Nov. 23, 2005 Page 1
of 2
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2005-51584 USER INFORMIRION:
LACH E M Addr SA2 P
ne#: 254 EMPL#:028401 CA#:
0363 TRANSMITTAL INFORMATION:
TO:
11/23/2005 LOCATION:I FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM1 -
TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 11/05/2005 ADD MANUAL TABLE OF CONTENTS DATE: 11/22/2005 CATEGORY: DOCUMENTS TYPE: TRM1
,j ,, b-C) (
Nov. 23, 2005 Page 2
of 2
ID:
TEXT 2.2 REMOVE:
REV:3 ADD:
REV: 4 CATEGORY:
ID:
TEXT REMOVE:
DOCUMENTS 3.1.3 REV:1 TYPE: TRM1 ADD:
REV: 2 CATEGORY:
ID:
TEXT REMOVE:
DOCUMENTS B3.1.3 REV:1 TYPE: TRM1 ADD:
REV: 2 CATEGORY:
ID:
TEXT REMOVE:
DOCUMENTS TYPE: TRM1 LOES REV:23 ADD:
REV: 24 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL
- Manual Name
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date:
11/22/2005
-Procedure Name Rev Issue Date TEXT LOES 24 11/22/2005
Title:
LIST OF EFFECTIVE SECTIONS Change ID I Change Number TEXT TOC
Title:
5 02/04/2005 TABLE OF CONTENTS TEXT 1.1 0
11/18/2002
Title:
USE AND APPLICATION DEFINITIONS avi 4
11
-N-TEXT 2.1 1
02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGA TEXT 2.2 4
11/22/ OO5
Title:
PLANT PROGRAMS AND SETPOINTS I P SETPOINT TABLE TEXT 3.0 0
Title:
TECHNICAL REQUIREMENT FOCRCOERAT>ON (TRO)
APPLICABILITY & SURVEILLANCE (TRS)
APPLICABILITY TEXT 3.1.1 0
1/18/2002
Title:
REACTIVITY CONTROL S ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (AT"4=AR>)
INSTRUMENTATION TEXT 3.1.2
+
0 11/18/2002
Title:
REACTIV CK SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 2
11/22/2005
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM CHECK VALVE i
ACCUMULATORS INSTRUMENTATION &
TEXT 3.2.1 5
11/04/2005
Title:
CORE OPERATING LIMITS REPORT (COLR)
Page 1 of 15 Report Date: 11/22/05 Page I of 15 Report Date: 11/22/05
SSES MANUAL Manual Name:
TRM1 Manual q itilA TECHNICAL REOUIREMENTS MANUAL UNIT 1
SSES MANUAL t Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.2 0
11/18/2002
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 0
11/18/2002
Title:
REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4
Title:
12/14/2004 SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 0
11/18/2002
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.5.1 1
02/04/2005
Title:
EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 0
11/18/2002
@JTitle: EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/18/2002
Title:
EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS-TEXT 3.6.1 0
11/18/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0
11/18/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/18/2002 -
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0
11/18/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0
11/18/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN Page 3 of 15 Report Date: 11/22/05 Page 3 of 15 Report Date: 11/22/05
SSES MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 IV 0.
TEXT 3.7.2
Title:
PLANT TEXT 3.7.3.1
Title:
PLANT 0
11/18/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)
AND GROUND WATER LEVEL 0
11/18/2002 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2
Title:
PLANT TEXT 3.7.3.3
Title:
PLANT TEXT 3.7.3.4
Title:
PLANT TEXT 3.7.3.5
Title:
PLANT TEXT 3.7.3.6
Title:
PLANT TEXT 3.7.3.7
Title:
PLANT TEXT 3.7.3.8
Title:
PLANT.
TEXT 3.7.4
Title:
PLANT TEXT 3.7.5.1
Title:
PLANT TEXT 3.7.5.2
Title:
PLANT SYSTEMS SYSTEMS SYSTEMS SYSTEMS 1
08/24/2005 SPRAY AND SPRINKLER SYSTEMS 2
08/18/2005 C02 SYSTEMS 0
11/18/2002 HALON SYSTEMS 0
11/18/2002 FIRE HOSE STATIONS 0
'I 0
11/18/2002 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0
11/18/2002 SYSTEMS FIRE RATED ASSEMBLIES 4
09/08/2005 SYSTEMS FIRE DETECTION INSTRUMENTATION 0
11/18/2002 SYSTEMS SOLID RADWASTE SYSTEM 0
11/18/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/18/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GASMIXTURE Page 4 of 15 Report Date: 11/22/05 Page 4 of 15 Report Date: 11/22/05
SSES MANUAL 4
f Manual Name:
TRM1 Kanual
Title:
TECHNICAL REQUIREMENTS MANUAL'UNIT 1 kw TEXT 3.7.5.3
Title:
PLANT SYSTEMS 0
11/18/2002 LIQUID HOLDUP TANKS TEXT 3.7.6 1
03/01/2005 i
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 0
11/18/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8 1
12/14/2004
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 0
11/18/2002
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC
-EXT 3.7.10 Yi
Title:
PLANT SYSTEMS 1
12/14/2004 SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.8.1
Title:
ELECTRICAL PROTECTIVE TEXT 3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT 3.8.2.2
Title:
ELECTRICAL AUTOMATIC 1
02/04/2005 POWER PRIMARY CONTAINMENT PENETRATION DEVICES CONDUCTOR OVERCURRENT 1
12/14/2004 POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 2
12/14/2004 I
POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
PROTECTION -
TEXT 3.8.3
Title:
ELECTRICAL TEXT 3.8.4
Title:
ELECTRICAL TEXT 3.8.5
Title:
ELECTRICAL 0
11/18/2002 POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES 0
11/18/2002 POWER 24 VDC-ELECTRICAL POWER SUBSYSTEM 0
11/18/2002 POWER DEGRADED VOLTAGE PROTECTION Page 5 of 15 Report Date: 11/22/05 Page 5 of 115 Report Date: 11/22/05
SSES MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.6 0
11/18/2002
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.9.1 0
11/18/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/18/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/18/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 0
11/18/2002
Title:
MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 0
11/18/2002
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 0
11/18/2002
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
C>
TEXT 3.10.4
Title:
MISCELLANEOUS LEADING 0
11/18/2002 EDGE FLOW METER (LEFM)
TEXT 3.11.1.1
Title:
RADIOACTIVE TEXT 3.11.1.2
Title:
RADIOACTIVE TEXT 3.11.1.3
Title:
RADIOACTIVE TEXT 3.11.1.4
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 0
11/18/2002 LIQUID EFFLUENTS CONCENTRATION 0
11/18/2002 LIQUID EFFLUENTS DOSE 0
11/18/2002 LIQUID WASTE TREATMENT SYSTEM 1
12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION Q
Page 6 of 15 Report Date: 11/22/05 Page 6 of 15 Report Date: 11/22/05
a SSES MANUAL 7 Manual Name:
TRM1 "anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.5
Title:
RADIOACTIVE 1
12/14/2004 RADIOACTIVE LIQUID EFFLUENTS PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1
Title:
RADIOACTIVE TEXT 3.11.2.2
Title:
RADIOACTIVE TEXT 3.11.2.3
Title:
RADIOACTIVE FORM TEXT 3.11.2.4
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS.
EFFLUENTS EFFLUENTS 2
08/24/2005 DOSE RATE 0
11/18/2002 DOSE -
NOBLE GASES 0
11/18/2002 DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0
11/18/2002 GASEOUS RADWASTE TREATMENT SYSTEM tEXT 3.11.2.5
%w
Title:
RADIOACTIVE TEXT 3.11.2.6
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS 1
05/20/2005 VENTILATION EXHAUST 2
12/14/2004 RADIOACTIVE GASEOUS TREATMENT SYSTEM EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3
Title:
RADIOACTIVE TEXT 3.11.4.1
Title:
RADIOACTIVE TEXT 3.11.4.2
Title:
RADIOACTIVE TEXT 3.11.4.3
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 0
11/18/2002 TOTAL DOSE 1
12/14/2004 MONITORING PROGRAM 1
12/14/2004 LAND USE CENSUS 0
11/18/2002 INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 1
Title:
LOADS CONTROL PROGRAM 0
11/19/2002 CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL Page 7 of 15 Report Date: 11/22/05 Page 7 of 15 Report Date:-11/22/05
SSES MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 v
- 6
TEXT 3.12.2 0
11/19/2002
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT B3.0
Title:
APPLICABILITY TEXT B3.1.1 0
11/19/2002 BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY 0
11/19/2002 I
Title:
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT B3.1.3 2
11/22/2005
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION L)
TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1
Title:
CORE OPERATING L TEXT B3.3.1
Title:
INSTRUMENTATION TEXT B3.3.2
Title:
INSTRUMENTATION TEXT B3.3.3
Title:
INSTRUMENTATION TEXT B3.3.4
Title:
INSTRUMENTATION IMITS 0
11/19/2002 BASES CORE OPERATING LIMITS REPORT (COLR) 0 11/19/2002 BASES RADIATION MONITORING INSTRUMENTATION 0
11/19/2002 BASES SEISMIC MONITORING INSTRUMENTATION 1
02/04/2005 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 1
07/06/2005 BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION Q."
Page 8 of 15 Report Date: 11/22/05 Page 8 of 15 Report Date: 11/22/05
SSES MANUAL Manual Name: TRM1
'Manual
Title:
TECHNICAL RE TEXT B3.3.5
Title:
INSTRUMENTATION TEXT B3.3.6
Title:
INSTRUMENTATION TEXT B3.3.7
Title:
INSTRUMENTATION TEXT B3.3.8
Title:
INSTRUMENTATION TEXT B3.3.9
Title:
INSTRUMENTATION
"'EXT B3.3.10 k6-9
Title:
INSTRUMENTATION TEXT B3.3.11
Title:
INSTRUMENTATION
- QUIREMENTS MANUAL UNIT 1 0
11/19/2002 BASES THIS PAGE INTENTIONALLY LEFT BLANK 3
10/19/2005 BASES TRM ISOLATION ACTUATION INSTRUMENTATION 0
11/19/2002 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1
10/22/2003 '
BASES TRM REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION 1
11/22/2004 BASES LPRM UPSCALE ALARM INSTRUMENTATION 0
11/19/2002 BASES REACTOR RECIRCULATION PUMP MG SET STOPS 1
10/22/2003 BASES MVP ISOLATION INSTRUMENTATION TEXT B3.4.1
Title:
REACTOR TEXT B3.4.2
Title:
REACTOR TEXT B3.4.3
Title:
REACTOR TEXT B3.4.4
Title:
REACTOR TEXT B3.4.5
Title:
REACTOR 0
11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 0
11/19/2002 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 0
11/19/2002 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0
11/19/2002 COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0
11/19/2002 COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Page 9 of 15 Report Date: 11/22/05 Page 9 of 15 Report Date: 11/22/05
SSES KMMUAL e
Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.5.1
Title:
ECCS AND RC:
TEXT E3.5.2
Title:
ECCS AND RC:
TEXT B3.5.3
Title:
ECCS AND RC:
TEXT B3.6.1
Title:
CONTAINMENT TEXT B3.6.2
Title:
CONTAINMENT INDICATION TEXT B3.6.3
Title:
CONTAINMENT TEXT B3.6.4
Title:
CONTAINMENT TEXT B3.7.1
Title:
PLANT SYSTEI TEXT B3.7.2
Title:
PLANT SYSTE]
TEXT B3.7.3.1
Title:
PLANT SYSTE]
TEXT B3.7.3.2
Title:
PLANT SYSTE)
TEXT B3.7.3.3
Title:
PLANT SYSTE)
I I
I 0
11/19/2002
[C BASES ADS MANUAL INHIBIT 0
11/19/2002
[C BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION 0
11/19/2002
11/19/2002 BASES VENTING OR PURGING 0
11/19/2002 BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION 0
11/19/2002 BASES SUPPRESSION POOL ALARM INSTRUMENTATION 1
12/14/2004 BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES 0
11/19/2002 IS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTJTOWN) 0 11/19/2002
[S BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL 0
11/19/2002
[S BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM 1
08/24/2005 IS BASES SPRAY AND SPRINKLER SYSTEMS 0
11/19/2002 IS BASES C02 SYSTEMS Ut-x Page 10 of 15 Report Date: 11/22/05 Page 1 0 of 15 Report Date: 11/22/05
SSES MANUAL i Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.4
Title:
PLANT TEXT B3.7.3.5
Title:
PLANT TEXT B3.7.3.6
Title:
PLANT TEXT B3.7.3.7
Title:
PLANT TEXT B3.7.3.8
Title:
PLANT "EXT B3.7.4
Title:
PLANT TEXT B3.7.5.1
Title:
PLANT TEXT B3.7.5.2
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 HALON SYSTEMS 0
11/19/2002 FIRE HOSE STATIONS 0
11/19/2002 YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0
11/19/2002 FIRE RATED ASSEMBLIES 1
01/12/2004 FIRE DETECTION INSTRUMENTATION 0
11/19/2002 SOLID RADWASTE SYSTEM 0
11/19/2002 SYSTEMS BASES MAIN CONDENSER OFFGAS 0
11/19/2002 SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT 0
11/19/2002 SYSTEMS BASES LIQUID HOLDUP TANKS 1
03/01/2005 SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 0
11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS'PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 1
12/14/2004
Title:
PLANT SYSTEMS BASES SNUBBERS Page 11 of 15 Report Date: 11/22/05 Page 11 of 15 Report Date: 11/22/05
SSES MANUAL a
Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
&J TEXT B3.7.9 1
12/14/2004 Titles PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1
Title:
ELECTRICAL PROTECTIVE TEXT B3.8.2.1
Title:
ELECTRICAL CONTINUOUS 1
02/04/2005 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0
11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
TEXT B3.8.2.2
Title:
ELECTRICAL AUTOMATIC 1
09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
TEXT B3.8.3
Title:
ELECTRICAL TEXT B3,8.4
Title:
ELECTRICAL TEXT B3.8.5
Title:
ELECTRICAL TEXT B3.8.6
Title:
ELECTRICAL TEXT B3.9.1 0
11/19/2002 POWER BASES DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 0
11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0
11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION.
1 02/04/2005 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM Page 12 of 15 Report Date: 11/22/05 Page 12 of 15 Report Date: 11/22/05
a SSES MANUAL i Manual Name:
TRM1
-anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 k0*
TEXT B3.10.1
Title:
MISCELLANEOUS TEXT B3.10.2
Title:
MISCELLANEOUS TEXT B3.10.3
Title:
MISCELLANEOUS 0
11/19/2002 BASES SEALED SOURCE CONTAMINATION 0
11/19/2002 BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION 0
11/19/2002 BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4
Title:
MISCELLANEOUS 0
BASES LEADING 11/19/2002 EDGE FLOW METER (LEFM)
TEXT B3.11.1.1
Title:
RADIOACTIVE EFFLUENTS
-EXT B3.11.1.2 44w
Title:
RADIOACTIVE EFFLUENTS 0
BASES 11/19/2002 LIQUID EFFLUENTS CONCENTRATION 0
11/19/2002 BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.1.5
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.2.1
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.2
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.3
Title:
RADIOACTIVE EFFLUENTS b
PARTICULATES FORM 0
11/19/2002 BASES LIQUID RADWASTE EFFLUENT MONXTORING INSTRUMENTATION 0
11/19/2002 BASES RADIOACTIVE LIQUID PROCESS MONITORING 1
12/14/2004-BASES DOSE RATE 0
11/19/2002 BASES DOSE -
NOBLE GASES 0
11/19/2002 BASES DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN Page 13 of 15 Report Date: 11/22/05 Page 13 of 15 Report Date: 11/22/05
SSES MANUATL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 6t TEXT B3.11.2.4
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.5
Title:
RADIOACTIVE EFFLUENTS 0
BASES 3
BASES 11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM 05/20/2005 VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION 1
BASES 01/27/2004 RADIOACTIVE GASEOUS EFFLUENT MONITORING TEXT B3.11.3
Title:
RADIOACTIVE EFFLUENTS 0
BASES 11/19/2002 TOTAL DOSE TEXT B3.11.4.1 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL 0.W)
TEXT B3.12.2
Title:
LOADS CONTROL PROGRAM TEXT B3.12.3
Title:
LOADS CONTROL PROGRAM TEXT 4.1 0
11/19/2002 BASES HEAVY LOADS REQUIREMENTS 0
11/19/2002 BASES LIGHT LOADS REQUIREMENTS 0
08/31/1998 -
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0
08/31/1998
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION Page 14 of 15 Report Date: 11/22/05 Page 14 of 15 Report Date: 11/22/05
W SSES MANUAL t Manual Name:
TRX1 vanual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.3 i
Title:
TEXT 4.4
Title:
TEXT 4.5
Title:
TEXT 4.6
Title:
TEXT 4.7
Title:
ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0
08/31/1998 CONTROLS SAFETY LIMIT VIOLATION 0
08/31/1998 CONTROLS PROCEDURES & PROGRAMS 0
08/31/1998 CONTROLS REPORTING REQUIREMENTS 0
08/31/1998 CONTROLS RADIATION PROTECTION PROGRAM 0
08/31/1998 CONTROLS TRAINING Page 15 of 15 Report Date: 11/22/05 Page 15 of 15 Report Date: 11/22/05
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 24 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title I - Effective Date TOC TABLE OF CONTENTS 01/28/2005 1.0 2.0 USE AND APPLICATION Pages TRM /1.0-1 thlo.gh TRM i 1.0-3 10/04/2002 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 a d TRM l/2.0-3 Page TRM / 2.0-4 Page TRM I 2.0-5 Pages TRM / 2.0-6 and TRM 1 2.0-7 Page TRM / 2.0-8 Pages TRM I 2.0-9 through TRM /2,0-11 Pages TRM / 2.0-12 through TRM / 2.0-15 08/31/1998 01/28/2005 06/25/2002 04/02/1999 11115/2004 12/03/2004 11/15/2004 11/15/2005 4
el,,4;: 11
'2
.,,u 1
'op T! i d
L
$9 4M-
A
k 3.0 3.1 APPLICABILITY Pages TRM 13.0-1 and TRM / 3.0-2 Pages TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEML Pages 3.1-1 througy16y Pages TRM / 3.1-7 nT Pages TRM / 3.1-9 anrRM f9a Page TRM / 3.1-10.
CORE OPERATINg Igh T
Pages TRM~2 04/08/1999 03/15/2002 04/08/1999 t Irr INS 08/31/1998 11/15/2005 02/18/1999 02/1811999 07/07/1999 10/31/2005 I
3.2 38 3.3 INSTRU T 13NTATION 0
H Page TRMJ/33-1 t Ig! h f*3 Page TM / 3.3-1 4 RI ID YRM5t
/o3.3-1~
Pages TRM / 3.3-19 n TR T 3.3-1a Page TRM /3.3-13 Page TRM /3.3-13 I
Page TRM /3.3-14 Pages TRM /331 Pages TRM / 3.3-17 R
Pages TIRM / 3.3-19 g
132 Pages TRM I 3.3-17a2R2 Pages TRM / 3.3-22; 3 through TRM I 3.3-22d Page TRM / 3.3-23 07/16/1999 11/28/2000 08/31/1998 12/17/1998 12/17/1998 06/02/2005 03/30/2001 09/13/2005 12/14/1998 10/22/2003 06/27/2001 06/14/2002 10/22/2003 11/15/2004 11/15/2004 12/03/2004 SUSQ EHAN A -
UNIT I T M /
OES 1 EF ECT VE D TE 1/15 200 SUSQUEHANNA - UNIT I TRM llLO5S-1 EFFECTIVE DATE 11/15/2005
SUSQUEHANNA STEAM ELECTRIC STATION, PPL Rev. 24 UST OF EFFECT7VE SECT7ONS (TECHNICAL REQUIREMENTS MANUAL)'
Section Title Effective Date Pages TRM / 3.3-24 and TRM / 3.3-25 Page TRM / 3.3-26 I
I 05/16/2003 10/22/2003 3.4 REACTOR COOLANT SYSTEM Pages 3.4-1through 3.4 Pages 3.4-6.through 3.4-11 Page TRM /3.4-12 Page 3.4-13 EMERGENCY CORE COOLING AND RCIC Page TRM /13.5-1' Pages 3.5-2 and 3.5-3 Page TRM / 3.54' Pages 3.5-5 through 3.5-7 10/23J1998 08/3111998 12/03/2004 08/31/1998 3.5 01/28/2005 08/31/1998 04/17/2000 08/31/1998 3.6 3.7 CONTAINMENT,,
Pages 3.6-1 tirough 3.6-3 Page TRM /f3.654 L Page 3.6-5 Pages TRM 1 3.6-6, through TRM / 3.6-8 08/31/1998 01/07/2002 08/31/1998 12/31/2002 PLANT SYSTEMS Pages 3.7-1'through 3.7-3 Pages TRM / 34 though TRM / 3.7-8 Pages TRM / 3.7-9,and TRM / 3.7-10 Page TRM /I37-11 Pages TRM / 3.7-12 and TRM / 3.7.13 Page TRM / 3.7-14 Pages TRM / 3.715 through TRM / 3.7-27 Pages TRM ' 3.7-28 and TRM / 3.7-29 Page TRs I3 7-;3_
'Pages T A i nd TRM 3.7-32 Page TR /1 7--T Pages
/ 3 Page T37 Pages Td A rE Oh TRM / 3.7-37 Pages 3
/3 ro h.7-40 Pages Tr V
~
n TRM /3.7-41 a Pages 3.
' 4 Page TIF/~-
Pages P '- thph 378 Page~ F Pages I
.~
d TM /3.7-51 PagesI PageTR/
Page TR
/.7544
.08/31/1998
.08/02/1999 08/16/2005 12/29/1999 08/02/1999 08/09/2005 08/02/1999 08/09/2005 08/25/2005 11/16/2001 01/09/2004 11/16/2001 10/05/2002 02/01/1999 08/31/1998 02/14/2005 08/31/1998 12/03/2004 10/13/1998 03/08/2003 03/09/2001 12/03/2004 04/15/2003 07/29/1999 SUSQUEHANNA
- UNIT I TRM / LOES-2 EFFECTIVE DATE 11/15/2005 SUSQUEHANNA - UNIT 1 TRM / LCIES-2 EFFECTIVE DATE 11/15/2005
SUSQUEHANNA STEAM ELECTRIC STATION-PPL Rev. 24 IJST OF EFFECTIVE SECTION$. (TECHNICAL REQUIREMENTS MANUAL)
Section TitLe
.. I I i
k Effective Date m
i!1I I I i
'0
- 1 i I I iIi
,i i
A i
I i
iI
'I ii13
, t 3.8 I, 1 I, ?
- 1.
I
'i i
ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 through TRM I 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM I 3.8-7 through TRM / 3.8-10 Page TRM /3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Pages TRM / 3.8-15 through TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page 3.8-20 Pages TRM I 3.8-21 through TRM /3.8-23 Pages 3.8-24 and 3.8-25 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 04/02/2002
,01/28/2005 04/02/2002 1;2/03/2004 08/10/2004 12/03/2004 08/31/1998 04/02/2002 08/31/1998 04102/2002 08/31/1998 06/06/1999 08/31/1998 08/31/1998 08/31/1998 03/08/2003 06/05/2002 04/07/2000 04/17/2002 3.9 3.10 3.11 MISCELLANEOUS Pages 3.10-1 through 3.10-4 Page TRM / 3.10-5 I !
Page TRM / 3.10-6
- f -
Page TRM / 3.10-7 Page TRM / 3.10-8 II I I RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page 3.11-13 Page TRM / 3.11-14 I Pages 3.11-15 and.i1t-16 Pages 3.11-17 and 3. 1118 Page TRM / 3.11-19 Pages 3.11-20 and 3. 121 Page TRM / 3.11-22 Pages TRM / 3.11-23 ad TRM / 3.11-24 Page 3.11-25 Pages TRM / 3.11-2 hrough TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM / 3.11.3 rug TRM / 3.11.32 Pages 3.11-33 throu 37 Page TRM / 3.11-38 Pages 3.11-39 throu 44 Page TRM / 3.11-45 Pages 3.11-46 and 3.11-47 08/31/1998 12/03/2004 08/31/1998 09/011998 1t03/2004 09/01/1998 08/31/1998 08/15/2005 08/31/1998 04/02/2002 05/13/2005 09/01/1998 01/21/2004 12/03/2004 01/21/2004 08/31/1998 12/03/2004 08/31/1998 12/03/2004 08/31/1998 SUSQUEHANNA
- UNIT I TRM / LOES-3 EFFECTIVE DATE 11/15/2005 SUSQUEHANNA - UNIT 1 TRIVI / LOES-3 EFFECTIVE DATE 11/15/2005
SUSQUEHANNA STEAM ELECTRIC STATION
- PPL Rev. 24 USTOFEFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date i
3.12 le : 1
- j, I
I
!ro I H II ic ii.I i
E 1 1 i, I 1 1.
LOADS CONTROL PROGRAM Pages TRM 1 3.12-1 through TRM / 3.12-5 02/05/1999 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/199 SUSQUEHANNA - UNIT 1 TRM I LOES-4 EFFECTIVE DATE 11/15/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 24 LiT OFEFFECT7VESECTIONS (TECHNICALREQUIREMENTSMANUAL)
Section Title
- Effective Date B 3.0 B3.1 B 3.2 APPLICABILITY BASES Pages B 3.0-1 through B $.01 Pages TRM / B 3.0-11 through TRM;/ B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM I B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM ! B 3.1-7 Page TRM / B 3.1-8 08/31/1998 03/15/2002 07/13/1999 08/31/1998 11/15/2005 02/18/1999 I
CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 B 3.4 B3.5 B 3.6 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page B 3.3-2 Pages TRM / B 3.3-3 and TRM / B 3.3-3A Pages TRM / B 3.3-4 through TRM / B 3.3-6 Pages TRM I B 3.3-7 through TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM I B 3.3-12 Page'TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM I B 3.3-14b Pages TRM /.B 3.3-15 and TRM/ B 3.3-16' Page TRM / B 3.3-17 i
Pages TRM / B 3.3-17a through TRM / B 3.3-17f Pages TRM / B3.3-18 and TRM / B 3.3-19 Page TRM / B 3.3-20 Page TRM r B 3.3-21 REACTOR COOLANT SY'TEM BASES Pages B 3.4-1 through 3.4-4 Page TRM / B 3.4-5 Page B 3.6 ECCS AND R IC BASES Pages B 3.5-1 through 3.5-5 04/07/2000 08/31/1998 01/31/2005 06/02/2005 03/30/2001 08/31/1998 09/13/2005 12103/2004 06/25/2002 06/14/2002
, 06/14/2002
-10/22/2003 11/15/2004 11/15/2004 05/16/2003 10/2212003 05/16/2003 08/31/1998 10/15/1999 08/31/1998 08/31/1998 CONTAINME IT BASES Page TRM B 3.6-1 Page TRM B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 07/26/2001 02/01/1999 08/31/1998 09/23/1999 01/07/2002 SUSQUEHANNA - UNIT 1 TRM / LOES-5 EFFECTIVE DATE 11/15/2005
SUSQUEHANNA STEAM ELECTRIC STATION" PPL Rev. 24 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section : Title Effective Date" B 3.7 B3.8 B.3.9 B 3.10 Pages TRM / B 3.6-'
Pages B.3.6-7 through TRM f B 3.6-11 PLANT SYSTEMS ASES11 Pages B 3.7-1 and B 3.7
'2 Pages TRM / B 3.7-3 through TRM I B 3.7-5 Page TRM l B 3.6'-6, Pages TRM I B 3.77, and TRM / B 3.7-7a Pages TRM I B 3.7-8 through TRM
.B 3.7-10 Page TRM / B 3.7-a Pages TRM / B 3.7-11,' and TRM I1B 3.7-1 Ia Pages TRM / B 3.7-12through TRM I B 3.7-14 Page TRM / B 3.7-14a Page TRM I B 3.7-14b Pages TRM / B 3.715,and TRM'I B 3.7-16 Pages B 3.7-17 t*rdughB 3.7r20 '
Pages TRM/B 3. 21 and TRMiB 3.7-21a Pages TRM/B 3.72 and TRM/B 3.7-23 Page B 3.7-24 I
Page TRM / B 3.
i75:
Pages B 3.7-26 t ro:ugh 'B 3.7-30 Page TRM I B 3.731' Page TRM / B 3.'32 Page TRM / B 3.733 Page TRM / B 3.734, Page TRM / B 3.7.35 12/03/2004 12/31/2002 08/31/1998 08/02/1999 08/16/2005 08/02/1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 04/07/2000 08/31/1998 12/03/2004 08/31/1998 12/03/2004 03/09/2001 04/15/2003 12/03/2004 07/05/2000 ELECTRICAL POWE=
ASES Page TRM / B 3. 3-1'Bel, Pages TRM / B 3.8-2 'and TRM / B 3.8-2a Page TRM / B 3. 3 Page TRM / B 3.
Page TRM / B 3. 3 Page TRM / B3.-4 Page TRM /B 3.~- 1 Pages TRM / B 3
'o t Iugh TR B 3.
Page TRM I B 3.t 17j 04/02/2002 01/28/2005 04/02/2002 04/02/2002 08/10/2004 04/02/2002 08/31/1998 04/02/2002 01/28/2005 B-16 REFUELING OPE Pages B 3.9-1 08/31/1998 MISCELLANEOUS I
S Pages B 3.10-1 t 3.102, Page TRIM / B3.I Pages TRM I B 3.1
,an TRM B 3.10-5 Pages TRM / B 3.10-6 and TRM B 3.10-7 08/31/1998 03/08/2003 08/23/1999 04/17/2002 SUSQUEHANNA~~~~~~~~
~
UN T IT M L E -
F E T V A E 1 / 5 2 0 SUSQUEHANNA - UNIT I j
i i i ; I ! 1 TRM / LOES-6 EFFECTIVE DATE 11/15/2005
SUSQUEHANNAXSTEAM ELECTRIC STATION:
PF UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
IL Rev. 24 Section Title Effective Date B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B3.1 1-1 through B3.11-9 PageTRMfB33.11-l10 Pages TRN/B 3.11-11 and TRMIB 3.11-1a Pages TRI'WB 3.11-12 and TRM/B 3.11-13 Page TRM F B 3.11-14 PageTRMJB3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM I B 3.11'20a Page TRM/B 3.11-0a Pages TRI B 3.11-1through TRM / B 3.11.23a Pages TR!l./ B 3.11-24!and TRM /IB 3.11-25 Pages B 3.11-26 through B 3.11-28 Page TRM I B 3.11-296 and TRM I B 3.11-30 Pages B 3.7-31 througIl B 3.7-35:
PageTRMWIB3.11-36, B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 trough TRM / B 3.12-3 08/30/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/30/1998 04/02/2002 04/02/2002 05/13/2005 01/21/2004 08/30/1998 12/03/2004 8/30/19998 02/12/1999 02/05/1999 TRM1 text LOES 11t9/05 SUSQUEHANNA - UNIT I TRM / LOES-7 EFFECTIVE DATE 11/15/2005
Instrument Trip Setpoint Program PPL Rev. 4 2.2 2.0 PLANT PROGRAMS AND SETPOINTS 2.2 Instrument Trip Setpoint Table The Instrument Trip Setpoint Limits in Table 2.2-1 are the Trip Setpoint value limits that were contained in the Instrumentation Setpoint tables for protection systems and other functions important to safety that, were included in the scope of the original Standard Technical Specifications. Actual instrument setpoints are established utilizing the Allowable Values specified in the Technical Specifications and Technical Requirements. Allowable Values are established in the Reference LCOs and TROs identified in this Table. TRO referencesiare enclosed in square brackets.
Instrumentation process setpoints for the listed subsystems and trip functions are set consistent with the Trip Setpoint Limit Column of Table 2.2-1. Actual setpoints are established in accordance with engineering procedures.
Alarm setpoints and other non-protection system trip settings as may be found in the Technical Specifications or in the Technical Requirements are not included in this table.
Reference NDAP-QA-1 104 Setpoint Change Control SUSQUEHANNA - UNIT 1 TRM / 2.0-5 EFFECTIVE DATE 04/02/1999
Instrument Trip Setpoint Program PPL Rev. 4 2.2 TABLE 2.2-1 (Page 1 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO]
RIP FUNCTION TRIP SETPOINT 2.2.1 Reactor Protection 2.2.1.1 3.3.1.1 Intermediate Range Monitor, Neutron Flux -
- 120/125 divisions of full scale High 2.2.1.2 3.3.1.1 Average Power iange Monitor, Neutron Flux
- 15% of RATED THERMAL POWER
- High Setdown 2.2.1.3 3.3.1.1 Average Power Range Monitor, Flow Biased See COLR - TRO 3.2 Simulated Thermal Power - High Two Loop Operation 2.2.1.4 3.3.1.1 Average Power Range Monitor, Flow Biased See COLR - TRO 3.2 Simulated Thermal Power-High Single Loop Operation 2.2.1.5 3.3.1.1 Average Power Range Monitor, Flow Biased
- 113.5% of RATED THERMAL Simulated Thernal Power - High Flow POWER Clamped 2.21.6 3.3.1.1 Average PoWer Range Monitor, Fixed Neutron
- 118% of RATED THERMAL Flux -High POWER 2.2.1.7 3.3.1.1 Reactor Vessel Steam Dome Pressure - High
- 1087 psig 2.2.1.8 3.3.1.1 Reactor VeselWater Level - Low, Level 3
Ž13.0 inches a 2.2.1.9 3.3.1.1 Main Steam Isolation Valve - Closure
- 10% closed 2.2.1.10 This Section Not Used 2.2.1.11 3.3.1.1 Drywell Pressure-High
- 1.72 psig 2.2.1.12 3.3.1.1 Scram Discharge Volume Water Level-High -
-65 gallons Level Transmiiter 2.2.1.13 3.3.1.1 Scram Discharge Volume Water Level -.High -
- 61 gallons Float Switchl 2.2.1.14 3.3.1.1 Turbine Stop Valve - Closure
- 5.5% dosed 2.2.1.15 3.3.1.1 Turbine Control Valve Fast Closure, Trip 2500 psig Oil Pressure-Low (continued)
-See Figure 2.2-1
[
SUSQUEHANNA - UNIT 1 TRM t/ 2.0-6 EFFECTIVE DATE 11/15/2004
PPL Rev. 4 Instrument Trip Setpoint Program 2.2 t
- ITABLE 2.2-1 (Page 2 of 8) l INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.1.16 OPRM Instrumentation 2 2.1.16.1 3.3.1.3 Sp Cell Signral Amplitude See COLR -TRO 3.2 22.1.16.2 3.3.1.3 N2 Confirmation Count Permissive See COLR -TRO 3.2 2r2.1.16.3
[3.3.9]
TOL Period Confirmation Tolerance 0.10 see 2l2.1.16.4
[3.3.9]
TasAveraging Filter 5 sec 2,2.1.16.5
[3.3.9]
Fc;Conditioning Filter Cutoff Frequency 1.5 Hz 2,2.1.16.6
[3.3.9]
Tmin Minimum Oscillation Period 1.0 sec 2.2.1.16.7
[3.3.9]
Tmax Maximum Oscillation Period 3.5 sec 2.2.1.16.8
[3.3.9]
Noise Floor Peak Discrimination Threshold I
2,2.1.16.9
[3.3.9]
Minimum LPRM/CeIl Cell Operability 2
Requirement 2,2.1.16.10
[3.3.9]
S1 Peak Threshold Setpoint 1.20 2,2.1.16.11
[3.3.9]
S21ValleyThreshold Setpoint 0.85 2.2.1.16.12
[3.3.9]
Smaax Max. Amplitude Trip Setpoint 1.50 2.2.1.16.13
[3.3.9]
DR3 Growth Rate Factor Setpoint 1.60 2.2.1.16.14
[3.3.9]
TI Io S1 to S2 Timer Range 0.5 sec 2,2.1.16.15
[3.3.9]
TI hhi Ito S2 Timer Range 1.75 sec 2.2.1.16.16
[3.3.9]
T2 lo S2 to(S3 or Smax) Timer Range 0.5 sec 2.2.1.16.17
[3.3.9]
T2 hi S2 to(S3 or Smax) Timer Range 1.75 sec 2.2.2 Isolation Actuation Instrumentation 2,2.2.1 Primary Containment Isolation 2.2.2.1.1 3.3.6.1 Reactor Vessel Water Level Low, Level 3 2 13.0 inches(a' 2.2.2.1.2 3.3.6.1 Reactor Vessel Water Level Low Low, Level 2 2 -38.0 inches(a) 2.2.2.1.3 3.3.6.1 Reactor Vessel Water Level Low Low Low, 2 -129 inchesca)
Level 1 2.2.2.1.4 3.3.6.1 Drywell Pressure - High s 1.72 psig 2.2.2.1.5 3.3.6.11[3.3.-6 SGTS Exhaust Radiation - High 23.0 mRlhr 2.2.2.1.6
[3.3.6]
Main Steam Line Radiation - High High s 15 x full power background I__
'without hydrogen injection (continued)
') See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-7 EFFECTIVE DATE 11/15/2004
Instrument TripSetpoint Program
- -. i 2.2 PPL Rev. 4 TABLE 2.2-1 (Page 3 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO
[TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.2.2 2.2.2.2.1 2.2.2.2.2 2.2.2.2.3 2.2.2,2.4 2.2.2.2.5 Secondary Containment Isolation 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 Reactor Vessel Water Level - Low Low, Level 2 Drywell Pressure - High Refuel Floor High Exhaust Duct Radiation -
High Railroad Access Shaft Exhaust Duct Radiation ! High Refuel Floor Wall Exhaust Duct Radiation -
High 2-38.0 inches(a)
- 1.72 psig
- 18 mR/hr
- 5 mR/hr
- 21 mR/hr 2.2.2.3 Main Steam Line Isolation 2.2.2.3.1 2.2.2.3.2 2.2.2.3.3 2.2.2.3.4 2.2.2.3.5
- Apl 2.2.2.3.6 2.2.2.3.7 2.2.2.3.8 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1
[3.3.6]
[3.3.6]
Reactor Vessel Water Level - Low Low Low, Level 1 Main Steam Line Pressure - Low Main Steam Line Flow - High Condenser Vacuum - Low Reactor Building Main Steam Line Tunnel Temperature - High This Section Not Used Reactor Building Main Steam Line Tunnel A Temperature - High Turbine Building Main Steam Tunnel Temperature - High 2 -129 inches(')
2 861 psig
- 113 psid 2 9.0 inches Hg vacuum
- 1770F
-*990F
- 1970F 2.2.2.4 Reactor Water Cleanup System Isolation 2.2.2.4.1 2.2.2.4.2 2.2.2.4.3 2.2.2.4.4 2.2.2.4.5 2.2.2.4.6 2.2.2.4.7 2.2.2.4.8 2.2.2.4.9 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1
[3.3.6]
3.3.6.1
[3.3.6]
3.3.6.1
[3.3.6]
Reactor Vessel Water Level - Low Low, Level 2 RWCU A Flow - High RWCU Flow - High RWCU Penetration Area Temperature - High RWCU Penetration Room Area A Temperature
- High RWCU Pump Area Temperature -.High RWCU Pump Room Area A Temperature -
High RWCU He t Exchanger Area Temperature -
High RWCU Hea t Exchanger Room Area A Temperature - High 2-38 inches~s)
- 59gpm
- 462gpm
- 131VF s 690F
- 147 0F
- 690F
- 1476F
- 69 0F (continued)
(a) See Figure 2.2-1 SUSQUEHJANNA - UNIT 1 TRM I 2.0-8 EFFECTIVE DATE 12/03/2004
- I I
I I
.i Instrument Trip Setpoint Program
- 1.i
!. ~' I-2.2 TABLE 2.2-1 (Page 4 of 8).
l INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO
[TRO]
TRIP FUNCTION TRIP SETPOINT z
iii; i
i I
i-3 1 1 i,
2,2.2.5 i
Reactor Core Isolation Cooling System Isolation,
il 1, i
I i
i.
Ir iI I, I
,i z
Ii P:
j
2.2.2.5.1 3.3.6.1 RCIC Steam Line A Pressure - High 2.2.2.5.2 3.3.6.1 RCIC Steam Supply Line Pressure - Low 2.2.2.5.3 3.3.6.1 RCIC Turbine 'Ehaust Diaphragm Pressure
-High 2,2.2.5.4 3.3.6.1 RCIC Equipment Room Temperature - High 2.2.2.5.5 3.3.6.1 RCIC Pipe Routing Area Temperature - High 2.2.2.5.6 3.3.6.1 RCIC Emergency Area Cooler Temperature -
High 2.2.2.5.7 3.3.6.1 DryweuPressure-High 2.2.2.5.8
[3.3.6]
RCIC Equipment Room A Temperature - High 2.2.2.5.9
[3.3.6]
RCIC Pipe Routing Area A Temperature -
High 2.2.2.6 High Pressure Coolant Injection System Isolation 5 188 inches H20 2 60 psig s 10.0 psig y 167°F S 167°F s 167°F 5 1.72 psig s 89°F S 89°F s 370 inches H20 2 104 psig S 10 psig s 167°F S 167°F
- 167°F S 1.72 psig s 89°F S 89°F 2.2.2.6.1 2.2.2.6.2 2.2.2.6.3 2.2.2.6.4 e
2.2.2.6.5 2.2.2.6.6 2.2.2.6.7 2.2.2.6.8 2.2.2.6.9 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1
[3.3.6]
[3.3.6]
HPCI Steam Une A Pressure - High HPCI Steaf n Supply Line Pressure - Low HPCI Turb ne Exhaust Diaphragm Pressure -
High J
HPCI Equiarnent Room Temperature - High HPCI Emergency Area Cooler Temperature -
High I
HPCI Pipe!Routing Area Temperature - High Drywell Pressure - High HPCI Equipment Room A Temperature - High HPCI Pipe Routng Area A Temperature -
High tem Isolation Reactor I y ter Level - Low, Level 3 Reactor f II team Dome Pressure - High RHR Flow.
67 2.2.2.7 Shutdown Cooling/Sysl 2.2.2.7.1 3.3.6.1 2.2.2.7.2 3.3.6.1
- 2.2.2.7.3
[3.3.6]
2.2.3 ECCS Actuation 2.2.3.1 Core Spray System 2.2.3.1.1 3.3.5.1 2.2.3.1.2 3.3.5.1 2.2.3.1.3 3.3.5.1 2 13.0 inches(8) s 98 psig S 25,000 gpm Level - Low Low Low, 2 -129 inches(a) ih S
- 1.72 psig Dome Pressure - Low 2 413, s 427 psig (a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-9 EFFECTIVE DATE 11/15/2004
. Instrument Trip Setpoint Program
-I 2.2 PPL Rev. 4 TABLE 2.2-1 (Page 5 of 8) i INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO
[TROJ TRIP FUNCTION TRIP SETPOINT 2.2.3.2 LPCI Mode of RHR System 2.2.3.2.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, 2 -129 inches(a)
Level 1 2.2.3.2.2 3.3.5.1 Drywell Pressure - High 5 1.72 psig 2.2.3.23 3.3.5.1 Reactor Vessel Steam Dome Pressure - Low,
Ž413, s 427 psig injection permissive 2.2.3.2.4 3.3.5.1 Reactor Vessel Steam Dome Pressure - Low, 2Ž236 psig, decreasing Recirculation Discharge Valve permissive 2.2.3.3 HPCI System 2.2.3.3.1 3.3.5.1 Reactor Vessel Water Level - Low Low, 2 -38 inches~a)
Level 2 2.2.3.3.2 3.3.5.1 Drywell Pressure - High S 1.72 psig 2.2.3.3.3 3.3.5.1 Condensate Storage Tank Level - Low 2 36.0 inches above tank bottom 2.2.3.3.4 3.3.5.1 Reactor Vessel Water Level - High, Level 8 s 54 inches 2.2.3.4 Automatic Depressurization System (ADS) 2.2.3.4.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, 2 -129 inches Level I 2.2.3.4.2 3.3.5.1 Drywell Pressure - High s 1.72 psig 2.2.3.4.3 3.3.5.1 ADS Timer I102seconds 2.2.3.4.4 3.3.5.1 Core Spray Pump Discharge Pressure - High 2 135, 5 155 psig 2.2.3.4.5 3.3.5.1 Low Pressure Coolant Injection Pump 2 121, s 129 psig Discharge Pressure - High 2.2.3.4.6 3.3.5.1 Reactor Vessel Water Level - Low, Level 3 2 13 inches Confirmatory 2.2.3.4.7 3.3.5.1 ADS Drywell Pressure Bypass Timer
< 420 seconds 2.2.3.5 Loss of Power - ECCS Actuation 2.2.3.5.1 4.16kv ESS Bus Undervoltage (Loss of Voltage < 20%)
2.2.3.5.1.1 3.3.8.1 Bus Undervoltage 2Ž823.2, s 856.8 Volts 2.2.3.5.1.2 3.3.8.1 Time delay 2 0.4, s 0.6 seconds (continued)
° See Figure 2.2-1 SUSQUEHANNA - UNIT I TRM / 2.0-10 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Program PPL Rev. 4 -2.2 2.2.3.5.21 2.~2.3.5.2.1 2.2.3.5.2.2 2.2.3.5.3 2.2.3.5.3.1 2.2.3.5.3.2 2.2.3.5.3.4 2.2.3.5.4 2.2.3.5.4.1 i
2.2.3.5.4.1 2.2.3.5.5.2 2.2.4 2.2.4.1 2.2.4.1 2.2.5 2.2.5.1 2,2.5.2 2.2.5 2.2.6.1 2.2.6.2 2.2.6.3
.TABLE 2.2-1 (Page 6 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCQ
' ROT tRIP FUNCTION 4.16kV ES$Bus Jndervoltage (Degraded Voltage < 65%)
$0 3Bus Undervoltage I 3.3.8.1 Time delay 4.16kV ESS Bus Undervoltage (Degraded Voltage, < 93%)
3.3.8.1 Bus Undervoltage 3.3.8.1 Time Delay(Non-LOCA) 3.3.8.1 Time Delay (LOCA) 480V ESS Bus 0B565 Undervotage (Degrad ed Voltage, < 65%)
(3.8.5]
480V Basis
[3.8.5]
Time Delay 480V ESS Bus OB565 Undervoltage (Degraded Voltage, < 92%)
[3.8.5]
480V Basis
[3.8.5]
Time Delay ATWS Alternate Rod Injectionland Recirculation Pump Trip 3.3.4.2/[3.1.1]
Reactor Vessel, Water Level - Low Low, Level 2 3.3.4.243.1.1]
Reactor Vessel Steam Dome Pressure - High End of Cycle Recirculation Pump Trip 3.3.4.1 Turbine Stop Valve-Closure 3.3.4.1 Turbine Control Valve - Fast Closure Reactor Core Isolation Cooling System Actuation 3.3.5.2 Reactor Vessel Water Level - Low Low, Level 2 3.3.5.2 Reactor Vessel Water Level - High, Level 8 3.3.5.2 l; condensate Storage Tank Level - Low TRIP SETPOINT 2 2641.1, s 2748.9 Volts 2 2.7, s 3.3 seconds 2 3829.3, s 3906.7 Volts 2 4 minute, 30 seconds s 5 minute, 30 seconds 2 9, s 11 seconds 2 308.9, < 315.1 Volts 2 4.5, s 5.5 seconds 2 437.6,
- 446.4 Volts 9, 511 seconds 2-38 inches(a) s 1135 psig s 5.5% dosed 2 500 psig 2 -38 inches(a) s 54 inches' 2 36.0 inches above tank bottom (continued)
(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-11 EFFECTIVE DATE 11/15/2004
PPL Rev. 4 Instrument Trip Setpoint Program i:
- 2.2 TABLE 2.2-1 (Page 7 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO
[TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.7 Control Rod Block 2.2.7.1 Rod Block Monitor 2.2.7.1.1 3.3.2 2.2.7.1.2 3.3.2 Low Power Range Upscale - Two Loop Operation I
Low Power Range Upscale - Single Loop Operation X
Downscale F I 0.58W + 52%
s 0.58W + 47%
5%
2.2.7.1.3 2.2.7.2 APRM 2.2.7.2.1
[3.1.3]
2.2.7.2.2 2.2.7.2.3 2.2.7.2.4 2.2.7.2.5 1[3.1.3]
[3.1.3]
[3.1.3]
[3.1.3]
Flow Biased Simulated Thermal Power-High
- Two Loop Operation Flow Biased Simulated Thermal Power High
- Single Loop Operation Flow Biased Simulated Thermal Power High
- High Flow Clamped Downscale Neutron Flux - High Setdown See COLR - TRO 3.2 See COLR - TRO 3.2 S 108% of RATED THERMAL POWER
Ž 5% of RATEDTHERMAL POWER
- 12% of RATED THERMAL POWER 2.2.7.3 Source Range Monitors 2.2.7.3.1 2.2.7.3.2 2.2.7.4
[3.1.3]
[3.1.3]
- [3.1.3]
[3.1.3]
Upscale Downscale
- 2E5 cps 2 3.0 cps I
2.2.7.4.1 2.2.7.4.2 Upscale Downscale s 108/125 divisions of full scale 2 5/125 divisions of full scale 2.2.7.5 Scram Discharge Volume 2.2.7.5.1 2.2.7.6
[3.1.3]
Water Level - High s 35.9 gallons Reactor Coolant System Recirculation Flow 2.2.7.6.1 2.2.7.6.2
[3.1.3]
[3.1.3]
Upscale Comparator 114%
- 10% flow deviation I
- (continued)
"With a signal-to-noise ratio 2 2, or within the limits of Figure 2.2-2.
I SUSQUEHANNA - UNIT 1 TRM / 2.0-12 EFFECTIVE DATE 11/15/2005
Instrument Trip Setpoint-Program I
-; ; : ?
= 2.2 PPL Rev. 4 IF TABLE 2.2-1 (Page 8 of 8)
I INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO
[TRO]
TRIP FUNCTION TRIP SETPOINT
[TR 0.
11]
I11 1
Hi i
I IIII
- Ii 2.2.8.1.
2.2.8.1.1 LCKtOAbb 3.3.7.1 3.3.7.1I 3.3.7.1 1, 3 3:
. 7: I,
i: 3.3.7*.1, f 2.2.8.1.2 2.2.8.1.-3 2.2.8.1.4 2.2.8.1.5 2.2.9 2.2.9.1 2.2.10 0 ;2.2.10.1 X 53.3.7.1 3.3, 7,1 Feedwater/Main Turbi 3,;
, 3.3.2.'2 3,, 'i2'N MVP Isolation 3-.3.11]
Main Control Room Outside Air Intake Radiation Monitor Reactor Vessel Water Level - Low Low, Level 2 Drywell Pressure - High Refuel Floor High Exhaust Duct Radiation
- High Railroad Access Shaft Exhaust Duct Radiation - High Refuel FloorWall Exhaust Duct Radiation
- High e Trip System Actuation Reactor Vessel Level - High Main Steam Line Radiation - High High s 5 mR/hr 2 -38.0 inches(a) s 1.72 psig S 18 mR/hr s5mR/hr S 21 mR/hr s 54.0 inches(a)
S 15 x full power background without hydrogen injection
() See Figure:
- ]f:,1ff S i, iT
- -,:" '. 1.
- ,,..4 -
. S i Q.-
i,
.b:
- -i1 '.
2.2-10, k..
- 2 7 '
' ".D
' j i 1'1,
- S 'j f < -
,E
.,:.,X1:1'
,.,f,..,:.,,
,j,;1,
': "'a". l l 0 ' ',,.W -:
. i-q:',0q l i 0 ' ir fj I
?'102g¢' 1:j f:...E.
'd '
' I'l S: '. '
' :ye ',
' i.'
'. ' 1
- i, I
a, ' '
i - - !,i c Sat S X
!1 i :I i[r I;
.1I IIII I
I!I!
- iI iII II
.1; SUSQUEHANNA - UNIT 1 TRM / 2.0-13 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Table 2.2 PPL Rev. 4
- I
. I1 I,
N,,
i}
t M 1
4 F[aIRE 2. 2-1 REACTOR VESSEL WATER LEVEL SUSQUEHANNA - UNIT 1 TRM / 2.0-14 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Table PPL Rev. 4
.2.2 Instrument Trip.0 Setpoint Table 2.2
' t,:'
3 2.8 2.6 2.4 2.2 2
ina-0 z
0 Cn 1.8 1.6 1.4 1.2 10.
0.8
~--
-Ac eptable----
Not Accept ble 0.6 0.4 0.2 0
_ 2 6
10 14 i8 22 26 30 Signal-to-oise Ratio Figure 212 p Setpoint Yersus Signal-to-Noise Ratio Minimum SRM Tril SUSQUEHANNA - UNIT 1 TRM / 2.0-15 EFFECTIVE DATE 11/15/2005
Control Rod Block Instrumentation I I: "
3.1.3 PPL Rev. 2 i
II II kw ,i
I 3.1 Reactivity Control Systems 3.'1.3 Control Rod Block Instrumentation TRO 3.1.3 i
APPLICABILIT i
CTI ACTIONS I.
The control rod block instrumentation for each function in Table 3.1.3-1 shall be OPERABLE.
f:
According to Table 3.1.3-1 NOTE Separate condition entry is allowed for each channel A. One or more required i
channels inoperable.
A.1 Enter the Condition referenced in Table 3.1.3-1for the channel.
Immediately B. As required by Required B.1 Place at least one inoperable 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery Action A. 1 and referenced channel in! the tripped of loss, of trip in Table 3.1.3-1.
condition.
capability AND B.2 Place the inoperable channel 7 days in theltripped condition.
C. As required by Required C.1 Place the inoperable channel 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Action A.1 and referenced in the trpped condition.
in Table 3.1.3-1.
D. Required Actions and D.1 Suspend Control Rod Immediately Completion Time of withdrawal.
Conditions B or C not met.
SUSQUEHANNA - UNIT 1 3.1-5 EFFECTIVE DATE 8/31/1998
PPL Rev. 2 Control Rod Block Instrumentation 3.1.3
. 1
, l, i
- 1.
i I TECHNICAL REQUIREMENT SURVEILLANCE
,-~~~ ~
S:
-- 1:
D 1.,
- i
- 1. Refer to Table 3.1.$-1 Functior.
-I NOTES----
to determine which TRSs apply for each Control Rod Block i,12 I
I-II',3
Neutron detectors may be excluded from CHANNEL CALIBRATION.
tWhen a channel is paced in an inoperable status solely for performance of required Surveillances, enty i'to associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> providei at least one other OPERABLE channel in the same trip system is monitoring that parameter.
I I
SURVEILLANCE FREQUENCY lRS3.1 Perform CIANNEL CHECK 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRSi3.1.3.2 I; i----NOTE-12 hours Only requited to be performed when MLFPD is greater then FRTP. (ITS LCO 3.2.4 -APRM gain and setpoints" Required Action A.1)
Verify APIRM Setpoints or gains are adjusted for the calculated MFLPD.
1i3 i F
I 7
TRS 3.1.3.3 Peform HANNEL FUNCTIONAL TEST 7 days TS3.1.3.4 Perform C bNEFUNCTIONAL TEST 92 days i
TRS 3.1.3.5 P
erform H ANNES CALIBRATION 184 days TRS 3.11.3.6 Perform HANNE¶._ CALIBRATION 24 months TRS 3.1.3.7 Peform GIC SSTEM FUNCTIONAL TEST 24 months SUSQUEHANNA - UNIT 1 3.1-6 EFFECTIVE DATE 8/31/1998
PPL Rev. 2 Control Rod Block Instrumentation f 1 3.1.3 TABLE 3.13-1 (Page 1 of 2)
CONTROL ROD BLOCK INSTRUMENTATION APPLICABLE REQUIRED CONDITIONS MODES OR OTHER CHANNELS REFERENCED FROM SPECIFIED PER TRIP dREQUIRED ACTION SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION A.1 REQUIREMENTS VALUE
- 1. APRM
- a. NeutronFlux-2, 5' 4
B TRS3.1.3.1 s14%RTP High Setdown TRS 3.1.3.4 TRS 3.1.3.5
- b. Flow Biased 1
4 B
TRS3.1.3.1 See COLR Simulated Thermal TRO 3.2 )
Power - High TRS 3.1.3.2 TRS 3.1.3.4 TRS 3.1.3.5
- c. FixedNeutronFlux 1
4 B
TRS3.1.3.1 S111%RTP
- High TRS 3.1.3.4 TRS 3.1.3.5
- d. Downscale 1
4 B
TRS 3.1.3.1 2 3% RTP TRS 3.1.3.4 TRS 3.1.3.5
- e. Inop 1,2 4
B TRS3.1.3.4 NA 53 4
B TRS 3.1.3.4 NA
- 2. Source Range Monitors
- a. DetectornotfullIn 2(
3 B
TRS3.1.3.3 NA TRS 3.1.3.7 Sa) 2 B
- b. Upscale 2<d) 3 B
TRS 3.1.3.3 s 3.3E5 cpsl TRS 3.1.3.6 TRS 3.1.3.7 5@
2 B
TRS 3.1.3.3 s 3.3E5 cps l TRS 3.1.3.6 TRS 3.1.3.7
- c. Inop 2<d) 3 B
B TRS 3.1.3.3 NA TRS 3.1.3.7 (continued)
(a)
(b)
(C)
(d) 0)
When performing Shutdown Margin Demonstration per Technical Specification 3.10.8.
See COLR for single loop operation per Technical Specification 3.4.1, Recirculation Loops Operating When not automatically bypassed with SRM counts 2 100 cps or the IRM channels on range 3 or higher.
When not automatically bypassed with IRM channels on range 8 or higher.
With any control rod withdrawn from a core cell containing one or more fuel assemblies.
SUSQUEHANNA - UNIT 1 TRM /3.1-7 EFFECTIVE DATE 11/15/2005
PPL Rev. 2 Control Rod Block Instrumentation I
I I. i 3.1.3 I
I i
F E TABLE 3.1.3-1 (Page 2 of 2)
CONTROL ROD BLOCK INSTRUMENTATIONS APPLICABLE REQUIRED CONDITIONS MODES OR OTHER CHANNELS REERENCED FROM SPECIFIED PER TRIP REQUIRED ACTION SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION A.1 REQUIREMENTS VALUE
- d. Downscale
- 2) 3 B
TRS3.1.3.3 21.8cps° l TRS 3.1.3.6 TRS 3.1.3.7 5°@
2 B
TRS3.1.3.3 a1.8cpsM l TRS 3.1.3.6 TRS 3.1.3.7
- a. Detectornotfullin 2,5")
6 B
TRS3.1.3.3 NA TRS 3.1.3.7
- b. Neutron Flux -
2,50 6
B TRS3.1.3.1 S11lo125 High TRS 3.1.3.3 divisions of full TRS 3.1.3.5 scale TRS 3.1.3.7
- c. Inop 2,5@
6 B
- d. Downscale 20 50@
6 B
TRS 3.i.3.1 31125 dvisions TRS 3.1.3.3 of full scale TRS 3.1.3.5 TRS 3 1.3.7-
- 4. Scram Discharge 1,2, 5t) 2 C
TRS 3.1.3.4 S 36.5 gallons Volume Water'Level -
TRS 3.1.3.6 High
- 5. Reactor Coolant System Recirculation Flow
- a. Upscale 1
2 C
TRS3.1.3.4 S117/125 TRS 3.1.3.5 divisions of full scale
- b. Inop 1
2 C
TRS3.1.3.4 NA
- c. Comparator 1
2 C
TRS 3.1.3.4 s511%flow TRS 3.1.3.5 deviation (e)
(a (h)
(i) a)
When not automatically bypassed with IRMs on range 3 or higher.
With a signal-to-noise ratio 2 2, or within the limits of TS Figure 3.3.1.2-1.
When not automatically bypassed with IRM channels on range 1.
When more than one control rod is withdrawn. Not applicable to control rods removed per Technical Specification 3.10.5 or 3.10.6.
Not required when eight or fewer fuel assemblies (adjacent to the SRMs) are in the core.
With any control rod withdrawn from a core cell containing one or more fuel assemblies.
I SUSQUEHANNA - UNIT 1 TRM / 11-8 EFFECTIVE DATE 11/15/2005
-Control Rod Block Instrumentation PPL Rev. 2 B 3.1.3 B 3.1.3 Control Rod Block Instrumentation BASES TRO The Control Rod Block Instrumentation is a portion of the Reactor Manual Control System (RMCS), which upon receipt of input signals from other systems and subsystems, inhibits movement or selection of control rods (Reference 1). The purpose of the Control Rod Block function is to avoid conditions that would require Reactor Protection System (RPS) action if allowed to proceed.
The specific Functions associated with the TRM Control Rod Block Instrumentation are identified in Table 3.1.3-1 and are discussed below.
- 1.
Average Power Ranae Monitors (APRM)
- 2.
Source Range Monitors (SRM)
- 3.
Intermediate Range Monitors (IRM)
The same grouping of neutron monitoring equipment (APRM, SRM, and IRM) that is used in the RPS is also used in the rod block circuitry. Half of the total monitors (APRM, SRM, and IRM) provide inputs to one of the two RMCS rod block logic circuits and the remaining half provide inputs to the other RMCS rod block circuit.
The APRM rod block settings are varied as a function of Reactor Coolant System (RCS) recirculation flow. The settings are selected so that all the neutron monitoring rod blocks are sufficient to avoid an' RPS action.
Mechanical switches in the SRM and IRM detector drive systems provide the position signals used to indicate that a detector is not fully inserted.
The SRM minimum count rate Allowable Value is discussed in the TS Bases for SR 3.3.1.2.4.
- 4.
Scram Discharge Volume Water Level - High Scram Discharge Volume Water Level - High signals are provided as inputs into both rod block logic circuits. Both rod block logic circuits sense when the high water level scram trip for the Scram Discharge Volume is bypassed.
The rod block from Scram Discharge Volume Water Level - High comes from one of two float type level switches installed in each of two scram discharge instrument volumes. The second float switch in each instrument volume provides a control room annunciation of increasing level below the' level at which a rod block occurs.
(continued)
SUSQUEHANNA - UNIT 1 TRM / B3.1-5 EFFECTIVE DATE 11/15/2005
I Control Rod Block Instrumentation
~-
IB 3.1.3 PPL Rev. 2 B 3.1.3 Control Rod Block Instrumentation B
,AS BASES 1 4i TRO (continued)
- 5.
RCS Recirculation Flow RCS Recirculation Flo w units A and C provide upscale, inoperable, and comparator rod block trip signals to one of the two RMCS rod block logic systems, and RCS Recirculation Flow units B and D provide these same trip signals to the other rod block logic system.
I The RCS Recirculation Flow converter upscale or inoperative alarm assures that no control rod is withdrawn unless the recirculation flow converters, which are necessary or the power operation of the Rod Block Monitors, are OPERABLE. The recirculation flow comparator alarm or inoperative Functions assure that no control rod is withdrawn unless the difference between the outputslof the fow converters is within limits and the comparator is in service.
ACTIONS The ACTIONS are defined to ensure proper corrective measures are taken in response to the inoperable components.
TRS The TRSs are performed at the specified Frequency to ensure that the Control Rod Block Function is maintained OPERABLE.
TRS 3.1.3.1. TRS 3.1.3.3. TRS 3.1.3.4. TRS 3.1.3.5. TRS 3.1.3.6. and TRS 3.1.3.7 Control Rod Block Inrt ment tion surveillances are performed consistent with the Bases for th comparable channels in LCO 3.3.1.1 and LCO 3.3.1.2.
TRS 3.1.3.2 TRS 3.1.3.2 is neces fry to ensure the APRM Flow Biased Simulated Thermal Power-High rod kBctck is properly adjusted for MFLPD. The MFLPD is required t e lculated and compared to Fraction of Rated Thermal Power (FR FrARM gain or setpoints to ensure the reactor is operating within the Esmtions of the safety analysis (LCO 3.2.4, "APRM Gain and Setpoints"e This T S is only required when MFLPD is greater than FRTP. The 12-ur Frequency is required because more rapid changes in power dint butiori are typically expected.
(continued)
I I
I I
I SUSQUEHANNA - UNIT I TRM / B 3.1-6 EFFECTIVE DATE 11/15/2005
PPL Rev. 2 Control Rod Block Instrumentation B 3.1.3 B 3.1.3 'Control Rod Block Instrumentation BASES (continued)
RE ER NCE
- 1.
FSAR Section 7.7.1 I
I I
SUSQUEHANNA - UNIT 1 TRM / B3.1-7 EFFECTIVE DATE 11/15/2005
Nov. 23, 2005 Page 1
of 3
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2005-51680 SER INF O TION:
G ROSE M Add NUCSA2 one#:
4 EMPL#:028401 CA#:
0363 TRANSMITTAL INFORMATION:
TO:
ewErcum4.i-RU£E9 11/23/2005 LOCATION:
FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION:
'REPLACE' directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 11/07/2005 ADD MANUAL TABLE OF CONTENTS DATE: 11/22/2005 CATEGORY: DOCUMENTS TYPE: TRM2
Nov. 23, 2005 Page 2
of 3
ID:
TEXT 2.2 REMOVE:
REV:4 ADD:
REV: 5 CATEGORY:
DOCUMENTS TYPE: TRM2 ID:
TEXT 3.1.1 REMOVE:
R 0
ADD:
REV:
(
REMOVE:
- 2 CATEGORY.
DOCUMENTS TYPE:
TRM2 ID:
TEXT 3.1.3 REMOVE:
REV:1 ADD:
REV: 2 CATEGORY: DOCUMENTS YPE: TRM2 ID:
TEXT B3.1.1 REMOVE:
REV: 0 ADD:
REV:
REMOVE:
R :2 CATEGORY:
DOCUMENTS TYPE: TRM2 ID:
TEXT B3.1.3 REMOVE:
REV:1 ADD:
REV: 2
Nov. 23, 2005 Page 3
of 3
CATEGORY:
ID:
TEXT REMOVE:
DOCUMENTS TYPE: TRM2 LOES REV:21 ADD:
REV: 22 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL
- USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL
' Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents 1!
Issue Date:
11/22/2005 Procedure Name Rev Issue Date TEXT LOES 22 11/22/2005
Title:
LIST OF EFFECTIVE SECTIONS Change ID Change Number TEXT TOC
Title:
5 02/04/2005 TABLE OF CONTENTS E'
S At 3/4' N!,1 TEXT 1.1 0
11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1
Title:
TEXT 2.2
Title:
1 02/04/2005 PLANT PROGRAMS AND SETPOINTS PLANT PROG(AMS N'
5 11/2205 PLANT PROGRAMS AND SETPOINTS P SETPOINT TABLE TEXT 3.0 0
2
Title:
APPLICABILITY TECHNIC FOR OPERATION (TRO)
APPLICABILITY TEXT 3.1.1 1
l 1/19/2002
Title:
REACTIVITY CONTROL MS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWt-ARV STRUMENTATION TEXT 3.1.2 C
0 11/19/2002
Title:
REACTIVIT CONOL SYSTEMS eeS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 2
Title:
REACTIVITY CONTROL SYSTEMS TEXT 3.1.4 0
Title:
REACTIVITY CONTROL SYSTEMS CHECK VALVE TEXT 3.2.1 4
Title:
CORE OPERATING LIMITS CORE 11/22/2005 CONTROL ROD BLOCK INSTRUMENTATION 11/19/2002 CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND 04/14/2005 OPERATING LIMITS REPORT (COLR)
Page 1 of 15 Report Date: 11/22/05 Page 1 of 15 Report Date: 11/22/05
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 I(
TEXT 3.3.1
Title:
INSTRUMENTATION TEXT 3.3.2
Title:
INSTRUMENTATION TEXT 3.3.3
Title:
INSTRUMENTATION TEXT 3.3.4
Title:
INSTRUMENTATION 0
11/19/2002 RADIATION MONITORING INSTRUMENTATION 0
11/19/2002 SEISMIC MONITORING INSTRUMENTATION 0
11/19/2002 METEOROLOGICAL MONITORING INSTRUMENTATION 1
07/06/2005 TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 2
10/19/2005
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION 0J TEXT 3.3.7
Title:
INSTRUMENTATION 0
11/19/2002 MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9
Title:
INSTRUMENTATION TEXT 3.3.10
Title:
INSTRUMENTATION TEXT 3.3.11
Title:
INSTRUMENTATION TEXT 3.4.1
Title:
11/22/2004 LPRM UPSCALE ALARM INSTRUMENTATION 1
12/14/2004 REACTOR RECIRCULATION PUMP MG SET STOPS 1
10/22/2003 MVP ISOLATION INSTRUMENTATION 0
11/19/2002 SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY (0W Page 2 of 15 Report Date: 11/22/05 Page 2 of 15 Report Date: 11/22/05
SSES MANUAL t Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 r
'TEXT 3.4.2
Title:
REACTOR TEXT 3.4.3
Title:
REACTOR TEXT 3.4.4
Title:
REACTOR TEXT 3.4.5
Title:
REACTOR TEXT 3.5.1 o
11/19/2002 COOLANT SYSTEM STRUCTURAL INTEGRITY 0
11/19/2002 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 1 12/14/2004 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0
11/18/2002 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1
02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT g'EXT 3.5.2 0
11/19/2002
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0
11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)
SHUTDOWN Page 3 of 15 Report Date: 11/22/05 Page 3 of 15 Report Date: 11/22/05
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 4
Qm, TEXT 3.7.2
Title:
PLANT TEXT 3.7.3.1
Title:
PLANT TEXT 3.7.3.2
Title:
PLANT TEXT 3.7.3.3
Title:
PLANT 0
11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)
AND GROUND WATER LEVEL 0
11/19/2002 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 1
08/24/2005 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 2
08/18/2005 SYSTEMS C02 SYSTEMS TEXT 3.7.3.4
Title:
PLANT 0
SYSTEMS HALON SYSTEMS 11/19/2002 TEXT 3.7.3.5
Title:
PLANT TEXT 3.7.3.6
Title:
PLANT TEXT 3.7.3.7
Title:
PLANT TEXT 3.7.3.8
Title:
PLANT 0
11/19/2002 SYSTEMS FIRE HOSE STATIONS 0
11/19/2002 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0
11/19/2002 SYSTEMS FIRE RATED ASSEMBLIES 4
09/08/2005
'SYSTEMS FIRE DETECTION INSTRUMENTATION U
TEXT 3.7.4
Title:
PLANT SYSTEMS 0
11/19/2002 SOLID RADWASTE SYSTEM TEXT 3.7.5.1 0
11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0
11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE Page 4 of 15 Report Date: 11/22/05 Page 4 of 15 Report Date: 11/22/05
SSES MANUAL V Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.3 0
11/19/2002
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 1
03/01/2005
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 0
11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 2
03/01/2005
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 0
11/19/2002
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1
12/14/2004 kw
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.8.1
Title:
ELECTRICAL PROTECTIVE 2
02/04/2005 POWER PRIMARY CONTAINMENT PENETRATION DEVICES CONDUCTOR OVERCURRENT TEXT 3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT 3.8.2.2
Title:
ELECTRICAL AUTOMATIC 1
12/14/2004 POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 2
12/14/2004 POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
PROTECTION -
TEXT 3.8.3
Title:
ELECTRICAL TEXT 3.8.4
Title:
ELECTRICAL TEXT 3.8.5
Title:
ELECTRICAL 0
11/19/2002 POWER DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 1
02/04/2005 POWER 24 VDC ELECTRICAL SUBSYSTEM 0
11/19/2002 POWER DEGRADED VOLTAGE PROTECTION Pe 5
o 1
R D
1 Page 5 of 15 Report Date: -11/22/05
SSES M4ANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.6 0
11/19/2002
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS COM1MUNICATIONS TEXT 3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 0
11/19/2002
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 0
11/19/2002
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 0
11/19/2002
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
\\e Qu.,
U(
TEXT 3.10.4
Title:
MISCELLANEOUS LEADING 0
11/19/2002 EDGE FLOW METER (LEFM)
TEXT 3.11.1.1
Title:
RADIOACTIVE TEXT 3.11.1.2
Title:
RADIOACTIVE TEXT 3.11.1.3
Title:
RADIOACTIVE TEXT 3.11.1.4
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 0
11/19/2002 LIQUID EFFLUENTS CONCENTRATION 0
11/19/2002 LIQUID EFFLUENTS DOSE 0
11/19/2002 LIQUID WASTE TREATMENT SYSTEM 1
12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION LI Page6' of 15 Report Date: 11/22/05 Page 6,
of 15 Report Date: 11/22/05
4 SSES AiNUAL 1 Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.2.1
Title:
RADIOACTIVE 2
08/24/2005 DOSE RATE EFFLUENTS TEXT 3.11.2.6
Title:
RADIOACTIVE 2
12/14/2004 RADIOACTIVE GASEOUS EFFLUENTS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.4.2
Title:
RADIOACTIVE TEXT 3.11.4.3
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS 1
12/14/2004 LAND USE CENSUS 0
11/19/2002 INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1
Title:
LOADS CONTROL PROGRAM TEXT 3.12.2 kai
Title:
LOADS CONTROL PROGRAM TEXT 3.12.3
Title:
LOADS CONTROL PROGRAM TEXT B3.0 0
11/19/2002 CRANE TRAVEL-SPENT FUEL STORAGE POOL 0
11/19/2002 HEAVY LOADS REQUIREMENTS 0
11/19/2002 LIGHT LOADS REQUIREMENTS 0
11/19/2002
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION JTRO) APPLICABILITY TEXT B3.1.1 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD TEXT B3.1.3 2
11/22/2005
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD AND CHECK VALVE TRANSIENT WITHOUT SCRAM ALTERNATE DRIVE (CRD) HOUSING SUPPORT BLOCK INSTRUMENTATION SCRAM ACCUMULATORS INSTRUMENTATION Page 7 of 15 Report Date: 11/22/05 Page 7 of 15 Report Date: 11/22/05
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.2.1 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR) ie
(,
TEXT B3.3.1
Title:
INSTRUMENTATION TEXT B3.3.2
Title:
INSTRUMENTATION TEXT B3.3.3
Title:
INSTRUMENTATION TEXT B3.3.4
Title:
INSTRUMENTATION TEXT B3.3.5
Title:
INSTRUMENTATION TEXT B3.3.6
Title:
INSTRUMENTATION TEXT B3.3.7
Title:
INSTRUMENTATION TEXT B3.3.8
Title:
INSTRUMENTATION TEXT B3.3.9
Title:
INSTRUMENTATION TEXT B3.3.10
Title:
INSTRUMENTATION TEXT B3.3.11
Title:
INSTRUMENTATION Page 8 of 15 0
11/19/2002 BASES RADIATION MONITORING INSTRUMENTATION 0
11/19/2002 BASES SEISMIC MONITORING INSTRUMENTATION 1
02/04/2005 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 1
07/06/2005 BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION 0
11/19/2002 BASES THIS PAGE INTENTIONALLY LEFT BLANK 3
10/19/2005 BASES TRM ISOLATION ACTUATION INSTRUMENTATION 0
11/19/2002 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1
10/22/2003 BASES TRM RPS INSTRUMENTATION 1
11/22/2004 BASES LPRM UPSCALE ALARM INSTRUMENTATION 0
11/19/2002 BASES REACTOR RECIRCULATION PUMP MG SET STOPS 1
10/22/2003 BASES MVP ISOLATION INSTRUMENTATION (C)
Q(~
Report Date: 11/22/05
A SSES MANUAL t Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.4.1
Title:
REACTOR TEXT B3.4.2
Title:
REACTOR TEXT B3.4.3
Title:
REACTOR TEXT B3.4.4
Title:
REACTOR TEXT B3.4.5
Title:
REACTOR 0
11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 0
11/19/2002 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 0
11/19/2002 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0
11/19/2002 COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0
11/19/2002 COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.5.1 0
11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 0
11/19/2002
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 0
11/19/2002
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1
Title:
CONTAINMENT TEXT B3.6.2
Title:
CONTAINMENT INDICATION TEXT B3.6.3
Title:
CONTAINMENT TEXT B3.6.4
Title:
CONTAINMENT 0
11/19/2002 BASES VENTING OR PURGING 0
11/19/2002 BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION 0
11/19/2002 BASES SUPPRESSION POOL ALARM INSTRUMENTATION 1
12/14/2004 BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Page 9 of 15 Report Date: 11/22/05 Page 9 of,15 Report Date: 11/22/05
SSES MANAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 4'
TEXT B3.7.1
Title:
PLANT TEXT B3.7.2
Title:
PLANT TEXT B3.7.3.1
Title:
PLANT TEXT B3.7.3.2
Title:
PLANT 0
11/19/2002 SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 11/19/2002 SYSTEMS BASES ULTIMATE HEAT SINK (UHS)
GROUND WATER LEVEL 0
11/19/2002 SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM 1
08/24/2005 SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3
Title:
PLANT TEXT B3.7.3.4
Title:
PLANT SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 C02 SYSTEMS 0
11/19/2002 HALON SYSTEMS C
TEXT B3.7.3.5
Title:
PLANT I
0 11/19/2002 SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6
Title:
PLANT 0
11/19/2002 YARD FIRE HYDRANTS AND SYSTEMS BASES HYDRANT HOSE HOUSES TEXT B3.7.3.7
Title:
PLANT TEXT B3.7.3.8
Title:
PLANT TEXT B3.7.4
Title:
PLANT TEXT B3.7.5.1
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 FIRE RATED ASSEMBLIES 1
01/12/2004 FIRE DETECTION INSTRUMENTATION 0
11/19/2002 SOLID RADWASTE SYSTEM 0
11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR Page 10 of 15 Report Date: 11/22/05 Page 10 '
of 15 Report Da~te: 11/22/05
Pi SSES MANUAL I Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.5.2
Title:
PLANT TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT TEXT B3.7.7 0
11/19/2002 SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0
11/19/2002 SYSTEMS BASES LIQUID HOLDUP TANKS 1
03/01/2005 SYSTEMS BASES ESSW PUMPHOUSE VENTILATION 0
11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 1
Title:
PLANT SYSTEMS BASES SNUBBERS 12/14/2004 T'EXT B3.7.9 1
12/14/2004 4i
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3..7.10 1
12/14/2004
Title:
PLANT.SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1
Title:
ELECTRICAL PROTECTIVE TEXT B3.8.2.1
Title:
ELECTRICAL CONTINUOUS 1
02/04/2005 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0
11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
TEXT B3.8.2.2
Title:
ELECTRICAL AUTOMATIC 1
09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
TEXT B3.8.3
Title:
ELECTRICAL TEXT B3.8.4
Title:
ELECTRICAL 0
11/19/2002 POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES 0
11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER'SUBSYSTEM Page 11 of 15 Report Date: 11/22/05 Page 11 of 15 Report Date: 11/22/05
SSES MANUAL I'
Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.8.5 0
11/19/2002
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1
02/04/2005
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2
-0 11/19/2002
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION 4ISFSI)
C, C)
TEXT B3.10.4 0
Title:
MISCELLANEOUS BASES LEADING TEXT B3.11.1.1 0
Title:
RADIOACTIVE EFFLUENTS BASES TEXT B3.11.1.2 0
Title:
RADIOACTIVE EFFLUENTS BASES TEXT B3.11.1.3 0
Title:
RADIOACTIVE EFFLUENTS BASES 11/19/2002 EDGE FLOW METER (LEFM) 11/19/2002 LIQUID EFFLUENTS CONCENTRATION 11/19/2002 LIQUID EFFLUENTS DOSE 11/19/2002 LIQUID WASTE TREATMENT SYSTEM
%u-Page 12 of 15 Report Date: 11/22/05 I
Page 12 of 15 Report Date: 11/22/05 1
SSES MANUAL I Manual Name:
TRM2 v'anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.1.4
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.1.5
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.2.1
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.2
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.3
Title:
RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4
Title:
RADIOACTIVE EFFLUENTS 0
11/19/2002 BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 0
11/19/2002 BASES RADIOACTIVE LIQUID PROCESS MONITORING 1
12/14/2004 BASES DOSE RATE 0
11/19/2002 BASES DOSE -
NOBLE GASES 0
11/19/2002 BASES DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN 0
11/19/2002 BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 3
05/20/2005
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION 1
01/27/2004 BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING TEXT B3.11.3
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.1
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.2
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.3
Title:
RADIOACTIVE EFFLUENTS 0
11/19/2002 BASES TOTAL DOSE 1
12/14/2004 BASES MONITORING PROGRAM 0
11/19/2002 BASES LAND USE CENSUS 0
11/19/2002 BASES INTERLABORATORY COMPARISON PROGRAM Page 13 of 15 Report Date: 11/22/05 Page 13 of 15 Report Date: 11/22/05
SSES NAdUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Q"W i TEXT B3.12.1
Title:
LOADS CONTROL TEXT B3.12..2
Title:
LOADS CONTROL TEXT B3.12.3
Title:
LOADS CONTROL 0
11/19/2002 PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL 0
11/19/2002 PROGRAM BASES HEAVY LOADS REQUIREMENTS 0
11/19/2002 PROGRAM BASES LIGHT LOADS REQUIREMENTS TEXT 3.11.1.5
Title:
RADIOACTIVE TEXT 3.11.2.2
Title:
RADIOACTIVE TEXT 3.11.2.3
Title:
RADIOACTIVE FORM TEXT 3.11.2.4
Title:
RADIOACTIVE TEXT 3.11.2.5
Title:
RADIOACTIVE TEXT 3.11.3
Title:
RADIOACTIVE TEXT 3.11.4.1
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
12/14/2004 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 0
11/19/2002 DOSE -
NOBLE GASES 0
11/19/2002
£ DOSE -
11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM 1
05/20/2005 VENTILATION EXHAUST TREATMENT SYSTEM 0
11/19/2002 TOTAL DOSE 1
12/14/2004 MONITORING PROGRAM TEXT 4.1 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION Page 14 of 15 Report Date: 11/22/05 Page 14 of 15 Report Date: 11/22/05
e SSES MANUAL
) Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.3
Title:
TEXT 4.4
Title:
TEXT 4. 5
Title:
TEXT 4.6
Title:
TEXT 4.7 Titles Page 15 of ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0
09/27/2003 CONTROLS SAFETY LIMIT VIOLATION 0
09/27/2003 CONTROLS PROCEDURES & PROGRAMS 0
09/27/2003 CONTROLS REPORTING REQUIREMENTS 0
09/27/2003 CONTROLS RADIATION PROTECTION PROGRAM 0
09/27/2003 CONTROLS TRAINING a
15 Report Date: 11/22/05 15_
Report Date: 11/22/05
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 22 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 01/28/2005 1.0 2.0 3.0 3.1 USE AND APPLICATION Page TRM / 1.0-1 08/31/1998 Page TRM / 1.0-2 10/04/2002 Page TRM / 1.0-3 08/31/1998 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM / 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 04/12/1999 Pages TRM / 2.0-6 and TRM / 2.0-7 11/15/2004 Page TRM / 2.0-8 12/03/2004 Pages TRM / 2.0-9 through TRM / 2.0-11 11/15/2004 Pages TRM /2.0-12 through TRM /2.0-15 11/15/2005 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 04/08/1999 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4
()04/08/1999 REACTIVITY CONTROL SY Pages 3.1-1 through 3A 08/31/1998 Pages TRM / 3.1-7 TR
/31-8
.11/15/2005 Pages TRM / 3.1M:
3.1-9a 02/18/1999 Page TRM / 3.
0 02/18/1999 CORE OPER(IN L IS REPORT Page 2
\\S 08/31/1998 Pagef TR
.22 through TRM / 3.2-39 03/03/2005 INR ?
AION gefrRM / 3.3-1 through TRM / 3.3-3 07/16/1999 RM / 3.3-4 11/28/2000 Paes 3.3-5 through 3.3-8 08/31/1998 Pages TRM / 3.3-9 and TRM / 3.3-9a 12/17/1998 Page TRM / 3.3-10 12/17/1998 Pages TRM / 3.3-11 and TRM / 3.3-1 Ia 06/02/2005 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 09/13/2005 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 10/22/2003 Page TRM / 3.3-16 06/27/2001 Pages TRM / 3.3-17 and TRM / 3.3-18 06/14/2002 Pages TRM / 3.3-19 and TRM /3.3-20 10/22/2003 I
3.2 3.3 SUSQUEHANNA - UNIT 2 TRM /LOES-1 EFFECTIVE DATE 11/15/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 22 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM 1 3.3-21 Pages TRM /3.3-21 a through TRM / 3.3-21d Pages TRM 1 3.3-22 Pages TRM /3.3-23 and TRM / 3.3-24 Page TRM I 3.3-25 11/15/2004 11/15/2004 12/03/2004 05/16/2003 10/22/2003 3.4 REACTOR COOLANT SYSTEM Pages 3.4-1 through 3.4-5 Pages 3.4-6 through 3.4-11 Page TRM / 3.4-12 Page 3.4-13 10/23/1998 08/31/1998 12/0312004 08/31/1998 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 01/28/2005 08/31/1998 04/17/2000 08/31/1998 3.6 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.7 PLANT SYSTEMS Pages TRM /-3.7-1 and TRM / 3.7-2 Page 3.7-3 Pages TRM / 3.7-4 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM /3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 and TRM / 3.7-13 Page TRM 1 3.7-14 Pages TRM / 3.7-15 through TRM /3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM 13.7-33 Pages TRM / 3.7-34 through TRM / 3.7-36 Pages 3.7-37 through 3.7-39 Pages TRM / 3.7-40 and TRM / 3.7-40a Pages 3.7-41 and 3.7-42 Page TRM /3.7-43 Pages 3.7-44 through 3.7-47 Page TRM / 3.7-48 07/29/1 999 08/31/1998 08/02/1999 08/16/2005 01/2112000 08/02/1999 08/09/2005 08/02/1999 08/09/2005 11/16/2001 08/25/2005 11/16/2001 01/09/2004 10/05/2002 02/01/1999 08/31/1998 02/14/2005 08/31/1998 12/03/2004 10/13/1998 03/08/2003 SUSQUEHANNA - UNIT 2 TRM I LOES-2 EFFECTIVE DATE 11/15/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 22 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / 3.7-49 and TRM I 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 03/09/2001 12/03/2004 04/15/2003 07/29/1999 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Page TRM /3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM /3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 04/02/2002 01/28/2005 01/31/2005 04/02/2002 12/03/2004 08/10/2004 12/03/2004 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 3.9 3:10 3.11 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 MISCELLANEOUS Pages 3.10-1 through 3.10-4 Page TRM / 3.10-5 Page TRM / 3.10-6 Page TRM / 3.10-7 Page TRM / 3.10-8 08/30/1998 03/08/2003 06/05/2002 04/07/2000 04/17/2002 RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-9 Page TRM /3.11-10 Pages 3.11-11 and 3.11-12 Page 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Pages 3.11-17 and 3.11-18 Page TRM / 3.11-19 Pages 3.11-20 and 3.11-21 Page TRM / 3.11-22 Pages TRM / 3.11-23 and TRM / 3.11-24 Page 3.11-25 08/31/1998 12/03/2004 08/31/1998 09/01/1998 12/03/1004 09/01/1998 08/31/1998 08/15/2005 08/31/1998 04/02/2002 05/1312005 09/01/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 11/15/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 22 UST OF EFFECT7VE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / 3.11-26 through TRM /3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Pages 3.11-33 through 3.11-37 Page TRM / 3.11-38 Pages 3.11-39 through 3.11-44 Page TRM / 3.11-45 Pages 3.11-46 and 3.11-47 01/21/2004 12/03/2004 01/21/2004 08/31/1998 12/03/2004 08/31/1998 12/03/2004 08/31/1998 3.12 4.0 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 02/05/1999 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 SUSQUEHANNA
- UNIT 2 TRM I LOES-4 EFFECTIVE DATE 11/15/2005 SUSQUEHANNA - UNIT 2 TRM I LOES-4 EFFECTIVE DATE 11/15/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 22 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 B3.1 B 3.2 B3.3 B 3.4 B 3.5 B 3.6 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM / B 3.0-11 through TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM I B 3.1-7 Page TRM I B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page B 3.3-2 Pages TRM / B 3.3-3 and TRM / B 3.3-3A Pages TRM / B 3.3-4 through TRM / B 3.3-6 Pages TRM / B 3.3-7 through TRM / B 3.3-9 Page B 3.3-10 Pages TRM I B 3.3-11 and TRM / B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Page TRM / B 3.3-15 Page TRM / B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a through TRM / B 3.3.19e Pages TRM / B 3.3-20 and TRM / B 3.3-21 Page TRM / B3.3-22 Page TRM / B3.3-23 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 08/31/1998 03/15/2002 07/13/1999 08/31/1998 11/15/2005 02/18/1999 08/31/1998 04/07/2000 08/31/1998 01/31/2005 06/02/2005 03/30/2001 08/31/1998 09/13/2005 12/03/2004 06/25/2002 06/14/2002 06/14/2002 10/22/2003 10/22/2003 10/22/2003 11/15/2004 11/15/2004 05/16/2003 10/22/2003 05/16/2003 08/31/1998 10/15/1999 08/31/1998 08/31/1998 07/26/2001 02/01/1999 08/31/1998 I
SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 11/15/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 22 IJST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 B 3.7 B 3.8 B.3.9 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM I B 3.7-3 through TRM / B 3.7-5 Page TRM / B 3.7-6 Pages TRM I B 3.7-7 and TRM / B 3.7-7a Pages TRM I B 3.7-8 through TRM / B 3.7-10 Page TRM / B 3.7-10a Pages TRM / B 3.7-11 through TRM / B 3.7-14 Page TRM / B 3.7-14a and TRM I B 3.7-14b Pages TRM I B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Pages TRM / B 3.7-21 and TRM / B3.7-21a Pages TRM/B 3.7-22 and TRM/B 3.7-23 Page B 3.7-24 Page TRM I B 3.7-25 Pages B 3.7-26 through B 3.7-30 Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM I B 3.7-35 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM/ B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM I B 3.8-16 Page TRM / B 3.8-17 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 09/23/1999 01/07/2002 12/03/2004 12/31/2002 08/31/1998 08/02/1999 08/16/2005 08/02/1999 08/02/1999 08/02/1999 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 04/07/2000 08/31/1998 12/03/2004 08/31/1998
- 12/03/2004 03/09/2001 04/15/2003 12/03/2004 07/05/2000 04/02/2002 01/28/2005 04/02/2002 04/02/2002 04/02/2002 08/10/2004 08/31/1998 04/02/2002 01/28/2005 08/31/1998 10/23/1998 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 Page TRM / B 3.10-3 08/31/1998 03/08/2003 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 11/15/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 22 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / B 3.10-4 and TRM / B 3.10-5 Pages TRM / B 3.10-6 and TRM / 3.10-7 08/23/1999 04/17/2002 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Pages TRM / B 3.11-10 Pages TRM/B 3.1 1-11 and TRM/B 3.11-11a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Pages TRM / B 3.11-21 through TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-28 Page TRM / B 3.11-29 and TRM / B 3.11-30 Pages B 3.11-31 through B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 05/13/2005 01/21/2004 08/31/1998 12/03/2004 08/31/1998 02/1211999 02/05/1999 TRM2 text LOES.doc 11/$/05 SUSQUEHANNA - UNIT 2 TRM I LOES-7 EFFECTIVE DATE 11/15/2005
Instrument Trip Setpoint Program PPL Rev. 5 2.2 2.0 PLANT PROGRAMS AND SETPOINTS 2.2 Instrument Trip Setpoint Table The Instrument Trip Setpoint Limits in Table 2.2-1 are the Trip Setpoint value limits that were contained in the Instrumentation Setpoint tables for protection systems and other functions important to safety that were included in the scope of the original Standard Technical Specifications. Actual instrument setpoints are established utilizing the Allowable Values specified in the Technical Specifications and Technical Requirements. Allowable Values are established in the Reference LCOs and TROs identified in this Table. TRO references are enclosed in square brackets.
Instrumentation process setpoints for the listed subsystems and trip functions are set consistent with the Trip Setpoint Limit Column of Table 2.2-1. Actual setpoints are established in accordance with engineering procedures.
Alarm setpoints and other non-protection system trip settings as may be found in the Technical Specifications or in the Technical Requirements are not included in this table.
Reference NDAP-QA-1104 Setpoint Change Control SUSQUEHANNA - UNIT 2 TRM / 2.0-5 EFFECTIVE DATE 04/02/1999
Instrument Trip Setpoint Program 2.2 PPL Rev. 5 TABLE 2.2-1 (Page 1 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.1 Reactor Protection 2.2.1.1 3.3.1.1 Intermediate Range Monitor, Neutron Flux -
- 120/125 divisions of full scale High 2.2.1.2 3.3.1.1 Average Power Range Monitor, Neutron Flux -
- 15% of RATED THERMAL POWER High Setdown 2.2.1.3 3.3.1.1 Average Power Range Monitor, Flow Biased See COLR - TRO 3.2 Simulated Thermal Power - High Two Loop Operation 2.2.1.4 3.3.1.1 Average Power Range Monitor, Flow Biased See COLR - TRO 3.2 Simulated Thermal Power - High Single Loop Operation 2.2.1.5 3.3.1.1 Average Power Range Monitor, Flow Biased
- 113.5% of RATED THERMAL Simulated Thermal Power - High Flow POWER Clamped 2.2.1.6 3.3.1.1 Average Power Range Monitor, Fixed Neutron
- 118% of RATED THERMAL Flux-High POWER 2.2.1.7 3.3.1.1 Reactor Vessel Steam Dome Pressure - High
- 1087 psig 2.2.1.8 3.3.1.1 Reactor Vessel Water Level - Low, Level 3 2 13.0 inches(a) 2.2.1.9 3.3.1.1 Main Steam Isolation Valve - Closure
- 10% closed 2.2.1.10 This Section Not Used 2.2.1.11 3.3.1.1 Drywell Pressure - High
- 1.72 psig 2.2.1.12 3.3.1.1 Scram Discharge Volume Water Level -High -
65 gallons Level Transmitter 2.2.1.13 3.3.1.1 Scram Discharge Volume Water Level - High -
- 61 gallons Float Switch 2.2.1.14 3.3.1.1 Turbine Stop Valve - Closure 5.5% closed 2.2.1.15 3.3.1.1 Turbine Control Valve Fast Closure, Trip Oil 2500 psig Pressure - Low (continued)
(a) See Figure 2.2-1
-SUSQUEHANNA - UNIT 2 TRM / 2.0-6 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Program PPL Rev. 5 2.2 TABLE 2.2-1 (Page 2 of 8)
INSTRUJMFNTATION SETPOINTS I
SYSTEM/REFERENCE LCO [TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.1.16 OPRM Instrumentation 2.2.1.16.1 3.3.1.3 Sp Cell Signal Amplitude See COLR -TRO 3.2 2.2.1.16.2 3.3.1.3 N2 Confirmation Count Permissive See COLR - TRO 3.2 2.2.1.16.3
[3.3.9]
TOL Period Confirmation Tolerance 0.10 sec 2.2.1.16.4
[3.3.9]
Ta Averaging Filter 5 sec 2.2.1.16.5
[3.3.9]
Fc Conditioning Filter Cutoff Frequency 1.5 Hz 2.2.1.16.6
[3.3.9]
Tmin Minimum Oscillation Period 1.0 sec 2.2.1.16.7
[3.3.9]
Tmax Maximum Oscillation Period 3.5 sec 2.2.1.16.8
[3.3.9]
Noise Floor Peak Discrimination Threshold 1
2.2.1.16.9
[3.3.9]
Minimum LPRM/Cell Cell Operability 2
Requirement 2.2.1.16.10
[3.3.9]
SI Peak Threshold Setpoint 1.20 2.2.1.16.11
[3.3.9]
S2 Valley Threshold Setpoint 0.85 2.2.1.16.12
[3.3.9]
Smax Max. Amplitude Trip Setpoint 1.50 2.2.1.16.13
[3.3.9]
DR3 Growth Rate Factor Setpoint 1.60 2.2.1.16.14
[3.3.9]
T1 lo SI to S2 Timer Range 0.5 sec 2.2.1.16.15
[3.3.9]
T1 hi Si to S2Timer Range 1.75 sec 2.2.1.16.16
[3.3.9]
T2 lo S2 to(S3 or Smax) Timer Range 0.5 sec 2.2.1.16.17
[3.3.9]
T2 hi S2 to(S3 or Smax) Timer Range 1.75 sec 2.2.2 Isolation Actuation Instrumentation 2.2.2.1 Primary Containment Isolation 2.2.2.1.1 3.3.6.1 Reactor Vessel Water Level Low, Level 3 2 13.0 inches(a) 2.2.2.1.2 3.3.6.1 Reactor Vessel Water Level Low Low, Level 2 2 -38.0 inches(a) 2.2.2.1.3 3.3.6.1 Reactor Vessel Water Level Low Low Low, 2 -129 inches(a)
Level 1 2.2.2.1.4 3.3.6.1 Drywell Pressure - High 1.72 psig 2.2.2.1.5 3.3.6.143.3.6]
SGTS Exhaust Radiation -High s 23.0 mR/hr 2.2.2.1.6
[3.3.6]
Main Steam Line Radiation - High High
- 15 x full power background without hydrogen injection (continued)
(a) See Figure 22-1 SUSQUEHANNA - UNIT 2 TRM I12.0-7 EFFECTIVE DATE 11/1512004
Instrument Trip Setpoint Program 2.2 PPL Rev. 5 TABLE 2.2-1 (Page 3 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO
[TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.2.2 2.2.2.2.1 2.2.2.2.2 2.2.2.2.3 2.2.2.2.4 2.2.2.2.5 Secondary Containment Isolation 3.3.6.2 1
3.3.6.2 3.3.6.2 3.3.6.2 1
3.3.6.2 1
Reactor Vessel Water Level - Low Low, Level 2 Drywell Pressure - High Refuel Floor High Exhaust Duct Radiation -
-igh Railroad Access Shaft Exhaust Duct Radiation - High Refuel Floor Wall Exhaust Duct Radiation -
-igh 2-38.0 inches(a) s 1.72 psig S 18 mR/hr s 5 mR/hr s 21 mR/hr 2.2.2.3 2.2.2.3.1 2.2.2.3.2 2.2.2.3.3 2.2.2.3.4 2.2.2.3.5 2.2.2.3.6 2.2.2.3.7 2.2.2.3.8 2.2.2.4 2.2.2.4.1 2.2.2.4.2 2.2.2.4.3 2.2.2.4.4 2.2.2.4.5 2.2.2.4.6 2.2.2.4.7 2.2.2.4.8 2.2.2.4.9 Main Steam Line Isolation 3.3.6.1 Reactor Vessel Water Level - Low Low Low, Level 1 3.3.6.1 Main Steam Line Pressure - Low 3.3.6.1 Main Steam Line Flow-High 33.6.1 Condenser Vacuum - Low 3.3.6.1 Reactor Building Main Steam Line Tunnel Temperature - High This Section Not Used
[3.3.6]
Reactor Building Main Steam Line Tunnel A Temperature - High
[3.3.6]
Turbine Building Main Steam Tunnel Temperature - High Reactor Water Cleanup System Isolation 3.3.6.1 Reactor Vessel Water Level - Low Low, Level 2 3.3.6.1 RWCU A Flow-High 3.3.6.1 RWCU Flow - High 3.3.6.1 RWCU Penetration Area Temperature - High
[3.3.61 RWCU Penetration Room Area A Temperature - High 3.3.6.1 RWCU Pump Area Temperature - High
[3.3.6]
RWCU Pump Room Area A Temperature -
High 3.3.6.1 RWCU Heat Exchanger Area Temperature -
High
[3.3.6]
RWCU Heat Exchanger Room Area A Temperature - High 2 -129 inches(a) 2 861 psig s 113 psid 2 9.0 inches Hg vacuum 5 1770F
- 990 F s 1970F 2 -38 inchessa) s 59 gpm s 462 gpm 5 131OF s 690 F s 1470F s 690 F
- 147°F S 690F (continued)
(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-8 EFFECTIVE DATE 12/03/2004
Instrument Trip Setpoint Program 2.2 PPL Rev. 5 TABLE 2.2-1 (Page 4 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO
[TROI TRIP FUNCTION TRIP SETPOINT 2.2.2.5 Reactor Core Isolation Cooling System Isolation 2.2.2.5.1 3.3.6.1 RCIC Steam Line A Pressure - High 2.2.2.5.2 3.3.6.1 RCIC Steam Supply Line Pressure - Low 2.2.2.5.3 3.3.6.1 RCIC Turbine Exhaust Diaphragm Pressure
- High 2.2.2.5.4 3.3.6.1 RCIC Equipment Room Temperature - High 2.2.2.5.5 3.3.6.1 RCIC Pipe Routing Area Temperature-High 2.2.2.5.6 3.3.6.1 RCIC Emergency Area Cooler Temperature -
High 2.2.2.5.7 3.3.6.1 Drywell Pressure - High 2.2.2.5.8
[3.3.6]
RCIC Equipment Room A Temperature - High 2.2.2.5.9
[3.3.6]
RCIC Pipe Routing Area A Temperature -
High 2.2.2.6 High Pressure Coolant Injection System Isolation
- 138 inches H20 2 60 psig
- 10.0 psig
- 167TF
- 167°F s 1670F
- 1.72 psig
- 890F
- 890F I
2.2.2.6.1 3.3.6.1 2.2.2.6.2 3.3.6.1 2.2.2.6.3 3.3.6.1 2.2.2.6.4 3.3.6.1 2.2.2.6.5 3.3.6.1 2.2.2.6.6 3.3.6.1 2.2.2.6.7 3.3.6.1 2.2.2.6.8
[3.3.6]
2.2.2.6.9
[3.3.6]
2.2.2.7 Shutdown Cooling/System Isola HPCI Steam Line A Pressure - High HPCI Steam Supply Line Pressure - Low HPCI Turbine Exhaust Diaphragm Pressure -
High HPCI Equipment Room Temperature - High HPCI Emergency Area Cooler Temperature -
High HPCI Pipe Routing Area Temperature - High Drywell Pressure - High HPCI Equipment Room A Temperature - High HPCI Pipe Routing Area A Temperature -
High ition Reactor Vessel Water Level - Low, Level 3 Reactor Vessel Steam Dome Pressure - High RHR Flow-High
- 370 inches H20 2 104 psig 10 psig
- 1670F
- 1670F
- 167¶F
- 1.72 psig s 890F s 89°F 2 13.0 inchesca)
- 98 psig
- 25,000 gpm 2.2.2.7.1 2.2.2.7.2 2.2.2.7.3 2.2.3 3.3.6.1 3.3.6.1
[3.3.6]
ECCS Actuation 2.2.3.1 2.2.3.1.1 2.2.3.1.2 2.2.3.1.3 Core Spray System 3.3.5.1 3.3.5.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, Level 1 Drywell Pressure - High Reactor Vessel Steam Dome Pressure - Low injection permissive 2 -129 inchest' S 1.72 psig 2 413, S 427 psig (continued)
(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-9 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Program 2.2 PPL Rev. 5 TABLE 2.2-1 (Page 5 of 8)
INSTRUMENTATION SETPOINTS I
SYSTEM/REFERENCE LCO
[TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.3.2 LPCI Mode of RHR System 2.2.3.2.1 3.3.5.1 2.2.3.2.2 2.2.3.2.3 3.3.5.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, Level I Drywell Pressure - High Reactor Vessel Steam Dome Pressure -
Low, injection permissive Reactor Vessel Steam Dome Pressure -
Low, Recirculation Discharge Valve permissive 2 -129 inchesta)
- 1.72 psig 2 413, *427 psig 2 236 psig, decreasing 2.2.3.2.4 3.3.5.1 2.2.3.3 HPCI System 2.2.3.3.1 3.3.5.1 2.2.3.3.2 2.2.3.3.3 2.2.3.3.4 3.3.5.1 3.3.5.1 3.3.5.1 Reactor Vessel Water Level - Low Low, Level 2 Drywell Pressure - High Condensate Storage Tank Level - Low Reactor Vessel Water Level - High, Level 8
Ž -38 inches(a)
- 1.72 psig 2 36.0 inches above tank bottom
- 54 inches 2.2.3.4 Automatic Depressurization System (ADS) 2.2.3.4.1 2.2.3.4.2 2.2.3.4.3 2.2.3.4.4 2.2.3.4.5 2.2.3.4.6 2.2.3.4.7 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, Level 1 Drywell Pressure - High ADS Timer Core Spray Pump Discharge Pressure - High Low Pressure Coolant InjectionT Pump Discharge Pressure - High Reactor Vessel Water Level - Low, Level 3 Confirmatory ADS Drywell Pressure Bypass Timer 2 -129 inches s 1.72 psig
- 102 seconds 2 135, 5 155 psig
Ž 121,
- 129 psig 2 13 inches
- 420 seconds 2.2.3.5 Loss of Power - ECCS Actuation 2.2.3.5.1 4.16kv ESS Bus Undervoltage (Loss of Voltage < 20%)
2.2.3.5.1.1 2.2.3.5.1.2 3.3.8.1 3.3.8.1 Bus Undervoltage Time delay
Ž 823.2,
- 856.8 Volts 2 0.4,
- 0.6 seconds (continued)
(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-10 EFFECTIVE DATE 11/1512004
Instrument Trip Setpoint Program 2.2 PPL Rev. 5 TABLE 2.2-1 (Page 6 of 8)
"l-INSTRUMENTATION SETPOINTS SYSTM/REERENE LC 2.2.3.5.2 2.2.3.5.2.1 2.2.3.5.2.2 2.2.3.5.3 2.2.3.5.3.1 2.2.3.5.3.2 2.2.3.5.3.4 2.2.3.5.4 2.2.3.5.4.1 2.2.3.5.4.2 2.2.3.5.5 2.2.3.5.5.1 2.2.3.5.5.2 2.2.4 SYSTEM/REFERENCE LCO
[TRO]
TRIP FUNCTION 47.16kV ESS Bus Undervoltage (Degraded Voltage < 65%)
3.3.8.1 Bus Undervoltage 3.3.8.1 Time delay 4.16kV ESS Bus Undervoltage (Degraded Voltage, <93%)
3.3.8.1 Bus Undervoltage 3.3.8.1 Time Delay (Non-LOCA) 3.3.8.1 Time Delay (LOCA) 480V ESS Bus OB565 Undervoltage (Degraded Voltage, <65%)
[3.8.5]
480V Basis
[3.8.5]
Time Delay 480V ESS Bus OB565 Undervoltage (Degraded Voltage, < 92%)
[3.8.5]
480V Basis
[3.8.5]
Time Delay ATWS Alternate Rod Injection and Recirculation Pump Trip TRIP SETPOINT 2 2641.1,S 2748.9 Volts
Ž 2.7, *3.3 seconds 2 3829.3, *3906.7 Volts
Ž 4 minute, 30 seconds
- 5 minute, 30 seconds 9,
- 11 seconds 2 308.9, s315.1 Volts 24.5, *5.5 seconds 2 437.6,S 446.4 Volts t9,*11 seconds 2.2.4.1 2.2.4.1 3.3.4.243.1.1]
3.3.4.243.1.1]
Reactor Vessel, Water Level - Low Low, Level 2 Reactor Vessel Steam Dome Pressure - High
Ž -38 inches(a)
- 1135 psig 2.2.5 2.2.5.1 2.2.5.2 2.2.6 2.2.6.1 2.2.6.2 2.2.6.3 End of Cycle Recirculation Pump Trip 3.3.4.1 Turbine Stop Valve-Closure 3.3.4.1 Turbine Control Valve - Fast Closure Reactor Core Isolation Cooling System Actuation 3.3.5.2 Reactor Vessel Water Level - Low Low, Level 2 3.3.5.2 Reactor Vessel Water Level - High, Level 8 3.3.5.2 Condensate Storage Tank Level - Low
- 5.5% closed
Ž 500 psig
Ž -38 inches~a
- 54 inches(s)
Ž 36.0 inches above tank bottom (continued)
See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-11 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Program 2.2 PPL Rev. 5 TABLE 2.2-1 (Page 7 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFE.RENCE LCO
[TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.7 Control Rod Block 2.2.7.1 Rod Block Monitor 2.2.7.1.1 3.3.2 Low Power Range Upscale - Two Loop
- 0.58W + 52%
Operation 2.2.7.1.2 3.3.2 Low Power Range Upscale - Single Loop
- 0.58W + 47%
Operation 2.2.7.1.3 Downscale 5%
2.2.7.2 APRM 2.2.7.2.1
[3.1.3]
Flow Biased Simulated Thermal Power-High See COLR - TRO 3.2
- Two Loop Operation 2.2.7.2.2
[3.1.3]
Flow Biased Simulated Thermal Power High See COLR - TRO 3.2
- Single Loop Operation 2.2.7.2.3
[3.1.3]
Flow Biased Simulated Thermal Power High
- 108% of RATED THERMAL POWER
- High Flow Clamped 2.2.7.2.4
[3.1.3]
Downscale 2 5% of RATED THERMAL POWER 2.2.7.2.5
[3.1.3]
Neutron Flux - High Setdown
- 12%h of RATED THERMAL POWER 2.2.7.3 Source Range Monitors 2.2.7.3.1
[3.1.3]
Upscale S2E5 cps 2.2.7.3.2
[3.1.3]
Downscale 23.0 cps° 2.2.7.4 Intermediate Range Monitors 2.2.7.4.1
[3.1.3]
Upscale
- 108/125 divisions of full scale 2.2.7.4.2
[3.1.3]
Downscale 2 5/125 divisions of full scale 2.2.7.5 Scram Discharge Volume 2.2.7.5.1
[3.1.3]
Water Level - High
- 35.9 gallons 2.2.7.6 Reactor Coolant System Recirculation Flow 2.2.7.6.1
[3.1.3]
Upscale 114%
2.2.7.6.2
[3.1.3]
Comparator
< 10% flow deviation (continued)
) With a signal-to-noise ratio 2 2, or within the limits of Figure 2.2-2.
I SUSQUEHANNA - UNIT 2 TRM / 2.0-12 EFFECTIVE DATE 11/15/2005
Instrument Trip Setpoint Program 2.2 PPL Rev. 5 TABLE 2.2-1 (Page 8 of 8)
INSTRUMENTATION SETPOINTS I
SYSTEM/REFERENCE LCO
[TRO]
TRIP FUNCTION TRIP SETPOINT 2.2.8 CRECOASS 2.2.8.1 3.3.7.1 Main Control Room Outside Air Intake
- 5 mR/hr Radiation Monitor 2.2.8.1.1 3.3.7.1 Reactor Vessel Water Level - Low Low,
> -38.0 inches(a)
Level 2 2.2.8.1.2 3.3.7.1 Drywell Pressure - High
< 1.72 psig 2.2.8.1.3 3.3.7.1 Refuel Floor High Exhaust Duct Radiation -
- 18 mR/hr High 2.2.8.1.4 3.3.7.1 Railroad Access Shaft Exhaust Duct
- 5 mR/hr Radiation - High 2.2.8.1.5 3.3.7.1 Refuel Floor Wall Exhaust Duct Radiation -
- 21 mR/hr High 2.2.9 Feedwater/Main Turbine Trip System Actuation 2.2.9.1 3.3.2.2 Reactor Vessel Level - High
- 54.0 inches~a 2.2.10 MVP Isolation
-2.2.10.1
[3.3.111 Main Steam Line Radiation - High High
- 15 x full power background without hydrogen injection (a) See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-13 EFFECTIVE DATE 1111512004
PPL Rev. 5 Instrument Trip Setpoint Table 2.2 FIGURE 2. 2-1 REACTOR VESSEL WATER LEVEL SUSQUEHANNA - UNIT 2 TRM / 2.0-14 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Table 2.2 PPL Rev. 5 Instrument Trip Setpoint Table 2.2 3
2.8 2.6 2.4 2.2 2
(n Cl) a_
z U) 1.8 1.6 1.4 1.2 1
0.8 I
I
_ g _Nt-Acc:eptable I\\
s
_I 0.6 0.4 0.2 0
2 6
10 14 18 22 26 30 Signal-to-Noise Ratio Figure 2.2-2 Minimum SRM Trip Setpoint Versus Signal-to-Noise Ratio SUSQUEHANNA - UNIT 2 TRM /2.0-15 EFFECTIVE DATE 11/15/2005
Control Rod Block Instrumentation 3.1.3 PPL Rev. 2 3.1 Reactivity Control Systems 3.1.3 Control Rod Block Instrumentation TRO 3.1.3 The control rod block instrumentation for each function in Table 3.1.3-1 shall be OPERABLE.
APPLICABILITY:
According to Table 3.1.3-1 ACTIONS I I^ITCtr i--I--G I r----
Separate condition entry is allowed for each channel CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more required A.1 Enter the Condition referenced Immediately channels inoperable.
in Table 3.1.3-1 for the channel.
B. As required by Required B.1 Place at least one inoperable 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from Action A.1 and channel in the tripped discovery of loss of referenced in condition.
trip capability Table 3.1.3-1.
AND B.2 Place the inoperable channel in 7 days the tripped condition.
C.
As required by Required C.1 Place the inoperable channel in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Action A.1 and the tripped condition.
referenced in Table 3.1.3-1.
D. Reqcuired Actions and D.1 Suspend Control Rod Immediately Completion Time of withdrawal.
Conditions B or C not met.
SUSQUEHANNA - UNIT 2 3.1-5 EFFECTIVE DATE 8/3111998
Control Rod Block Instrumentation 3.1.3 PPL Rev. 2 TECHNICAL REQUIREMENT SURVEILLANCE NOTES-----
- 1.
Refer to Table 3.1.3-1 to determine which TRSs apply for each Control Rod Block Function.
- 2.
Neutron detectors may be excluded from CHANNEL CALIBRATION.
- 3.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided at least one other OPERABLE channel in the same trip system is monitoring that parameter.
SURVEILLANCE FREQUENCY TRS 3.1.3.1 Perform CHANNEL CHECK 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRS 3.1.3.2 NOTE--------
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Only required to be performed when MLFPD is greater then FRTP. (ITS LCO 3.2.4 MAPRM gain and setpoints" Required Action A.1)
Verify APRM Setpoints or gains are adjusted for the calculated MFLPD.
TRS 3.1.3.3 Perform CHANNEL FUNCTIONAL TEST 7 days TRS 3.1.3.4 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.1.3.5 Perform CHANNEL CALIBRATION 184 days TRS 3.1.3.6 Perform CHANNEL CALIBRATION 24 months TRS 3.1.3.7 Perform LOGIC SYSTEM FUNCTIONAL TEST 24 months SUSQUEHANNA - UNIT 2 3.1-6 EFFECTIVE DATE 8/31/1998
Control Rod Block Instrumentation 3.1.3 PPL Rev. 2 TABLE 3.1.3-1I(Page I of 2)
CONTROL ROD BLOCK INSTRUMENTATION s-'-
CONDITIONS APPLICABLE REQUIRED REFERENCED MODES OR OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION Al REQUIREMENTS VALUE
- 1. APRM
- a.
Neutron Flux - High 2, 5(a) 4 B
TRS 3.1.3.1 s 14% RTP Setdown TRS 3.1.3.4 TRS 3.1.3.5
- b. Flow Biased 1
4 B
TRS 3.1.3.1 See COLR Simulated Thermal TRS 3.1.3.2 TRO 3.2(b° Power-High TRS 3.1.3.4 TRS 3.1.3.5
- c.
Fixed Neutron Flux 1
4 B
TRS 3.1.3.1
- 111% RTP
- High TRS 3.1.3.4 TRS 3.1.3.5
- d.
Downscale 1
4 B
TRS 3.1.3.1 2 3% RTP TRS 3.1.3.4 TRS 3.1.3.5
- e. Inop 1, 2 4
B TRS 3.1.3.4 NA 5ts 4
B TRS 3.1.3.4 NA
- 2.
Source Range Monitors
- a.
Detector not full in 2(c) 3 B
- b.
Upscale 2(O 3
-B TRS 3.1.3.3 s 3.3E5 cps TRS 3.1.3.6 TRS 3.1.3.7 2
B TRS -3.1.3.3 s 3.3E5 cps l TRS 3.1.3.6 TRS 3.1.3.7
- c.
Inop 2 (
3 B
TRS 3.1.3.3 NA TRS 3.1.3.7 50 2
B TRS 3.1.3.3
.NA TRS 3.1.3.7 (continued)
(a) When performing Shutdown Margin Demonstration per Technical Specification 3.10.8.
(b) See COLR for single loop operation per Technical Specification 3.4.1, Recirculation Loops Operating (c) When not automatically bypassed with SRM counts 2 100 cps or the IRM channels on range 3 or higher.
(d) When not automatically bypassed with IRM channels on range 8 or higher.
° With any control rod withdrawn from a core cell containing one or more fuel assemblies.
SUSQUEHANNA - UNIT 2 TRM /3.1-7 EFFECTIVE DATE 11/15/2005
Control Rod Block Instrumentation 3.1.3 PPL Rev. 2 TABLE 3.1.3-1(Page 2 of 2)
CONTROL ROD BLOCK INSTRUMENTATION -..
CONDITIONS APPLICABLE REQUIRED REFERENCED MODES OR OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION Al REQUIREMENTS VALUE
- d.
Downscale
- 3.
- a.
Detector not full in
- b.
Neutron Flux - High
- c.
Inop 3
B 50)0 2
B 2, 5) 2, 56) 2, 50 6
B 6
B TRS 3.1.3.3 TRS 3.1.3.6 TRS 3.1.3.7 TRS 3.1.3.3 TRS 3.1.3.6 TRS 3.1.3.7 TRS 3.1.3.3 TRS 3.1.3.7 TRS 3.1.3.1 TRS 3.1.3.3 TRS 3.1.3.5 TRS 3.1.3.7 TRS 3.1.3.3 TRS 3.1.3.7 TRS 3.1.3.1 TRS 3.1.3.3 TRS-3.1.3.5 TRS 3.1.3.7 TRS 3.1.3.4 TRS 3.1.3.6 21.8 cpsI I 21.8 cps0 I NA
- 110/125 divisions of full scale NA 6
B
- d.
Downscale
- 4.
Scram Discharge Volume Water Level-High
- 5. Reactor Coolant System Recirculation Flow
- a.
Upscale
- b.
Inop
- c.
Comparator i, 2, 5°)
6 B
3/125 divisions of full scale
< 36.5 gallons 2
C 1
2 C
TRS 3.1.3.4 TRS 3.1.3.5 TRS 3.1.3.4 TRS 3.1.3.4 TRS 3.1.3.5 s 117/125 divisions of full scale NA
- 11% low deviation 1
1 2
2 C
C (e) to (0)
(h)
(I)
(j)
When not automatically bypassed with IRMs on range 3 or higher.
With a signal-to-noise ratio 2 2, or within the limits of TS Figure 3.3.1.2-1.
When not automatically bypassed with IRM channels on range 1.
When more than one control rod is withdrawn. Not applicable to control rods removed per Technical Specification 3.10.5 or 3.10.6.
Not required when eight or fewer fuel assemblies (adjacent to the SRMs) are in the core.
With any control rod withdrawn from a core cell containing one or more fuel assemblies.
I SUSQUEHANNA - UNIT 2 TRM /3.1-8 EFFECTIVE DATE 11/1512005
Control Rod Block Instrumentation PPL Rev. 2 B 3.1.3 B 3.1.3Control Rod Block Instrumentation BASES TRO The Control Rod Block Instrumentation is a portion of the Reactor Manual Control System (RMCS), which upon receipt of input signals from other systems and subsystems, inhibits movement or selection of control rods (Reference 1).
The purpose of the Control Rod Block function is to avoid conditions that would require Reactor Protection System (RPS) action if allowed to proceed.
The specific Functions associated with the TRM Control Rod Block Instrumentation are identified in Table 3.1.3-1 and are discussed below.
- 1.
Averaae Power Ranae Monitors (APRM)
- 2.
Source Range Monitors (SRM)
- 3.
Intermediate Range Monitors (IRM)
The same grouping of neutron monitoring equipment (APRM, SRM, and IRM) that is used in the RPS is also used in the rod block circuitry. Half of the total monitors (APRM, SRM, and IRM) provide inputs to one of the two RMCS rod block logic circuits and the remaining half provide inputs to the other RMCS rod block circuit.
The APRM rod block settings are varied as a function of Reactor Coolant System (RCS) recirculation flow. The settings are selected so that all the neutron monitoring rod blocks are sufficient to avoid an RPS action. Mechanical switches in the SRM and IRM detector drive systems provide -the position signals used to indicate that a detector is not fully inserted.
The SRM minimum count rate Allowable Value is discussed in the TS Bases for SR 3.3.1.2.4.
- 4.
Scram Discharge Volume Water Level - High Scram Discharge Volume Water Level - High signals are provided as inputs into both rod block logic circuits. Both rod block logic circuits sense when the high water level scram trip for the Scram Discharge Volume is bypassed. The rod block from Scram Discharge Volume Water Level - High comes from one of two float type level switches installed in each of two scram discharge instrument volumes. The second float switch in each instrument volume provides a control room annunciation of increasing level below the level at which a rod block occurs.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.1-5 EFFECTIVE DATE 11/15/2005
Control Rod Block Instrumentation PPL Rev. 2 B 3.1.3 B 3.1.3 Control Rod Block Instrumentation BASES TRO
- 5.
RCS Recirculation Flow (continued)
RCS Recirculation Flow units A and C provide upscale, inoperable, and comparator rod block trip signals to one of the two RMCS rod block logic systems, and RCS Recirculation Flow units B and D provide these same trip signals to the other rod block logic system.
The RCS Recirculation Flow converter upscale or inoperative alarm assures that no control rod is withdrawn unless the recirculation flow converters, which are necessary for the power operation of the Rod Block Monitors, are OPERABLE. The recirculation flow comparator alarm or inoperative Functions assure that no control rod is withdrawn unless the difference between the outputs of the flow converters is within limits and the comparator is in service.
ACTIONS The ACTIONS are defined to ensure proper corrective measures are taken in response to the inoperable components.
TRS The TRSs are performed at the specified Frequency to ensure that the Control Rod Block Function is maintained OPERABLE_
TRS 3.1.3.1. TRS 3.1.3.3. TRS 3.1.3.4. TRS 3.1.3.5. TRS 3.1.3.6, and TRS 3.1.3.7 Control Rod Block Instrumentation surveillances are performed consistent with the Bases for the comparable channels in LCO 3.3.1.1 and LCO 3.3.1.2.
TRS 3.1.3.2 TRS 3.1.3.2 is necessary to ensure the APRM Flow Biased Simulated Thermal Power-High Rod Block is properly adjusted for MFLPD. The MFLPD is required to be calculated and compared to Fraction of Rated Thermal Power (FRTP) or APRM gain or setpoints to ensure the reactor is operating within the assumptions of the safety analysis (LCO 3.2.4, "APRM Gain and Setpoints!).
This TRS is only required when MFLPD is greater than FRTP. The 12-hour Frequency is required because more rapid changes in power distribution are typically expected.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.1-6 EFFECTIVE DATE 11/15/2005
Control Rod Block Instrumentation PPL Rev. 2 B 3.1.3 B 3.1.3 Control Rod BASES (continued)
REFERENCE 1.
Block Instrumentation FSAR Section 7.7.1 I
SUSQUEHANNA - UNIT 2 TRM / B 3.1-7 EFFECTIVE DATE 11/15/2005