc.
P.O. Box 10385 P.O. Box 31995 Jackson, MS 39289-0385 Jackson, MS 39286-1995 President Director Claiborne County Nuclear Safety Assurance Board of Supervisors Entergy Operations, Inc.
P.O. Box 339 P.O. Box 756 Port Gibson, MS 39150 Port Gibson, MS 39150 Regional Administrator, Region IV Director U.S. Nuclear Regulatory Commission Nuclear Safety & Licensing 611 Ryan Plaza Drive, Suite 400 Entergy Operations, Inc.
Arlington, TX 76011-8064 1340 Echelon Parkway Jackson, MS 39213-8298 Senior Resident Inspector U.S. Nuclear Regulatory Commission Manager, Licensing P.O. Box 399 Entergy Operations, Inc.
Port Gibson, MS 39150 P.O. Box 756 Port Gibson, MS 39150 General Plant Manager Operations Richard Penrod, Senior Environmental Entergy Operations, Inc. Scientist/State Liaison Officer P.O. Box 756 Office of Environmental Services Port Gibson, MS 39150 Northwestern State University Russsell Hall, Room 201 Attorney General Natchitoches, LA 71497 Department of Justice State of Louisiana Mr. William R. Brian P.O. Box 94005 Vice President of Operations Baton Rouge, LA 70804-9005 Grand Gulf Nuclear Station Entergy Operations, Inc.
State Health Officer P. O. Box 756 State Board of Health Port Gibson, MS 39150 P.O. Box 139 Jackson, MS 39205 November 2006