MONTHYEARML24038A0222024-02-0505 February 2024 Achp Letter on Section 106 Programmatic Agreement Participation IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 IR 05000373/20230042024-01-24024 January 2024 County Station - Integrated Inspection Report 05000373/2023004 and 05000374/2023004 ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20230122024-01-18018 January 2024 County Station - Biennial Problem Identification and Resolution Inspection Report 05000373/2023012 and 05000374/2023012 ML23342A1242024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23325A1092024-01-0505 January 2024 Review of the Management Plan for Three Mile Island Station, Unit No. 2, Debris Material ML23354A2902024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0028 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23360A6082023-12-27027 December 2023 County Station Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000373/2024010 and 05000374/2024010 ML23354A2112023-12-20020 December 2023 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML23354A2062023-12-20020 December 2023 (TMI-2), Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000373/20230032023-11-0909 November 2023 County Station Integrated Inspection Report 05000373/2023003, 05000374/2023003, and 07200070/2023001 ML23286A2602023-11-0808 November 2023 Issuance of Amendment Nos. 260 and 245 to Renewed Facility Operating Licenses Relocation of Pressure and Temperature Limit Curves to the Pressure Temperature Report IR 05000373/20234012023-11-0707 November 2023 County Station Security Baseline Inspection Report 05000373/2023401 and 05000374/2023401 RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans IR 05000374/20230102023-10-11011 October 2023 NRC Inspection Report 05000374/2023010 IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs ML23243A9082023-08-29029 August 2023 Shpo Letter to TMI-2 Regarding Section 106 Activities IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 ML23216A1742023-08-14014 August 2023 Consultation Letter to David Morrison for TMI-2 ML23216A1752023-08-14014 August 2023 Consultation Letter to Joanna Cain for TMI-2 ML23216A1772023-08-14014 August 2023 Consultation Letter to Rebecca Countess for TMI-2 ML23216A1782023-08-14014 August 2023 Consultation Letter to Steve Letavic for TMI-2 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 ML23216A1732023-08-14014 August 2023 Consultation Letter to Christine Turner for TMI-2 ML23221A1402023-08-0808 August 2023 (TMI-2), Response to Requests for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor ML23212A9012023-08-0303 August 2023 Regulatory Audit Report to Support the Review of the Amendments to Relocation of the Pressure Temperature Limit Curves to the Pressure and Temperature Limits Report IR 05000373/20230022023-08-0101 August 2023 County Station - Integrated Inspection Report 05000373/2023002 and 05000374/2023002 ML23200A1882023-07-31031 July 2023 TMI-2 Correction Letter Amendment 67 ML23209A7632023-07-28028 July 2023 Letter from PA Shpo to TMI-2 Solutions on Cultural and Historic Impacts of Decommissioning ML23208A3182023-07-27027 July 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI 2024-02-05
[Table view] |
Text
April 12, 2006 James L. Caldwell, Regional Administrator Region III United States Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352
SUBJECT:
LASALLES DELIBERATE WALK DOWN THE THREE MILE ISLAND AND CHERNOBYL PATHWAYS
Dear Mr. Caldwell:
In reading the report# by the NRC special inspection team on the Site Area Emergency declared at the LaSalle nuclear plant, I had many of my questions about this event answered. However, I was extremely troubled to learn the following information:
00:25 a.m. Control room operators entered EOP LGA-10, Failure to Scram. Per procedure, actuation of the automatic depressurization system (ADS) was inhibited and all emergency core cooling system (ECCS) injection was manually prevented.[NRC report enclosure, page 5]
According to the report, ECCS and ADS remained inhibited for seven minutes, until operators restored them at 00:32 am.
A primary cause of the March 1979 accident at Three Mile Island was the operators, following their procedures, turning off the ECCS. Had they not done so, the reactor core would not have partially melted down.
A primary cause of the April 1986 accident at Chernobyl was the operators intentionally disabling the ECCS prior to a low power test. Had they not done so, the test would have failed instead of the reactor.
All of my training, education, and experience tells me that you do not intentionally disable the emergency core cooling systems without a very, very, very solid reason. LaSalle lacked even a flimsy reason.
I can see why the decision was not black and white. The discussion on page 12 of the enclosure to the NRC report reported that two of the three control rods with uncertain position indication were diagonally adjacent and that the operators consulted with the qualified nuclear engineer on-shift at the time about Letter dated March 23, 2006, from Mark A. Satorius, Director - Division of Reactor Projects, Region III, Nuclear Regulatory Commission, to Christopher M. Crane, President and Chief Nuclear Officer, Exelon Nuclear, LaSalle Country Station, Unit 1 / NRC Special Inspection Report 05000373/2006009.
Washington Office: 1707 H Street NW Suite 600
- FAX: 202-223-6162 Cambridge Headquarters: Two Brattle Square
- FAX: 617-864-9405 California Office: 2397 Shattuck Avenue Suite 203
April 12, 2006 Page 2 of 2 whether the reactor was subcritical. Having worked many years as a qualified nuclear engineer on boiling water reactors like LaSalle, I fully understand and recognize that the individual could not make that determination from the information available at that time.
Nevertheless, there was ample information available to the operators and qualified nuclear engineer in that control room and at that time to make the determination that the risk from the three control rods -
even if it was postulated they were fully withdrawn - was orders of magnitude lower than the risk from a recently shut down reactor with ALL OF THE EMERGENCY CORE COOLING SYSTEMS DISABLED. It doesnt take RISKMAN or SPAR or a Ouija board to have made the right call that night.
To quote from page 11 of the NRC report enclosure:
Although all reactor power, pressure, and water level indications were indicative of a shutdown reactor condition, control room operators were faced with anomalous indications for 3 of the 185 Unit 1 control rods, potentially indicating that they were stuck in some intermediate position and that the reactor may not remain shutdown under all design basis conditions.
True enough. And the initiation of one or more of the ECCS pumps would have injected cold water into the reactor vessel. This positive reactivity insertion could conceivably caused the reactor to re-achieve criticality had the three control rods, especially the two diagonally adjacent rods, been withdrawn. But a thinking person would have weighed the risk from that credible scenario against the risk from equally credible design basis events, such as a pipe break or stuck open relief valve (bear in mind that this entire event was triggered by the inadvertent opening of five turbine bypass valves), and not disabled ALL OF THE EMERGENCY CORE COOLING SYSTEMS and INHIBITED THE AUTOMATIC DEPRESSURIZATION SYSTEM. That was one of the stupidest, highest risk actions Ive seen in my 25-plus year career.
Has the NRC analyzed the consequences of that control room action? From a risk-informed perspective, would it not have been far, far, far wiser NOT to intentionally disable ALL OF THE EMERGENCY CORE COOLING SYSTEMS?
And I truly believe my perspective is not armchair quarterbacking. Had I been on-shift as the qualified nuclear engineer in the control room that night, I feel certain that Id have prevented ALL OF THE EMERGENCY CORE COOLING SYSTEMS from being disabled, or have died trying to prevent it.
I worked as a Shift Technical Advisor / Reactor Engineer at Browns Ferry in June 1980 when Unit 3 experienced a partial scram that caused the Failure to Scram EOPs to be revised. In fact, but for a lost coin toss, Id have been the STA on shift during that June 28th event. I have more than a passing appreciation for the risks associated from withdrawn control rods. But I also have an appreciation for the clear and present danger the reactor core faces when ALL OF THE EMERGENCY CORE COOLING SYSTEMS are disabled. I would not have been a party to deliberately putting the reactor at greater risk.
Sincerely, David Lochbaum Director, Nuclear Safety Project