Letter Sequence Approval |
---|
TAC:MC8096, Revise Topical Report References in ITS 5.6.5, Colr (Approved, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf IR 05000285/20230032023-07-10010 July 2023 NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska ML23151A0032023-06-0505 June 2023 Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, Shpo; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commission'S Analysis of Omaha Public Power District'S Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1252022-08-0303 August 2022 Letter to Mr. Timothy Rhodd, Chairperson, Iowa Tribe of Kansas and Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1262022-08-0303 August 2022 Letter to Roger Trudell, Chairman, Santee Sioux Nation, Nebraska, Re., Ft Calhoun LTP Section 106 ML22101A1092022-08-0303 August 2022 Letter to Mr. Durell Cooper, Chairman, Apache Tribe of Oklahoma; Re., Ft Calhoun LTP Section 106 ML22138A1242022-08-0303 August 2022 Letter to Mr. Reggie Wassana, Governor, Cheyenne and Arapaho Tribes, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1292022-08-0303 August 2022 Letter to Tiauna Carnes, Chairperson, Sac and Fox Nation of Missouri in Kansas, Re., Ft Calhoun LTP Section 106 ML22138A1212022-08-0303 August 2022 Letter to Mr. Edgar Kent, Chairman, Iowa Tribe of Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1282022-08-0303 August 2022 Letter to Victoria Kitcheyan, Chairwoman, Winnebago Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1232022-08-0303 August 2022 Letter to Mr. Leander Merrick, Chairperson, Omaha Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1272022-08-0303 August 2022 Letter to Vern Jefferson, Chairman, Sac and Fox Tribe of the Mississippi in Iowa, Re., Ft Calhoun LTP Section 106 ML22214A0922022-08-0303 August 2022 Letter to Stacy Laravie, Thpo, Ponca Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22159A2152022-06-28028 June 2022 Letter Forwarding FRN on Public Meeting and Request for Comment on License Termination Plan LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information IR 05000285/20220032022-06-15015 June 2022 NRC Inspection Report 05000285/2022003 ML22119A2472022-05-0303 May 2022 Review of Amendment Request to Add a LC to Include LTP Requirements, RAI for Environmental Review IR 05000285/20220022022-04-28028 April 2022 NRC Inspection Report 050-00285/2022-002 LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report 2024-01-31
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements ML20071E1042020-03-25025 March 2020 Issuance of Amendment to Change the Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan to Reflect an ISFSI-Only Configuration ML19297D6772019-12-11011 December 2019 Issuance of Amendment to Revise the Permanently Defueled Technical Specifications to Align to the Requirements for Permanent Removal of Spent Fuel from the Spent Fuel Pool ML18047A6612018-03-28028 March 2018 Issuance of Amendment No. 298, Request to Modify License Condition 3.C to Delete Requirement for Commission-Approved Cyber Security Plan (CAC No. MF9850; EPID L-2017-LLA-0236) ML18068A1652018-03-0909 March 2018 Correction to Page 1 of Attachment to Enclosure 1 for Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML18010A0872018-03-0606 March 2018 Issuance of Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML17338A1722018-01-19019 January 2018 Issuance of Amendment No. 296, Revise Technical Specifications (TS) to Delete Dry Spent Fuel Cask Loading Limits from TS 3.8.3(6), Figure 2-11, Table 3-4, Table 3-5, and TS 4.3.1.3 (CAC No. MF9831; EPID L-2017-LLA-0235) ML17276B2862017-12-12012 December 2017 Issuance of Amendment No. 295, Revise the Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MF8951; EPID L-2016-LLA-0036) ML17289A0602017-11-22022 November 2017 Issuance of Amendment No. 294, Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9559; EPID L-2017-LLA-0184) ML17278A6072017-11-17017 November 2017 Issuance of Amendment No. 293, Request to Revise Current Licensing Basis for the Auxiliary Building to Use American Concrete Institute Ultimate Strength Requirements (CAC No. MF8525; EPID L-2016-LLA-0013) ML17165A4652017-07-28028 July 2017 Fort Calhoun Station, Unit 1 - Issuance of Amendment No. 292, Revise Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning (CAC No. MF8437) ML17123A3482017-07-27027 July 2017 Issuance of Amendment No. 291, Revise the Radiological Emergency Response Plan for Permanently Defueled Condition ML17179A1782017-06-29029 June 2017 Correction to Technical Specification Definitions - Page 7 for Amendment No. 286, Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and ... LIC-17-0047, Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2017-05-15015 May 2017 Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme ML17053A0992017-04-0707 April 2017 Issuance of Amendment No. 290, Request to Delete License Condition 3.D., Fire Protection Program, No Longer Needed for Permanently Shutdown and Defueled Condition ML16182A3632016-08-19019 August 2016 Issuance of Amendment No. 289, Request to Adopt Technical Specification Task Force (TSTF)-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML16139A8042016-06-0808 June 2016 Issuance of Amendment No. 288, Request to Adopt Technical Specifications Task Force (TSTF)-426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiative 6b & 6c ML16084A7552016-04-0505 April 2016 Issuance of Amendment No. 287, Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using CLIIP ML15307A0132016-02-23023 February 2016 Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition ML15288A0052015-12-15015 December 2015 Issuance of Amendment No. 285, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15294A2792015-11-19019 November 2015 Issuance of Amendment No. 284, Request to Revise License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15209A8022015-08-10010 August 2015 Issuance of Amendment No. 283, Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML15111A3992015-06-30030 June 2015 Issuance of Amendment No. 282, Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood ML15035A2032015-03-27027 March 2015 Issuance of Amendment No. 281, Revise Technical Specification 3.1, Table 3-3 to Correct Administrative Error in Surveillance Method for Containment Wide Range Radiation Monitors ML15015A4132015-02-20020 February 2015 Issuance of Amendment No. 280, Revise Technical Specification 3.2, Table 3-5 to Add New Surveillance Requirement ML14356A0122014-12-29029 December 2014 Issuance of Amendment No. 279, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months ML14328A8142014-12-22022 December 2014 Issuance of Amendment No. 278, Revise Technical Specification 2.5, Auxiliary Feedwater (AFW) System to Allow 7-Day Completion Time for Turbine-Driven AFW Pump Based on TSTF-340, Revision 3 ML14279A2752014-11-0606 November 2014 Issuance of Amendment No. 277, Revise Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3, for One-Time Extension of Frequency to Maximum of 28 Months ML14209A0272014-08-0707 August 2014 Issuance of Amendment No. 276, Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML14003A0032014-01-28028 January 2014 Issuance of Amendment No. 274, Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan ML13296A5842013-10-25025 October 2013 Issuance of Amendment No. 273, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks (Exigent Circumstances) ML13203A0702013-07-26026 July 2013 Issuance of Amendment No. 272 - Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact (Exigent Circumstances) ML13070A0422013-03-29029 March 2013 Issuance of Amendment No. 271, Relocate Technical Specification LCO 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report ML13043A6612013-02-28028 February 2013 Issuance of Amendment No. 270 to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation Circuits ML1126204022011-09-30030 September 2011 Issuance of Amendment No. 268, Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications ML1118615712011-08-31031 August 2011 Issuance of Amendment No. 267, Revise Technical Specification (TS) 2.15 and TS 3.1 Related to Operability of Secondary Control Element Assembly Position Indication System Channels; Correction to TS 2.10.2(7)c ML1118010942011-07-27027 July 2011 Issuance of Amendment No. 266, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1015202962010-06-0202 June 2010 License Amendment, Issuance of Amendment No. 265, Revise Technical Specification 2.15, Table 2-5, Note C for Safety Valve Acoustic Position Indication (Emergency Circumstances) ML1009100772010-05-14014 May 2010 License Amendment, 264, Revision of Tech Spec Sections 2.0.1 and 2.7 for Inoperable System, Subsystem, or Component Due to Inoperable Power Source and Deletion of Diesel Generator Surveillance Requirement 3.7(1)e ML0925405912009-10-0909 October 2009 License Amendment, Issuance of Amendment No. 263 Modify Technical Specifications to Add Operability and Testing Requirements for Steam Generator Blowdown Isolation on a Reactor Trip ML0919005692009-07-24024 July 2009 Unit No.1 - Issuance of Amendment No. 261, Modify Transformer Allowed Outage Time in Technical Specification 2.7(2) and Delete Associated 2.7(2) Special Reporting Requirements in TS 5.9.3j ML0916205692009-07-24024 July 2009 Issuance of Amendment 262, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0912801022009-07-22022 July 2009 Issuance of Amendment No. 260, Modification of Surveillance Requirements in TS 3.6(3), Containment Recirculating Air Cooling and Filtering System & Removal of License Conditions ML0832606972009-05-12012 May 2009 Issuance of Amendment No. 259, Revise Technical Specifications to Correct Typographical Errors and Make Administrative Clarifications ML0907108912009-03-27027 March 2009 License Amendment, Issuance of Amendment No. 258, Revise Limiting Condition for Operation 2.7(2)j in TS 2.7, Electrical Systems, to Clarify Allowed Outage Time for Emergency Diesel Generators ML0730903612007-12-17017 December 2007 Issuance of Amendment No. 251, Modify Technical Specification Requirements to Support Addition of Safety-Related Swing Inverters to 120 Volt AC Buses ML0720400972007-07-26026 July 2007 Conforming License Amendment to Incorporate the Mitigation Strategies of Commission Order EA-02-026 (Tac No. MD4534) ML0720402832007-07-26026 July 2007 Revised Pages of Facility Operating License DPR-40 to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 ML0706102692007-06-0606 June 2007 Issuance of Amendment No. 250 Adoption of TSTF-447 to Delete Requirements for Hydrogen Purge System - CLIIP 2024-01-31
[Table view] Category:Safety Evaluation
MONTHYEARML24019A1682024-01-31031 January 2024 Safety Evaluation Report for Approval of License Termination Plan ML21271A5992021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 8, 12, Omaha Public Power District, FCS-SAF-103, FCS Deconstruction Health and Safety Plan CAC2 ML20056E4872020-02-26026 February 2020 Staff Review of Fort Calhoun Independent Spent Fuel Storage Installation Physical Security Plan, Security Training and Qualification Plan, and Safeguard Contingency Plan, Revision 0 and the Verification of Additional Security Measures (ASM) ML19297D6742019-12-0909 December 2019 FCS ISFSI Only Tech Specs SER ML18017B0052018-03-30030 March 2018 Review of the Irradiated Fuel Management Plan (CAC No. MF9553; EPID L-2017-LLL-0009) ML18047A6612018-03-28028 March 2018 Issuance of Amendment No. 298, Request to Modify License Condition 3.C to Delete Requirement for Commission-Approved Cyber Security Plan (CAC No. MF9850; EPID L-2017-LLA-0236) ML18010A0872018-03-0606 March 2018 Issuance of Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML17338A1722018-01-19019 January 2018 Issuance of Amendment No. 296, Revise Technical Specifications (TS) to Delete Dry Spent Fuel Cask Loading Limits from TS 3.8.3(6), Figure 2-11, Table 3-4, Table 3-5, and TS 4.3.1.3 (CAC No. MF9831; EPID L-2017-LLA-0235) ML17276B2862017-12-12012 December 2017 Issuance of Amendment No. 295, Revise the Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MF8951; EPID L-2016-LLA-0036) ML17263B1982017-12-11011 December 2017 Letter and Safety Evaluation, Request for Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) ML17289A0602017-11-22022 November 2017 Issuance of Amendment No. 294, Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9559; EPID L-2017-LLA-0184) ML17275A2642017-11-21021 November 2017 Safety Evaluation Input on Fort Calhoun Station Request for Approval of Permanently Defueled Emergency Plan and Emergency Action Level Scheme, Docket No. 50-285 ML17278A6072017-11-17017 November 2017 Issuance of Amendment No. 293, Request to Revise Current Licensing Basis for the Auxiliary Building to Use American Concrete Institute Ultimate Strength Requirements (CAC No. MF8525; EPID L-2016-LLA-0013) ML17165A4652017-07-28028 July 2017 Fort Calhoun Station, Unit 1 - Issuance of Amendment No. 292, Revise Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning (CAC No. MF8437) ML17123A3482017-07-27027 July 2017 Issuance of Amendment No. 291, Revise the Radiological Emergency Response Plan for Permanently Defueled Condition ML17144A2462017-06-21021 June 2017 Approval of Certified Fuel Handler Training and Retraining Program to Facilitate Activities Associated with Decommissioning and Irradiated Fuel Handling Management ML17053A0992017-04-0707 April 2017 Issuance of Amendment No. 290, Request to Delete License Condition 3.D., Fire Protection Program, No Longer Needed for Permanently Shutdown and Defueled Condition ML16141A7392016-05-27027 May 2016 Safety Evaluation, Review of Aging Management Program of Reactor Vessel Internals Based on MRP-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines ML16104A0742016-04-15015 April 2016 Relief Request, Request to Use a Portion of a Later Edition of the ASME B&PV Code, Section XI, Fourth 10-Year Inservice Inspection Interval ML16084A7552016-04-0505 April 2016 Issuance of Amendment No. 287, Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using CLIIP ML15307A0132016-02-23023 February 2016 Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition ML16041A3082016-02-19019 February 2016 Relief Requests P-1 - LPSI and CS Pumps; P-2 - Adjusting Hydraulic Parameters Consistent W/Code Case OMN-21; G-1 - Test Frequency Consistent W/Code Case OMN-20, Fifth 10-Year Inservice Testing Interval ML15288A0052015-12-15015 December 2015 Issuance of Amendment No. 285, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15294A2792015-11-19019 November 2015 Issuance of Amendment No. 284, Request to Revise License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15232A0032015-08-21021 August 2015 Relief Request RR-14, Relief from ASME Code Case N-729-1 Requirements for Reactor Vessel Head Penetration Nozzle Welds, Fourth 10-Year Inservice Inspection Interval ML15209A8022015-08-10010 August 2015 Issuance of Amendment No. 283, Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML15111A3992015-06-30030 June 2015 Issuance of Amendment No. 282, Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood ML15035A2032015-03-27027 March 2015 Issuance of Amendment No. 281, Revise Technical Specification 3.1, Table 3-3 to Correct Administrative Error in Surveillance Method for Containment Wide Range Radiation Monitors ML15015A4132015-02-20020 February 2015 Issuance of Amendment No. 280, Revise Technical Specification 3.2, Table 3-5 to Add New Surveillance Requirement ML14356A0122014-12-29029 December 2014 Issuance of Amendment No. 279, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months ML14328A8142014-12-22022 December 2014 Issuance of Amendment No. 278, Revise Technical Specification 2.5, Auxiliary Feedwater (AFW) System to Allow 7-Day Completion Time for Turbine-Driven AFW Pump Based on TSTF-340, Revision 3 ML14323A5992014-12-0202 December 2014 Relief Request RR-13, Relief from Inservice Testing Requirements to Perform Testing of 4 Valves During the April 2015 Refueling Outage ML14316A1672014-11-19019 November 2014 Relief Request RR-14, Proposed Alternative for Temporary Acceptance of a Pin Hole Leak in Raw Water System 20-Inch Elbow Located in Room 19 of Auxiliary Building ML14279A2752014-11-0606 November 2014 Issuance of Amendment No. 277, Revise Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3, for One-Time Extension of Frequency to Maximum of 28 Months ML14209A0272014-08-0707 August 2014 Issuance of Amendment No. 276, Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML14003A0032014-01-28028 January 2014 Issuance of Amendment No. 274, Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan ML13296A5842013-10-25025 October 2013 Issuance of Amendment No. 273, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks (Exigent Circumstances) ML13203A0702013-07-26026 July 2013 Issuance of Amendment No. 272 - Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact (Exigent Circumstances) ML13141A6082013-06-25025 June 2013 Safety Assessment in Response to Request for Information Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment ML13070A0422013-03-29029 March 2013 Issuance of Amendment No. 271, Relocate Technical Specification LCO 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report ML13043A6612013-02-28028 February 2013 Issuance of Amendment No. 270 to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation Circuits ML13017A4672013-01-31031 January 2013 Approval of Request for Change to the Reactor Vessel Surveillance Capsule Removal Schedule ML12333A1192012-12-31031 December 2012 Issuance of Amendment No. 269, Incorporate New Radial Peaking Factor Definition and Clarify Limiting Condition for Operation (LCO) 2.10.2(6) ML1126204022011-09-30030 September 2011 Issuance of Amendment No. 268, Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications ML1118615712011-08-31031 August 2011 Issuance of Amendment No. 267, Revise Technical Specification (TS) 2.15 and TS 3.1 Related to Operability of Secondary Control Element Assembly Position Indication System Channels; Correction to TS 2.10.2(7)c ML1122702902011-08-18018 August 2011 Relief Request RR-12 from Code Case N-722, Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated with Alloy 600/82/182 Materials, Fourth 10-Year Inservice Inspection Interval ML1118010942011-07-27027 July 2011 Issuance of Amendment No. 266, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1022101332010-08-20020 August 2010 Request for Use of Alternative to Depth-Sizing Qualification for Volumetric Examinations of Reactor Pressure Vessel Welds for 4th 10-year Inservice Inspection Interval ML1009100772010-05-14014 May 2010 License Amendment, 264, Revision of Tech Spec Sections 2.0.1 and 2.7 for Inoperable System, Subsystem, or Component Due to Inoperable Power Source and Deletion of Diesel Generator Surveillance Requirement 3.7(1)e 2024-01-31
[Table view] |
Text
August 30, 2006 Mr. R. T. Ridenoure Vice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 550 Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION, UNIT NO. 1 - ISSUANCE OF AMENDMENT RE: USE OF M5 FUEL CLADDING (TAC NO. MC8096)
Dear Mr. Ridenoure:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 241 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1 (FCS). The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated August 11, 2005, as revised by letter dated November 8, 2005, and supplemented by letter dated April 12, 2006.
The amendment revises TS 4.2.1, Fuel Assemblies, to permit the use of AREVA (Framatome ANP) M5 advanced alloy for fuel rod cladding and structural components such as guide tubes, intermediate spacer grids, end plugs, and guide thimble tubes at the FCS. M5 will be used beginning with Refueling Cycle 24. The M5 cladding is a proprietary zirconium-based alloy that is chemically different from that of zircaloy and ZIRLO, which are the fuel cladding materials currently approved for use in the FCS TS. In addition, TS 5.9, Reporting Requirements, was revised to include the Framatome ANP topical report evaluating the impact of M5 material properties on NRC-approved methodologies used at the FCS.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285
Enclosures:
- 1. Amendment No. 241 to DPR-40
- 2. Safety Evaluation cc w/encls: See next page
August 30, 2006 Mr. R. T. Ridenoure Vice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 550 Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION, UNIT NO. 1 - ISSUANCE OF AMENDMENT RE: USE OF M5 FUEL CLADDING (TAC NO. MC8096)
Dear Mr. Ridenoure:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 241 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1 (FCS). The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated August 11, 2005, as revised by letter dated November 8, 2005, and supplemented by letter dated April 12, 2006.
The amendment revises TS 4.2.1, Fuel Assemblies, to permit the use of AREVA (Framatome ANP) M5 advanced alloy for fuel rod cladding and structural components such as guide tubes, intermediate spacer grids, end plugs, and guide thimble tubes at the FCS. M5 will be used beginning with Refueling Cycle 24. The M5 cladding is a proprietary zirconium-based alloy that is chemically different from that of zircaloy and ZIRLO, which are the fuel cladding materials currently approved for use in the FCS TS. In addition, TS 5.9, Reporting Requirements, was revised to include the Framatome ANP topical report evaluating the impact of M5 material properties on NRC-approved methodologies used at the FCS.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285 DISTRIBUTION:
PUBLIC GHill (2)
Enclosures:
- 1. Amendment No. 241 to DPR-40 LPLIV Reading RidsNrrDorlDpr
- 2. Safety Evaluation RidsNrrDorl (CHaney/CHolden)
RidsNrrDorlLpl4 (DTerao) RidsNrrDirsItsb cc w/encls: See next page RidsNrrPMAWang RidsNrrLALFeizollahi RidsOgcRp RidsAcrsAcnwMailCenter RidsRegion4MailCenter (DGraves)
Package: ML062430003 TFord, DSS ACCESSION NO.: ML061710538 TS pages: ML062420160 OFFICE NRR/LPL4/PM NRR/LPL4/LA SBWB/BC OGC NRR/LPL4/BC NAME AWang LFeizollahi GCranston MZobler DTerao DATE 7/17/06 7/13/06 6/9/06 7/21/06 7/26/06 OFFICIAL RECORD COPY
Ft. Calhoun Station, Unit 1 cc:
Winston & Strawn Mr. Daniel K. McGhee ATTN: James R. Curtiss, Esq. Bureau of Radiological Health 1700 K Street, N.W. Iowa Department of Public Health Washington, DC 20006-3817 Lucas State Office Building, 5th Floor 321 East 12th Street Chairman Des Moines, IA 50319 Washington County Board of Supervisors P.O. Box 466 Blair, NE 68008 Mr. John Hanna, Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 310 Fort Calhoun, NE 68023 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services R & L Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Mr. David J. Bannister, Manager Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. Joe L. McManis Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550 Fort Calhoun, NE 68023-0550 April 2006
OMAHA PUBLIC POWER DISTRICT DOCKET NO. 50-285 FORT CALHOUN STATION, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 241 License No. DPR-40
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the Omaha Public Power District (the licensee) dated August 11, 2005, as revised by letter dated November 8, 2005, and supplemented by letter dated April 12, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, Renewed Facility Operating License No. DPR-40 is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Facility Operating License No. DPR-40.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 90 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Facility Operating License Date of Issuance: August 30, 2006
ATTACHMENT TO LICENSE AMENDMENT NO. 241 RENEWED FACILITY OPERATING LICENSE NO. DPR-40 DOCKET NO. 50-285 Replace the following page 3 of the Facility Operating License with the attached revised page 3.
Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
REMOVE INSERT 4.0 - Page 1 4.0 - Page 1 5.0 - Page 9 5.0 - Page 9
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 241 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-40 OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION, UNIT NO. 1 DOCKET NO. 50-285
1.0 INTRODUCTION
By application dated August 11, 2005 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML052240083), as revised by letter dated November 8, 2005 (ADAMS Accession No. ML053120421), and as supplemented by letter dated April 12, 2006 (ADAMS Accession No. ML061040257), Omaha Public Power District (OPPD, the licensee) requested changes to the Technical Specifications (Appendix A to Renewed Facility Operating License No. DPR-40) for the Fort Calhoun Station, Unit No. 1 (FCS).
The proposed amendment would revise Technical Specification (TS) 4.2.1, Fuel Assemblies, and TS 5.9, Reporting Requirements. Specifically, the proposed changes would revise TS 4.2.1, Fuel Assemblies, to permit the use of AREVA (Framatome ANP) M5 advanced alloy for fuel rod cladding and structural components such as guide tubes, intermediate spacer grids, end plugs, and guide thimble tubes at the FCS. M5 will be used beginning with Refueling Cycle 24. The M5 cladding is a proprietary zirconium-based alloy that is chemically different from that of zircaloy and ZIRLO, the fuel cladding materials currently approved for use in the FCS TS. In addition, OPPD proposed to revise TS 5.9 to include the Framatome ANP topical report evaluating the impact of M5 material properties on NRC-approved methodologies used at the FCS.
The supplemental letter dated April 12, 2006, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staffs original proposed no significant hazards consideration determination as published in the Federal Register on December 6, 2005 (70 FR 72675).
2.0 REGULATORY EVALUATION
By letter dated June 18, 2003, the NRC-approved Framatome Topical Report BAW-10227P-A, Revision 1, Evaluation of Advanced Cladding and Structural Material (M5) in PWR
[pressurized-water reactor] Reactor Fuel. This topical report describes Framatome M5 fuel and provides justification for its use in PWR fuel cladding and core structural components. The licensee has stated in its submittal that operating FCS with M5 in the reactor core will continue to meet the licensing limits required for FCS. The licensee has proposed TS revisions to account for the presence of M5 fuel in the FCS core.
The Nuclear Regulatory Commission (NRC) staff reviewed the licensee's amendment request to ensure that operation with M5 fuel cladding, in accordance with the proposed changes, will be within the conditions of operation necessary for application of BAW-10227P-A, Revision 1.
In addition, the NRC staff ensured that the licensee will continue to operate the plant within its design basis and comply with applicable regulatory requirements following implementation of the proposed changes. These include Title 10 of the Code of Federal Regulations (10 CFR),
Part 50, Section 50.46; General Design Criteria 4, 10, 33, 34, and 35; and as described in Standard Review Plan Section 4.2. The NRC staff has approved similar submittals at plants implementing BAW-10227P-A, Revision 1, specifically at Crystal River Unit 3, Oconee Units 1, 2, and 3, Davis Besse Unit 1, Three Mile Island Unit 1, and Arkansas Nuclear One Unit 1.
3.0 TECHNICAL EVALUATION
The license amendment request would revise the Design Features section of FCS TS 4.2.1 to include the allowance to use M5 advanced alloy as a fuel rod cladding and fuel assembly structural material. Specifically, TS 4.2.1 adds two words, or M5, such that the revised TS would read, Each assembly shall consist of a matrix of zircaloy, ZIRLO, or M5 clad fuel rods with an initial composition of natural or slightly enriched uranium dioxide (UO2) as fuel material.
3.1 Analyses and Evaluations Topical report BAW-10227P-A, Revision 1, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel (Reference 3), provides the technical licensing basis for the use of M5 fuel cladding material and structural material. The M5 cladding is a Framatome ANP proprietary material comprised of approximately 99 percent zirconium and 1 percent niobium. M5 cladding provides improved performance over standard zircaloy cladding in the areas of fuel cladding corrosion and hydrogen pickup, fuel assembly and fuel rod growth, fuel rod bowing, and fuel rod cladding creep. The M5 fuel cladding alloy has been tested in both reactor and non-reactor environments to establish its enhanced mechanical and structural properties.
Framatome ANP has evaluated the properties of M5 and determined that the use of M5 as cladding and structural material either would have no significant impact or would produce an improvement in performance and increased margins for the following parameters and analyses:
- Fuel assembly and rod growth
- Fuel assembly handling and shipping loads
- Fuel rod internal pressure
- Fuel centerline melting temperature
- Fuel rod cladding fatigue
- Fuel rod cladding creep collapse
- High temperature swelling and rupture
- High temperature oxidation Framatome ANP has determined that the M5 advanced alloy will perform acceptably at all normal operating conditions.
The licensee evaluated the performance of the M5 cladding performance for both loss of coolant accident (LOCA) and non-LOCA scenarios. The licensees conclusion was that the results with M5 fuel would not be substantially different from the results obtained with only zircaloy in the core. This conclusion is consistent with the conclusions in Framatome Topical Report BAW-10227P-A, Revision 1 (Reference 3). Based on the review of the licensees submittal, the NRC staff concludes that the licensee may perform reload analyses to evaluate FCS operation with cores including M5 fuel cladding with its present NRC-approved models adjusted to compensate for the presence of M5 fuel cladding. This ensures that the licensee will continue to meet the currently applicable regulatory requirements for LOCA and non-LOCA events.
3.1.1 LOCA Analyses Framatome ANP has performed an evaluation of the LOCA performance of the M5 cladding alloy for the generic accident scenarios described in BAW-10227P-A, Revision 1 (Reference 3).
The LOCA evaluation is performed with a set of analyses demonstrating compliance with 10 CFR 50.46. Framatome ANP stated that a comparison of the results obtained using the base evaluation model methods with zircaloy cladding and the results obtained for an identical case using M5 swelling and rupture model shows that the M5 cladding performance should not adversely affect core operation or operating limits.
In a supplemental letter, dated April 12, 2006 (Reference 4), OPPD provided the following large-break LOCA (LBLOCA) and small-break LOCA (SBLOCA) analysis results. These results were provided to confirm that FCS will meet the criteria set forth in 10 CFR 50.46(b).
Peak Cladding Temperature, EF 1675 Maximum Local Oxidation, % 0.82 Total Oxidation (whole core hydrogen), % 0.02 Coolable Geometry Confirmed Long Term Cooling Confirmed The LBLOCA results are for the fresh fuel in the core. According to FCS, the LBLOCA results are conservative relative to the once-burned and beyond fuel, and are more limiting (higher PCT) than the SBLOCA results.
A comparison of the results for zircaloy-4 and M5 cladding is provided below. These data are obtained from Topical Report EMF-2103PA for LBLOCA and from BAW-10240(P)-A for SBLOCA.
Differences LBLOCA SBLOCA Peak Cladding Temperature <10 EF <10 EF Maximum Local Oxidation <0.1% <0.3%
Total Oxidation (whole core hydrogen) <0.1% <0.1%
At the NRC staffs request, the licensee also addressed a concern that the resident fuel may have pre-existing oxidation that needs to be considered in estimating the maximum local oxidation in the event of a LOCA. In its supplemental letter dated April 12, 2006, the licensee provided its response to the concern, including reference to information in the Framatome Topical Report EMF-2103(P)(A), Realistic Large Break LOCA Methodology for Pressurized Water Reactors (Reference 5), where this issue was also addressed and approved by the NRC staff.
The NRC staff finds that the results of the LOCA analyses for FCS considered the total LOCA oxidation and meets the oxidation criterion of less than or equal to 17 percent of the total cladding thickness for oxidation set forth in 10 CFR 50.46(b)(2).
The NRC staff also finds that the preexisting oxidation of the fuel is not expected to contribute to the LOCA maximum core-wide hydrogen generation. Therefore, the NRC staff concludes that the core-wide hydrogen generation analysis results demonstrate that FCS meets the core-wide hydrogen generation criterion of 10 CFR 50.46(b)(3).
As discussed above, the licensee has performed LBLOCA and SBLOCA analyses for FCS using LBLOCA and SBLOCA methodologies approved for FCS. The licensees LBLOCA and SBLOCA calculations are demonstrated in the following:
E. The calculated LBLOCA and SBLOCA values for peak cladding temperature (PCT),
maximum local oxidation, and core-wide hydrogen generation are less than the limits of 2200 EF, 17 percent, and 1.0 percent, respectively, as specified in 10 CFR 50.46(b)(1)-(3).
F. Compliance with 10 CFR 50.46(b)(1)-(3) and (5) assures that the core will remain amenable to cooling as required by 10 CFR 50.46(b)(4). The staff notes that no other matters that could affect coolable geometry are involved in the requested amendment.
In summary, the NRC staff concludes that the licensees LOCA analyses were performed with approved LOCA methodologies that demonstrate FCS complies with the requirements of 10 CFR 50.46(b)(1)-(5). Therefore, the NRC staff finds the licensees LOCA analyses acceptable.
3.1.2 Non-LOCA Analyses Framatome ANP determined that the non-LOCA safety analyses performed using zircaloy material properties apply equally to M5 cladding. The licensee referred to Framatome Topical Report BAW-10227P-A, Revision 1 (Reference 3), which draws the conclusion that the difference in zircaloy and M5 fuel cladding alone would not cause a substantial change in the analysis results. Based on information provided by the licensee and because the material properties of M5 cladding are similar to those of zircaloy, the NRC staff has determined that this conclusion is reasonable. Therefore, it is not necessary to recalculate any of the non-LOCA safety analyses solely because the cladding material is changed from zircaloy to M5. As part of the regular reload process, the licensee will perform analyses of non-LOCA events for Refueling Cycle 24 using the methodology identified in the NRC-approved Topical Report BAW-10179P-A, Safety Criteria and Methodology for Acceptable Cycle Reload Analysis. Accordingly, the NRC staff concludes that the use of M5 will not substantially affect
the non-LOCA analyses and the FCS licensing basis for non-LOCA events will remain the same. Therefore, the NRC staff finds that the licensee has acceptably addressed non-LOCA events.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Nebraska State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding published on December 6, 2005 (70 FR 72675). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
7.0 REFERENCES
- 1. Letter from Ross T. Ridenoure (OPPD) to NRC, Fort Calhoun Station Unit No. 1 -
License Amendment Request to Support Use of M5 Fuel Cladding, and 10 CFR 50.46 and 10 CFR Appendix K Exemption Request, dated August 11, 2005.
- 2. Letter from Ross T. Ridenoure (OPPD) to NRC, Fort Calhoun Station Unit No. 1 -
Revised License Amendment Request to Support Use of M5' Fuel Cladding, dated November 8, 2005.
- 3. BAW-10227P-A, Revision 1, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, dated June 18, 2003.
- 4. Letter from Harry J. Faulhaber (OPPD) to NRC, Response to Request for Additional Information Related to the Use of M5 Fuel Cladding, dated April 12, 2006.
- 5. EMF-2103(P)(A), Realistic Large Break LOCA Methodology for Pressurized Water Reactors, dated April 30, 2003.
- 6. BAW-10240(P)-A, Incorporation of M5TM Properties in Framatome ANP Approved Methods, dated May 2004.
Principal Contributor: Tanya Ford Date: August 30, 2006