ML060180504

From kanterella
Jump to navigation Jump to search
Inservice Inspection Report End of Cycle 17 Refueling Outage
ML060180504
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 01/09/2006
From: Gordon Peterson
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML060180504 (167)


Text

Duke GARY R. PETERSON rPowere Vice President McGuire Nuclear Station A Duke Energy Company Duke Power MGO1 VP / 12700 Hagers Ferry Road Huntersville, NC 28078-9340 704 875 5333 704 875 4809 fax grpeters@duke-energy. corn January 9, 2006 U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: Document Control Desk

Subject:

McGuire Nuclear Station, Unit 1 Docket No. 50-369 Inservice Inspection Report End of Cycle 17 Refueling Outage Attached is the Inservice Inspection Report of Duke Energy Corporation's (Duke) McGuire Nuclear Station Unit 1 for Outage 3/EOC 17. This report is submitted pursuant to the filing requirements of Article IWA-6000 of Section XI of the ASME Code.

Reportable Indications One reportable indication was found in the pressurizer lower head to shell weld. This indication was determined to exceed the allowable flaw size for acceptance by volumetric examination. In such cases, the ASME Code allows acceptance of the flaw indication by analytical evaluation. Therefore, the indication was evaluated in accordance with the methods described in paragraph IWB-3600 of ASME Code Section XI.

Section 4.1 of the attached report includes a copy of the "Flaw Evaluation for McGuire Unit 1 Pressurizer Lower Head to Shell Weld," performed by Westinghouse. The evaluation concludes that the Unit 1 pressurizer is acceptable for continued operation for a period of ten years without repair, and that the following standards have been satisfied:

1) Acceptance Criteria Based on Flaw Size (IWB-3611)
2) Acceptance Criteria Based on Stress Intensity Factor (IWB-3612)

Duke requests NRC review and approval of the flaw evaluation report.

www.duke-energy comr

U.S. Nuclear Regulatory Commission January 9, 2005 Page 2 Limited Examinations Section 4.4 of the attached report lists the limited examination item number. A limited examination relief request is under development and will be submitted to the NRC for review and approval in accordance with 10 CFR 50.55a(g)(5)(iii).

This Inservice Inspection Report contains no regulatory commitment statements. Any questions on this matter should be directed to Norman T. Simms, Regulatory Compliance, at (704) 875-4685.

I Attachment

U.S. Nuclear Regulatory Commission January 9, 2005 Page 3 cc w/o att:

Mr. W.D. Travers Regional Administrator, Region II U. S. Nuclear Regulatory Commission Atlanta Federal Center, 23 T 85 61 Forsyth Street, S.W.

Atlanta, Georgia 30303 Mr. J.F. Stang Jr., Project Manager (addressee only)

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop O-8H4A 11555 Rockville Pike Rockville, MD 20852-2738 J.B. Brady NRC Senior Resident Inspector McGuire Nuclear Station

U.S. Nuclear Regulatory Commission January 9, 2005 Page 4 bxc wlatt:

Master File: 1.3.8.1 - Routine Reports F.L. Grass (MGO1MM)

Kay L. Crane bxc w/o att:

C.J. Thomas G.J. Underwood (EC05A)

Jerome Swan (MGOlMM)

R.K. Rhyne (EC05A)

R. Branch (MGO1MM)

N. T. Sirnms ELL (ECO50)

ATTACMMNT INSERVICE INSPECTION REPORT Duke Power Company.

McGuire Nuclear Station Unit 1 Seventeenth Refueling Outage

^ Duke V Energy.

OWNER'S REPORT t FOR INSERVICE INSPECTIONS MCGUIRE UNIT 1 2005 REFUELING OUTAGE 3IEOC 17 Location: McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, North Carolina 28078-9340 NRC Docket No. 50-369 National Board No. 44 Commercial Service Date: December 1, 1981 Document Completion Date: It- \'\- 2005 Owner: Duke Energy Corporation 526 South Church St.

Charlotte, N.C. 28201-1006 Revision 0 Prepared By. Date _J2/'i- a I a Reviewed By. ITCa 7*JL Date IOL-a to5

-t eV fA i_, Approved By: Date l ;/ 0/

FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

1. Owner:Duke Energy Corporation. 526 S. Church St.. Charlotte. NC 28201-1006 (Name and Address of Owner)
2. Plant: McGuire Nuclear Station. 12700 Hagers Ferrv Road Huntersville. N.C. 28078-9340 (Name and Address of Plant)
3. Plant Unit: 1 4. Owner Certificate of Authorization (If required) N/A
5. Commercial Service Date: December 1. 1981 6. National Board Number for Unit 44
7. Components Inspected:

Component or Manufacturer or Manufacturer or State or National Appurtenance Installer Installer Serial Province No. Board No.

No.

See Section 1.1 in the Attached Report Note: Supplemental sheets Inthe form of lists, sketches, or drawings may be used, provided (1) size Is 81/2 In. x 11In., (2) Information In items 1 through 6 on this report Is Included on each sheet, and (3) each sheet Is numbered and the number of sheets is recorded at the top of this form.

Total number of pages contained In this report 122.

FORM NIS-1 (Back)

8. Examination Dates April 13, 2004 to October 18, 2005
9. Inspection Period Identification: Second Period
10. Inspection Interval Identification: Third Interval
11. Applicable Edition of Section Xl 1998 Addenda 2000
12. Date/Revision of Inspection Plan: September 8, 2005/ Revision 1
13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for the Inspection Plan. See Sections 2.0. 3.0. and 6.0
14. Abstract of Results of Examinations and Tests. See Section 4.0. and 6.0
15. Abstract of Corrective Measures. See Section 4.3 We certify that a) the statements made in this report are correct b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No. (if applicable) N/A Expiration Date N/A Date I?/ 9 20 0Of Signed Duke Energv Corp.

Owner By :A S 1/

_117 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of North Carolina employed by

  • HSB CT. of Connecticut have inspected the components described in this Owners' Report during the period ADril 13. 2004 to October 18, 2005, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owners' Report in accordance with the Inspection Plan and as required by the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations, test, and corrective measures described in this Owners' Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or rty dama e or a loss of any kind arising from or connected with this inspection

____ ____ Commissions N.C. 1524 I,N

/ Inspect6fe'Signature National Board, State, Province, and Endorsements Date December 19, 2005

  • The Hartford Steam Boiler Inspection & Insurance Company of Connecticut 200 Ashford Center North Suite 205 Atlanta, GA. 30338-4860 (800) 417-3721 www.hsbct.com I

DISTRIBUTION LIST

1. Duke Energy Corporation Nuclear Assurance Division Quality Assurance Technical Services
2. Inspection and Welding Services (ISI Coordinator)
3. NRC Document Control Desk
4. Hartford Steam Boiler Inspection and Insurance Corporation of Connecticut (AIA) do ANII. At McGuire
5. State of North Carolina Department of Labor c/o J. M. Givens, Jr.

TABLE OF CONTENTS Section Title Revision 1.0 General Information 0 2.0 Third Ten-Year Interval Inspection Status 0 3.0 Final Inservice Inspection Plan 0 4.0 Results of Inspections Performed 0 5.0 Owners Report for Repair / Replacement Activities 0 6.0 Pressure Testing 0

1.0 General Information This report describes the Inservice Inspection of Duke Energy Corporation's McGuire Nuclear Station Unit 1 during Outage 3/ EOC 17. This is the first outage of the Second Inspection Period of the Third Ten-Year Interval. ASME Section XI, 1998 Edition through the 2000 Addenda was the governing Code for selection and performance of the ISI examinations.

Included in this report are: the inspection status for each examination category, the final inservice inspection plan, the inspection results for each item examined, and corrective action(s) taken when reportable conditions were found. In addition, there is an Owner's Report for Repair / Replacement section included for complete NIS-2 documentation of repairs and replacements.

1.1 IdentificationNumbers Manufacturer National Manufacturer or Installer State or Board Item or Installer Serial No. Province No. No.

Reactor Vessel Combustion CE67102 NC-178379 20766 Engineering Pressurizer Westinghouse 1471 NC-178395 68-123 Steam Generator 1A BWI 7701-04 NC-302668 157 Steam Generator 1B BWI 7693-01 NC-302669 146 Steam Generator 1C BWI 7701-03 NC-302670 155 Steam Generator 1D BWI 7701-02 NC-302671 154 Centrifugal Pacific Pumps 1A-48582 N/A 19 Charging Pump 1B-48583 22 Containment Spray Heat Delta Southern Co. 1A-35005-73-1 NC-1 47799 3394 Exchanger 1B-35005-73-2 NC-147796 3395 Outage 3/EOC 17 Refueling Outage Report Page 1 of 6 McGuire Unit 1 Revision 0 Section 1 December 12, 2005

1.1 Identification Numbers Continued Manufacturer National Manufacturer or Installer State or Board Item or Installer Serial No. Province No. No.

Excess Letdown Heat Atlas Industrial 1809 NC-1 87817 1554 Exchanger Manufacturing Company Letdown Heat Exchanger Joseph Oat & Sons, Inc. 2049-2A NC-1 87881 552 Reciprocating Charging Union Pump Company N721031 B-603 N/A N/A Pump 1A 1-114E841G01 Reactor Coolant Pump Westinghouse 1B 2-114E841 G01 N/A N/A I C 3-114E841 G01 1D 4-114E841 G01 Reciprocating Charging Metal Bellows Company 74730-002 N/A 002 Pump Accumulator Reciprocating Charging Richmond Engineering N-2409.10 N/A 75219 Pump Suction Stabilizer Supply Co.

Residual Heat Joseph Oat & Sons, Inc. 1A-2046-2A NC-234202 635 Removal Heat 1B-2046-2A NC-234201 636 Exchanger Safety Injection Pump Pacific Pumps 1A-49355 N/A 80 1B-49356 . 81 Regenerative Heat Joseph Oat & Sons, Inc. 2047-2A NC-187897 595 Exchanger 596 597 Seal Water Heat Atlas Industrial 1766 NC 169797 1548 Exchanger Manufacturing Company Seal Water AMF Cuno 1A-13 N/A 3822 Injection Filter 1B-14 3823 Outage 31EOC 17 Refueling Outage Report Page 2 of 6 McGuire Unit 1 Revision 0 Section 1 December 12, 2005

1.1 Identification Numbers Continued Manufacturer National Manufacturer or Installer State or Board Item or Installer Serial No. Province No. No.

Main Steam Supply to Duke Power Co. SA N/A 4 Auxiliary Equipment System Containment Air Release Duke Power Co. VQ N/A 12 and Addition System Main Steam System Duke Power Co. SM N/A 17 Main Steam Vent to Duke Power Co. SV N/A 18 Atmosphere System Reactor Coolant System Duke Power Co. NC N/A 28 Liquid Waste Recycle Duke Power Co. WL N/A 29 System Refueling Water System Duke Power Co. FW N/A 31 Auxiliary Feedwater Duke Power Co. CA N/A 32 System Residual Heat Removal Duke Power Co. ND N/A 35 System Nuclear Service Water Duke Power Co. RN N/A 36 System Chemical & Volume Duke Power Co. NV N/A 37 Control System Component Cooling Duke Power Co. KC N/A 38 System Main Feedwater System Duke Power Co. CF N/A 39 Containment Spray Duke Power Co. NS N/A 40 System I Outage 3/EOC 17 Refueling Outage Report Page 3 of 6 McGuire Unit 1 Revision 0 Section 1 December 12, 2005

1.1 Identification Numbers Continued Manufacturer National Manufacturer or Installer State or Board Item or Installer Serial No. Province No. No.

Containment Ventilation Duke Power Co. RV N/A 41 Cooling Water System Safety Injection System Duke Power Co. NI N/A 42 Containment Purge Duke Power Co. VP N/A 6 Ventilation _

Safety Injection Delta Southern Co. 41617-72-1 NC-1 78396 3038 Accumulator Tank 1A _

Safety Injection Delta Southern Co. 41617-72-2 NC-178397 3039 Accumulator Tank 1B Safety Injection Delta Southern Co. 41617-72-3 NC-1 78398 3040 Accumulator Tank 1C Safety Injection Delta Southern Co. 41617-72-4 NC-178399 3041 Accumulator Tank 1D Unit 1 Duke Power Co. N/A N/A 44 1.2 Personnel, Equipment and Material Certifications All personnel who performed or evaluated the results of inservice inspections during the time frame bracketed by the examination dates shown on the NIS-1 Form were certified in accordance with the requirements of the 1998 Edition of ASME Section XI with the 2000 Addenda including Appendix VII for ultrasonic inspections. In addition, ultrasonic examiners were qualified in accordance with ASME Section Xl, Appendix VilI, and 1995 Edition with the 1996 Addenda through the Performance Demonstration Initiative (PDI) for similar metal piping welds.

The appropriate certification records for each inspector, calibration records for inspection equipment, and records of materials used (i.e. NDE consumables) are on file at McGuire Nuclear Station or copies may be obtained by contacting Duke Energy's Corporate Office in Charlotte, North Carolina.

Outage 3/EOC 17 Refueling Outage Report Page 4 of 6 McGuire Unit 1 Revision 0 Section 1 December 12, 2005

1.3 Reference Documents The following reference documents apply to the inservice inspections performed during this report period. A copy may be obtained by contacting the ISI Plan Manager at Duke Energy's Corporate Office in Charlotte, North Carolina:

1. Request for Relief (RFR)01-004 (Class 1, 2 and 3 snubber examination under station technical specification)
2. RFR 01-005 (Risk Informed Inservice Inspection Program Submittal)
3. RFR 01-008 (Risk Informed ISI Alternative to Use VT-2 Instead of Volumetric Examination of Socket Welds)
4. Code Case N-460 (Alternative Examination Coverage For Class 1 and Class 2 Welds)
5. RFR-01 -GO-002 to use Code Case N-416-2 "Alternative Pressure Test Requirement for Welded Repairs, Fabrication Welds for Replacement Parts and Piping Subassemblies, or Installation of Replacement Items by Welding, Class 1, 2 and 3 Section XI, Division 1.'
6. Westinghouse Flaw Evaluation For McGuire Unit 1Pressurizer Lower Head to Shell Weld 1.4 Augmented and Elective Examinations Augmented and elective examination information found within this Inservice Inspection Report is not required by the ASME Section Xl Code; therefore, it is exempt from ANII review, verification, and/or record certification.

Outage 3IEOC 17 Refueling Outage Report Page 5 of 6 McGuire Unit 1 Revision 0 Section 1 December 12, 2005

1.5 Responsible Inspection Agency The Hartford Steam Boiler Inspection and Insurance Company of Connecticut is responsible for the third party inspections required by ASME Section Xl.

Authorized Nuclear Inservices Inspectior(s)

Name: J. F. Swan Employer: The Hartford Steam Boiler Inspection & Insurance Company of Connecticut Business 200 Ashford Center North Address: Suite 205 Atlanta, GA 30338-4860 (800) 417-3721 www.hsbct.com Outage 3/EOC 17 Refueling Outage Report Page 6 of 6 McGuire Unit 1 Revision 0 Section 1 December 12, 2005

( 2.0 Third Ten-Year Interval Inspection Status The completion status of inspections required by the 1998 ASME Code Section Xi through the 2000 Addenda is summarized in this section. The requirements are listed by the ASME Section Xi Examination Category as defined in Table IWB-2500-1 for Class 1 Inspections, Table IWC-2500-1 for Class 2 Inspections and IWF-2500-1 for Class 1, 2, and 3 Component Supports. Augmented and Risk Informed inspections are also included.

During the McGuire Third 10 Year Interval piping welds will be examined under the Risk Informed Inservice Inspection program developed in accordance with methodology contained in the Westinghouse Owners Group (WOG) Topical Report, WCAP-14572, Revision 1-NP-A. Request for Relief 01 -005 was submitted to the NRC seeking approval to incorporate the Risk Informed Program into the Third 10 Year Interval ISI Plan for McGuire Unit 1. The NRC approved use of this program per SER dated June 12, 2002. Previous code examination Categories B-F, B-J, C-F-1, and C-F-2 will now be combined under the new Risk Informed Category R-A.

Class 1 Inspections 6Deferral Examination Description Inspections Inspections Percentage Category Required Completed Completed Allowed B-A Pressure Retaining Welds 28 5 17.85% Yes in Reactor Vessel B-B Pressure Retaining Welds 5 3 60.00% No in Vessels Other than Reactor Vessel B-D Full Penetration Welded 36 10 27.77% Partial Nozzles in Vessels Inspection Program B B-F Pressure Retaining Reference Dissimilar Metal Welds in Risk Vessel Nozzles Informed Program R01. Items B-G-1 Pressure Retaining Bolting 243 151 62.13% No Greater than 2 " in Diameter Outage 3IEOC 17 Refueling Outage Report Page 1 of 5 McGuire Unit 1 Revision 0 Section 2 December 12, 2005

Class 1 Inspections (Continued)

Examination Description Inspections Inspections Percentage 'Deferral Category Required Completed Completed Allowed B-G-2 Pressure Retaining 16 7 43.75% No Bolting 2" and Less in Diameter B-J Pressure Retaining Welds Reference in Piping Risk Informed Program R01. Items B-K Welded Attachments for 6 4 66.66% No Piping, Pumps and Valves B-L-1 Pressure Retaining Welds N/A N/A N/A Yes inPump Casings B-L-2 Pump Casings 1 0 0.00% Yes B-M-1 Pressure Retaining N/A N/A N/A Yes Welds in Valve Bodies B-M-2 Valve Body > 4 in. 7 4 57.14% Yes

_ Nominal Pipe Size B-N-1 Interior of Reactor Vessel 3 1 33.33% No B-N-2 Integrally Welded Core Support Structures and 2 0 0.00% Yes Interior Attachments to Reactor Vessels B-N-3 Removable Core Support 1 0 0.00% Yes Structures B-O Pressure Retaining Welds 3 1 33.33% Yes in Control Rod Housings Outage 3/EOC 17 Refueling Outage Report Page 2 of 5 McGuire Unit 1 Revision 0 Section 2 December 13, 2005

Class 1 Inspections (Continued)

Examination Category DescrIption Inspections Required 1

J Inspections l Percentage Completed l Completed 6Deterral Allowed B-P All Pressure Retaining REFERENCE SECTION 6.0 OF THIS REPORT Components B-Q Steam Generator Tubing See Note Below F-A Class 1 Component 69 28 l 40.57% No F01.01 0 Supports l l l Note: Steam Generator Tubing Is examined and documented by the Metallurgy and Lab Services SectionlNuclear Technical Services Division as required by the Station Technical Specifications and Is not Included In this report.

Deferral of Inspection to the end of the Interval as allowed by ASME Section Xl Tables IWB 2500-1.

These examination categories are exempt from percentage requirements per IWB-2412 (a),

Inspection Program B.

Outage 3IEOC 17 Refueling Outage Report Page 3 of 5 McGuire Unit 1 Revision 0 Section 2 December 12, 2005

Class 2 Inspections 6

Examination Description Inspections Inspections Percentage Deferral Category Required Completed Completed Allowed C-A Pressure Retaining Welds 26 8 30.76% No in Pressure Vessels C-B Pressure Retaining Nozzle 9 4 44.44% No Welds in Vessels C-C Integral Attachments for 33 15 45.45% No Vessels, Piping, Pumps and Valves C-D Pressure Retaining Bolting N/A N/A N/A N/A Greater Than 2" in Diameter C-F-1 Pressure Retaining Welds Reference in Austenitic Stainless Risk Informed Steel or High Alloy Piping Program R01.

Items C-F-2 Pressure Retaining Welds Reference in Carbon or Low Alloy Risk Informed Steel Piping Program R01.

_ _ _ _ _ _ _ _ _ __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _Ite ms C-G Pressure Retaining Welds 3 2 66.66% No in Pumps and Valves C-H All Pressure Retaining REFERENCE SECTION 6.0 OF THIS REPORT Components F-A Class 2 Component 233 99 42.48% No F01.020 Supports Outage 3/EOC 17 Refueling Outage Report Page 4 of 5 McGuire Unit 1 Revision 0 Section 2 December 12, 2005

Additional Component Support Examinations Class 1, 2 & 3 Examination Description inspections Inspections Percentage Deferral Category _ Required Completed Completed Allowed F-A Supports other than Piping 45 19 42.22% No F01.040 Supports Class 1, 2 & 3 F01.050 Component Supports,

  • Examinations to be performed per Request for Relief 01-004 Risk Informed Inservice Inspection Program Class 1 and 2 Augmented Inspections Description Percentage Complete Pipe Rupture Protection (Item No. Series G03.) 5 Examinations required for Outage 3 / EOC-17 Reactor Vessel Head to Pipe Welds (Item No. No Examinations required for Series G04.) Outage 3/ EOC-17 Bare Metal Inspections (Item No. Series GO5.) No Examinations required for

_ _ _ _ _ _ _ Outage 3/ EOC-17 Outage 3/EOC 17 Refueling Outage Report Page 5 of 5 McGuire Unit 1 Revision 0 Section 2 December 12, 2005

3.0 Final Inservice Inspection Plan The final Inservice Inspection Plan shown in this section lists all ASME Section Xi Class 1, Class 2, Class 3, Augmented and Risk Informed examinations credited for this report period.

The information shown below is a field description for the reporting format included in this section of the report:

ITEM NUMBER = ASME Section Xl Tables IWB-2500-1 (Class 1), IWC-2500-1 (Class 2), IWF-2500-1 (Class 1 and Class 2 ), Augmented and Risk Informed Requirements ID NUMBER = Unique Identification Number SYS = Component System Number ISO/DWG NUMBERS - Location and/or Detail Drawings PROC - Examination Procedures INSP REQ. = Examination Technique - Magnetic Particle, Dye Penetrant, etc.

MAT/SCH = General Description of Material DIA / THICK = Diameter/Thickness CAL BLOCKS = Calibration Block Number COMMENTS = General and/or Detail Description Outage 3/EOC 17 Refueling Outage Report Page 1 of 1 McGuire Unit 1 Revision 0 Section 3 December 12, 2005

EOC 17 (

CATEGORY B-B. Pressure Retaining Welds In DUKE ENERG ..ORPORATION (

INSERVICE INSPECTiON PLAN MANAGEMENT Vessels Other Than Reactor Vessels Inservice Inspection Database Management System Plan Report Pressurizer McGuire 1 Page 1 Inservice Inspection Plan for Interval 3 Outage 3 12212/005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS

  • a Shell-to-Head; Circumferential 802.011.001 1PZR-1 MCM 1201.01-170 NDE-620 UT CS 91.500 50337 PRESSURIZER LOWER HEAD TO SHELL.

Circumferential MCM 1201.01-171 PDI-UT-6 3.750 50236A WELD TO BE EXAMINED OUTAGE 6/EOC 21 Class A Head to (THIRD INTERVAL), OUTAGE 1/EOC 22 AND Shell OUTAGE 3/EOC 24 (FOURTH INTERVAL) PER REQUIREMENTS OF IWB-2420 (B)

B02.011.002 1PZR-5 MCM 1201.01-170 NDE-620 UT CS 91.500 50337 PRESSURIZER CIRCUMFERENTIALWELD.

Circumferential MCM 1201.01-171 PDI-UT-6 3.750 50236A EXAMINED OUTAGE 3/EOC17 ADDITIONAL Class A PZR Upper Head to SAMPLE FOR ITEM NUMBER B02.011.001 Shell REFERENCE PIP M-05-4894 Total B02.011 Items: 2 Shell-to-Head; Longitudinal B02.012.001 1PZR-6 MCM 1201.01-170 NDE-620 UT CS 91.500 50337 PRESSURIZER LOWER HEAD TO SHELL.

Longitudinal MCM 1201.01-171 PDI-UT-6 3.750 50236A Class A Head to Shell 802.012.002 1PZR-9 MCM 1201.01-170 NDE-620 UT CS 91.500 50337 PRESSURIZER UPPER HEAD TO SHELL.

Longitudinal MCM 1201.01-171 PDI-UT-6 3.750 50236A EXAMINED OUTAGE 3/EOC17 ADDITIONAL Class A Head to SAMPLE FOR ITEM NUMBER B02.011.001 Shell REFERENCE PIP M-05-4894 Total B02.012 Items: 2 Total B02 Items: 4

EOC 17 (

DUKE ENERG( ORPORATION (

CATEGORY B-G-1, Pressure Retaining Bolting, INSERVICE INSPECTION PLAN MANAGEMENT Greater Than 2 In. In Diameter Inservice Inspection Database Management System Plan Report MReactor Vessel McGuire I Page 2 Inservice Inspection Plan for Interval 3 Outage 3 12/12J2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMI 3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS Closure Head Nuts B06.010.009 1RPV-449-02-09 MCM 1201.01-204 QAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.010 1RPV-449-02-10 MCM 1201.01-204 OAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.011 1RPV-449-02-11 MCM 1201.01-204 OAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.016 1RPV-449-02-16 MCM 1201.01-204 OAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.017 1RPV-449-02-17 MCM 1201.01-204 OAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.018 1RPV-449-02-18 MCM 1201.01-204 OAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.019 1RPV-449-02-19 MCM 1201.01-204 QAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.020 1RPV-449-02-20 MCM 1201.01-204 QAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01 -206 1.770

EOC17 ( f DUKE ENERG JRPORATION CATEGORY B-G-1, Pressure Retaining Bolting. INSERVICE INSPECTION PLAN MANAGEMENT Greater Than 2 In. In Diameter Inservice Inspection Database Management System Plan Report WReactor Vessel McGuire 1 Page 3 Inservice Inspection Plan for Interval 3 Outage 3 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B06.010.021 1RPV-449-02-21 MCM 1201.01-204 QAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.022 1RPV-449-02-22 MCM 1201.01-204 QAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.023 1RPV-449-02-23 MCM 1201.01-204 QAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.024 1RPV-449-02-24 MCM 1201.01-204 GAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.025 1RPV-449-02-25 MCM 1201.01-204 QAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.026 1RPV-449-02-26 MCM 1201.01-204 OAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.027 1RPV-449-02-27 MCM 1201.01-204 QAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.028 1RPV-449-02-28 MCM 1201.01-204 QAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.029 1RPV-449-02-29 MCM 1201.01-204 QAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01 -206 1.770

(

EOC 17 DUKE ENERG(f.JRPORATION C CATEGORY B-G-1. Pressure Retaininq Bolting. INSERVICE INSPECTION PLAN MANAGEMENT Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report McGuire 1 Page 4 Weacor Vesel Inservice Inspection Plan for Interval 3 Outage 3 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS B06.010.030 1RPV-449-02-30 MCM 1201.01-204 QAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.031 1RPV-449-02-31 MCM 1201.01-204 QAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.032 1RPV-449-02-32 MCM 1201.01-204 OAL-1 3 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.033 1RPV-449-02-33 MCM 1201.01-204 OAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 B06.010.034 1RPV-449-02-34 MCM 1201.01-204 QAL-1 3 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MOM 1201.01-206 1.770 B06.010.035 1RPV-449-02-35 MCM 1201.01-204 QAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 806.010.036 1RPV-449-02-36 MCM 1201.01-204 QAL-13 VT-1 CS 10.540 REACTOR VESSEL CLOSURE HEAD NUT.

NC MCM 1201.01-206 1.770 Total B06.010 Items: 24

EOC 17 CATEGORY B-G-1. Pressure Retaininq Bolting.

DUKE ENERG(,ORPORATION INSERVICE INSPECTION PLAN MANAGEMENT

(

Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report Reactor Vessel McGuire 1 Page 5 N Inservice Inspection Plan for Interval 3 Outage 3 12112/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS Closure Studs, when removed B06.030.016 1RPV-449-01 -16 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.017 1RPV-449-01 -17 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.018 1RPV-449-01 -18 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.019 1RPV-449-01-19 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.020 1RPV-449-01 -20 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.021 1RPV-449-01-21 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.022 1RPV-449-01 -22 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.023 1RPV-449-01-23 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A

EOC 17 (~ (OPOAT CATEGORY B-G-1. Pressure Retalninq Bolting.

DUKE ENERGt _RPORATION (

INSERVICE INSPECTION PLAN MANAGEMENT Greater Than 2 In. In DIameter Inservice Inspection Database Management System Plan Report Reactor Vessel McGuire 1 Page 6 Inservice Inspection Plan for Interval 3 Outage 3 12/1212005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B06.030.024 1RPV-449-01 -24 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.025 1RPV-449-01 -25 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.026 1RPV-449-01-26 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.027 1RPV-449-01 -27 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.028 1RPV-449-01 -28 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.029 1RPV-449-01-29 . MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.030 1RPV-449-01-30 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.031 1RPV-449-01-31 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.032 1RPV-449-01 -32 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A

EOC 17 DUKE ENERG$ _.,RPORATION

(

CATEGORY =-G-1 Pressure Retainin Botin INSERVICE INSPECTION PLAN MANAGEMENT Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report MReactor Vessel McGuire 1 Page 7 Inservice Inspection Plan for Interval 3 Outage 3 1211212005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B06.030.033 1RPV-449-01 -33 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.034 1RPV-449-01-34 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.035 1RPV-449-01-35 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A B06.030.036 1RPV-449-01-36 MCM 1201.01-204 PDI-UT-5 UT CS 7.000 50501 REACTOR VESSEL CLOSURE HEAD STUD.

NC MCM 1201.01-206 57.688 Class A Total 1306.030 Items: 21

(

EOC 17 DUKE ENERG(.ORPORATION (

CATEGORY B-G-1. Pressure Retaining Bolting. INSERVICE INSPECTION PLAN MANAGEMENT Greater Than 2 In. In Diameter Inservice Inspection Database Management System Plan Report

  • Reactor Vessel McGuire 1 Page 8 Inservice Inspection Plan for Interval 3 Outage 3 12/12f2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMI BERS PROC INSP REQ MAT/SCH DIATHK CAL BLOCKS COMMENTS Closure Washers, Bushings 806.050.009 lRPV-449-03-09 MCM 1201.01-204 OAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.010 1RPV-449-03-1 0 MCM 1201.01-204 QAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.011 1RPV-449-03-11 MCM 1201.01-204 OAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.016 1RPV-449-03-16 MCM 1201.01-204 QAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A 806.050.017 1RPV-449-03-17 MCM 1201.01-204 QAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.018 1RPV-449-03-18 MCM 1201.01-204 QAL-1 3 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.019 1RPV-449-03-19 MCM 1201.01-204 QAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.020 1RPV-449-03-20 MCM 1201.01-204 QAL-1 3 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A

EOC 17 DUKE ENERG( %QORPORATION (

CATEGORY B-G-1. Pressure Retainina Bolting. INSERVICE INSPECTION PLAN MANAGEMENT Greater Than 2 In. In Diameter Inservice Inspection Database Management System Plan Report WReactor Vessel McGuire 1 Page 9 Inservice Inspection Plan for Interval 3 Outage 3 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B06.050.021 1RPV-449-03-21 MCM 1201.01-204 QAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.022 1RPV-449-03-22 MCM 1201.01-204 QAL-1 3 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.023 1RPV-449-03-23 MCM 1201.01-204 QAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.024 1RPV-449-03-24 MCM 1201.01-204 QAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.025 1RPV-449-03-25 MCM 1201.01-204 QAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.026 1RPV-449-03-26 MCM 1201.01-204 QAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 - 1.719 Class A B06.050.027 1RPV-449-03-27 MCM 1201.01-204 OAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.028 1RPV-449-03-28 MCM 1201.01-204 QAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.029 1RPV-449-03-29 MCM 1201.01-204 QAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A

EOC 17 CATEGORY B-G-1. Pressure Retaininq Bolting.

DUKE ENERG( -JRPORATION INSERVICE INSPECTION PLAN MANAGEMENT

(

Greater Than 2 in. In Diameter Inservice Inspection Database Management System Plan Report WReactor Vessel McGuire 1 Page 10 Inservice Inspection Plan for Interval 3 Outage 3 12112/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS B06.050.030 1RPV-449-03-30 MCM 1201.01-204 QAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.031 1RPV-449-03-31 MCM 1201.01-204 OAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.032 1RPV-449.03-32 MCM 1201.01-204 QAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.033 1RPV-449-03-33 MCM 1201.01-204 QAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.034 1RPV-449-03-34 MCM 1201.01-204 OAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.035 1RPV-449-03-35 MCM 1201.01-204 OAL-13 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A B06.050.036 1RPV-449-03-36 MCM 1201.01-204 QAL-1 3 VT-1 CS 10.560 REACTOR VESSEL CLOSURE HEAD WASHER.

NC MCM 1201.01-206 1.719 Class A Total B06.050 Items: 24 Total B06 Items: 69

EOC 17 (

PDUKE CATEGORY B-G-2. Pressure Retaininq Bolting. 2 ENERt. ;ORPORATION INSERVICE INSPECTION PLAN MANAGEMENT

(

In. And Less In Diameter Inservice Inspection Database Management System Plan Report OPiRIncq McGuire 1 Page 11

  • Inservice Inspection Plan for Interval 3 Outag L B3 12112/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CA~I BLOCKS COMMENTS Bolts, Studs, and Nuts B07.050.001 INC-5-FL1 MCFI-1NC5 QAL-13 VT-1 CS 1.375 FLANGE BOLTING (12 STUDS). BOLT SIZE NC MC-ISIN3-1553-02.00 10.000 DETERMINED USING CHART IN MIP/OIAI7650/01 Class A ENCLOSURE 13.2. EXAMINE ALL BOLTING MATERIAL. EXAMINE BOLTING IN PLACE B07.050.002 1NC-5-FL2 MCFI-1NC5 QAL-13 VT-1 CS 1.375 FLANGE BOLTING (12 STUDS). BOLT SIZE NC MC-ISIN3-1553-02.00 10.000 DETERMINED USING CHART INMWP/0/A/7650/01 Class A ENCLOSURE 13.2. EXAMINE ALL BOLTING Flange MATERIAL. EXAMINE BOLTING IN PLACE Total B07.050 Items: 2

EOC17 DUKE ENERG(

CATEGORY B-G-2. Pressure Retalning Bolting, 2 INSERVICE INSPECTION PLAN MANAGEMENT ORPORATION

(

in. And Less In Diameter Inservice Inspection Database Management System Plan Report McGuire 1 Page 12 Inservice Inspection Plan for Interval 3 Outag 3e3 1211212005 ITEM NUMBER ID NUMBER SYS ISOIDWG NUMBERS PROC INSP REQ MAT/SCH DIAJTHK CAAL BLOCKS COMMENTS Bolts, Studs, and Nuts^ ^

B07.070.064F 1NI- 81 MCM 1205.00-0005 QAL-13 VT-1 SS 1.375 6' VALVE, MCFI-1 N185. INSPECT ONLY ONE NI MC-ISIN3-1562-03.01 0.000 VALVE IN THIS GROUP (64A-64F) PER INTERVAL Class A (ITEM # 4J-008). EXAMINE BOLTING IN PLACE Total 1307.070 Items: 1 Total B07 Items: 3

EOC 17 (

CATEGORY B-K. Welded Attachments For DUKE ENERG( %ORPORATION (

INSERVICE INSPECTION PLAN MANAGEMENT Vessels. PPin-g. Pumps, And Valves Inservice Inspection Database Management System Plan Report TEMNUMBER IVessels McGuire 1 Page 13 Inservice Inspection Plan for Interval 3 Outage 3 12112/2005 ITEM NUMBER ID NUMBER SYS ISO/DW( '3 NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS

        • Welded Attachments -*

B10.010.004 1PZR-W13C MCM 1201.01-170 NDE-25 MT CS 6.000 WELDED ATTACHMENT. PRESSURIZER NC MCM 1201.01-0048 NDE-35 4.000 SEISMIC LUG TO SHELL. W-X QUADRANT. MT Class A MCM 1201.01-140 Seismic Lug to OR PT MAY BE USED DEPENDING ON Shell EXAMINATOR'S NEEDS B10.010.005 1PZR-W13D MCM 1201.01-170 NDE-25 MT CS 6.000 WELDED ATTACHMENT. PRESSURIZER NC MCM 1201.01-0048 NDE-35 4.000 SEISMIC LUG TO SHELL. W-Z QUADRANT. MT Class A MCM 1201.01-0140 Seismic Lug to OR PT MAY BE USED DEPENDING ON Shell EXAMINATOR'S NEEDS Total B10.010 Items: 2 Total B10 Items: 2

EOC17 (

CATEGORY B-M-2. Valve Body DUKE ENERG(CJRPORATION INSERVICE INSPECTION PLAN MANAGEMENT

(

Inservice Inspection Database Management System Plan Report McGuire 1 Page 14 Inservice Inspection Plan for Interval 3 Outage 3 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIANTHK CAL BLOCKS COMMENTS

'* Valve Body, Exceeding NPS 4__-

B12.050.003C 1NI-76A MCM 1205.00-0012 QAL-14 VT-3 SS 10.000 10 CRANE-ALOYCO GATE VALVE (ITEM #

NI MC-ISIN3-1 562-02.00 0.000 4J-043). INSPECT ONE OF THE FOLLOWING Class A MCFI-1 NI87 VALVES: 1NI-54A, 1NI-65B, 1NI-76A, OR 1NI-88B ONLY IF DISASSEMBLED FOR MAINTENANCE, REPAIR, OR VOLUMETRIC EXAMINATION.

Total B12.050 Items: 1 Total B12 Items: 1

EOC 17 CATEGORY &-A. Pressure Retaining Welds In DUKE ENERG( .JRPORATiON INSERVICE INSPECTION PLAN MANAGEMENT

(

Pressure Vessels Inservice Inspection Database Management System Plan Report Head Circumferential Welds McGuire 1 Page 15 Inservice Inspection Plan for Interval 3 Outage 3 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUME 3ERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS C01.020.090 1RCPSS-SH-3 MCM 1201.04-272 NDE-3630 UT SS 12.000 50313 RECIPROCATING CHARGING PUMP SUCTION Circumferential NV MC-ISIN3-1554-03.00 0.375 STABLIZER.

Class B Shell to Upper Head C01.020.091 1RCPSS-SH-2 MCM 1201.04-272 NDE-3630 UT SS 12.000 50313 RECIPROCATING CHARGING PUMP SUCTION Circumferential NV MC-ISIN3-1554-03.00 0.375 STABLIZER.

Class B Shell to Lower Head Total C01.020 Items: 2 Total C01 Iems: 2

EOC 17 (

CATEGORY C-B. Pressure Retainlng Nozzle DUKE ENER(h JORPORATION (

INSERVICE INSPECTION PLAN MANAGEMENT Welds In Vessels Inservice Inspection Database Management System Plan Report Nozzles In Vessels <= 1/2 In. Nominal Thickness McGuire 1 Page 16 Inservice Inspection Plan for Interval 3 Outage 3 1211212005 ITEM NUMBER ID NUMBER SYS ISO/DWG INUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS Nozzle-to-Shell (Nozzle to Head or Nozzle to Nozzle) Weld C02.011.001 1RCPSS-INLET MCM 1201.04-272 NDE-35 PT Ss 4.000 RECIPROCATING CHARGING PUMP SUCTION NV MC-ISIN3-1554-03.00 0.375 STABLIZER.

Class B Inlet Nozzle to Shell C02.011.002 1RCPSS-OUTLET MCM 1201.04-272 NDE-35 PT SS 4.000 RECIPROCATING CHARGING PUMP SUCTION NV MC-ISIN3-1554-03.00 0.375 STABLIZER.

Class B Outlet Nozzle to Shell Total C02.011 hems: 2 Total C02 Items: 2

EOC17 (

CATEGORY C-C, Welded Attachments For DUKE ENERG(..,ORPORATION (

INSERVICE INSPECTION PLAN MANAGEMENT Vessels, Piplnq. Pumps, And Valves Inservice Inspection Database Management System Plan Report NPressure Vessels McGuire 1 Page 17 Inservice InspectIon Plan for Interval 3 Outage 3 12/1212005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA1THK CAL BLOCKS COMMENTS

        • Welded Attachments ****

C03.010.003 1RCPSS-SUPP MCM 1201.04-272 NDE-35 PT SS 12.000 RECIPROCATING CHARGING PUMP SUCTION NV MC-ISIN3-1554-03.00 0.375 STABLIZER SUPPORT.

Class B WELDED ATTACHMENT. EXAMINED OUTAGE 2

/EOC-16 AS ADDITIONAL SAMPLE FOR ITEM NUMBER C03.010.005.

Total C03.010 Items: 1

EOC 17

( DUKE ENERGORPORATION

(

CATEGORY C-C. Welded Attachments For INSERVICE INSPECTION PLAN MANAGEMENT Vessels, PiPingn Pumps, And Valves Inservice Inspection Database Management System Plan Report McGuire 1 Page 18 Inservice Inspection Plan for Interval 3 Outage 3 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DW( GNUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS Welded Attachments C03.020.025 1-MCA-ND-H63 MCSRD-NDA/sht. 6 NDE-35 PT SS 8.000 WELDED ATTACHMENT. INSPECT WITH Rigid Support ND MC-ISIN3-1561-01.00 0.203 F01.020.181A.

Class B 1-MCA-ND-H63 C03.020.027 1-MCA-ND-H335 MCSRD-NIO/sht. 1 NDE-35 PT SS 18.000 WELDED ATTACHMENT.

Rigid Restraint ND MC-ISIN3-1561-01.00 0.750 Class B 1-MCA-ND-H335 C03.020.042 1-MCA-NS-H36 MCSRD-NSA/sht. 1 NDE-35 PT SS 8.000 WELDED ATTACHMENT. INSPECT WITH Rigid Support NS MC-ISIN3-1563-01.00 0.125 F01.020.261 B.

Class B 1-MCA-NS-H36 C03.020.072 1-MCA-VQ-H1-1 MCSRD-VQA/sht. 2 NDE-35 PT SS 6.000 WELDED ATTACHMENT. INSPECT WITH Rigid Support VO MC-ISIN3-1585-01.00 0.125 F01.020.652A.

Class B 1-MCA-VQ-H1 1 Total C03.020 hems: 4 Total C03 Items: 5

EOC 17 (

CATEGORY C-G. Pressure Reta ining Welds In DUKE ENERG(_ORPORATION INSERVICE INSPECTION PLAN MANAGEMENT

(

Pumps And Valves Inservice Inspection Database Management System Plan Report McGuire 1 Page 19 Inservice Inspection Plan for Interval 3 Outage 3 12/1212005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

  • Valve Body Welds -- *-

C06.020.002A 1CF-126B-1 MCM 1205.00-989/1 NDE-25 MT CS 6.000 ITEM # 6J-26. INSPECT ONE VALVE IN THIS CF MC-ISIN3-1591-01.01 1.165 GROUP (2A-2D) PER INTERVAL.

Class B Valve Body to Valve Body Total C06.020 items: 1 Total C06 Items: 1

EOC 17 (

CATEGORY D-A, Welded Attact iments For DUKE ENERG(_JRPORATION INSERVICE INSPECTION PLAN MANAGEMENT

(

Vessels. PiPIng. Pumps. And V.3lves Inservice Inspection Database Management System Plan Report NPressure Vessels McGuire 1 Page 20 Inservice Inspection Plan for Interval 3 Outage 3 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

  • --* Welded Attachments D01.010.010 1LDHX-SUPPORT MCM 1201.06-0021 QAL-13 VT-1 NA 0.000 VERTICAL LETDOWN HEAT EXCHANGER NV MC-ISIN3-1573-02.00 0.375 WELDED ATTACHMENT.

Class C MC-1220-39 Total D01.010 Items: 1

EOC 17 CATEGORY D-A, Welded Attachiments For DUKE ENERG( jRPORATION INSERVICE INSPECTION PLAN MANAGEMENT

(

Vessels, Piping. Pumps, And Vsalves Inservice Inspection Database Management System Plan Report McGuire 1 Page 21 Inservice Inspection Plan for Interval 3 Outage 3 1211212005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

'* Welded Attachments D01.020.061 1-MCA-KC-2134 MCSRD-KC-304/sht.1 QAL-13 VT-1 NA 20.000 WELDED ATTACHMENT. INSPECT WITH Rigid Restraint KC MC-ISIN3-1573-01.01 0.125 F01.030.0125B.

Class C 1-MCA-KC-2134 Total D01.020 Items: 1 Total D1 Items: 2

EOC 17

( DUKE ENERC( _.ORPORATION (

CATEGORY F-A Suppors INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report IMass N PUMnBE Supports McGuire I Page 22 Inservice Inspection Plan for Interval 3 Outage 3 1211212005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS "A", One-Directional, "B", Multi-Directional, "C", Thermal Movement F01.010.008A 1-MCR-NC-555 MCSRD-NC-03/sht. 1 QAL-14 VT-3 NA 4.000 Rigid Support NC 0.000 Class A F01.010.053C 1-MCR-ND-507 MCSRD-ND-01/sht. 1 QAL-14 VT-3 NA 14.000 Mech Snubber ND 0.000 Class A F01.010.103B 1-MCR-NI-527 MCSRD-NI-01/sht. 2 OAL-14 VT-3 NA 6.000 Rigid Restraint NI 0.000 Class A F01.010.107A 1-MCR-NI-547 MCSRD-NI-03/sht. 1 QAL-14 VT-3 NA 6.000 Rigid Support NI 0.000 Class A F01.010.151B 1-MCR-NV-814 MCSRD-NV-08/sht. 1 OAL-14 VT-3 NA 2.000 Rigid Restraint NV 0.000 Class A F01.010.152B 1-MCR-NV-848 MCSRD-NV-06/sht. 1 QAL-14 VT-3 NA 2.000 Rigid Support NV 0.000 Class A Total F01.010 Items: 6

(

EOC 17 DUKE ENERGCORPORATION C CATEGORY F-A. Supports INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report McGuire 1 Page 23 Mims 2 Pipinag SuPorts Inservice Inspection Plan for Interval 3 Outage 3 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS "A", One-Directional, "B", MultI-DIrectional, "C", Thermal Movement F01.020.001C 1-MCA-CA-H365 MCSRD-CAM/sht. 2 QAL-14 VT-3 NA 6.000 Hyd Snubber CA MC-ISIN3-1592-01.00 0.000 Class B F01.020.007C 1-MCA-CA-H411 MCSRD-CAN/sht. 1 QAL-14 VT-3 NA 6.000 Hyd Snubber CA MC-ISIN3-1592-01.00 0.000 Class B F01.020.051C 1-MCA-CF-H152 MCSRD-CFC/sht.1 QAL-14 VT-3 NA 18.000 Hyd Snubber CF MC-ISIN3-1591-01.01 0.000 Class B F01.020.101C 1-MCA-FW-H1 MCSRD-FWA/sht. 6 OAL-14 VT-3 NA 14.000 Spring Hgr FW MC-ISIN3-1571-01.00 0.000 Class B F01.020.151C 1-MCA-ND-H2 MCSRD-NDA/sht. 4 QAL-14 VT-3 NA 8.000 Spring Hgr ND MC-ISIN3-1561-01.00 0.000 Class B F01.020.152B 1-MCA-ND-H7 MCSRD-NDA/sht. 4 QAL-14 VT-3 NA 8.000 Rigid Restraint ND MC-ISIN3-1561-01.00 0.000 Class B F01.020.154A 1-MCA-ND-H21 MCSRD-NDA/sht. 2 QAL-14 VT-3 NA 8.000 Rigid Support ND MC-1IIN3-1561-01.00 0.000 Class B F01.020.181 A 1-MCA-ND-H63 MCSRD-NDA/sht. 6 QAL-14 VT-3 NA 8.000 Rigid Support ND MC-ISIN3-1561-01.00 0.203 Class B

EOC 17 (

CATEGORY F-A, Supports DUKE ENERG( JRPORATION (

INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report

  • Class 2 Pipngn Supnorts McGuire 1 Page 24 Inservice Inspection Plan for Interval 3 Outage 3 12112/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS F01.020.182A 1-MCA-ND-H49 MCSRD-NDAlsht. 7 QAL-14 VT-3 NA 8.000 Rigid Support ND MC-ISIN3-1561-01.00 0.125 Class B F01.020.183B 1-MCA-ND-H259 MCSRD-FWA/sht. 7 QAL-14 VT-3 NA 14.000 Rigid Restraint ND MC-ISIN3-1561-01.00 0.000 Class B F01.020.213A 1-MCR-NI-827 MCSRD-NI-08/sht. 1 QAL-14 VT-3 NA 2.000 Rigid Support NI MC-ISIN3-1562-03.00 0.000 Class B F01.020.222C 1-MCR-NI-717 MCSRD-NI-11/sht. 1 QAL-14 VT-3 NA 2.000 Hyd Snubber NI MC-ISIN3-1562-03.01 0.000 Class B FO1.020.225B 1-MCR-NI-774 MCSRD-NI-09/sht. 3 QAL-14 VT-3 NA 4.000 Rigid Restraint NI MC-ISIN3-1562-03.00 0.000 Class B F01.020.226B 1-MCR-NI-775 MCSRD-NI-09/sht. 3 QAL-14 VT-3 NA 4.000 Rigid Restraint NI MC-ISIN3-1562-03.00 0.000 Class B F01.020.260A 1-MCA-NS-H30 MCSRD-NSC/sht. 1 QAL-14 VT-3 NA 10.000 Rigid Support NS MC-ISIN3-1563-01.00 0.000 Class B F01.020.261B 1-MCA-NS-H36 MCSRD-NSA/sht. 1 QAL-14 VT-3 NA 8.000 Rigid Restraint NS MC-ISIN3-1563-01.00 0.125 Class B F01.020.262C 1-MCA-NS-H39 MCSRD-NSA/sht. 1 QAL-14 VT-3 NA 8.000 Spring Hgr NS MC-ISIN3-1563-01.00 0.000 Class B

EOC 17 (

CATEGORY F-A. Supports DUKE ENERG( _ORPORATION (

INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report Class 2 Plingq Supports McGuire 1 Page 25 Inservice Inspection Plan for Interval 3 Outage 3 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS F01.020.316A 1-MCA-NV-H23 MC-1190-NV-01-03 QAL-14 VT-3 NA 3.000 Rigid Support NV MC-ISIN3-1554-03.01 0.000 Class B F01.020.317A 1-MCA-NV-H27 MC-1 190-NV-01 -03 QAL-14 VT-3 NA 3.000 Rigid Support NV MC-ISIN3-1554-03.01 0.000 Class B F01.020.318B 1-MCA-NV-H29 MC-1190-NV-01-03 OAL-14 VT-3 NA 3.000 Rigid Restraint NV MC-ISIN3-1554-03.01 0.000 Class B F01.020.319C MC-1683-NV.04-R27 MC-1683-NV.04 QAL-14 VT-3 NA 2.000 Hyd Snubber NV MC-ISIN3-1554-03.01 0.000 Class B F01.020.320A MC-1683-NV.04-R28 MC-1683-NV.04 QAL-14 VT-3 NA 2.000 Rigid Support NV MC-ISIN3-1554-03.01 0.000 Class B F01.020.554A 1-MCA-SM-H70 MCSRD-SMA/sht. 4 QAL-14 VT-3 NA 36.000 Rigid Support SM MC-ISIN3-1593-01.03 0.000 Class B F01.020.555C 1-MCA-SM-H73 MCSRD-SMA/sht. 4 QAL-14 VT-3 NA 42.000 Hyd Snubber SM MC-iSIN3-1593-01.03 0.000 Class B F01.020.601C 1-MCA-SV-H13 MCSRD-SVA/sht. 1 OAL-14 VT-3 NA 6.000 Spring Hgr SV MC-ISIN3-1593-01.00 0.000 Class B F01.020.652A 1-MCA-VQ-H11 MCSRD-VQA/sht. 2 QAL-14 VT-3 NA 6.000 Rigid Support VO MC-ISIN3-1585-01.00 0.125 Class B

EOC 17 CATEGORY F-A, Supports DUKE ENERG( - JRPORATION INSERVICE INSPECTION PLAN MANAGEMENT

(

Inservice Inspection Database Management System Plan Report C!ass 2 PIPIna Supports McGuire 1 Page 26 Inservice Inspection Plan for Interval 3 Outage 3 12112/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS Total F01.020 Items: 26

EOC17 (

CATEGORY F-A. Supports DUKE ENERG( -ORPORATION (

INSERVICE INSPECTION PLAN MANAGEMENT Inservice Inspection Database Management System Plan Report MClass 3 Plnina Surpports McGuire 1 Page 27 Inservice Inspection Plan for Interval 3 Outage 3 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS

  • A", One-Directional, "B", Multi-Directional, "C", Thermal Movement F01.030.112A 1-MCA-KC-1089 MCSRD-KC-303/sht.2 QAL-14 VT-3 NA 6.000 Rigid Support KC MC-ISIN3-1573-01.01 0.000 Class C F01.030.114A 1-MCA-KC-1006 MCSRD-KC-305/sht.2 OAL-14 VT-3 NA 16.000 Rigid Support KC MC-ISIN3-1573-01-00 0.000 Class C F01.030.115A 1-MCA-KC-2297 MCSRD-KC-305/sht.3 QAL-14 VT-3 NA 8.000 Rigid Support KC MC-ISIN3-1573-02-00 0.000 Class C F01.030.116A 1-MCA-KC-H100 MCSRD-KC-305/sht.3 OAL-14 VT-3 NA 8.000 Rigid Support KC MC-ISIN3-1573-02-00 0.000 Class C F01.030.125B 1-MCA-KC-2134 MCSRD-KC-304/sht.1 QAL-14 VT-3 NA 20.000 INSPECT WITH D01.020.061.

Rigid Restraint KC MC-ISIN3-1573-01.01 0.125 Class C F01.030.1128B 1-MCA-KC-1034 MCSRD-KC-311/sht.2 QAL-14 VT-3 NA 6.000 Rigid Restraint KC MC-ISIN3-1573-02.02 0.000 Class C F01.030.129B 1-MCA-KC-1027 MCSRD-KC-311/sht.3 OAL-14 VT-3 NA 6.000 Rigid Restraint KC MC-ISIN3-1573-02.02 0.000 Class C F01.030.152C 1-MCA-KD-083 MCSRD-KD-10/sht.2 QAL-14 VT-3 NA 6.000 Hyd Snubber KD MC-ISIN3-1609-01.01 0.000 Class C

EOC 17 S CATEGORY i-.SDot DUKE ENERG( JRPORATION INSERVICE INSPECTION PLAN MANAGEMENT

(

Inservice Inspection Database Management System Plan Report wlass 3 PPipng Supports McGuire 1 Page 28 Inservice Inspection Plan for Interval 3 Outage 3 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS F01.030.153C 1-MCA-KD-165 MCSRD-KD-12/sht.1 QAL-14 VT-3 NA 6.000 Spring Hgr KD MC-ISIN3-1609-01.01 0.000 Class C F01.030.271A 1-MCA-WN-H29 MCSRD-WNB/sht.1 QAL-14 VT-3 NA 8.000 Rigid Support WN MC-ISIN3-1609-07.00 0.000 Class C F01.030.272B 1-MCA-WN-H64 MCSRD-WNB/sht.3 QAL-14 VT-3 NA 6.000 Rigid Restraint WN MC-ISIN3-1609-07.00 0.000 Class C Total F01.030 Hems: 11

EOC 17

(' DUKE ENERG .VRPORATION (

CATEGORY F-A.Supports INSERVICE INSPECTION PLAN MANAGEMENT N

I Sunports Other Than Pipinci Supports Inservice Inspection Database Management System McGuire 1 Inservice Inspection Plan for Interval 3 Outage 3 Plan Report Page 29 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIA/THK CAL BLOCKS COMMENTS Class 1, 2, and 3 F01.040.001B 1PZR-SKIRT MCM 1201.01-0048 OAL-14 VT-3 NA 0.000 PRESSURIZER SUPPORT SKIRT.

NC MC-ISIN3-1553-02.00 0.000 Class A F01.040.002B 1PZR-LUGS MCM 1201.01-0170 QAL-14 VT-3 NA 0.000 PRESSURIZER SUPPORT LUGS.

NC MC-ISIN3-1553-02.00 0.000 Class A F01.040.003B 1PZR-SUPPORT MC-1070-4 OAL-14 VT-3 NA 0.000 PRESSURIZER LOWER AND UPPER SUPPORT NC MC-ISIN3-2553-02.00 0.000 FRAME. REFERENCE DRAWING MC-1070-6.

Class A MC-1070-22 F01.040.006B 1RCP-B-SUPPORT MC-1070-4 QAL-14 VT-3 NA 0.000 REACTOR COOLANT PUMP 1B SUPPORT NC MC-ISIN3-1553-01.00 0.000 (3 ASSEMBLIES).

Class A MC-1070-17 F01.040.010B 1RCPSS-SUPPORT MCM 1201.04-0272 QAL-14 VT-3 NA 0.000 RECIPROCATING CHARGING PUMP SUCTION NV MC-ISIN3-1554-03.00 0.375 STABILIZER Class B SUPPORT.

Total F01.040 Items: 5 Total F01 Items: 48

EOC 17 (

CATEGORY AUG. Auamented Insnections DUKE ENERG( JRPORATION INSERVICE INSPECTION PLAN MANAGEMENT

(

Inservice Inspection Database Management System Plan Report LAucmented Examination McGuire 1 Page 30 Inservice Inspection Plan for Interval 3 Outage 3 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMEIERS PROC INSP REQ MAT/SCH DIANTHK CAL BLOCKS COMMENTS Pipe Rupture Protection G03.001.004 1NC1F-109 MCFI-1NC-47 NDE-600 UT SS 10.000 ^ AUGMENTED EXAMINATION.

Circumferential NC MC-ISIN3-1553-01.00 PDI-UT-2 1.000 REFERENCE DOCUMENT SRG-78-001 REV.2 Class A (DISTRIBUTION CODE MADM-257). *SEE SECTION 8 FOR CALIBRATION BLOCK REQUIREMENTS.

G03.001.004A 1NC1F-109 MCFI-1NC-47 NDE-35 PT SS 10.000 AUGMENTED EXAMINATION.

Circumferential NC MC-ISIN3-1553-01.00 1.000 REFERENCE DOCUMENT SRG-78-001 REV.2 Class A (DISTRIBUTION CODE MADM-257).

G03.001.005 1NC-102-1 MCFI-1 NC-47 NDE-600 UT SS 10.000

  • AUGMENTED EXAMINATION.

Circumferential NC MC-ISIN3-1553-01.00 PDI-UT-2 1.000 REFERENCE DOCUMENT SRG-78;001 REV.2 Class A (DISTRIBUTION CODE MADM..257). -SEE SECTION 8 FOR CALIBRATION BLOCK REQUIREMENTS.

G03.001.005A 1NC-102-1 MCFI-1 NC-47 NDE-35 PT SS 10.000 AUGMENTED EXAMINATION.

Circumferential NC MC-ISIN3-1553-01.00 1.000 REFERENCE DOCUMENT SRG-78-001 REV.2 Class A (DISTRIBUTION CODE MADM-257).

G03.001.006 1NC-102-2 MCFI-1 NC-47 NDE-600 UT SS 10.000

  • AUGMENTED EXAMINATION.

Circumferential NC MC-ISIN3-1553-01.00 PDI-UT-2 1.000 REFERENCE DOCUMENT SRG-78-001 REV.2 Class A (DISTRIBUTION CODE MADM-257). *SEE SECTION 8 FOR CALIBRATION BLOCK REQUIREMENTS.

G03.001.006A 1NC-102-2 MCFI-1NC-47 NDE-35 PT SS 10.000 AUGMENTED EXAMINATION.

Circumferential NC MC-ISIN3-1553-01.00 1.000 REFERENCE DOCUMENT SRG-78-001 REV.2 Class A (DISTRIBUTION CODE MADM-257).

G03.001.007 1NC-128-1 MCFI-1NC-47 NDE-600 UT SS 10.000 AUGMENTED EXAMINATION.

Circumferential NC MC-ISIN3-1553-01.00 PDI-UT-2 1.000 REFERENCE DOCUMENT SRG-78-001 REV.2 Class A (DISTRIBUTION CODE MADM-257). *SEE SECTION 8 FOR CALIBRATION BLOCK REQUIREMENTS.

EOC 17 (

CATEGORY AUG. Augmented Inspections DUKE ENERG( JORPORATION INSERVICE INSPECTION PLAN MANAGEMENT

(

Inservice Inspection Database Management System Plan Report

  • Auamented Examination McGuire 1 Page 31
  • Inservice Inspection Plan for Interval 3 Outage 3 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS G03.001.007A 1NC-128-1 MCFI-1 NC-47 NDE-35 PT Ss 10.000 AUGMENTED EXAMINATION.

Circumferential NC MC-ISIN3-1553-01.00 1.000 REFERENCE DOCUMENT SRG-78-001 REV.2 Class A (DISTRIBUTION CODE MADM-257).

G03.001.008 1NC-128-2 MCFI-1 NC-47 NDE-600 UT SS 10.000

  • AUGMENTED EXAMINATION.

Circumferential NC MC-ISIN3-1553-01.00 PDI-UT-2 1.000 REFERENCE DOCUMENT SRG-78-001 REV.2 Class A (DISTRIBUTION CODE MADM-257). 'SEE SECTION 8 FOR CALIBRATION BLOCK REQUIREMENTS.

G03.001.008A 1NC-128-2 MCFI-1 NC-47 NDE-35 PT SS 10.000 AUGMENTED EXAMINATION Circumferential NC MC-ISIN3-1553-01.00 1.000 REFERENCE DOCUMENT SRG-78-001 REV.2 Class A (DISTRIBUTION CODE MADM-257)

Total G03.001 Items: 10 Total G03 Items: 10

EOC 17 ( (

DUKE ENERG( - .jRPORATION CATEGORY R-A. Risk Informed Pipina INSERVICE INSPECTION PLAN MANAGEMENT Examinations Inservice Inspection Database Management System Plan Report

  • Class 1 and 2 Piping Welds McGuire 1 Page 32 Inservice Inspection Plan for Interval 3 Outage 3 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MATISCH DIA/THK CAL BLOCKS COMMENTS Elements Subject to Thermal Fatigue ****

R01.011.081 1N132A-2 MCFI-1 N121 NDE-600 UT SS 18.000 SEGMENT NI-060.

Circumferential NI MC-ISIN3-1562-03.01 PDI-UT-2 0.250 *SEE SECTION 8 FOR CALIBRATION BLOCK Class B Elbow to REQUIREMENTS.

Elbow R01.011.083 1N1267-2 MCFI-1 N175 NDE-600 UT SS 3.000

  • SEGMENT NI-062A.

Circumferential NI MC-ISIN3-1562-01.00 PDI-UT-2 0.438 *SEE SECTION 8 FOR CALIBRATION BLOCK Class B Reducer to REQUIREMENTS.

Pipe R01.011.084 1N1227-6 MCFI-1 N174 NDE-600 UT SS 3.000

  • SEGMENT NI-063A.

Circumferential NI MC-ISIN3-1562-01.00 PDI-UT-2 0.438 *SEE SECTION 8 FOR CALIBRATION BLOCK Class B Reducer to REQUIREMENTS.

Tee R01.011.140 1NV15-2 MCFI-1NV8 NDE-600 UT SS 4.000

  • SEGMENT NV-011A.

Circumferential NV MC-ISIN3-1554-03.01 PDI-UT-2 0.531 *SEE SECTION 8 FOR CALIBRATION BLOCK Class B Tee to REQUIREMENTS.

Pipe R01.011.153 1NV1F2112 MCFI-1 NV63 NDE-600 UT SS 2.000

  • SEGMENT NV-020AG.

Circumferential NV MC-ISIN3-1554-01.00 PDI-UT-2 0.344 *SEE SECTION 8 FOR CALIBRATION BLOCK Class B Pipe to REQUIREMENTS.

Reducer R01.011.154 1NV1F331 MCFI-1NV5 NDE-600 UT SS 2.000

  • SEGMENT NV-0201A.

Circumferential NV MC-ISIN3-1554-01.00 PDI-UT-2 0.344 *SEE SECTION 8 FOR CALIBRATION BLOCK Class B Pipe to REQUIREMENTS.

Reducer R01.011.155 1NV3-3 MCFI-1NV185 NDE-600 UT SS 3.000

  • SEGMENT NV-065.

Circumferential NV MC-ISIN3-1554-03.00 PDI-UT-2 0.438 *SEE SECTION 8 FOR CALIBRATION BLOCK Class B Elbow to REQUIREMENTS.

Pipe R01.011.156 1NV1F6223 MCFI-1NV145 NDE-600 UT SS 2.000 ^ SEGMENT NV-077B.

Circumferential NV MC-ISIN3-1554-01.02 PDI-UT-2 0.344 *SEE SECTION 8 FOR CALIBRATION BLOCK Reducer to REQUIREMENTS.

Class B Pipe

EOC 17 (

CATEGORY R-A. Risk Informed PiRina DUKE ENERGi -JRPORATION (

INSERVICE INSPECTION PLAN MANAGEMENT Examinations Inservice Inspection Database Management System Plan Report Class I and 2 Pining Welds McGuire 1 Page 33 Inservice Inspection Plan for Interval 3 Outage 3 12/12/2005 ITEM NUMBER ID NUMBER SYS ISO/DWG NUMBERS PROC INSP REQ MAT/SCH DIAITHK CAL BLOCKS COMMENTS R01.011.157 1NV1FW53-51 MCFI-1NV53 NDE-600 UT Ss 3.000

  • SEGMENT NV-080A.

Circumferential NV MC-ISIN3-1554-01.02 PDI-UT-2 0.438 *SEE SECTION 8 FOR CALIBRATION BLOCK Class B Pipe to REQUIREMENTS.

Tee R01.011.204 1RV1F107 MCFI-1RV31 NDE-600 UT CS 12.000

  • SEGMENT RV-013.

Circumferential RV MC-ISIN3-1604.03-00 PDI-UT-2 0.375 *SEE SECTION 8 FOR CALIBRATION BLOCK Class B Pipe to REQUIREMENTS.

Pipe Total R01.011 htems: 10

-- *- Elements Subject to Corrosive, Erosive, or Cavitation Wastage RO1.013.002 1RV1F104A MCFI-1RV31 NDE-946 UT CS 12.000 STEP SEGMENT RV-002.

Circumferential RV MC-ISIN3-1604-03.00 0.375 WEDGE EXAMINE A 1 FT. LENGTH OF PIPE AT WELD TO Class B Pipe to DETERMINE WALL THICK. EXAMINE 6 INCHES Valve EACH SIDE OF WELD, MARK IN 1 INCH GRID Total R01.013 Items: 1 Total R01 Items: 11

4.0 Results of Inspections Performed The results of each examination shown in the final Inservice Inspection Plan (Section 3 of this report) are included in this section. The completion date and status for each examination are shown. All examinations revealing reportable indications and any corrective action required as a result are described in further detail in Subsection 4.1 and 4.2. Corrective measures performed and limited examinations are described in further detail in Subsections 4.3 and 4.4.

The information shown below is a field description for the reporting format included in this section of the report:

ITEM NUMBER ASME Section XI Tables IWB-2500-1 (Class 1), IWC-2500-1 (Class 2), IWF-2500-1 (Class 1 and Class 2),

Augmented and Risk Informed Requirements ID NUMBER Unique Identification Number SYSTEM Component System Identification INSP DATE Date of Examination INSP STATUS CLR Clear REC Recordable REP Reportable INSP LIMITED Indicates inspection was limited.

Coverage obtained is listed GEO REF _ Yes (Geometric Reflector N No applies only to UT)

Y Yes RFR (Relief Request) = No COMMENTS General and/or Detail Description Outage 3IEOC 17 Refueling Outage Report Page 1 of 2 McGuire Unit 1 Revision 0 Section 4 December 12, 2005

4.1 Reportable Indications There was one reportable indication for the examinations associated with this report period. Item Number B02.01 1.001 reference Corrective Action Program PIP M-05-4894 and Westinghouse Flaw evaluation For McGuire Unit 1 Pressurizer Lower Head to Shell Weld (December 2005).

4.2 Corrective Action Corrective action is action taken to resolve flaws and relevant conditions, including supplemental examinations, analytical evaluations, repair / replacement activities, and corrective measures. There was one corrective action for the examinations associated with this report period.

Item Number B02.01 1.001 had a reportable condition, which the ASME Section Xl Code required two additional examination. For additional information covering this examination item, reference PIP M-05-4894 and the Westinghouse Flaw evaluation For McGuire Unit 1 Pressurizer Lower Head to Shell Weld, (December 2005).

4.3 Corrective Measures Corrective measures are actions (such as maintenance) taken to resolve relevant conditions, but not including supplemental examinations, analytical evaluations, and repair / replacement activities. Any corrective measures performed for examinations associated with this report period will be shown on the examination data sheets which are on file at the Duke Energy Corporate Office in Charlotte, North Carolina.

4.4 Limited Examinations Limitations (i.e., 90% or less of the required examination coverage obtained) identified for examinations associated with this report period are shown below. A relief request will be submitted to seek NRC acceptance of the limited coverage this information will be on file at the Duke Energy Corporate Office in Charlotte, North Carolina.

Item Number Description ofLimitation R01.011.157 58.3%

Outage 3/EOC 17 Refueling Outage Report Page 2 of 2 McGuire Unit 1 Revision 0 Section 4 December 13, 2005

Westinghouse Westinghouse Electric Company NudearServices P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 USA Mr, Mike Langel Direct tel: 412-374-5651 Duke Energy Corporation Direct fax: 412-374-3451 McGtire Nuclear Station e-mail: beddindcqwestinghouse.com 12700 Hagers Ferry Road Westinghouse 5.O 36762 Huntersville, NC 28078-8985 Customer P.O0 DS1574 Task Work Auth. #:

Our ref DPC-05-74 December 1,2005 DUKE POWER COMPANY MCGUIRE UNIT 1NUCLEAR PLANT Final Evaluation of Indications in Pressurizer Lower Read to Shell Weld

Dear Mr. Langel:

Westinghouse was asked to evaluate five circumferential indications located on the lower head to shell weld region of the McGuire Unit I pressurizer. The indications were found by UT examinations performed in this region.

Attached is the final letter report documenting the acceptability of the indications. All of Duke Energy's comments have been addressed in this report.

1. LT7R.-PAFM-05-76, "Flaw Evaluation for McGuire Unit 1 Pressurizer Lower Head to Shell'Weld," December 2005.

If there are-any questions concerning this evaluation, please contact Mr. Chris Ng at 724-722-6030 or mne at 412-374-5651.

Sincrely, WESTINGHOUSE ELECTRIC COMPANY LLC Daniel Beddingfleld Customer Project Manager Attachment Official record electronically approved in EDMS A BNFL Croup company

Page 2 of 2 Our ref: DPC-05-74 December 1, 2005 cc: Allen Smith Duke Charlotte - Mail Code EC05P Pete Harden Westinghouse Charlotte Scott Brown McGuire Warren Bamford Westinghouse Chris Ng Westinghouse Mel Arey Duke Charlotte Official record electronically approved in EDMS 2000 A BNFL Group company

Westinghouse Proprietary Class 2 LTR-PAFM-05-76 Flaw Evaluation For McGuire Unit 1 Pressurizer Lower Head to Shell Weld December 2005 C. K. Ng W. H. Bamford Verified by: _-

S. Jirawongkraisorn Piping Analysis and Fracture Mechanics Approved by:

S. Swamy Manager, Piping Analysis and Fracture Mechanics

Westinghouse Proprietary Class 2

1.0 INTRODUCTION

During Fall 2005 outage. inspection of McGuire Unit I pressurizer revealed five subsurface circumferential indications in the region of tie lower head to shell weld. Flaw evaluations to determine the acceptability of the detected indications have been performed using the ASME Code Section XI IWB-3600 flaw evaluation procedures and acceptance criteria. The objective of this letter report is to document the technical basis and results of the flaw evaluations performed.

2.0 CODE ACCEPTANCE CRITERIA There are two alternate sets of flaw acceptance criteria for continued service without repair in paragraph IWB-3600 of ASME Code Section Xl [1]:

1. Acceptance Criteria Based on Flaw Size (IWB-361 1)
2. Acceptance Criteria Based on Stress Intensity Factor (IWB-3612)

For the flaw evaluation, analyses were performed using both acceptance criteria. To illustrate, one evaluation was performed using the flaw size acceptance criteria discussed in Section 2.1, in order to determine the limiting allowable flaw size for all the design transients. The allowable flaw size for Criteria (1) is based on the limiting flaw size determined for the normal/upset and emergency/faulted condition transients since the margins of safety are different for these two sets of operating conditions. Then a second evaluation was performed using the criteria based on stress intensity factor discussed in Section 2.2, to find the limiting allowable flaw size for all the design transients. The limiting allowable flaw size for Criteria (2) is determined similar to that for Criteria (1). Once the limiting allowable flaw sizes for both Criteria (1) and (2) have been determined, the flaw sizes were then compared, and the more beneficial criterion (allowing the largest flaw) was chosen to be the end-of-evaluation period allowable flaw size.

2.1 Criteria Based on Flaw Size The code acceptance criteria are stated in Paragraph IWB-3611 of Section XI:

ar < 0.1 ak For normal conditions (upset & test conditions inclusive) and a( < 0.5 a; For faulted conditions (emergency condition inclusive) where af = The maximum size to which the detected flaw is calculated to grow at the end of the next specified period, as applicable.

a = The minimum critical flaw size under normal operating conditions (upset and test conditions inclusive) a = The minimum critical flaw size for initiation of non-arresting growth under postulated faulted conditions (emergency conditions inclusive)

Page 2 of Page 12

Westinghouse Proprietary Class 2 To determine whether an indication is acceptable for continued service without repair, both criteria must be met.

2.2 Criteria Based on Stress Intensity Factor The term stress intensity factor (K1) is defined as the driving force on a crack. It is a function of the size of the crack and the applied stresses, as well as the overall geometry of the structure. In contrast, the fracture toughness (Ku, Kd is a measure of the resistance of the material to propagation of a crack. It is a material property, and a function of temperature.

The criteria with respect to K, used in the evaluation are from IWB-3612 of Section XI. The criteria are.

K < K/5 For normal conditions (upset & test conditions inclusive)

K <T For faulted conditions (emergency conditions inclusive) where K, = The maximum applied stress intensity factor for the flaw size af to which a detected flaw will grow, during the conditions under consideration, to the next specified period.

K,, = Fracture toughness based on crack arrest for the corresponding crack tip temperature.

Kk = Fracture toughness based on fracture initiation for the corresponding crack tip temperature.

To determine whether a surface flaw is acceptable for continued service without repair, both cliteria must be met.

3.0 DESIGN TRANSIENTS The design transients for the McGuire Unit [ pressurizer are listed in Table 3-1[2]. In addition, the transients evaluated in the WOG program pertaining to Modified Operating Procedures (MOP) heatup/cooldown transients [3, 41 that are applicable to McGuire Unit I were also considered.

These MOP heatuplcooldown transients were listed in Table 5-8 of Reference [31. It was demonstrated in Reference [5] that the McGuire Unit 1pressurizer transients are bounded by those used in References [3, 41.

Both the minimum critical flaw sizes (a,, under normal operating conditions, or a; under faulted conditions) and the stress intensity factor, K,, are functions of the stresses at the cross-section where the flaw of interest is detected, along with the material properties. Therefore, the first step Page 3 or Page 12

Westinghouse Proprietary Class 2 for the evaluation of an as-found indication is to determine the appropriate limiting thermal transients for the location of interest. The selection of the most limiting transient was determined by reviewing the through-wall transient stress of all the applicable transients. The transient with the highest stress in the area of the flaw was chosen as the worst case. The most limiting transients are die set of hypothetical out-of-limit transients listed in Table 4-2 of Reference [4].

Table 3-1 Summary of McGuire Unit 1 Pressurizer Transients Numnber of Number Transient Identification Occurrences Normal Condition i Heatup 200 2 Cooldown 200 3 Unit Loading/Unit Unloading 13200 4 Step Load Increase/Step Load Decrease 2000 5 Large Step Load Decrease with Steam Dump 200 6 Steady State Fluctuations -A l.5xI05 7 Steady State Fluctuations -B 3.0xIO1 8 Feedwater Cycling 2000 9 Normal Loop Shutdown 80 to Normal Loop Startup 70 11 Boron Concentration Equalization 26400 Upset Condition 12 Loss of Load 80 13 Loss of Power 40 14 Partial Loss of Flow 80 15 Reactor Trip from Full Power - No Cooldown 230 16 Reactor Trip from Full Power - Cooldown, no SI 160 17 Reactor Trip from Full Power - Cooldown, with SI 10 18 Inadvertent RCS Depressuization 20 19 Inadvertent Auxiliary Spray 10 20 Inadvertent Startup of an Inactive Loop 10 21 Control Rod Drop 80 22 Inadvertent S.I. Actuation 60 23 Excessive Feedwater Flow 30 Emergency Condition Page 4 of Page 12

Westinghouse Proprietary Class 2 Table 3-1 Summary of McGuire Unit 1 Pressurizer Transients 24 Small Loss of Coolant Accident 5 25 Small Steam Break 5 26 Complete Loss of Flow 5 Faulted Condition 27 Reactor Coolant Pipe Break l 28 Large Steam Line Break 1 29 Feedwater Line Break I 30 Reactor Coolant Pump Locked Rotor 31 Control Rod Ejection I Test Condition 32 Turbine Roll Test 20 33 Primary Side Hydro Test 10 34 Secondary Side Hydro Test 10 35 Primary Side Leak Test 200 36 Secondary Side Leak Test 80 37 Tube Leakage Test 800 4.0 CRITICAL FLAW SIZE CALCULATION 4.1 Introduction The key parameters used in the evaluation of any indication discovered during inservice inspection include two critical flaw depths. The first of these is critical flaw depth a, calculated using stresses from the governing normal, upset and test conditions. The second one is the critical flaw depth a1 calculated based on the stresses from the governing emergency and faulted conditions.

4.2 Stress Intensity Factor Calculations Another key element of the critical flaw size calculations is the determination of the driving force or stress intensity factor (K,). The stress intensity factor calculation for an embedded flaw was taken from the work by Shah and Kobayashi [63 which is applicable to an embedded flaw in a semi-infinite medium, subjected to an arbitrary stress profile. This expression below has been shown to be applicable to embedded flaws in a thick-walled pressure vessel in a paper by Lee and Bamford [7].

K -[f bl s2 6+a i2*9).[2 ~

Ck2b.sin ]

I, (b- os6+astiEk lk2)E,(k)-k2K(k) where:

Page 5 of Page 12

Westinghouse Proprietary Class 2 M = Applied bending moment I = Moment of inertia b = Semi-minor axis of the ellipse a = Semi-major axis of the ellipse 9 = Angle in the parametric equations of the ellipse c = Distance from centerline of the wall to centerline of the flaw E(k) = Complete elliptic integral of the second kind K(k) = Complete elliptic integral of the first kind k, k' = Modulus and complimentary modulus of Jacobian elliptic functions respectively 4.3 Fracture Toughness The other key element in the determination of critical flaw sizes is the fracture toughness of the material. The fracture toughness has been taken directly from the reference curves of Appendix A,Section XI. In the transition temperature region, these curves can be represented by the following equations:

Kic = 33.2 + 2.806 exp. [0.02 (T-RTNryr + 100XF)]

KID = 26.8 + 1.233 exp. [0.0145 (T-RTNyr + 1600 F)]

where Kc and K1, are in ksi a/i;.

The only other information needed for the determination of the toughness is the value of RTNrT, which was determined from the material test certificates [8, 9. 10] for the McGuire Unit I pressurizer, as shown in Table 4-1 below. The determination used the estimation process of NUREG 0800, the NRC standard review plan, and specifically branch technical position MTEB 5-2, to estimate RTmyr from three Charpy tests at a specific temperature.

Table 4-1 RTNryr for McGuire Unit I Pressurizer Material Location Heat No. Charpy Results RTNDT (ft-lb) (OF)

Lower Shell B4979 44, 56, 50 (long.) 30 0 F Bottom head C0487 62, 50, 50 (long.) 10F Weld WFQ121 94, 94, 87 lOF Page 6 of Page 12

Westinghouse Proprietary Class 2 5.0 FATIGUE CRACK GROWTH In applying the ASME Code acceptance criteria as introduced in Section 2.0, the final flaw size (ad) is defined as the maximum flaw size to which the detected flaw is calculated to grow at the end of a specified period, or until the next inspection time. To determine the fatigue crack growth (FCG) for each indication of interest, the normal and upset thermal transients and pressure loadings must be considered. The methods used in the crack growth analysis are the same as those suggested by Section Xi of the ASME Code. The analysis procedure involves postulating an initial flaw at the affected region and predicting the growth of that flaw due to an imposed series of loading transients.

5.1 Analysis Methodology The input required for a fatigue crack growth analysis is basically the information necessary to calculate the parameter AK, (range of stress intensity factor), which depends on the geometry of the crack, its surrounding structure and the range of applied stresses in the crack area. Once AK, is calculated, the growth due to a particular stress cycle can be calculated based on the ferritic steel reference crack growth curve for the air environment from Appendix A of ASME Code Section Xl.

This incremental growth is then added to the original crack size, and the analysis proceeds to the next cycle or transient. The procedure is continued in this manner until all of the analytical transients known to occur in the 10 years of operation have been analyzed.

The design thermal transients considered in the analysis were taken from the original design transient specification, and combined with those developed in the WOO program pertaining to the mitigation and evaluation of Pressurizer Insurge/Outsurge Transients [3, 4]. It was demonstrated in Reference [5] that the McGuire Unit I pressurizer transients are bounded by those used in References 13, 41. These transients were distributed equally over the plant design life.

5.2 Crack Growth Rate Reference Curves The crack growth rate curves used in the analyses were taken directly from Appendix A of Section XI of the ASME Code. Air environment curve was used for the subsurface flaws which are not exposed to the primary water environment. The crack growth rate reference curve for air environment is a function of applied stress intensity factor range (AK,) and stress ratio (R). This reference curve is also shown in Figure 5- 1.

d = (1.99x10-')25.72 (2.88 - R)-'07,&K307 where da

- = Crack growth rate, micro-inches/cycle R = j,. (OSR < 1)

AK, = stress intensity factor range. ksi/i;;

= Kinx-K, Page 7 of Page 12

Westinghouse Proprietary Class 2 Gay.I1 a-e/ 1 11 -c11 to lot to2 101 10 FIG. A-4300-1 REFERENCE FATIGUE CRACK CROWTH CURVES FOR CARBON AND LOW ALLOY FERRITIC STEELS EXPOSED TO AIR ENVIRONMENTS (SUBSURFACE FLAWSY Figure 5-1 Reference Fatigue Crack Growth Curves for Carbon and Low Alloy Ferritic Steels in Air Environment Page 8 of Page 12

Westinghouse Proprietary Class 2 6.0 FLAW EVALUATION The evaluation procedures contained in ASME Section Xl are clearly specified in paragraph IWB-3600. Once an indication is discovered, it must be characterized as to its location, length (C) and depth dimension (2a for embedded flaws), including its distance from the nearest surface (S) for embedded indications. This characterization is discussed in further detail in Article IWA-3000 of Section Xl.

6.1 Evaluation of Detected Indications The following parameters were calculated for each of the five subsurface (embedded) indications detected [Ill and shown in Table 6-1:

Flaw Depth Parameter, alt Surface Proximity Parameter, A/t where:

t = wall thickness of region where indication is located e = length of indication a = half depth of embedded flaw in the width direction 8 = distance from flaw centerline to surface, (8 = S + a)

S = smallest distance from edge of embedded flaw to surface Table 6-1 Flaw Parameters for Detected Indications Indication No. S (in) f (in) a (in) ( (in) S (n) St a/t 1 0.480 2.30 0.125 3.8 0.605 0.159 0.033 2 0.400 t.75 0.150 3.8 0.550 0.145 0.039 7 0.600 10.20 0.30() 3.9 0.900 0.231 0.077 1( 0.830 3.30 0.285 3.9 1.115 0.286 0.073 1 0.630 6.00 0.1 35 3.9 0.765 0.196 0.035 The above flaw parameters were then used to determine the critical flaw depth as discussed in Section 4.0 and based on the acceptance criteria discussed in Section 2.0. The resulting allowable flaw depth (a/t) at the end-of-evaluation period is shown in Table 6-2.

Table 6-2 End-of-Evaluation Period Allowable Flaw Depth I Indication No. I I 1 2 1 7 1 10 I ii Allowable a/t 0.056 0.053 0.084 0.121 0.068 Page 9 of Page 12

Westinghouse Proprietary Class 2 In order to determine the acceptability of the detected flaw for an operation period of 10 years, the flaw parameters of the detected indications shown in Table 6-1 are used in postulating the initial flaws in the fatigue crack growth calculations for an operation period of 10 years. The resulting flaw size at the end of the 10 years operational period is then compared with the allowable flaw size determined using the methodology discussed in Section 4.0. The results of the comparison are shown in Table 6-3 below and that all the detected indications at the end of a 10 year operational period are below the maximum acceptance flaw sizes per ASME Code Section XI IWB-3600 flaw evaluation procedures and acceptance criteria. It should be noted that the results presented in Table 6-3 are conservative and the inherent conservatism in the flaw evaluation is discussed in Section 6.2.

Table 6-3 Flaw Evaluation Results of Detected Indications Indication No. 1 2 7 10 II Initial a/t 0.033 0.039 0.077 0.073 0.035 Final a/t in 10 years 0.033 0.040 0.079 0.076 0.035 Aw e < 05< 08< 1<

IAllowable a/t 0.056 10.053 10.084 10.1210.6 6.2 Conservatism in the Flaw Evaluation Conservative pressurizer insurgeloutsurge transients were used in the fatigue crack growth calculation. The severity of these insurge/outsurge transient depends primarily on the temperature difference (AT) between the pressurizer and the hot leg. Based on Table 5-8 in Reference [31, the range of insurgetoutsurge transients varies from 350 0 F to 280 0 F. Two transients, one with a AT values of 303 0F and another one with a AT values of 350'F, were used to conservatively bound the range of insurge/outsurge transients in Table 5-8 of Reference [3]. The transient with a AT value of 303'F was used to envelop those transients with AT values 303'F or below. Similarly, the transient with a AT value of 350 0F was used conservatively to envelop those with AT values above 303 0F.

The number of pressurizer insurgedoutsurge transient design cycles used in the fatigue crack growth calculation is conservative. The analysis performed under the WOG program [3, 41 was based on a total of 1438 insurgeloutsurge transient design cycles that are associated with the heatup and cooldown events for the full design life of a power plant, as did the evaluation performed herein. The number of such insurgetoutsurge transient design cycles predicted for McGuire Unit I based on the actual plant operating history was only 607, and thus result in a factor of more than two on the actual design cycles.

The temperature used in the fracture toughness prediction is conservative. The minimum fluid temperature during a worst case insurge transient was 1000 F and I 20'F was conservatively used in the evaluation, even though the temperatures at the locations of all the detected indications were at least 1000 F higher than the minimum fluid temperature when the peak transient stress occurred, thus, leading to conservatively low fracture toughness predictions.

Page 10 of Page 12

Westinghouse Proprietary Class 2 The use of the lower bound crack arrest toughness value, KI., in the determination of allowable flaw size for the normal and upset conditions is conservative. The 2005 addendum of the ASME Code has already revised the criteria to allow the use of the static fracture toughness, Kj, which would result in significantly larger allowable flaw depths.

7.0

SUMMARY

AND CONCLUSION A flaw evaluation on the acceptability of the five detected circumferential subsurface indications in the lower head to shell weld region of McGuire Unit I pressurizer has been perforned. Using the thermal transients from the original design specification, in addition to those from the WOG program pertaining to the mitigation and evaluation of Pressurizer insurgeloutsurge transients, it can be demonstrated that all the detected indications are acceptable for an operation period of 10 years without repair.

Page IIof Page 12

Westinghouse Proprietary Class 2

8.0 REFERENCES

1. ASME Code Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," 1989 Edition.
2. Westinghouse Design Specification 679046 Revision 4. (Westinghouse Proprietary Document)
3. WCAP-14950 Rev. 0, "Mitigation and Evaluation of Pressurizer InsurgelOutsurge Transients, February 1998. (Westinghouse Proprietary Document)
4. WCAP-14717 Rev. 1. "Westinghouse Owners Group Evaluation of the Effects of Insurge/Outsurge Out-of-Limit Transients on the Integrity of the Pressurizer Program MUHP-5063 Summary Report" August 1998. (Westinghouse Proprietary Document)
5. McGuire Nuclear Station, Units I & 2, MCC-1201.01-00-0043, Rev 0, Pressurizer Lower Head and Nozzle Qualification.
6. Shah, R. C. and Kobayashi, A. J., "Stress Intensity Factor for an Elliptical Crack Under Arbitrary Loading," Engineering Fracture Mechanics, Vol. 3, 198 1, pp. 71-96.
7. Lee, Y. S. and Bamford, W. H.. "Stress Intensity Factor Solutions for a Longitudinal Buried Elliptical Flaw in a Cylinder Under Arbitrary Loads," presented at ASME Pressure Vessel and Piping Conference, Portland Oregon, June 1983. Paper 83-PVP-92.
8. Lukens Steel Company Test Certificate for Heat No. C0487, Order No. 63706-1, dated 6/20/72. (Westinghouse Proprietary Document)
9. Lukens Steel Company Test Certificate for Heat No. B4979, Order No. 16703-1, dated 9130n2. (Westinghouse Proprietary Document)
10. Metallurgical Laboratory Lab No. M-1889, Sample WFQ-121, Westinghouse Electric Co., Tampa Division, dated 3/211973. (Westinghouse Proprietary Document)
11. McGuire Unit I UT Vessel Examination Summary No. B02.01 1.001 dated 10/5/2005.

Page 12 of Page 12

DUKE ENERGY( 3PORATION QUALITY ASSURANCE I ECHNICAL SERVICES (

In-Service Inspection Database Management System Run D EOC 17 McGuire 1 Inservice Inspection Listing Page 1 Plant: McGuire 1 1211212005 Interval 3 Outage 3 ITEM NUMBER ID NUMBER SYSTEM INSP DATE INSP STATUS INSP LIMITED GEO REF RFR COMMENTS B02.01 1.001 1PZR-1 10/05/2005 REP --- N N REFERENCE WESTINGHOUSE FLAW EVALUATION FOR PRESSURIZER LOWER HEAD TO SHELL WELD. SEE PIP M-05-4894 B02.011.002 1PZR-5 10/08/2005 CLR N N B02.012.001 1PZR-6 10/05/2005 CLR N N B02.012.002 1PZR-9 10/08/2005 CLR N N B06.010.009 1RPV-449-02-09 NC 09/24/2005 CLR N N B06.01 0.010 1RPV-449-02-1 0 NC 09/24/2005 CLR N N B06.010.011 1RPV-449-02-11 NC 09/24/2005 CLR N N B06.010.016 1RPV-449-02-16 NC 09/25/2005 CLR N N B06.010.017 1RPV-449-02-17 NC 09/26/2005 CLR N N B06.010.018 1RPV-449-02-18 NC 09/26/2005 CLR N N B06.010.019 1RPV-449-02-19 NC 09/27/2005 CLR N N B06.010.020 1RPV-449-02-20 NC 09/27/2005 CLR N N B06.010.021 1RPV-449-02-21 NC 09/27/2005 CLR --- N N B06.010.022 1RPV-449-02-22 NC 09/27/2005 CLR --- N N B06.010.023 1RPV-449-02-23 NC 09/28/2005 CLR --- N N B06.010.024 1RPV-449-02-24 NC 09/28/2005 CLR --- N N B06.010.025 1RPV-449-02-25 NC 09/27/2005 CLR ... N N B06.010.026 1RPV-449-02-26 NC 09/27/2005 CLR --- N N B06.010.027 1RPV-449-02-27 NC 09/28/2005 CLR --- N N B06.010.028 1RPV-449-02-28 NC 09/27/2005 CLR --- N N B06.010.029 1RPV-449-02-29 NC 09/28/2005 CLR --- N N B06.010.030 1RPV-449-02-30 NC 09/28/2005 CLR N N B06.010.031 1RPV-449-02-31 NC 09/28/2005 CLR --- N N B06.010.032 1RPV-449-02-32 NC 09/28/2005 CLR --- N N B06.010.033 1RPV-449-02-33 NC 09/29/2005 CLR --- N N B06.010.034 1RPV-449-02-34 NC 09/28/2005 CLR --- N N B06.010.035 1RPV-449-02-35 NC 09/29/2005 CLR --- N N B06.010.036 1RPV-449-02-36 NC 09/29/2005 CLR --- N N B06.030.016 1RPV-449-01 -16 NC 09/28/2005 CLR ... N N B06.030.017 1RPV-449-01-17 NC 09/28/2005 CLR --- N N B06.030.018 1RPV-449-01-18 NC 09/28/2005 CLR --- N N B06.030.019 1RPV-449-01-19 NC 09/28/2005 CLR --- N N B06.030.020 1RPV-449-01-20 NC 09/28/2005 CLR --- N N B06.030.021 1RPV-449-01 -21 NC 09/28/2005 CLR ... N N B06.030.022 1RPV-449-01-22 NC 09/28/2005 CLR --- N N

DUKE ENERGN( RPORATION QUALITY ASSURANCE iECHNICAL SERVICES

(

In-Service Inspection Database Management System Run D EOC 17 McGuire 1 Inservlce Inspection Listing Page 2 Plant: McGuire 1 12/12/2005 Interval 3 Outage 3 ITEM NUMBER ID NUMBER SYSTEM INSP DATE INSP STATUS INSP LIMITED GEO REF RFR COMMENTS B06.030.023 1RPV-449-01-23 NC 09/28/2005 CLR -- N N B06.030.024 1RPV-449-01-24 NC 09/28/2005 CLR --- N N B06.030.025 1RPV-449-01-25 NC 09/28/2005 CLR --- N N B06.030.026 1RPV-449-01-26 NC 09/28/2005 CLR --- N N B06.030.027 1RPV-449-01-27 NC 09/28/2005 CLR --- N N B06.030.028 1RPV-449-01-28 NC 09/28/2005 CLR --- N N B06.030.029 1RPV-449-01-29 NC 09/28/2005 CLR --- N N B06.030.030 1RPV-449-01-30 NC 09/28/2005 CLR --- N N B06.030.031 1RPV-449-01-31 NC 09/28/2005 CLR --- N N B06.030.032 1RPV-449-01-32 NC 09/28/2005 CLR --- N N B06.030.033 1RPV-449-01-33 NC 09/28/2005 CLR --- N N B06.030.034 1RPV-449-01-34 NC 09/28/2005 CLR --- N N B06.030.035 1RPV-449-01-35 NC 09/28/2005 CLR --- N N B06.030.036 1RPV-449-01-36 NC 09/28/2005 CLR --- N N B06.050.009 1RPV-449-03-09 NC 09/24/2005 CLR --- N N B06.050.01 0 1RPV-449-03-1 0 NC 09/24/2005 CLR --- N N B06.050.011 1RPV-449-03-11 NC 09/24/2005 CLR --- N N B06.050.016 1RPV-449-03-16 NC 09/25/2005 CLR --- N N B06.050.017 1RPV-449-03-17 NC 09/26/2005 CLR -- N N B06.050.018 1RPV-449-03-18 NC 09/26/2005 CLR --- N N B06.050.019 1RPV-449-03-19 NC 09/27/2005 CLR --- N N B06.050.020 1RPV-449-03-20 NC 09/27/2005 CLR --- N N B06.050.021 1RPV-449-03-21 NC 09/27/2005 CLR --- N N B06.050.022 1RPV-449-03-22 NC 09/27/2005 CLR --- N N B06.050.023 1RPV-449-03-23 NC 09/28/2005 CLR --- N N B06.050.024 1RPV-449-03-24 NC 09/28/2005 CLR --- N N B06.050.025 1RPV-449-03-25 NC 09/27/2005 CLR --- N N B06.050.026 1RPV-449-03-26 NC 09/27/2005 CLR --- N N B06.050.027 1RPV-449-03-27 NC 09/28/2005 CLR --- N N B06.050.028 1RPV-449-03-28 NC 09/27/2005 CLR --- N N B06.050.029 1RPV-449-03-29 NC 09/28/2005 CLR --- N N B06.050.030 1RPV-449-03-30 NC 09/28/2005 CLR --- N N B06.050.031 1RPV-449-03-31 NC 09/28/2005 CLR --- N N B06.050.032 1RPV-449-03-32 NC 09/28/2005 CLR --- N N B06.050.033 1RPV-449-03-33 NC 09/29/2005 CLR --- N N B06.050.034 1RPV-449-03-34 NC 09/28/2005 CLR --- N N

DUKE ENERGI( RPORATION QUALITY ASSURANCE 1 ECHNICAL SERVICES

(

In-Service Inspection Database Management System Run D EOC 17 McGuire 1 Inservice Inspection Listing Page 3 Plant: McGuire 1 12/1212005 Interval 3 Outage 3 ITEM NUMBER ID NUMBER SYSTEM INSP DATE INSP STATUS INSP LIMITED GEO REF RFR COMMENTS B06.050.035 1RPV-449-03-35 NC 09/29/2005 CLR --- N B06.050.036 1RPV-449-03-36 NC 09/29/2005 CLR --- N B07.050.001 1NC-5-FL1 NC 09/22/2005 CLR --- N B07.050.002 1NC-5-FL2 NC 09/22/2005 CLR --- N B07.070.064F 1NI-181 NI 09/27/2005 CLR --- N B10.010.004 1PZR-W13C NC 10/02/2005 CLR --- N B10.010.005 1PZR-W13D NC 10/02/2005 CLR --- N B12.050.003C 1N1-76A NI 09/29/2005 CLR --- N C01.020.090 1RCPSS-SH-3 NV 09/13/2005 CLR --- N C01.020.091 1RCPSS-SH-2 NV 09/13/2005 CLR --- N C02.011.001 1RCPSS-INLET NV 09/13/2005 CLR --- N C02.011.002 1RCPSS-OUTLET NV 09/13/2005 CLR --- N C03.010.003 1RCPSS-SUPP NV 09/13/2005 CLR --- N C03.020.025 1-MCA-ND-H63 ND 09/08/2005 CLR --- N C03.020.027 1-MCA-ND-H335 ND 09/08/2005 CLR --- N C03.020.042 1-MCA-NS-H36 NS 09/12/2005 CLR --- N C03.020.072 1-MCA-VQ-H11 VQ 09/12/2005 CLR --- N C06.020.002A 1CF-1266-1 CF 09/19/2005 CLR --- N D01.010.010 1LDHX-SUPPORT NV 09/08/2005 CLR --- N D01.020.061 1-MCA-KC-2134 KC 08/22/2005 CLR --- N F01.010.008A 1-MCR-NC-555 NC 09/21/2005 CLR --- N F01.010.053C 1-MCR-ND-507 ND 09/21/2005 CLR --- N F01.010.103B 1-MC R-NI-527 NI 09/21/2005 CLR --- N F01.010.107A 1-MCR-NI-547 NI 09/21/2005 CLR --- N F01.010.151B 1-MCR-NV-814 NV 09/21/2005 CLR --- N F01.010.152B 1-MCR-NV-848 NV 09/21/2005 CLR --- N F01.020.001 C 1-MCA-CA-H365 CA 08/24/2005 CLR --- N F01.020.007C 1-MCA-CA-H411 CA 08/24/2005 CLR --- N F01.020.051C 1-MCA-CF-H152 CF 08/24/2005 REC --- N F01.020.101C 1-MCA-FW-H1 FW 08/24/2005 CLR --- N F01.020.151C 1-MCA-ND-H2 ND 08/29/2005 CLR - N F01.020.1528 1-MCA-ND-H7 ND 08/23/2005 CLR --- N F01.020.154A 1-MCA-ND-H21 ND 08/29/2005 CLR --- N F01.020.181A 1-MCA-ND-H63 ND 08/29/2005 CLR --- N F01.020.182A 1-MCA-ND-H49 ND 08/23/2005 CLR --- N F01.020.183B 1-MCA-ND-H259 ND 08/23/2005 CLR --- N

DUKE ENERG'v RPORATION QUALITY ASSURANCE I ECHNICAL SERVICES

(

In-Service Inspection Database Management System Run D EOC 17 Page 4 McGuire 1 Inservice Inspection Listing Plant: McGuire 1 12/12/2005 Interval 3 Outage 3 ITEM NUMBER ID NUMBER SYSTEM INSP DATE INSP STATUS INSP LIMITED GEO REF RFR COMMENTS F01.020.213A 1-MCR-NI-827 NI 09/21/2005 CLR --- N N F01.020.222C 1-MCR-NI-717 NI 09/21/2005 CLR --- N N F01.020.225B 1-MCR-NI-774 NI 09/21/2005 CLR --- N N F01.020.226B 1-MCR-NI-775 NI 09/21/2005 CLR --- N N F01.020.260A 1-MCA-NS-H30 NS 08/29/2005 CLR --- N N F01.020.261 B 1-MCA-NS-H36 NS 08/30/2005 REC --- N N F01.020.262C 1-MCA-NS-H39 NS 08/30/2005 CLR --- N N F01.020.316A 1-MCA-NV-H23 NV 08/23/2005 REC --- N N F01.020.317A 1-MCA-NV-H27 NV 08/23/2005 CLR --- N N F01.020.318B 1-MCA-NV-H29 NV 08/23/2005 CLR --- N N F01.020.319C MC-1 683-NV.04-R27 NV 08/30/2005 CLR --- N N F01.020.320A MC-1683-NV.04-R28 NV 08/30/2005 CLR --- N N F01.020.554A 1-MCA-SM-H70 SM 08/31/2005 CLR --- N N F01.020.555C 1-MCA-SM-H73 SM 08/31/2005 CLR --- N N F01.020.601C 1-MCA-SV-H13 SV 08/31/2005 CLR --- N N F01.020.652A 1-MCA-VO-H1-1 VQ 08/31/2005 CLR --- N N F01.030.112A 1-MCA-KC-1 089 KC 08/23/2005 CLR --- N N F01.030.114A 1-MCA-KC-1 006 KC 08/23/2005 CLR --- N N F01.030.115A 1-MCA-KC-2297 KC 08/23/2005 CLR --- N N F01.030.116A 1-MCA-KC-H100 KC 08/23/2005 CLR --- N N F01.030.125B 1-MCA-KC-2134 KC 08/22/2005 CLR --- N N F01.030.128B 1-MCA-KC-1034 KC 08/23/2005 CLR --- N N F01.030.129B 1-MCA-KC-1027 KC 08/23/2005 REC --- N N F01.030.152C 1-MCA-KD-083 KD 08/24/2005 CLR --- N N F01.030.153C 1-MCA-KD-165 KD 08/24/2005 CLR --- N N F01.030.271A 1-MCA-WN-H29 WN 08/24/2005 CLR --- N N F01.030.272B 1-MCA-WN-H64 WN 08/24/2005 CLR --- N N F01.040.001 B 1PZR-SKIRT NC 09/27/2005 CLR --- N N F01.040.002B 1PZR-LUGS NC 09/26/2005 CLR --- N N F01.040.003B 1PZR-SUPPORT NC 09/26/2005 CLR --- N N F01.040.006B 1RCP-B-SUPPORT NC 09/27/2005 CLR --- N N F01.040.01 OB 1RCPSS-SUPPORT NV 09/21/2005 CLR --- N N G03.001.004 1NC1 F-109 NC 10/03/2005 CLR 62.05% N N G03.001.004A 1NC1 F-109 NC 09/30/2005 CLR --- N N G03.001.005 1NC-102-1 NC 10/03/2005 CLR --- Y N G03.001.005A 1NC- 102-1 NC 09/30/2005 CLR --- N N

DUKE ENERGY( 4PORATION QUALITY ASSURANCE TECHNICAL SERVICES In-Service Inspection Database Management System Run D EOC 17 McGuire 1 Inservice Inspection Listing Page 5 Plant: McGuire 1 12/12/2005 Interval 3 Outage 3 ITEM NUMBER ID NUMBER SYSTEM INSP DATE INSP STATUS INSP LIMITED GEO REF RFR COMMENTS G03.001.006 1NC-1 02-2 NC 10/03/21005 CLR --- N N G03.001.006A 1NC-1 02-2 NC 09/30/21 005 CLR --- N N G03.001.007 1NC-128-1 NC 10/03/21005 CLR --- Y N G03.001.007A 1NC-1 28-1 NC 09/25/21205 CLR --- N N G03.001.008 1NC-128-2 NC 10/03/21 D05 CLR --- Y N G03.001.008A 1NC-1 28-2 NC 09/25/21005 CLR --- N N R01.011.081 1NI32A-2 NI 09/28/21005 CLR --- N N R01.011.083 1N1267-2 NI 09/30/2' 005 CLR --- N N R01.011.084 1N1227-6 NI 09/30/2' 005 CLR --- N N R01.011.140 1NV15-2 NV 09/08/2'005 CLR --- N N R01.011.153 1NV1F2112 NV 09/13/2 005 CLR --- N N R01.011.154 1NV1 F331 NV 09/12/2 005 CLR --- N N R01.011.155 1NV3-3 NV 09/12/2 005 CLR --- N N R01.011.156 1NV1 F6223 NV 09/12/2 005 CLR --- N N R01.011.157 1NV1 FW53-51 NV 09/29/2 005 CLR 58.30% N Y R01.011.204 1RVlF107 RV 09/28/2 005 CLR --- N N R01.013.002 1RV1F104A RV 09/28/2005 CLR --- N N

5.0 Owner's Report for Repair/ReplacementActivities As required by the applicable code, records of Class 1 and Class 2 Repair and Replacement work is included on NIS-2 forms in this section.

No items were determined to have work performed outside this report period.

I Work Order Number I Signoff Date/EOC I PIP Number lNONE INONE INONE The NIS-2 forms included in this section were completed for work performed during this report period.

The individual work request documents and manufacturers' data reports are on file at McGuire Nuclear Station.

5.1 Class 1and 2 Preservice Examinations As required by the applicable code, Preservice Inspection (PSI) Examinations were performed on ISI Class 1 and 2 items during this report period. All Class 1 and 2 PSI examination data listed below is on file in the McGuire Nuclear Station QA Vault.

Work Order Number Identification Number ISI Type of Class Inspection 98483701 1MCA-CF-H172 B VT-3 98658128 1-NS-VA-163 B VT-1 98659985 1-SV-VA-7 B VT-1 98668359 1-NV-VA-93 B VT-1 98668359/06 1-MCR-S-NV-100-2-X B VT-3 98670899 1-SM-VA-001 B VT-3 98672034/05 1-NM-92 B VT-3 98673347 1-SV-VA-27 B VT-3 98681633 1-NC-VA-3 A VT-3 98682724 1-SM-VA-0089 B VT-3 98685325/06 1-N1-482 B VT-3 98685544 1-NI-VA-60 A VT-3 98697282 1-NV-VA-0015 A VT-1 98700121 1-SM-005 B VT-1 98701853 1-SM-VA-3 B VT-1 98703813 1-SM-VA-7 B VT-3 98715371 1-NM-VA-220 B VT-3 Outage 3/EOC 17 Refueling Outage Report Page 1 of 2 McGuire Unit 1 Revision 0 Section 5 December 12, 2005

(

Work Order Number Identification Number ISI Type of Class Inspection 98717515 1-NM-VA-190 B VT-3 98718052 1-NM-VA-200 B VT-3 98728033 1-MCA-CA-H369 B VT-3 98728060 1-MCA-NS-H101 B VT-3 98728061 1-MCA-NS-H105 B VT-3 98728068 1-MCA-SM-H018 B VT-3 98728069 1-MCA-SM-H102 B VT-3 98728075 1-MCR-NI-589 A VT-3 98728076 1-MCR-NI-653 A VT-3 98728077 1-MC R-NV-747 A VT-3 98728078 1-MCR-NV-758 B VT-3 98728079 1-MCR-NV-1 032 B VT-3 98728080 1-MCR-NV-1 047 B VT-3 98729513 1-NV-VA-8 B VT-1 98738791/01 1B Residual Heat B VT-1 Removal HX 98749281 1-MCR-BB-518 B VT-3 98749495/01 1-NI-167 A VT-3 98749992 1-NIFE5470 B VT-1 98751712 1-MCA-RN-H959 B VT-3 98752538 1-MCR-NC-557 A VT-3 98753382/01 1-V1-149 B VT-3 Outage 3/EOC 17 Refueling Outage Report Page 2 of 2 McGuire Unit 1 Revision 0 Section 5 December 12, 2005

( FORM NIS-2 OWNER'S REPOF( OREPAIR / REPLACEMENT ACTIVITY OR As Required By The Provisions Of The ASME Code Section Xl

(

1. Owner Address: Duke Power Comoanv la. Date October 12. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Fery Road. Huntersville. NC 28078 2a. Unit: 01 02 03 O3Shared (specify Units )
3. Work Performed By: Duke Power Comoanv 3a. Work Order #: 98483701 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organizatfon Job #

Type Code Symbol Stamp: N/A Authorization No. NIŽA Expiration Date: N/A 3b. NSM or MM #:_ N/A

4. (a) Identification of System: CF- Feedwater 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME III 19Z1 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2001 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

l Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped Installed (yes or no)

A 0 Repaired, E No 1-MCA-CF-H172 Duke Power N/A N/A N/A N/A 0 Replaced,

_ El Replacement 0 Yes B 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes D 0 Repaired, 0l No 0 Replaced, 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced,

. 0 Replacement 0Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work. Reolaced items# 9 and 8 with nuts.
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. 0 Other U ExemptO Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed FL Grass Jr.QA Tech Specialist Date Owner orwer s Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT have inspected the components described in this Owners Report during the period

,9>/vS to/(//2L/C4; and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury r property damage or a loss of any kind arising from or connected with this nspection.

I nspector's ture orme FSwan Commissions NCI524, N-I National Board, State, Province and Endorsements C Date/D-QS Page 2 of 2

FORM NIS-2 OWNER'S REPO( FOR REPAIR / REPLACEMENT ACTIVITY As Required By The Provisions Of The ASME Code Section Xl

(

1. Owner Address: Duke Power Comoanv 1a. Date October 9.2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville, NC 28078 2a. Unit: 01 02 03 OShared (specify Units )
3. Work Performed By: Duke Power CompanV 3a. Work Order #:. 98658128 Address: 526 S. Church Street. Charlotte NC 28201-1006 Aair Argmisaton Job#

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: WA 3b. NSM or MM #:_ N/A

4. (a) Identification of System: NS - Containment Sprav 4. (b) Class of System: 8
5. (a) Applicable Construction Code: ASMEiII 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mig Serial No. National Board No. Other Identification Year Built Corrected. Removed, or ASME Code Stamped

__ _ __ __ __ __ __ ___ _ __ __ __ ___ __ _ __ __installed ( me or no)

A 0 Repaired, 0 No 1-NS-VA-1 63 Atwood - Morrell 4-11382-01 399 N/A 1998 0 Replaced, El Replacement E Yes B 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced, O0Replacement 0Yes Page l of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced bolting material in the bearina cover.
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. El Other 0 ExemptO Pressure psig Test Temp. _ F Pressure psig Test Temp. OF Pressure pSig Test Temp. OF
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A Certificate of A thrization No. N/A Expiration Date N/A Signe7 FL Grass Jr.QA Tech Specialist Date /0 e l-

' or Owners Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB Xpave inspected the components described in this Owner's Report during the period 3 to a and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for y personal injury property damage or a loss of any kind arising from or connected with this lspection. >

eromne F Swan Commissions NC1524. N-I nspectors lNational Board, State, Province and Endorsements

( /Date /&

Page 2 of 2

( FORM NIS-2 OWNER'S REPOI .0OR REPAIR / REPLACEMENT ACTIVITY As Required By The Provisions Of The ASME Code Section Xi

(

1. Owner Address: Duke Power Companv 1a. Date October 5. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferr, Road. Huntersville. NC 28078 2a. Unit: 01 02 03 OShared (specify Units )
3. Work Performed By: Duke Power Companv 3a. Work Order #: 98659985 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organriatlln Job #

Type Code Symbol Stamp: WA Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #:_ N/A

4. (a) Identification of System: SV - Main Steam Vent to Atmosphere 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME III 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2001)Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped Installed (yes or no)

A 0 Repaired, 0 No 1-SV-VA-7 Babcock - Wilcox 15958-2-2 10 V File# 1076 1977 0 Replaced, El Replacement El Yes B 0 Repaired, 0 No O Replaced,

_ 0 Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced,

o Replacement 0 Yes D 0 Repaired, 0 No o Replaced, 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced,

. . 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced,

.0 Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced pluc
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. 0 Other 0 Exempt0 Pressure psig Test Temp. OF Pressure p sig Test Temp. _F Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed \tS7>° FL Grass Jr.QA Tech Specialist Date Owher or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HB CT have insp the components described in this Owner's Report during the period o5 to and state that to the best of my knowledge and belief, the Owner las performed ehminations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury r property damage or a loss of any kind arising from or connected with this inspection. r arome F Swan Commissions NC1524. N-I vInspector's National Board, State, Province and Endorsements C Date 0 fi )

Page 2 of 2

( FORM NIS-2 OWNER'S REPO,( FOR REPAIR / REPLACEMENT ACTIVITY C As Required By The Provisions Of The ASME Code Section Xl

1. Owner Address: Duke Power Comoanv la. Date October29. 20Q5 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Hagers Ferry Road. Huntersville. NC 28078 2a. Unit: 01 02 03 OShared (specify Units )
3. Work Performed By: Duke Power Companv 3a. Work Order #: 98668359 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organiron Job E Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #: N/A
4. (a) Identification of System: NV - Chemical and Volume Control 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME lIl 19Z1 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 0016 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped Installed (yes or no)

A 0 Repaired, 0 No 1-NV-VA-93 Dresser TE09046 298 N/A 1978 0 Replaced, IO Replacement 0 Yes B 0 Repaired, 0 No 1-NV-VA-93 Dresser TG33993 1879 N/A 1984 0 Replaced, El Replacement El Yes C 0 Repaired, 0 No 0 Replaced, O0Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced,

_ O Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, 3OReplacement 0Yes F 0 Repaired, 0 No 0 Replaced, 0 Replacement 0Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Renlaced valve. inlet. and outlet flanoe holtina material.
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. E Other 0 ExemptO Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks Test Derformed Der Drocedure MP/O/A/7700/045.

(Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed FL Grass Jr.QA Tech Specialist Date D/ :5 Owner opOwner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by H§B CT,have inspected te components described in this Owner's Report during the period 9 G / OS" to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermor neither the Inspector nor his employer shall be liable in any manner for Many personal injury r property damage or a loss of any kind arising from or connected with this ome F Swan Commissions NC1524, N-I nspector's National Board, State, Province and Endorsements

/ Date .2 Page 2 of 2

I-FORM NIS-2 OWNER'S REPOF( .-OR REPAIR / REPLACEMENT ACTIVITY As Required By The Provisions Of The ASME Code Section Xl

(

1. Owner Address: Duke Power Companv Ia. Date 10/11/2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of I
2. Plant Address: McGuire Nuclear Station 12700 Hacers Ferry Road. Huntersville. NC 28078 2a. Unit: [M1 02 03 OShared (specify Units )
3. Work Performed By: Duke Power Comoanv 3a. Work Order # : 98668359/06 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Orgarkzon Job 0 Type Code Symbol Stamp: N/A Authorlzation No. N/A Expiration Date: N/A 3b. NSM or MM #:ME-100542A
4. (a) Identification of System: NV 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME III 1971 Edition, Summer and Winter Addenda, NWA Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mtg Mfg Serial No. National Board No. Other Identification Year Built Corred, Removed, or ASME Code Stamped Installed (yes or no)

A 0 Repaired, En No 1-MCR-S-NV-100-2-X Duke Power N/A N/A Hanger N/A 0 Replaced, IE_ Replacement 0Yes B 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes C 0 Repaired, 0 No 03Replaced, O0Replacement 0 Yes D 0 Repaired, 0 No O Replaced,

. 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced,

. 0 Replacement 0Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3)each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Cutout and replaced/rewelded item 7.
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. 0 Other 0 Exemptlo Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signedd., F.R. Sorrow.QA Tech Support Date 10/11, 2005 Owner or Owner's Designee, Etle CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT have inspet he components described in this Owner's Report during the period e0aZL4F to LO/2/.fis; and state that to the best of my knowledge and belief, the Owner has performed examifations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

  • rome F Swan Commissions NC1524. N-I Inspector's ture National Board, State, Province and Endorsements Date /V Page 2 of 2

(- FORM NIS-2 OWNER'S REPOI.(. OR REPAIR / REPLACEMENT ACTIVITY (

As Required By The Provisions Of The ASME Code Section Xl

1. Owner Address: Duke Power Companv la. Date November8.2004 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Fery Road. Huntersville. NC 28078 2a. Unit: 01 02 03 OShared (specify Units )
3. Work Performed By: Duke Power Companv 3a. Work Order #: 98670899 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organizaion Job #

Type Code Symbol Stamp: /LA Authorization No. WA Expiration Date: N/A 3b. NSM or MM #:_ N/A

4. (a) Identification of System: SM - Main Steam 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME III 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1995. 1996 Addenda (1992 through 1992 Addenda for Class MC and CC and their supports)
6. Identification of Components:

Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped

__ _ __ _ __ _ ___ _ __ _ __ _ ___ _ __ _ _ _ _ _ _ _ _ _ _ _ _ __ ___ __ ___ __ ___ _ _ ___ __ ___ __ _ _ __ _ _I n sta lled ( ye s o r n o)

A 0 Corrected, 0 No 1-SM-VA-001 Atwood I Morrill 1-623 N/A N/A 1975 0 Removed, I____El Installed E Yes B 0 Corrected, 0 No 0 Removed, 0 Installed 0 Yes C 0 Corrected, 0 No O Removed,

. o Installed 0 Yes D 0 Corrected, 0 No 0 Removed, 3OInstalled 0 Yes E 0 Corrected, O No 0 Removed, 0 Installed 0 Yes F 0 Corrected, 0 No 0 Removed,

_ 0 Installed 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced popDet
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. 0 Other 0 Exempt[D Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed V FL Grass Jr.QA Tech Specialist Owner oawner's Designee, Title Date /6/ 22 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSI CT yhve ins he omponents described in this Owner's Report during the period 7~/t;)/ to I/e0/0!; and state that to the best of my knowledge and belief, the Owner hatperformed eiamiiations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injjqy or property damage or a loss of any kind arising from or connected with this a inspection..

"Z/-,Aie rome F Swan Commissions NC11524. N-I lnspectorlf&natXEre National Board, State, Province and Endorsements I

I Page 2 of 2

( FORM NIS-2 OWNER'S REPO. rOR REPAIR / REPLACEMENT ACTIVITY (

As Required By The Provisions Of The ASME Code Section Xi

1. Owner Address: Duke Power Comoanv 1a. Date 10/18/2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Hagers Ferry Road. Huntersville, NC 28078 2a. Unit: E31 02 03 OShared (specify Units I
3. Work Performed By: Duke Power Comranv 3a. Work Order # : 98672034/05 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organization Job #

Type Code Symbol Stamp: N/A Authorization No. WA Expiration Date: N/A 3b. NSM or MM #: N/A

4. (a) Identification of System: NM 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME IlIl 19Z1 Edition, Summer and Winter Addenda, Code Cases (b) Applicable Edition of Section XI Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

l Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corected, Removed, or ASME Code Stamped

_ __ _ _ __ _ _ __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _In sta lled (ye s o r no )

A 0 Repaired, 0 No 1-NM-92 Dresser TK-61806 1966 N/A 1995 MReplaced,

_ 0 Replacement li3Yes B 0 Repaired, 0 No 1-NM-92 Dresser TH-03996 1939 N/A 1987 0 Replaced, I__Replacement E3Yes C 0 Repaired, 0 No 0 Replaced,

__ 0Replacement 0Yes D 0 Repaired, 0 No 0 Replaced, 0 Replacement 0Yes E 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced, 0 Replacement 0Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in.x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Reglaced Valve 1NM-92
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. E Other 0 ExemptJ Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks Pressure test performed per MP/O/A/7700/045 (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed dA.,

.- F.R. Sorrow.QA Tech SuDDort Date 10118, 2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT iave inspected e components described in this Owner's Report during the period

! /30/6mtoj/ZS; and state that to the best of my knowledge and belief, the Owner has perormed examiiations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xi.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury r property damage or a loss of any kind arising from or connected with this inspection.

/>m me F Swan Commissions NC1524. N-I Inspector ivatyre National Board, State, Province and Endorsements

(

I Page 2 of 2

FORM NV-I (BACK)

CERTIFICATE OF COMPLIANCE WE CERTIFY THAT THE STATEMENTS MADE IN THIS REPORT ARE CORRECT AND THAT THIS VALVE CONFORMS TO THE RULES OF CONSTRUCTION OF THE ASNE COOE FOR NUCLEAR POWER PLANT COMPONENTS. SECTION III, DIV.I. 1971 EDITION. ADDENDA - SiLumr in.e,.

1973 , CODE CASE No. NA

' J ,

IEC)

DATE /S/ss 7 SIGNED See Para. 1 above (N CERTIFICATE HOLDER) Prin Quaiy Assurance Engineer OUR ASME CERTIFICATE OF AUTHORIZATION NO. iN-1141 _ TO USE THE NV SYMBOL EXPIRES May 20, 1989 (NV)

(DATE)

CERTIFICATION OF DESIGN DESIGN INFORMATION ON FILE AT Drsbser Plant, Alexandria, La.

STRESS ANALYSIS REPORT (CUSS I ONLY) ON FILE AT_

3 DESIGN SPECIFICATIONS CERTIFIED BY R. E. Miller PE STATE North Carolina REG. NO. 4860 STRESS REPORT CERTIFIED BYI D. K. Sharma

  • E STATE Louisiana REG. NO. 20244 SIGNATURE NOT REQUIRED-LIST NAME ONLY CERTIFICATE OF SHOP INSPECTION I.THE UNDERSIGNED, HOLDING A VALID COMMISSION ISSUED IV THE NATIONAL POARD OF BOILER AND PRESSURE VESSEL INSPECTORS AND THE STATE OR PROVINCE OF LOUISIANA AND EMPLOYED BY THE HARTFORD STEAM BOILER I 1 I COMPANY OF HARTFORD. CON.. HAVE INSPECTED THE PUNPOR VALVEDESCRIBED IN THIS DATA REPORT ON t4'T, 3 o 191rZAND STATE THAT TO THE BEST OF MY KNOWLEDGE AND BELIEF.TNE N CERTIFICATE HOLDER HAS CONSTRUCTED THIS PUMP. OR VALVE. IN ACCORDANCE WITH THE ASME CODE FOR NUCLEAR POWER PLANT COMPONENTS.

BY SIGNING THIS CERTIFICATE. NEITHER THE INSPECTOR NOR HIS EMPLOYER MAKES ANY WARRANTY.EXPRESSEO OR IMPLIED.

CONCERNING THE EQUIPMENT DESCRIBED IN THIS DATA REPORT.FUTHERMORE.NEITHER THE INSPECTOR NOR HIS EMPLOYER SHALL BE LIABLE IN ANY MANNER FOR ANY PERSONAL INJURY OR PROPERTY DAMAGE OR A LOSS OF ANY KIND ARISING FROM DR CONNECTED WITH THIS INSPECTION.

DATE /0AL ,I9g..7t ,

SIGNED *< ¶,,, COMMISSIONS Louisiana Y i/

(INSPECTOR) (HAT'L.BD.STATE PROV.AHD NO.)

FORM NO. OA-0071-0776

lINDUSTmtALl VALVIS FORM NV-I N CERTIFICATE HOLDERS DATA REPORT FOR SAFETY AND SAFETY RELIEF VALVES*

(AS REOUIRED BY THE PROVISIONS OF THE ASME CODE. SECTION III. DIV. 1)

Oresr Induestries, Inc., Dresser Valve & Controls Div., Industrial Valve North

1. MANUFACTURED By A.er.iciO Opraticfs, Ihterseetift Hw6. . r-&i 322RbNorth Alexwnudia, LA (NAME AND ADDRESS OF N CERTIFICATE HOLDER)

Duke Power Co., P. 0. Box 32307, Charlotte, NC 28232-2307

2. YANUFACTURED FOR (NAME AND ADDRESS OF PURCHASER OR OWNER)

Duke Pwr.Co., McGuire Nuc. Station, HY 73, Cowans Ford, NC

3. LOCATION OF INSTALLAlION _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(NAME AND ADDRESS) Z02Ib

4. NC3037 1939 1987 (CRN) (DRAWING NO.) (NATL.8RD.NO.) (YEAR BUILT)

S. VALVE 1-1/2"1910-30F/S4-1-XLS2-NC3037 IDENTIFYING NOS TH-03996 (MODEL NO.,SERIES NO.) (N CERTIFICATE HOLDERS' SERIAL NO.)

Safetv Relief 2 TYPE -J - -CLASS tSAFFTYrSAFETY RELIEF:PILOT:POIER ACTUATED)

'0.~74~- ---

ORIFICE SIZE NOMINAL INLET SIZE OUTLET SIZE 2 INCH INCH INiCH B. SET PRESSURE(PSIG) 150 Saturated OF RATED TEMPERATURE -

STAMPED CAPACITY 2823 LBS/KR.

  • 10  % OVERPRESSURE BLOWDOWN(PSIG) 15 SAT.STEAM HYDROSTATIC TEST (PSIG) 1NLET **See Below OUTLET ***See Below (APPLICABLE TO VALVES FOR CLOSED SYSTEMS ONLY)
7. PRESSURE RETAINING PIECES SERIAL NO. OR MATERIAL SPECIFICATION IDENTIFICATION ,INCL. TYPE OR GRADE BODY AAT55 S3'C51 PGr rp8M SONNET OR YOKE AAT44 cA351, Gr- CrF8M f SUPPORT RODS NOZZLE AAF76 W182, Gr. P316 oisc A16280 fRA4 7 9 , Mrep 316 SPRING WASHERS ADJUSTING SCREW SPINDLE SPRING BOLTING C TO'q Air On CMssl rl Acn OTHER PIECES PTAg .m1QA- ( r h
  • SUPPLEMENT SHEETS IN FORM OF LISTS.SKETCHES OR DRAWINGS MAY BE USED PROVIDED (1) SIZE IS 8-1/2 X II11 (2) INFORMATION IN ITEMS 1.2 ON THIS DATA REPORT IS INCLUDED ON EACH SHEET. AND (3) EACH SHEET IS NUMBERED AND NUMBER OF SHEETS IS RECORDED AT TOP OF THIS FORM.

K0

11 V

Il-ILJr FORM NO. CA- 0071-

I VALVES I Rl SSER DRESSER VALVE AND CONTROLS DMSION Dresser Industries, Inc.

hIdushtll Volvo North Ane icon Operatlos CE~rIFICATE OF CCNFORMCE/COMPLIANCE P.O. B= 1430

  • AMexxdkx Loeanm 71309-1430 Duke Power Company P. 0. Box 32307 Charlotte, NC 28232

Subject:

Your Order No. P33445-77 Dresser Order No. 25-91850-0 Gentlemen:

We hereby certify that the following listed valves furnished on the above order have been manufactured, inspected and accepted in accordance with Dresser's engineering, design, material and quality requirements. We further certify that the attached documents which are a part of the certification, are accurate and in coTpliance with the record requirements of this order.

We further certify that the chemicals in all fluids and lubricants used during final cleaning and valve assembly are in compliance with the design specifications and its design criteria, and all water used for cleaning, hydrostatic and functional testing, meets the requirements for demineralized water per ANSI N45.2.1, 1973.

Item No. 3 (1 ) 1-1/2"1910-30F/S4-1-XLS2-NC3037 M Serial No. TH-03996

>tag - MRV-023

,>/ National Board No. 1939 Set Pressure 150 PSIG Capacity 2823 #/Hr. Steam Valves cleaned per CL-12, Rev. 7 Valves assembled per AS-95, Rev. 1 Valves tested per PT-23, Rev. 0 Valves packaged per PC-50, Rev. 6 Very truly yours, John P. Watz Principal Quality Assur ce Engineer BY:

'FDakeX ation Specialist BEH/jf EL:(318) 6Ad-2250

  • WX: (510) 976-5733 *TEX 58-6423 v CABLE- DMD ComMe_

Dewrance' KNcWc

(C FORM NIS-2 OWNER'S REPO,( .-OR REPAIR / REPLACEMENT ACTIVITY C As Required By The Provisions Of The ASME Code Section Xl

1. Owner Address: Duke Power Comoany la. Date October 10. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville, NC 28078 2a. Unit: 01 02 03 OShared (specify Units )
3. Work Performed By: Duke Power Companv 3a. Work Order #: 98673347 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Orgeni2atfon Job #

Type Code Symbol Stamp: N/A Authorization No. N Expiration Date: N/A 3b. NSM or MM N/A

4. (a) Identification of System: SV - Main Steam Vent to Atmosohere 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME III 19Z1 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair/ Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built corrected, Removed, or ASME Code Stamped Installed (yes or no)

A 0 Repaired, 0 No 1-SV-VA-27 Walworth C61 629 709 V File# 784 1976 0 Replaced, Ed Replacement El Yes B 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, E0 Replacement 0Yes F 0 Repaired, 0 No 0 Replaced, 0Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced wedge
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. El Other 0 Exempto Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed f FL Grass Jr.QA Tech SDecialist Date zL/ts0 E Owner or Owner's Designee, Tile CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by

&L CQ have ipected Up omponents described in this Owners Report during the period to L1O/4/ and state that to the best of my knowledge and belief, the Owner has p6rformed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury o property damage or a loss of any kind arising from or connected with this l me F Swan Commissions NC1524. N-I inspector's National Board, State, Province and Endorsements Date /0 2O/ b Page 2 of 2

( FORM NIS-2 OWNER'S REPOR( . OR REPAIR / REPLACEMENT ACTIVITY (

As Required By The Provisions Of The ASME Code Section Xi

1. Owner Address: Duke Power Companv 1a. Date October 9. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville. NC 28078 2a. Unit: 01 02 03 OShared (specify Units )
3. Work Performed By: Duke Power Comoanv 3a. Work Order # .

OS2Aa1 qas Address: 526 S. Church Street. Charlotte NC 28201 -1006 Repair Organization Job #

Type Code Symbol Stamp: N/A Authorization No. M/A Expiration Date: N/A 3b. NSM or MM #: N/A

4. (a) Identification of System: NC - Reactor Coolant 4. (b) Class of System: A
5. (a) Applicable Construction Code: ASME III 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped

_ Installed (yes or no)

A 0 Repaired, 0 No 1-NC-VA-3 Crosby N56925-00-0009 525 N/A 1978 0 Replaced, I 0 Replacement El Yes B 0 Repaired, 0 No 1-NC-VA-3 Crosby N56925-00-0001 25 N/A 1974 0 Replaced, E0 Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced, O0Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced valve
8. Tests Conducted:Hydrostatic l Pneumatic l Nom. Operating Press. 0 Other E ExemptJ Pressure 2235 psig Test Temp. 538 OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks Test performed per the Class A Walk-down (W/O #98682187).

(Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed FL Grass Jr.QA Tech Specialist Date ____

Ower or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT, have inspecped jte components described in this Owner's Report during the period

°1/I//£ io/ykM/;to and state that to the best of my knowledge and belief, the Owner has performed exa'miiations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. /

C /^Jerome F Swan Commissions NC11524. N-I Inspectors Sffpfure National Board, State, Province and Endorsements Date .01al Page 2 of 2

I rC- .

ffF CR 0 SUY VA LV E GA 0 E CO PAN Y g

,J . W R Ei TM ALAU M ASS Q.C.-44B FOR"I NV-I FC)R SAFETY AND SAFETY RELIEF VALVES As required by the prov*ssoanS of the ASME Code Ru:es NB-25 n &sTAR EPORlT Safety and Safety Relief Valves II.Manufactured By Crosby Valve & Gage Conp:tnv. 43 Kendrick St., Ircntham. Mlass. 02093 6M6 IIB-BP-86 Name and Address Model No. N-56925 order No. N-300580 Contract Date 2/12/73 Duke Power Company I1. Manufactured For Charlotte, North Carolina Order

  • A-.33957 Name and Address II3.Owner Duke Power Company, 422. South Chturch St.. Chtarlotte. North Carolina 28201 Name and Address 4.LocatlonotPlant McGuire Nuclear Station Unit A1. Covans Ford, North Carolina I-NC-l Serial No. N56925-00-0001 Dawing NO. DS-C-56925 Rev. 0
5. Valve ldentification 2.154 Type_ Safety oririce Size M Pipe Size .- inlet 6 Outlet 6 Inch Inch Inch lnm.

Safety.Satety Relief.Pilot.Power Actuated .

248 51; 70 F A. Sot Pressure fPSIrt Rated Ter per .tuie Stamped Capacity 420006?/hrt. 3 I. overpressure .. Dlowdown *PSlGt 124 Hlydrostatic Test (PSIG) inlct 4575 Complete Valve 750

7. The material, design. construction and workmanship comply with AS)(E Code. Sectior. Ill.

Class 1 Edition 1971 Addenda Date Winter 1972 Pressure Containing or Pressure Retaining Components Serial.No. Material Speci(fcation

i. Castings . Identification lncluding Type or Gr..de ASTM A-351-72 Gr. CF8M Body N N SA-351Gr. CF8'!

ASTH A-105-71 Gr. II Sonnet N90353-34-00l. 6 - .$IQ5Jar TT

b. Bar Stock and Forgings Support Rods ASTh A-192-71 Gr. F Nozzle ASE1' S.A-182 flr.F Disc Insert .N90426-33-o0o1 vne_- Stet.llite Cr. B6 rO -030-3 2-ocJ35 AST11 A-105-71 Gr. II Spring Washers Baottom N90 50- 32-:0636 Adjusting Bolt ASfl4 Gr. ET Spindle N90354-34-0025 A.E 3 93-l r. n6 AST'- A-276-72 Type 440C Spindle Ball 1i90355-0025 ASHEI SA-276 T"rpe 440C

.1 .,

E~ . .__ __ q w 0,s  ;&.

I.-.

.. , .- '.. . .I

( C.

Serial No. or Materlal Speciftcation ItI sI c. Spring jdeotification NX-2761 -001 6 Including Type or Grade ASTM A-304 Gr. 51P,601i

. d. Bolting

e. Other Parts such as Pilot Components nle^

__.S si1 dprv x--* L w~niqA.-iA

.. _- vv nmL4

-v _

  • u. -.

Tnenn1.P1 IR AS.1I A-193-/l Gr B-Bonnet Stud 87589 .ASm!E ,-1q93 Or. Bi ASTM' A-194-71 Gr. 211 Bonnet Stud Nut 2371 ASME SA-19i'4 r. 1?2

_A We certify that the statewents made In tbis report are correct.

Date _5 . 19 4 Signed Crosby Valve & Gage Co. By Mfanufacturer QA Manager .

Certificate of Authorization No. 331 expires November 9, 1974 DESIGN INTO&NATION ON FILE AT CROSBY VALVE & GAGE COMPANY DESIGN REPORT NO. EC-158 I CERTIFICATE or SHOP INSPECTION

1. the undersigned, holdirg a valid commission issued by tbe National Board of Boiler and pressure Vessel Inspectors and tbe State or Province cf -r.4. aR employed by Mutua1 Doiler & Nachinery Irsurarce Co.*. Waltliar, 'ass. have Inspected the oquipment dcscribed in this Data Report on 19-. and state tbat to the best of my knowledge and belier. the ijanufacturer has coistructed tbis equip-ment in accordance with the applicable Subsections of ASVE Section TII.

By signir.g this certificate. neither the Inspector nor bis enrployer makes any wairtany. cx-pressed or implicd. concernar.g the equipment described in this Data Report.Fuithermore. neither the Inspector nor his employer shall be liable in any mnanner for any personal injury or property damage or a loss of any kind arising frcsn or connected with this inspection.

  • Factory Mutual Croup of Insuranice Co.

Date 19 (Iliapectori , , ._ Commissions t d (ispectrin -4Natimnal Plo:rd. S:te. provrnce and No 1 6

I,.. .-. .-...........

.1 ... . ._ .... ... E_....

( FORM NIS-2 OWNER'S REPOi( FOR REPAIR / REPLACEMENT ACTIVITY C As Required By The Provisions Of The ASME Code Section Xi

1. Owner Address: Duke Power Companv 1a. Date October 5. 2005 526 S. Church Street. Charlotte, NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Hagers Ferry Road. Huntersville, NC 28078 2a. Unit: E1 C2 03 OShared (specify Units )
3. Work Performed By: Duke Power Comrany 3a. Work Order #: 98682724 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organizaton Job #

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #: N/A

4. (a) Identification of System: SM - Main Steam 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME ill 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other identification Year Built Corrected, Removed, or ASME Code Stamped

. Installed (yes or no)

A 0 Repaired, 0 No 1-SM-VA-0089 Kerotest E028R-1 -1 2554 N/A 2001 0 Replaced, El Replacement E Yes B 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced,

. . 0 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced,

. . 0 3 Replacement 0 Yes E 03Repaired, 0 No 0 Replaced,

.. 0 Replacement 0Yes F 0 Repaired, 0 No 0 Replaced,

. O Replacement 0Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in.x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced Bonnet and Disc
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. El Other 0 ExemptLJ Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks Test performed per MP/O/A/7700/045.

(Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed F FL Grass Jr QA Tech Specialist Date __

Owier or 9~rner's Designee, Tite CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HS9 CT have inspected the components described in this Owner's Report during the period

/ziTOV to'rL41  ; and state that to the best of my knowledge and belief, the Owner Has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this

/7inspection. D i erom e F Swan Commissions NC1524. N-I Inspector's 84ture National Board, State, Province and Endorsements Date/

Page 2 of 2

( FORM NIS-2 OWNER'S REPOT -'OR REPAIR / REPLACEMENT ACTIVITY (

As Required By The Provisions Of The ASME Code Section Xl

1. Owner Address: Duke Power Comoanv 1a. Date 10/16/2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Hacers Ferry Road. Huntersville. NC 28078 2a. Unit: 311 02 03 OShared (specify Units )
3. Work Performed By: Duke Power Companv 3a. Work Order # : 98685325/06 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organization Job #

Type Code Symbol Stamp: N/A Authorization No. M/A Expiration Date: N/A 3b. NSM or MM #: N/A

4. (a) Identification of System: NI 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME IlIl 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped Installed es or no)

A 0 Repaired, 0 No Valve 1N1-482 Borg-Warner 47779 1347 N/A 1979 0 Replaced, IEIN Replacement EN Yes B 03Repaired, 0 No 0 Replaced, 0Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, O3 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, 0 Replacement 0Yes F 0 Repaired, 0 No 0 Replaced, 0 Replacement 0Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in.x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced disc and bonnet and seal welded bonnet to body.
8. Tests Conducted:Hydrostatic E Pneumatic 0 Nom. Operating Press. 13 Other 0 ExemptO Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks Test performed Der MP/O/A/7700/045 (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed-~'~ .,

-F R- 5qnrmnw- A Tpr-h SRunnort Date -10/16, 2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HsCT e inspeted e components described in this Owner's Report during the period aj ML3/tolo//6*.4&; and state that to the best of my knowledge and belief, the Owner hAs performed e)amiriations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personalHi ry or property damage or a loss of any kind arising from or connected with this Jerome F Swan Commissions 1 N Inspect tse National Board, State, Province and Endorsements C Date, Page 2 of 2

( FORM NIS-2 OWNER'S REPO( FOR REPAIR / REPLACEMENT ACTIVITY (

As Required By The Provisions Of The ASME Code Section Xl

1. Owner Address: Duke Power Companv 1a. Date October5.2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville. NC 28078 2a. Unit: E1 02 03 OShared (specify Units
3. Work Performed By: Duke Power Comoanv 3a. Work Order #: 98685544 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organization Job #

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #: N/A

4. (a) Identification of System: NI - Safety Iniection 4. (b) Class of System: A
5. (a) Applicable Construction Code: ASME III 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

l Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mtg Mig Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped

__ _ _ __ ___ _ _ _ ___ _ _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ ____ ____ _ _ _ _I nsta l le d( y s o no A 0 Repaired, 0 No 1-NI-VA-60 Atwood Morrill 7-15436-01 367 N/A 1986 0 Replaced, E0 Replacement E0Yes B 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, i, 0 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced,

0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced, 0 Replacement 0Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced disc
8. Tests Conducted:Hydrostatic a Pneumatic E Nom. Operating Press. E Other l ExemptfO Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp NLA Certificate of Authorization No. N/A Expiration Date N/A Signed o- FL Grass Jr.QA Tech Specialist Date zo/S,/asc oro;wer's Designee. Title CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT have insp teqthe components described in this Owners Report during the period I >7 EI LV%-,KOf r Of and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury property damage or a loss of any kind arising from or connected with this inspection.

F Swan Natome Commissions NC1524. N-B ffInspector's S!yr National Board, State, Province and Endorsements Date 9 Page 2 of 2

( FORM NIS-2 OWNER'S REPOi FOR REPAIR / REPLACEMENT ACTIVITY (

As Required By The Provisions Of The ASME Code Section Xl

1. Owner Address: Duke Power Companv 1a. Date October28.2004 526 S. Church Street. Charlotte, NC 28201-1006 Sheet _1__ of I
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville, NC 28078 2a. Unit: 01 02 03 OShared (specify Units
3. Work Performed By: Duke Power Companv 3a. Work Order #: 98697282 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repsir Organization Job #

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #: N/A

4. (a) Identification of System: NV - Chemical and Volume Control 4. (b) Class of System: A
5. (a) Applicable Construction Code: ASMEIII 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for RepairI Replacement Activity: 1995. 1996 Addenda (1992 through 1992 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected. Removed, or ASME Code Stamped

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Installed (yes or no)

A 0 Corrected, 0 No 1-NV-VA-001 5 Walworth A0657 241 N/A 1974 0 Removed, Ed Installed El Yes B 0 Corrected, 0 No 0 Removed,

. . O Installed 0 Yes C 0 Corrected, 0 No 03Removed,

_ . _ 0 Installed 0 Yes D ' 0 Corrected, 0 No 0 Removed, 0 Installed 0 Yes E 0 Corrected, 0 No 03Removed, 0 Installed 0 Yes F 0 Corrected, 0 No 0 Removed, 0 Installed 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced studs and nuts in the cover / bonnet as well as seal welded.
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. 0 Other E Exempto Pressure PSig Test Temp. OF Pressure p sig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp Nf/A Certificate of Authorization No. N/A Expiration Date N/A Signed FL Grass Jr.QA Tech SDecialist Date P/f Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HS CT ave inspe ted pe components described in this Owner's Report during the period

/h7 2 to a and state that to the best of my knowledge and belief, the Owner his pe formed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or roperty damage or a loss of any kind arising from or connected with this i spection. -

me F Swan Commissions NC1524, N-I spet

/7 National Board, State, Province and Endorsements U ate / 0/ t<9 Page 2 of 2

( FORM NIS-2 OWNER'S REPOt .-OR REPAIR / REPLACEMENT ACTIVITY (

As Required By The Provisions Of The ASME Code Section Xi

1. Owner Address: Duke Power Comoanv 1a. Date November 10. 2004 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Hagers Ferry Road. Huntersville, NC 28078 2a. Unit: 01 02 03 OShared (specify Units _)
3. Work Performed By: Duke Power Companv 3a. Work Order #: 98700121 Address: 526 S. Church Street. Charlotte NC 28201-1006 Rear Orgnization Job 0 Type Code Symbol Stamp: W/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #: N/A
4. (a) Identification of System: VI - Instrument Air 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASMg III 19Z1 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xi Utilized for Repair / Replacement Activity: 1995. 1996 Addenda (1992 through 1992 Addenda for Class MC and CC and their supports)
6. Identification of Components:

Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Ideniification Year Built Corrected, Removed, or ASME Code Stamped

_ ___ _ __ _ ___ _ _ __ __ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ ____ _ _ __ ____ _ _ __ _ _ _I n st al l ed( es o no A 0 Corrected, 0 No VI System Duke Power N/A 34 N/A 1981 0 Removed, l0 Installed 0 Yes B 0 Corrected, 0 No O Removed, o Installed 0Yes C 0 Corrected, 0 No O Removed, 0 Installed 0 Yes D 0 Corrected, 0 No 0 Removed, 0 Installed 0 Yes E 0 Corrected, 0 No 0 Removed, E3 Installed 0 Yes F 0 Corrected, 0 No 0 Removed,

[3 Installed 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced nuts on the flange at valve 1SM005
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. El Other 0 ExemptO Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed 9ost

(-).- FL Grass Jr.QA Tech Specialist Date _________

Owner oOwner's Designee, Tle CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSS CT have inspecte te components described in this Owner's Report during the period 119LtlL to L///Lt.Qi; and state that to the best of my knowledge and belief, the Owner hag p6rformed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Xinspection.

g rome F Swan Commissions NC1524. N-I Inspector'seatu? National Board, State, Province and Endorsements Date Page 2 of 2

( FORM NIS-2 OWNER'S REPO(. FOR REPAIR / REPLACEMENT ACTIVITY (

As Required By The Provisions Of The ASME Code Section Xi

1. Owner Address: Duke Power Company 1a. Date October 9. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville. NC 28078 2a. Unit: 11 02 03 OShared (specify Units
3. Work Performed By: Duke Power ComDanv 3a. Work Order #: 98701853 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organzation Job #

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #: MEJ 00117

4. (a) Identification of System: SM - Main Steam 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME III 19Y1 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998.2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped Installed (yes or no)

A 0 Repaired, 0 No 1-SM-VA-3 Atwood - Morrell 2-623 N/A V File# 503 1975 0 Replaced, El Replacement 1 Yes B 0 Repaired, 0 No O Replaced, 0 Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, 0

3 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced Main PopDet and one body stud
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. 0 Other 0 ExemptO Pressure psig Test Temp. OF Pressure p sig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed.i d FL Grass Jr.QA Tech Specialist Date _/__/ _

Ownmer oe'wrner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by H CT aBhave inspe ted e components described in this Owner's Report during the period to /ZL >; and state that to the best of my knowledge and belief, the Owner ha pe ormed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

rome F Swan Commissions NC11524. N-I Inspector's Si6are National Board, State, Province and Endorsements Date Page 2 of 2

C FORM NIS-2 OWNER'S REPOF .-OR REPAIR / REPLACEMENT ACTIVITY (

As Required By The Provisons Of The ASME Code Section Xi

1. Owner Address: Duke Power Company la. Date October 9. 2005 526 I. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Hagers Ferry Road. Huntersville. NC 28078 2a. Unit: E211 02 03 O3Shared (specify Units )
3. Work Performed By: Duke Power Companv 3a. WorkOrder#: 98703813 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organizatin JobC Type Code Symbol Stamp: N/A Authorization No. N Expiration Date: N/A 3b. NSM or MM #: ME1 00117
4. (a) Identification of System: SM - Main Steam 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASMEIl 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xi Utilized for Repair/ Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

_ Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped Installed (yes or no)

A 0 Repaired, 0 No 1-SM-VA-7 Atwood - Morrell 4-623 N/A V File# 593 1975 0 Replaced, E0 Replacement 0 Yes B 0 Repaired, 0 No o Replaced, O Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, O0Replacement 0Yes D 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced, O0Replacement 0Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in.x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced Main Poppet
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. El Other 0 Exempto Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signede &- .Ma FL Grass Jr.QA Owner oe(owner's Designee, Title Tech Specialist Date ____1/2 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by ijB CJ have insp ted he components described in this Owner's Report during the period lZ L<f° to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for ny personal injury or property damage or a loss of any kind arising from or connected with this jspection.1-sp nJerome F Swan Commissions NC1524. N-I Inspector' iatur National Board, State, Province and Endorsements Date 0 ,

Page 2 of 2

( FORM NIS-2 OWNER'S REPOr NOR REPAIR / REPLACEMENT ACTIVITY (

As Required By The Provisions Of The ASME Code Section Xi

1. Owner Address: Duke Power Comranv 1a. Date October 4. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville. NC 28078 2a. Unit: E1l 02 03 OShared (specify Units )
3. Work Performed By: Duke Power Companv 3a. WorkOrder#: 98715371 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organization Job #

Type Code Symbol Stamp: NA Authorization No. N/A Expiration Date: N/A 3b. NSM or MM: ft hMrMM~kA- ri1 9iZ

4. (a) Identification of System: NM - Nuclear SamP~ing 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME IlIl 19ZJ Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

l Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of component Name of Mfg Mfg Seeral No. National Board No. Other Identification Year Built Coffected, Removed, or ASME Code Stamped

_ Installed (yes or no)

A 0 Repaired, 0 No 1-NM-VA-220 Kerotest DY1 1-4 6751 V File# 470 1975 0 Replaced, IEl Replacement 1 Yes B 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes C 0 Repaired, 0 No 03Replaced, l 0 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced,

.__ , , _l 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced,

_ . O Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes Page I of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced disc
8. Tests Conducted:Hydrostatic El Pneumatic a Nom. Operating Press. E Other 0 ExemptlO Pressure psig Test Temp. _ F Pressure psig Test Temp. OF Pressure psig Test Temp. _ F
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed FL Grass Jr.QA Tech Specialist Date /__

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CThave inspecledAhe components described in this Owner's Report during the period q/24,CBS to LIf 5*; and state that to the best of my knowledge and belief, the Owner Was performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

cJ me F Swan Commissions NC1524. N-I Inspector's Azre National Board, State, Province and Endorsements JDate / /.

Page 2 of 2

( FORM NIS-2 OWNER'S REPO,(  ::OR REPAIR / REPLACEMENT ACTIVITY As Required By The Provisions Of The ASME Code Section XI

(

1. Owner Address: Duke Power Comranv 1a. Date October 4. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Hagers Ferry Road. Huntersville. NC 28078 2a. Unit: E1 02 03 OShared (specify Units_ )
3. Work Performed By: Duke Power Compan 3a. Work Order #: 98717515 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organizalion Job #

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #:_ MGMM-12566

4. (a) Identification of System: NM-- Nuclear Samplina 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASMEIII 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section XI Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mtg Mfg Serial No. National Board No. Other Identification Year Built Corrected. Removed, or ASME Code Stamped

_ __ __ __ _ _ ___ __ _ ____ __ _ _ ___ __ _ __ __ __ _ __ __ __ ___ _ __ _ __ __ _ _ ___ _ __ _ _In sta fle d (y e s o r no )

A 0 Repaired, 0 No 1-NM-VA-190 Kerotest FZ39-21 7742 V File# 623 1975 0 Replaced, IEl Replacement 0 Yes B 0 Repaired, 0 No O Replaced, C

. 0 Replacement 0Yes 0 Repaired, 0 No 0 Replaced,

. _ 0 Replacement 0Yes D 0l Repaired, 0 No 0 Replaced,

. 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced,

. . 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced,

. . 0 Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in.x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work RePlaced disc
8. Tests Conducted:Hydrostatic D Pneumatic 0 Nom. Operating Press. EJ Other [1 ExemptlA Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed FL Grass Jr QA Tech Specialist Date s___

Owner orbvner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HB CTave inspe ed he components described in this Owner's Report during the period A 0/

to/O/I/

and state that to the best of my knowledge and belief, the Owner fas peiiormed examirations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury r property damage or a loss of any kind arising from or connected with this rome F Swan Commissions NC1524. N-I Inspector National Board, State, Province and Endorsements JDate / / /d Page 2 of 2

( FORM NIS-2 OWNER'S REPO( ,:OR REPAIR / REPLACEMENT ACTIVITY As Required By The Provisions Of The ASME Code Section Xl

(

1. Owner Address: Duke Power Com1anv 1a. Date October4.2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Hagers Ferry Road. Huntersville, NC 28078 2a. Unit: 01 02 03 OShared (specify Units
3. Work Performed By: Duke Power Comranv 3a. Work Order #: 98718052 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organization Job 5 Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM 44 Yr. RMRAjA-L1I.,=4I irv

,VI'.av,,vr tZ

4. (a) Identification of System: NM - Nuclear Samplina 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME Ill 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped Installed (yes or no)

A 0 Repaired, 0 No 1-NM-VA-200 Kerotest SSA1-25 7746 V File# 623 1975 0 Replaced, II__ Replacement El Yes B 0 Repaired, 0 No 0 Replaced,

_ 0 Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes D - 0 Repaired, 0 No 0 Replaced, O3 Replacement 0 Yes E 0 Repaired, 0 No 03Replaced,

. . OReplacement 3 O Yes F 0 Repaired, 0 No 0 Replaced,

_ 0 Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced disc
8. Tests Conducted:Hydrostatic O Pneumatic O Nom. Operating Press. E Other [1 ExemptEl Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed Owe °li, nrFL Grass Jr.QA Tech Specialist Date d74Zt/2s-2 Owner ovt~wner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT have inspe te the components described in this Owner's Report during the period 2sto  ; and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described inthis Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Ainspection. D

(] inpetion.rome Inspector's ure F Swan Commissions NC1524. N-I National Board, State, Province and Endorsements J Dae Page 2 of 2

FORM NIS-2 OWNER'S REPOI6 ,-OR REPAIR / REPLACEMENT ACTIVITY As Required By The Provisions Of The ASME Code Section Xi C

r

1. Owner Address: Duke Power Comoanv 1a. Date SeDtember 27. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haciers Ferry Road. Huntersville. NC 28078 2a. Unit: 211 02 03 OShared (specify Units
3. Work Performed By: Duke Power Company 3a. Work Order #: 98728033 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organization Job #

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #: N/A

4. (a) Identification of System: CA - Auxilarv Feedwater 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME III 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section XI Utilized for Repair/ Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped

_ _ __ _ __ __ _ __ _ _Installed (yes or no)

A 0 Repaired, 0 No 1-MCA-CA-H369 Duke Power 16547 N/A N/A N/A 0ZIReplaced, I. I 0 Replacement 0 Yes B 0 Repaired, 0dNo 1-MCA-CA-H369 Duke Power 27675 N/A N/A N/A 0 Replaced, E0 Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, O3 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced,

_ 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced, 0 Replacement 0Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced snubber
8. Tests Conducted:Hydrostatic l Pneumatic l Nom. Operating Press. 0 Other O ExemptLZ Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed 4 o FL Grass Jr.QA Tech Specialist Date OwnerA Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by H CT CB have inspected )he components described in this Owners Report during the period al to Z 7lL ; and state that to the best of my knowledge and belief, the Owner prformed eamirnftions and taken corrective measures described in this Owner's Report in ps accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal inju or property damage or a loss of any kind arising from or connected with this

/2inspection, A 7nDaec re e

M-4d ome F Swan Commissions NC1 524. N-I National Board, State, Province and Endorsements Page 2 of 2

( FORM NIS-2 OWNER'S REPOt rOR REPAIR / REPLACEMENT ACTIVITY (

As Requlred By The Provisions Of The ASME Code Section XI

1. Owner Address: Duke Power Comoanv 1a. Date Seotember 27. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville. NC 28078 2a. Unit: 01 02 03 OShared (specify Units
3. Work Performed By: Duke Power Companv 3a. Work Order #: 98728060 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organization Job #

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #:_ N/A

4. (a) Identification of System: NS - Containment Sprav 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME II I19Z1 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

l Column 1 Column 2 Column 3 Column 4 Column 5 Col 6. Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped

_ _ _ Installed (yes or no)

A 0 Repaired, 0 No 1-MCA-NS-H101 Duke Power 19769 N/A N/A N/A 0 Replaced, 0 Replacement 0 Yes B 0 Repaired, E0No 1-MCA-NS-H101 Duke Power 15862 N/A N/A N/A 0 Replaced, d0Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, O0Replacement a Yes F 0 Repaired, 0 No 0 Replaced,

. 0 Replacement 0Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3)each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced snubber
8. Tests Conducted:Hydrostatic El Pneumatic [I Nom. Operating Press. 0 Other E Exemptol Pressure psig Test Temp. _F Pressure psig Test Temp. _F Pressure psig Test Temp. _F
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed - (I FL Grass JrQA Tech Specialist Date q_7_2 Owner oiOwner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by H B Cl have ins cted he components described in this Owner's Report during the period

'tja-O05 to L/dS; and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xi.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injuryf property damage or a loss of any kind arising from or connected with this 1/ J er rome F Swan Commissions NC1524. N-I nsp re National Board, State, Province and Endorsements t/ Dat / /gC Page 2 of 2

( FORM NIS-2 OWNER'S REPOI FOR REPAIR / REPLACEMENT ACTIVITY C As Required By The Provisions Of The ASME Code Section Xl

1. Owner Address: Duke Power Comranv 1a. Date SeDtember22.2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville. NC 28078 2a. Unit: 01 02 03 OShared (specify Units
3. Work Performed By: Duke Power Comoanv 3a. Work Order #: 98728061 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organization Job #

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM N/A

4. (a) Identification of System: NS - Containment Sprav 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME III 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair I Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg D Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped installed (yes or no)

A 0 Repaired, Ed No 1-MCA-NS-H105 Duke Power 19899 N/A N/A N/A E Replaced, I I 0 Replacement 0 Yes B 0 Repaired, 0dNo 1-MCA-NS-H105 Duke Power 20934 N/A N/A N/A 0 Replaced, El Replacement 0 Yes C 0 Repaired, 0 No O Replaced, 0 Replacement 0 Yes D 0 Repaired, 0 No O Replaced,

. o Replacement 0 Yes E 0 Repaired, 0 No O Replaced, O Replacement 0 Yes F 0 Repaired, 0 No O Replaced, O Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced snubber
8. Tests Conducted:Hydrostatic 5 Pneumatic 5 Nom. Operating Press. 5 Other 5 ExemptOl Pressure psig Test Temp. .. OF Pressure psig Test Temp. OF Pressure psig Test Temp. _ F
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed FL Grass JrQA Tech Specialist Date OhnerorlOwner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by H CT have inspec)ed the components described in this Owner's Report during the period OA to w C2- o and state that to the best of my knowledge and belief, the Owner ha perkormed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injjry or property damage or a loss of any kind arising from or connected with this Dinspection G f

/ inspection.mrome Inspector nat e F Swan_ Commissions NC1524. N-I National Board, State, Province and Endorsements 6 Date 72 /0 C Page 2 of 2

( FORM NIS-2 OWNER'S REPOF( FOR REPAIR / REPLACEMENT ACTIVITY (

As Required By The Provisions Of The ASME Code Section XI

1. Owner Address: Duke Power Comoanv 1a. Date SeDtember 22. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Hagers Ferry Road. Huntersville. NC 28078 2a. Unit: El1 02 03 OShared (specify Units
3. Work Performed By: Duke Power ComDanv 3a. Work Order #:, 98728068 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organization Job #

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #:_ N/A

4. (a) Identification of System: SM - Main Steam 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME III 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identificabon Year Built Corrected, Removed, or ASME Code Stamped

_ Installed (yes or no)

A 0 Repaired, 0 No 1-MCA-SM-H01 8 Duke Power 21410 N/A N/A N/A 0 Replaced, I _o Replacement 0 Yes B a Repaired, 0 No 1-MCA-NS-H01 8 Duke Power 15722 N/A N/A N/A 0 Replaced, 0 Replacement 0 Yes C 0 Repaired, 0 No o Replaced,

_ O Replacement 0 Yes D O0Repaired, 0 No O Replaced, O Replacement 0 Yes E 0 Repaired, 0 No O Replaced, F

o Replacement 0 Yes 0 Repaired, 0 No O Replaced,

. O Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced snubber
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. 0 Other 0 ExempttO Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure -psig Test Temp. OF
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.

Type Code Symbol Stamp NLA Certificate of Authorization No. N/A Expiration Date N/A Signed sa 2 FL Grass JrQA Tech Specialist Date _

Owner ofOwner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSRt[CT ave insp cted he components described in this Owner's Report during the period f9/7/ /sto 4/LZZ/ Dtand state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection. }

e F Swan Commissions NC1524, N-I nspect's National Board, State, Province and Endorsements Dat 8 -7L Page 2 of 2

( FORM NIS-2 OWNER'S REPOI( -OR REPAIR / REPLACEMENT ACTIVITY C As Required By The Provisions Of The ASME Code Section Xl

1. Owner Address: Duke Power Companv 1a. Date September 20. 2005 526 S. Church Street. Charlotte. NC 28201 -1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville. NC 28078 2a. Unit: El1 C2 03 OShared (specify Units )
3. Work Performed By: Duke Power Company 3a. Work Order#: 98728069 Address: 526 S. Church Street. Charlotte NC 28201 -1006 Repair Organization Job #

Type Code Symbol Stamp: N/A Authorization No. NIA Expiration Date: N/A 3b. NSM or MM #t: N/A

4. (a) Identification of System: SM - Main Steam 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME III 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped

__ __ _ __ _ __ _ __ _ _ _ __ _Installed (yes or no)

A 0 Repaired, 0 No 1-MCA-SM-H102 Duke Power 00123 N/A N/A N/A 0 Replaced, 0 Replacement 0 Yes B 0 Repaired, 0 No 1-MCA-SM-H102 Duke Power 15718 N/A N/A N/A 0 Replaced, El Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced, 10 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, O Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced,

. 0 Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of WorkI .

Panin-ori czn. hhar oBw o v

8. Tests Conducted:Hydrostatic D Pneumatic 0 Nom. Operating Press. 0 Other 0 ExemptO Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed FL Grass Jr.QA Tech Specialist Date _

bwner 75~Ower's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT have inspected the components described in this Owner's Report during the period 9/15/2005 to 9/20/2005 ; and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal inju or property damage or a loss of any kind arising from or connected with this inspection. p

-JeroArme F Swan Commissions NC1 524, N-I Inspector's S4nlture National Board, State, Province and Endorsements I

Date 9/20/2005 I

Page 2 of 2

( FORM NIS-2 OWNER'S REPOF( .OR REPAIR / REPLACEMENT ACTIVITY (

As Required By The Provisions Of The ASME Code Section Xl

1. Owner Address: Duke Power Companv 1a. Date SeDtember 28. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntermville. NC 28078 2a. Unit: 01 02 03 OShared (specify Units
3. Work Performed By: Duke Power Comvanv 3a. Work Order #: 98728075 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organization Job #

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM N/A

4. (a) Identification of System: NI - Safety Iniection 4. (b) Class of System: A
5. (a) Applicable Construction Code: ASME III 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped Installed (yes or no)

A 0 Repaired, Ed No 1-MCR-NI-0589 Duke Power 22343 N/A N/A N/A 0 Replaced,

_ 0 Replacement 0 Yes B 0 Repaired, E0 No 1-MCR-NI-0589 Duke Power 15860 N/A N/A N/A 0 Replaced, 1_0Replacement 0 Yes C 0 Repaired, 0 No O Replaced, 0 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced,

_ 0Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced, 0Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3)each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced snubber
8. Tests Conducted:Hydrostatic 5 Pneumatic a Nom. Operating Press. C Other 0 ExemptIl Pressure psig Test Temp. .. OF Pressure psig Test Temp. .. OF Pressure psig Test Temp. .. OF
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed t /)FL Grass JrQA Tech Specialist Date _

Owner o er's Designee, 'ltle CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT have inspecteg the components described in this Owner's Report during the period 2/ 1. to 9/z9 1  ; and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this ji spection.

~e-- erome F Swan Commissions NC1524. N-I Inspector's Signture National Board, State, Province and Endorsements

/Date22 /

Page 2 of 2

( FORM NIS-2 OWNER'S REPOI FOR REPAIR / REPLACEMENT ACTIVITY C As Required By The Provisions Of The ASME Code Section Xi

1. Owner Address: Duke Power Company 1a. Date September 28. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville. NC 28078 2a. Unit: 01 C2 03 OShared (specify Units )
3. Work Performed By: Duke Power Comoanv 3a. Work Order #: 98728076 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organization Job #

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #: N/A

4. (a) Identification of System: NI - Safety Iniection 4. (b) Class of System: A
5. (a) Applicable Construction Code: ASME 1111971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped Installed (yes or no)

A 0 Repaired, 0 No 1-MCR-NI-0653 Duke Power 20860 N/A N/A N/A 0 Replaced, 0

3 Replacement 0 Yes B 0 Repaired, 0l No 1-MCR-NI-0653 Duke Power 19914 N/A N/A N/A 0 Replaced, E0 Replacement 0 Yes C 0 Repaired, 0 No O Replaced, 0 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced, O3 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, O3 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of W nlrk Pinnnkinroil Qni ihhinr
8. Tests Conducted:Hydrostatic 0 Pneumatic EJ Nom. Operating Press. a Other 0 ExemptIl Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed A; 4 FL Grass Jr.QA Tech Specialist Date _,t,/

'Owner ortDwner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT have insp cted he components described in this Owner's Report during the period 9f / 2f oSto ,92Di; and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this hinspection.

. erome F Swan Commissions NC1524, N-I JInspector's Sign re National Board, State, Province and Endorsements Datel / f Page 2 of 2

C FORM NIS-2 OWNER'S REPOI( ,-OR REPAIR / REPLACEMENT ACTIVITY (

As Required By The Provisions Of The ASME Code Section Xi

1. Owner Address: Duke Power Company 1a. Date October 4. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet I of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville. NC 28078 2a. Unit: El1 02 03 0Shared (specify Units )_
3. Work Performed By: Duke Power Comoanv 3a. Work Order #: 98728077 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organizatllo Job#

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #t: N/A

4. (a) Identification of System: NV - Chemical and Volume Control 4. (b) Class of System: A
5. (a) Applicable Construction Code: ASME IlIl 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped

_ _ __ _ __ _ _ __ _ _ __ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ __ __ __ ___ __ __ _ __ _ _ __ ___ __ _ _ _ _In sta lled (W eso r no )

A 0 Repaired, El No 1-MCR-NV-0747 Duke Power 15132 N/A N/A N/A El Replaced, I _O Replacement 0Yes B 0 Repaired, El No 1-MCR-NV-0747 Duke Power 15044 N/A N/A N/A 0 Replaced, Ed Replacement 0Yes C 0 Repaired, 0 No 0 Replaced,

_3 0 Replacement 0Yes D 0 Repaired, 0 No 0 Replaced,

. _ v 0 Replacement 0Yes E 0 Repaired, 0 No 03Replaced,

. . . 0Replacement 0Yes F 0 Repaired, 0 No 0 Replaced,

. .. 0 Replacement 0Yes Page I of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced snubber
8. Tests Conducted:Hydrostatic 0 Pneumatic [ Nom. Operating Press. [I Other 0 ExemptlA Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure -psig Test Temp. OF
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed,-0-,;O Fl Gracss

. Jr.OA

_ Tech Rnpcialiqt

_ M_ _ ._ .._ . Date 1;16--

'Owner oFOwner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by H B CT have inspe tel the components described in this Owner's Report during the period r %ort2tO /?1VW; and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal inju or property damage or a loss of any kind arising from or connected with this me F Swan Commissions NC11524, N-I nspectorS i 7 re National Board, State, Province and Endorsements 6( _on2A>Ac-Date/ C,-/ VY Page 2 of 2

( FORM NIS-2 OWNER'S REPOIC rOR REPAIR / REPLACEMENT ACTIVITY (

As Required By The Provisions Of The ASME Code Section Xi

1. Owner Address: Duke Power Companv 1a. Date October 4. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGulre Nuclear Station 12700 Hagers Ferry Road. Huntersville. NC 28078 2a. Unit: 01 02 03 OShared (specify Units
3. Work Performed By: Duke Power Companv 3a. WorkOrder#: 98728078 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organizallon Job #

Type Code Symbol Stamp: !N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #:_ N/A

4. (a) Identification of System: NV - Chemical and Volume Control 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME III 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

l Column 1 l Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped

_ _ __ __ __ __ __ _ ___ _ __ _ _ __ ___ _ __ _ __ __ _ _ _ __ __ _ _ _ _ _ _ __ __ __ ___ _ __ _ _In st a lled (yes or n o)

A 0 Repaired, 0 No 1-MCR-NV-0758 Duke Power 14962 N/A N/A N/A 0 Replaced, I 0 I___ Replacement 0 Yes B 0 Repaired, 0 No 1-MCR-NV-0758 Duke Power 14903 N/A N/A N/A 0 Replaced, E0 Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced,

. 0 Replacement 0 Yes E 0 Repaired, 0 No O Replaced,

-. 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced,

. 0 Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work. Replaced snubber
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. 0 Other 0 ExemptlA Pressure psig Test Temp. OF Pressure psig Test Temp. .. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed 97 D FL Grass Jr.QA Tech S ecialist Date -Lol Owner or OGner's Designee, Tile CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by H ;B CTave inspec e5lthe components described in this Owners Report during the period o to /f W IA ; and state that to the best of my knowledge and belief, the Owner Was pe rformed exAmihations and taken corrective measures described in this Owners Report in accordance with the requirements of ASME Code, Section Xi.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury r property damage or a loss of any kind arising from or connected with this

/linspection.

Irome F Swan Commissions NC11524. N-I Inspector's Sj r National Board, State, Province and Endorsements Dat e Page 2 of 2

(

FORM NIS-2 OWNER'S REPOf FOR REPAIR / REPLACEMENT ACTIVITY As Required By The Provisions Of The ASME Code Section Xi

(

1. Owner Address: Duke Power Companv 1a. Date October 4. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville. NC 28078 2a. Unit: 01 02 03 OShared (specify Units )
3. Work Performed By: Duke Power ComDany 3a. Work Order #: 98728079 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organization Job #

Type Code Symbol Stamp: N/A Authorization No. NZA Expiration Date: N!A 3b. NSM or MM #- N/A

4. (a) Identification of System: NV - Chemical and Volume Control 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME IlIl 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xi Utilized for Repair / Replacement Activity: 19982001I Addenda (1998 through 2000 Addenda for Class MC and CC and their supports) 9 i
6. Identification of Components:

Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped Installed (yes or no)

A 0 Repaired, 0 No 1-MCR-NV-1032 Duke Power 20388 N/A N/A N/A 0 Replaced, B

0 Replacement 0 Yes 0 Repaired, 0 No 1-MCR-NV-1032 Duke Power 15865 N/A N/A N/A 0 Replaced,

_ E0 Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, O3 Replacement 0 Yes D .*,0 Repaired, 0 No 0 Replaced, E

0 3 Replacement 0 Yes 0 Repaired, 0 No

- . 0 Replaced, F

.. O Replacement D Yes 0 Repaired, 0 No 0 Replaced, O0Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced snubber
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. 0 Other 0 Exempt0 Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure -psig Test Temp. OF
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed !Z( L; FL Grass Jr.QA Tech Specialist Date ___

'Owiner o% er's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CThave inspected the components described in this Owner's Report during the period to LDLY/Qa; and state that to the best of my knowledge and belief, the Owner has performed enations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this ninspection.

i on rome F Swan Commissions NC1524. N-I Inspectors S' re National Board, State, Province and Endorsements I

Date 0 5 Page 2 of 2

( FORM NIS-2 OWNER'S REP& FOR REPAIR / REPLACEMENT ACTIVITY As Required By The Provisions Of The ASME Code Section Xl

(

1. Owner Address: Duke Power Comoanv 1a. Date October4.2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of I
2. Plant Address: McGuire Nuclear Station 12700 Hagers Ferrv Road. Huntersville, NC 28078 2a. Unit: El1 02 03 OShared (specify Units 11
3. Work Performed By: Duke Power Companv 3a. Work Order #: 98728080 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Ofganization Job #

Type Code Symbol Stamp: NL Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #: N/A

4. (a) Identification of System: NV - Chemical and Volume Control 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME IlIl 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Seial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped Installed (yes or no)

A 0 Repaired, El No 1-MCR-NV-1047 Duke Power 15069 N/A N/A N/A IZ Replaced,

. 0Replacement 0Yes B 0 Repaired, E No 1-MCR-NV-1047 Duke Power 15064 N/A N/A N/A 0 Replaced, El Replacement 0 Yes C 0 Repaired, 0 No 03Replaced, 0 Replacement 0 Yes D 0 Repaired, 0 No O Replaced,

_ 0 Replacement 0 Yes E 0.Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced,

, . 0 Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced snubber
8. Tests Conducted:Hydrostatic a Pneumatic 5 Nom. Operating Press. S Other a ExemptEl Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed ok7-0t 4 FLs Grass Jr.QA Tech Specialist Date owner ofOwner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT have inspe ted the components described in this Owner's Report during the period 9/-/05 to  ; and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xi.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal inju or property damage or a loss of any kind arising from or connected with this inp .erome F Swan Commissions NC1524. N-I Inspector's itture National Board, State, Province and Endorsements Date /0/ &t; Page 2 of 2

( FORM NIS-2 OWNER'S REP( --OR REPAIR / REPLACEMENT ACTIVITY As Required By The Provisions Of The ASME Code Section XI (

1. Owner Address: Duke Power ComDany 1a. Date October 9. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Hagers Ferr, Road. Hunteraville. NC 28078 2a. Unit: 01 02 03 OShared (specify Units )
3. Work Performed By: Duke Power Comganv 3a. Work Order #: 98729513 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Orfanizaltion Job #

Type Code Symbol Stamp: N/A Authorization No. WA Expiration Date: N/A 3b. NSM or MM N/A

4. (a) Identification of System: NV - Chemical and Volume Control 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME III 19fl Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair/ Replacement Activity: 1998. 2001DAddenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped Installed (yes or no)

A 0 Repaired, 0 No 1-NV-VA-8 Walworth A0591 35 N/A 1973 0 Replaced,

_ Ed Replacement E Yes B 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, F

O0Replacement 0Yes 0 Repaired, 0 No 0 Replaced, 0 Replacement 0Yes Page 1 of2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in.x 11 in. (2) information in items 1through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced bonnet bolting material
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. El Other 0 ExemptO Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed FL Grass JrQA Tech Specialist Date _/_

'Owner eq Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSBjLTQhave inspected toe components described in this Owner's Report during the period t4/o / and state that to the best of my knowledge and belief, the Owner ha's performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this

{)inspection. _

ome F Swan Commissions NC11524. N-I Inspector's National Board, State, Province and Endorsements l/ Date /0/6 >

Page 2 of 2

( FORM NIS-2 OWNER'S REPC FOR REPAIR / REPLACEMENT ACTIVITY As Required By The Provisions Of The ASME Code Section Xl

(

1. Owner Address: Duke Power Companv 1a. Date 09/26/05 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Hagers Ferr, Road. Huntersville. NC 28078 2a. Unit: E31 02 03 OShared (specify Units )
3. Work Performed By: Duke Power Companv 3a. Work Order #: 98738791/01 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organization Job #

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #: N/A

4. (a) Identification of System: ND 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME III 19Z1 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998, 200 ) Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped Installed (yes or no)

A 0 Repaired, 0 No 1B Residual Heat OReplaced, Removal HX Joseph Oats & Sons 2046-2A 636 N/A 1973 E3Replacement Id Yes B 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes C 0 Repaired, 0 No O Replaced, 3O Replacement 0 Yes D 0 Repaired, 0 No O Replaced, 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced,

_ 0 Replacement 0Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced nuts on bottom flange.
8. Tests Conducted:Hydrostatic l Pneumatic [1 Nom. Operating Press. 0 Other E Exempt19 Pressure -_ psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed<6 44,,-' FR Sorrow.QA Tech. SuPport Date 09/26, 2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT have inscpcteqthe components described in this Owner's Report during the period 0/7ia5 to =(a25; and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xi.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury r property damage or a loss of any kind arising from or connected with this Ad inspection.D gJ h Jerome

- F Swan Commissions NC1524, N-I Inspector's 51fnure National Board, State, Province and Endorsements

( Date Page 2 of 2

( FORM NIS-2 OWNER'S REP( :OR REPAIR / REPLACEMENT ACTIVITY As Required By The Provisions Of The ASME Code Section Xl

(

1. Owner Address: Duke Power Companv 1a. Date October 5. 2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1 .
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville. NC 28078 2a. Unit: 11 02 03 OShared (specify Units
3. Work Performed By: Duke Power Companv 3a. Work Order #: 98749281 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organization Job #

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM N/A

4. (a) Identification of System: BB - Steam Generator Blowdown Recycle 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME IlIl 1971 Edition, Summer and Winte Addenda N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 20Ct0 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped IInstalled (Yes or no)

A 0 Repaired, 0 No 1-MCR-BB-0518 Duke Power N/A N/A N/A N/A 0 Replaced, B

_ . E0 Replacement 0 Yes 0 Repaired, 0 No 0 Replaced, C

0Replacement 0 Yes 0 Repaired, 0 No 0 Replaced, D

_3_

_ 0Replacement 0 Yes 0 Repaired, 0 No 0 Replaced,

_3__. . _ _ 0Replacement 0Yes E 0 Repaired, 0 No 0 Replaced,

. 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced,

_ . . 0 Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work c ReDlaced bolting material with threaded rod and nuts
8. Tests Conducted:Hydrostatic El Pneumatic 0 Nom. Operating Press. 0 Other a ExemptO Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed - 4 FL Grass Jr.QA Tech SDecialist Date a4A*

Owner or Oner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT have inspe ted the components described in this Owner's Report during the period 7174oS to  ; and state that to the best of my knowledge and belief, the Owner

'has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this ynspectio n.r rome F Swan Commissions NC1524. N-I 7Inspectors re National Board, State, Province and Endorsements Dat o>Q Page 2 of 2

( FORM NIS-2 OWNER'S REP( iOR REPAIR I REPLACEMENT ACTIVITY As Required By The Provisions Of The ASME Code Section XI

(

1. Owner Address: Duke Power Companv 1a. Date 10/03/2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville. NC 28078 2a. Unit: E31 02 03 OShared (specify Units _
3. Work Performed By: Duke Power Comoanv 3a. Work Order # : 98749495/01 Address: 526 S. Church Street. Charlotte NC 28201-1006 Reptar Organization Jopb Type Code Symbol Stamp: N/ Authorization No. N/A Expiration Date: N/A 3b. NSM or MM #: N/A
4. (a) Identification of System: Ni 4. (b) Class of System: A
5. (a) Applicable Construction Code: ASME III 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section XI Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

_ Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped Installed (yes or no)

A 0 Repaired, 0 No Valve 1NI-167 Kerotest ADF6-1 5849 N/A 1975 0 Replaced, E_Replacement [lXYes B 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced,

. 03 Replacement 0 Yes D 03Repaired, 0 No 0 Replaced, O 0 Replacement 0 Yes E 0 Repaired, 0 No 03Replaced,

. 0 Replacement 0 Yes T 0 Repaired, 0 No

/0 Replaced,

_ _ __ __ _._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ R ep lac em en t 0Y es Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Seal welded bonnet to body
8. Tests Conducted:Hydrostatic D Pneumatic EJ Nom. Operating Press. 5 Other [ ExemptZd Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signeazil&dJ F.R. Sorrow.QA Tech Supoort Date 10/03, 2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hv inspe~ptev the components described in this Owner's Report during the period to / /oSL;and state that to the best of my knowledge and belief, the Owner t/

has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xi.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

(1Inspector's y rome FSwan Commissions NC1524. N-I National Board, State, Province and Endorsements J DateZ Page 2 of 2

( FORM NIS-2 OWNER'S REP( .FOR REPAIR / REPLACEMENT ACTIVITY As Required By The Provisions Of The ASME Code Section Xi

(

1. Owner Address: Duke Power Company 1a. Date October 9.2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville. NC 28078 2a. Unit: 01 02 03 OShared (specify Units
3. Work Performed By: Duke Power Compan 3a. Work Order #:

Address: 526 S.Church Street. Charlotte NC 28201 -1006 Repair Organization Job #

Type Code Symbol Stamp: N/A Authorization No. N/A Expiration Date: N/A 3b. NSM or MM # N/A

4. (a) Identification of System: Nl - Safety Iniection 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME IlIl 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2001) Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Serial No. National Board No. Other Identficallon Year Built CorrecIted, Removed, or ASME Code Stamped

_ _ __ _ __ __ _ __ _ _ _ __ _ __In _ _ _ _ _ _ _ _ _ _ _ _ _ stalle d (ye s o r n o)

A 0 Repaired, 0 No NI Piping System Duke Power N/A 42 N/A 1981 0 Replaced, l0Replacement 0 Yes B 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes C 0 Repaired, 0 No 0 Replaced, D

0 Replacement 0Yes 0 Repaired, 0 No O Replaced, 0 Replacement 0 Yes E 0 Repaired, 0 No O Replaced,

[0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced, 0 Replacement 0Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work. ReDlaced boltina material in flange at 1NIFE5470.
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. El Other 0 ExemptO Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed FL

. Grns n.r-OA Tech SRncialist

_. A__ _. . A. . . __. . ___._.._.

Date o O%,ner opowner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT ave inspe9ted she components described in this Owners Report during the period 99 toi6LS /and state that to the best of my knowledge and belief, the Owner has'performed e'd;ami1ations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this

/nspection.E

  • o me F Swan Commissions NC1524, N-I nspector's National Board, State, Province and Endorsements Dat i7/o&/s Page 2 of 2

( FORM NIS-2 OWNER'S REP( NOR REPAIR / REPLACEMENT ACTIVITY (

As Required By The Provisions Of The ASME Code Section XI

1. Owner Address: Duke Power Companv la. Date October 12. 2005 526 _ htrC 28201-106 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville, NC 28078 2a. Unit: 01 02 03 OShared (specify Units
3. Work Performed By: Duke Power Comnanv 3a. Work Order #: 98751712 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organtion Job C Type Code Symbol Stamp: N/A Authorization No. NIA Expiration Date: W/A 3b. NSM or MM #: ME100530
4. (a) Identification of System: RN - Nuclear Service Water 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME liI 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Buitt Corrected, Removed, or ASME Code Stamped

_ __ _ _ __ _ _ _ _ __ __ __ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _In stalle d (v e s or n o)

A 0 Repaired, 0 No 1-MCA-RN-H959 Duke Power N/A N/A N/A N/A 0 Replaced, I_ _Replacement El Yes B 0 Repaired, 0 No 0 Replaced, C

O Replacement 0Yes 0 Repaired, 0 No 0 Replaced, D

0 Replacement 0Yes 0 Repaired, 0 No 0 Replaced,

__ O Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, F

0 Replacement 0 Yes 0 Repaired, 0 No 0 Replaced,

_ 0 Replacement 0Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work. added item# 8 by weldina to item#7 Der modification MEl 00530.
8. Tests Conducted:Hydrostatic 5 Pneumatic 0 Nom. Operating Press. I Other 0 Exempt0 Pressure psig Test Temp. .. IF Pressure_ psig Test Temp. .. OF Pressure psig Test Temp. .. OF
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed -e/Z Wd FL Grass Jr QA Tech Specialist Date A S

' '6vner/ownr'sDesignee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT have inspetet the components described in this Owner's Report during the period

/ Z to /L  ; and state that to the best of my knowledge and belief, the Owner hsisirformed ekaminations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for Iny personal injury or property damage or a loss of any kind arising from or connected with this

//nspection.

rome F Swan Commissions NC1524. N-I f Inspector's hire National Board, State, Province and Endorsements

( Date 2. ,/ j Page 2 of 2

( FORM NIS-2 OWNER'S REPt FOR REPAIR / REPLACEMENT ACTIVITY As Required By The Provisions Of The ASME Code Section Xi

(

1. Owner Address: Duke Power Company la. Date October 12. 2005 526 S. Church Street, Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville, NC 28078 2a. Unit: l1 02 03 OShared (specify Units )
3. Work Performed By: Duke Power Companv 3a. Work Order #:

Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair Organization Job 9 Type Code Symbol Stamp: NLA Authorization No. N Expiration Date: N/A 3b. NSM or MM N/A

4. (a) Identification of System: NC - Reactor Coolant 4. (b) Class of System: A
5. (a) Applicable Construction Code: ASME III 1971 Edition, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section XI Utilized for Repair / Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Other Identification Year Built Corrected, Removed, or ASME Code Stamped Irnstalled (yes or no)

A 0 Repaired, E No 1-MCR-NC-557 Duke Power N/A N/A N/A N/A E Replaced, 0 Replacement 0Yes B 0 Repaired, E No 1-MCR-NC-557 Duke Power N/A N/A N/A N/A 0 Replaced, Ed Replacement 0 Yes C 03Repaired, 0 No 0 Replaced,

_ 0 Replacement 0 Yes D 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced, 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced, 0

3 Replacement 0 Yes Page 1 of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work. Replaced snubber
8. Tests Conducted:Hydrostatic 0 Pneumatic 0 Nom. Operating Press. 0 Other 0 ExemptlA Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturers Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed g3/X va FL Grass Jr.QA Tech Specialist Date Owner or mer's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HS8 CT have inspecjed te components described in this Owner's Report during the period

/ g W<A/ to m ; and state that to the best of my knowledge and belief, the Owner has performed exdminations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xi.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for ninspection.a any personal injury opproperty damage or a loss of any kind arising from or connected with this t

romne F Swan Commissions NC1 524. N-I Ntional Board, State, Province and Endorsements Nnspa

( / Dat/7',,

Page 2 of 2

FORM NIS-2 OWNER'S REPC FOR REPAIR / REPLACEMENT ACTIVITY As Required By The Provisions Of The ASME Code Section Xi

(

1. Owner Address: Duke Power Companv la. Date 10/15/2005 526 S. Church Street. Charlotte. NC 28201-1006 Sheet 1 of 1
2. Plant Address: McGuire Nuclear Station 12700 Haaers Ferry Road. Huntersville, NC 28078 2a. Unit: [M1 02 03 OShared (specify Units )
3. Work Performed By: Duke Power ComRDan 3a. Work Order # : 98753382/01 Address: 526 S. Church Street. Charlotte NC 28201-1006 Repair OrganIzafon Job #

Type Code Symbol Stamp: N/A Authorization No. &A Expiration Date: NMA 3b. NSM or MM #*: N/A

4. (a) Identification of System: VI 4. (b) Class of System: B
5. (a) Applicable Construction Code: ASME III 1971 EdItion, Summer and Winter Addenda, N/A Code Cases (b) Applicable Edition of Section Xl Utilized for Repair/ Replacement Activity: 1998. 2000 Addenda (1998 through 2000 Addenda for Class MC and CC and their supports)
6. Identification of Components:

= Column 1 Column 2 Column 3 Column 4 Column 5 Col 6 Column 7 Column 8 Name of Component Name of Mfg Mfg Serial No. National Board No. Oter Identification Year Built Corected. Removed, or ASME Code Stamped

_ __ _ __ _ _ _ __ __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ __ __ __ __ __ _ _I n sta ll e (V a g o r n o)

A 0 Repaired, 0 No 1VI-1 49 KEROTEST ADF7-11 6570 VALVE 1975 0 Replaced,

____Replacement EYes B 0 Repaired, 0 No O Replaced, C

_ 0 Replacement 0 Yes 0 Repaired, 0 No 0 Replaced, D

_ 0 Replacement 0 Yes 0 Repaired, 0 No 0 Replaced,

[0 Replacement 0 Yes E 0 Repaired, 0 No 0 Replaced,

. 0 Replacement 0 Yes F 0 Repaired, 0 No 0 Replaced,

[0 Replacement 0Yes Page I of 2

Form NIS-2 (Back)

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in. (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7. Description of Work Replaced valve disc.
8. Tests Conducted:Hydrostatic E0 Pneumatic El Nom. Operating Press. 0 Other E ExemptOI Pressure psig Test Temp. OF Pressure psig Test Temp. OF Pressure psig Test Temp. OF
9. Remarks (Applicable Manufacturer's Data Reports to be attached)

CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed G o F.R. Sorrow.QA Tech SuDDort Date 10/15, 2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT have inspected te components described in this Owner's Report during the period

/a/Ii J2< to ,Aff and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury o pproperty damage or a loss of any kind arising from or connected with this gnspection.

V Inspector's Si're-. /rome FSwan Commissions NC1524. N-I National Board, State, Province and Endorsements Date /

Page 2 of 2

6.0 Pressure Testing Table 6-1 shows the number of Class 1 (Category B-P), Class 2 (Category C-H), and Risk Informed Segment (Category R-A) pressure tests completed for refueling outage EOC 17. There was no through-wall leakage observed during any of the pressure tests.

__ _ Table 6-1 Outage Specific Summary Examination Category Test Requirement Total Completed EOC17 B-P System Leakage Test (IWB-5221) 1 C-H System Leakage Test (IWC-5221) 14 R-A Risk Informed VT-2 for Socket Welds 67 Segments Table 6-2 shows a completion status of pressure tests conducted during the first period of the third ten-year interval.

Taie 6-2 Parind Snedlic Summar_

Total Total (%/0)

Examination Test Examinations Examinations Examinations Category Requirement Required For Credited For Complete For This Period This Period This Period B-P System Leakage 3 3 100%

Test (IWB-5221)

C-H System Leakage 30 119 63.33%

Test (IWC-5221)

R-A System Leakage (67 Segments 201 100%

Test Each Refueling Outage)

Section 6 Prepared By: Date:

Section 6 Re w d By: Date:

l~ zig e g C 17-13 -(5 Outage 3/EOC 17 Page 1 of 7 McGuire Unit 1 Revision 0 Section 6 - Third Ten-Year Interval December 7, 2005

- The Class 1 (Category B-P) pressure test zone is required each refueling outage.

Table 6-3 shows a completion status of the Class 1 (Category B-P) pressure test zone conducted during refueling cycle EOC 17.

Table 6-3 Detailed Class 1 Listing EOC 17 Zone Completion Number Boundary Dwg Status EOC 17 VT-2 Examination Date 1NC-070L-A MC-ISIL-1553-01.00 Complete 16-Oct-05 MC-ISIL-1 553-02.00 Complete 16-Oct-05 MC-ISIL-1 553-02.01 Complete 16-Oct-05 MC-ISIL-1554-01.00 Complete 16-Oct-05 MC-ISIL-1554-01.01 Complete 16-Oct-05 MC-ISIL-1554-01.02 Complete 16-Oct-05 MC-ISIL-1561-01.00 Complete 16-Oct-05 MC-ISIL-1562-01.00 Complete 16-Oct-05 MC-ISIL-1562-02.00 Complete 16-Oct-05 MC-ISIL-1562-02.01 Complete 16-Oct-05 MC-ISIL-1562-03.00 Complete 16-Oct-05 MC-ISIL-1562-03.01 Complete 16-Oct-05 Class 2 (Category C-H) pressure test zones are required once each inspection period.

Table 6-4 shows a completion status of Class 2 (Category C-H) pressure tests required for the first period of the third ten-year interval.

Table 6-4 Detailed Class 2 Period Listing VT-2 Examination Zone Number Boundary Dwg Completion Status Date 1 1BB-096L-B MC-ISIL-1580-01.00 See Endnote 2 2 1BB-098L-B MC-ISIL-1572-03.00 Completed in EOC17 16-Oct-05 MC-ISIL-1580-01.00 Completed in EOC17 16-Oct-05 MC-ISIL-1584-01.00 Completed in EOC17 16-Oct-05 3 1CA-006L-B MC-ISIL-1592-01.00 Completed in EOC16 04-Apr-04 4 1CA-032L-B MC-ISIL-1584-01.00 See Endnote 2 MC-ISIL-1591-01.01 See Endnote 2 MC-ISIL-1592-01.00 See Endnote 2 MC-ISIL-1617-01.00 See Endnote 2 Outage 3/EOC 17 Page 2 of 7 McGuire Unit 1 Revision 0 Section 6 - Third Ten-Year Interval December 7, 2005

VT-2 Examination Zone Boundary Dwg Completion Status Date 5 1FW-027L-B MC-ISIL-1 554-03.00 See Endnote 2 MC-ISIL-1554-03.01 See Endnote 2 MC-ISIL-1561 -01.00 See Endnote 2 MC-ISIL-1 562-03.00 See Endnote 2 MC-ISIL-1563-01.00 See Endnote 2

___ MC-ISIL-1571-01.00 See Endnote 2 6 1ND-01 9L-B MC-ISIL-1 554-01.02 Completed in EOC1 7 17-Nov-04 MC-ISIL-1561-01.00 Completed in EOC17 17-Nov-04 MC-ISIL-1562-03.00 Completed in EOC17 17-Nov-04 MC-ISIL-1562-03.01 Completed in EOC17 17-Nov-04 MC-ISIL-1563-01.00 Completed in EOC17 17-Nov-04 MC-ISIL-1571-01.00 Completed in EOC17 17-Nov-04 MC-ISIL-1572-01.00 Completed in EOC17 17-Nov-04 7 1ND-050L-B MC-ISIL-1561-01.00 Completed in EOC17 05-Oct-04 MC-ISIL-1 562-03.01 Completed in EOC1 7 05-Oct-04 MC-ISIL-1563-01.00 Completed in EOC1 7 05-Oct-04 8 1NI-021 L-B MC-ISIL-1 562-02.00 Completed in EOC16 31-Mar-04 MC-ISIL-1562-02.01 Completed in EOC16 31-Mar-04 MC-ISIL-1572-01.01 Completed in EOC16 31 -Mar-04 9 1NI-022L-B MC-ISIL-1562-03.00 Completed in EOC17 04-Oct-04 MC-ISl-1562-03.01 Completed in EOC17 04-Oct-04 10 1Nl-039L-B MC-ISIL-1562-03.01 Completed in EOC15 19-Sep-02 11 1NI-053L-B MC-ISIL-1562-03.00 Completed in EOC17 08-Feb-05 12 1Nl-060L-B MC-ISIL-1 562-02.01 See Endnote 2 MC-ISIL-1 562-03.00 See Endnote 2 13 1NI-071 L-B MC-ISIL-1 562-01.00 Completed in EOC17 29-Apr-04 14 1NI-074L-B MC-ISIL-1562-03.00 Completed in EOC17 04-Oct-05 15 1NM-046L-B MC-ISIL-1572-01.01 Completed in EOC16 31 -Mar-04 16 1NS-023L-B MC-ISIL-1563-01.00 Completed in EOC17 23-Sep-04 Outage 3/EOC 17 Page 3 of 7 McGuire Unit 1 Revision 0 Section 6 - Third Ten-Year Interval December 7, 2005

VT-2 Examination Zone Boundary Dwg Completion Status Date 17 1NS-024L-B MC-ISIL-1563-01.00 Completed in EOC17 12-Auq-04 18 1NV-01 6L-B MC-ISIL-1 554-01.00 See Endnote 2 MC-ISIL-1 554-01.01 See Endnote 2 MC-ISIL-1 554-01.02 See Endnote 2 MC-ISIL-1554-02.00 See Endnote 2 MC-ISIL-1554-02.01 See Endnote 2 MC-ISIL-1 554-03.00 See Endnote 2 MC-ISIL-1 554-03.01 See Endnote 2 MC-ISIL-1554-05.00 See Endnote 2 MC-ISIL-1561-01.00 See Endnote 2 MC-ISIL-1562-01.00 See Endnote 2

_ MC-ISIL-1562-03.00 See Endnote 2 19 1NV-017L-B MC-ISIL-1554-01.00 See Endnote 2 MC-ISIL-1554-01.01 See Endnote 2 MC-ISIL-1554-01.02 See Endnote 2 MC-ISIL-1 554-01.03 Completed in EOC17 16-Oct-05 20 1NV-01 8L-B MC-ISIL-1 554-01.02 See Endnote 2 21 1NV-020L-B MC-ISIL-1554-01.02 Completed in EOC16 02-Apr-04 22 1NV-045L-B MC-ISIL-1554-03.00 Completed in EOC17 21 -Jan-05 23 1NV-051 L-B MC-ISIL-1554-03.01 See Endnote 2 24 1RN-004L-B MC-ISIL-1574-04.00 Completed in EOC17 29-Aug-05 25 1RV-002L-B MC-ISIL-1604-03.00 Completed in EOC17 29-Aug-05 26 1SA-035L-B MC-ISIL-1593-01.02 Completed in EOC17 22-Sep-04 27 1SM-006L-B MC-ISIL-1572-03.00 Completed in EOC17 08-Sep-05 MC-ISIL-1 591-01.01 Completed in EOC17 08-Sep-05 MC-ISIL-1593-01.00 Completed in EOC17 08-Sep-05 MC-ISIL-1593-01.03 Completed in EOC17 08-Sep-05 28 1SM-036L-B MC-ISIL-1593-01.00 See Endnote 2 MC-ISIL-1593-01.02 Completed in EOC17 08-Sep-05 MC-ISIL-1593-01.03 See Endnote 2 Outage 3/EOC 17 Page 4 of 7 McGuire Unit 1 Revision 0 Section 6 - Third Ten-Year Interval December 7, 2005

VT-2 Examination Zone Boundary Dwg Completion Status Date 29 1SM-037L-B MC-ISIL-1593-01.00 See Endnote 2 MC-ISIL-1593-01.03 See Endnote 2 30 1 YA-043L-B MC-ISIL-1617-01.00 Completed in EOC17 18-Sep-05 Risk Informed Segments (Category R-A) that receive a pressure test are required each refueling outage. Table 6-5 shows a completion status of the Risk Informed Segment pressure test zones conducted during refueling cycle EOC 17.

Table 6-5 Detailed Risk Informed Pressure Test Listina EOC17 -

Zone Segment Completion EOC 17 VT-2 Number Boundary Dwg Number Status Examination Date 1 1NC-070L-A MC-ISIL-1553-01.00 NC-18 Complete 16-Oct-05 2 NC-19 Complete 16-Oct-05 3 NC-20 Complete 16-Oct-05 4 NC-21 Complete 16-Oct-05 5 NC-23 Complete 16-Oct-05 6 3NC-86 Complete 16-Oct-05 7 NC-89 Complete 16-Oct-05 8 NC-90 Complete 16-Oct-05 9 MC-ISIL-1553-02.00 NC-054 Complete 16-Oct-05 10 NC-055 Complete 16-Oct-05 11 NC-056 Complete 16-Oct-05 12 MC-ISIL-1 554-01.00 NV-033A Complete 16-Oct-05 13 NV-033B Complete 16-Oct-05 14 NV-034A Complete 16-Oct-05 15 NV-034B Complete 16-Oct-05 16 NV-037 Complete 16-Oct-05 17 NV-038 Complete 16-Oct-05 18 NV-041A Complete 16-Oct-05 19 NV-041B Complete 16-Oct-05 20 NV-042A Complete 16-Oct-05 21 NV-042B Complete 16-Oct-05 Outage 3/EOC 17 Page 5 of 7 McGuire Unit 1 Revision 0 Section 6 - Third Ten-Year Interval December 7, 2005

EOC 17 Zone Segment Completion EOC 17 VT-2 Number Boundary Dwg Number Status Examination Date 22 1NC-070L-A MC-ISIL-1554-01.01 NV-030A Complete 16-Oct-05 23 NV-030B Complete 16-Oct-05 24 NV-032A Complete 16-Oct-05 25 NV-032B Complete 16-Oct-05 26 NV-035 Complete 16-Oct-05 27 NV-036 Complete 16-Oct-05 28 NV-039A Complete 16-Oct-05 29 NV-039B Complete 16-Oct-05 30 NV-040A Complete 16-Oct-05 31 NV-040B Complete 1*

16-Oct-05 32 MC-ISIL-1562-01.00 NI-068 Complete 16-Oct-05 33 NI-069 Complete 16-Oct-05 34 NI-070 I-Complete I 16-Oct-05 35 NI-071 Complete 16-Oct-05 t I 36 1NV-016L-B MC-ISIL-1554-01.00 NV-020H Complete 18-Oct-05 37 NV-020F Complete j 18-Oct-05 38 NV-020GA Complete 18-Oct-05 39 MC-ISIL-1554-01.01 NV-020AD Complete 18-Oct-05 40 NV-020B Complete 18-Oct-05 41 NV-020CA Complete 18-Oct-05 42 NV-020D Complete 18-Oct-05 43 NV-020EA Complete 18-Oct-05 3 NV-01 9AA Complete 18-Oct-05 44 MC-ISIL-1554-03.00 45 NV-019B Complete 18-Oct-05 46 NV-01 9D Complete 18-Oct-05 47 NV-020AB Complete 18-Oct-05 48 NV-020AC Complete 18-Oct-05 59 NV-021 A Complete 18-Oct-05 50 NV-021 B Complete 18-Oct-05 51 MC-ISIL-1 554-03.01 4NV-002AB Complete 18-Oct-05 52 NV-002D Complete 18-Oct-05 53 NV-019C Complete I 18-Oct-05 54 NV-01 9E Complete 18-Oct-05 55 1NV-017L-B MC-ISIL-1554-01.00 bNV-028 Complete 03-Nov-05 5NV-029 Complete 03-Nov-05 56 57 MC-ISIL-1554-01.01 bNV-026 Complete 03-Nov-05 5

_ NV-027 Complete 03-Nov-05 58 59 1NV-01 8L-B MC-ISIL-1554-01.02 NV-080A 4 Complete 16-Oct-05 60 NV-080B 4 Complete

-- I 16-Oct-05 61 NV-084A Complete 16-Oct-05 Outage 3/EOC 17 Page 6 of 7 McGuire Unit 1 Revision 0 Section 6 - Third Ten-Year Interval December 7, 2005

EOC 17 Zone Segment Completion EOC 17 VT-2 Number Boundary Dwg Number Status Examination Date 62 1NV-018L-B MC-ISIL-1554-01.02 NV-084B Complete 29-Nov-05 63 NV-084C Complete 29-Nov-05 64 1NV-045L-B MC-ISIL-1554-03.00 NV-002C Complete 18-Oct-05 65 NV-108A Complete 31 -Oct-05 66 NV-1 09 Complete 31-Oct-05 67 1 NV-0511-B I MC-ISIL-1554-03.01 INV-01 1A Complete 18-Oct-05 1All system pressure test requirements were met for the first inspection period. Some pressure tests were completed after EOC 17 but prior to December 1, 2005, the date ending the first period. Those pressure tests credited for the first period that are not listed in this summary report will be shown in the summary report for EOC 18.

2 The first period completion status for this pressure test will be shown in the summary report for EOC 18.

3Part of this segment is also shown on drawing MC-ISIL-1554-03.01 4Part of this segment is also shown on drawing MC-ISIL-1562-03.00 6Part of this segment is also shown on drawing MC-ISIL-1554-01.03 6Part of this segment is also shown on drawings MC-ISIL-1 554-03.01 and MC-ISIL-1 562-01.00 Outage 3/EOC 17 Page 7 of 7 McGuire Unit 1 Revision 0 Section 6 - Third Ten-Year Interval December 7, 2005