ML053360574

From kanterella
Jump to navigation Jump to search
Point Beach - Notice of Significant Licensee Meeting with Nuclear Management Company, LLC, to Discuss the Status of Improvement Initiatives for the Corrective Action and Engineering Programs
ML053360574
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/02/2005
From: Louden P
NRC/RGN-III/DRP/RPB5
To:
Nuclear Management Co
References
CAL 3-04-001
Download: ML053360574 (4)


Text

December 2, 2005 CAL 3-04-001 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: Nuclear Management Company, LLC (NMC)

Name of Facility: Point Beach Nuclear Plant, Units 1 and 2 Docket Numbers: 50-266; 50-301 Date and Time of Meeting: Wednesday, December 21, 2005, 1:00 p.m. (CST)

Location of Meeting: U.S. Nuclear Regulatory Commission Region III Office 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4351 Purpose of Meeting: The purpose of the meeting is to discuss the status of NMCs improvement initiatives for the corrective action and engineering programs.

Category: This is a Category 1 meeting. The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the business portion of the meeting, but before the meeting is adjourned.

NRC Attendees:

J. Caldwell, Regional Administrator G. Grant, Deputy Regional Administrator M. Satorius, Director, Division of Reactor Projects C. Pederson, Director, Division of Reactor Safety P. Louden, Chief, Branch 5, Division of Reactor Projects Others as designated Licensee Attendees:

D. Koehl, Site Vice-President J. McCarthy, Site Director Others as designated

Notice of Significant Licensee Meeting NOTE: Attendance at this meeting by NRC personnel should be made known to Mike Kunowski via e-mail or by telephone ((630) 829-9618) by COB on Monday, December 19, 2005. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (eg., braille, large print), please notify the NRCs meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Approved by: /RA/

Patrick Louden, Chief Branch 5 Division of Reactor Projects Meeting

Contact:

Mike Kunowski Project Engineer (630)-829-9618 MAK3@nrc.gov See Distribution List DOCUMENT NAME:E:\Filenet\ML053360574.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME PLouden:sls DATE 12/02/2005 OFFICIAL RECORD COPY

Notice of Significant Licensee Meeting Distribution:

M. Johnson (MRJ1), Director, Office of Enforcement B. Jones (BWJ), Assistant General Counsel for Materials Litigation and Enforcement, OGC B. Sheron (BWS), Associate Director for Engineering and Safety Systems, NRR B. Boger (BAB2), Director, Associate Director for Operating Reactor Oversight and Licensing, NRR F. Bonnett (FPB), Enforcement Coordinator, NRR P. Habighorst (PJH2), Region III Coordinator, OEDO H. Nieh (HKN), Project Directorate, Division of Licensing Project Management, NRR H. Chernoff, Project Manager, Project Directorate, Division of Licensing Project Management, NRR M. Satorius (MAS), Director, Division of Reactor Projects, RIII S. West (KSW), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Point Beach DRS Branch Chiefs (JFL, DEH, RDL, KXR, AMS1, SKO, HXP1)

K. OBrien (KGO), Enforcement/Investigations Officer, RIII R. Lickus (RML2), State Liaison Officer, RIII PMNS RIII Public Affairs (VTM, RJS2)

J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP