Salem / Hope Creek Allegations Summary of allegations:

1. SOWE - safety conscious work environment (production over safety)

A. Specific SCWE incidents

  • Sept 24,2002 at Sale pterates .

confidential report substantiates a legation, Third Step Grievance

  • March 17, 2003 at Hope Creek n confide that ft"W ressured or restart withou ýforced outage - bypass valve incident; Forced outage & bypass valve repair occurred.
  • March 17, 2003 at Hope tole d alleger he did*

not have the authority to stop the evolution (reactivity e-xcursion during the bypass valve shutdown?) even though he knew itwas ill-conceived.

  • June 17, 2003 at Hop~eCreek - ED.G l~akage exceeds LCO time; pressure' to avoid shutdown O WNRdirected operato to not shutdown; shutdown later commenced.
  • Fall ()2002 at Salem - Maaeiet NA a ýstartup checklist step'.
  • Excessive use of temporary logs to monito~r de graded 'equipment. (NEOs can. provide)

Salem grassing (i.e., heroic effort 's) deviated from expected approachI lessons learned -from 1994 grassing* 10

  • Higher Tritium sample concentration in Spring 2003 - "a serious issue that had o bQhandled with kid gloves to keep us [PSEG) out of trouble" B. General SCWE
  • Discussions w t Ii pt al, including some taped
  • Ineraci. n W perating management & staff Lettrto~mpO nd EUCP - March 25
  • Comment (mostly negative) from ECP survery - 40 2002 & IQ 2003 Approach - Inomto nti ecord was deleIW inaccordance with the Freedom of InformatioQ Act, exemptions r7, FDIA--[

Page 10o2

  • Interviews with all shift managers at Salem and Hope Creek by tech nica1/0I/con SUltant team to generally address SCWE
  • NRC-directed survey of operations staffs to address specific issues raised or should have been raised in an anonymous manner to NRC ?
  • Get April 2003 results of Gallup G-12 survey (multi-year effort to measure staff engagement, an indirect measure of SCWE)
2. Technical Review of Specific Incidents
  • Technical review of above specific incidents (many previously reviewed) to assure technical Inuclear safety considerations were met in'light of new info;.

Approach - Residents perform review and document in memo to file.

3. Discrimination
  • Termination following raising safety concerns triMM
  • Termination date of April 16 mo'ved up to March'28 a6 request
  • ECP report of July 1'7 and Winston-Str'awn review find her alleged discrimination to be unsubstantiated due to Human Resources' decisions to end position and to advance termination date.

Approach - 01 to open. discrimination case.

4. Wrongdoing
  • PSEG destroys unfavorable documents
  • Three specifics knows some; as asked to rewrite a notifica~tion, Winston-Strawn investigation differed from interviewees' accounts Ap~proach - Perform additional review to clarify general statements for possible 01 review October 1,2003 G: Br. 3\Salem\allegation-culture.wpd Page 2 of 2