ML052980038

From kanterella
Jump to navigation Jump to search

Request for Additional Information for the Review of the Palisades Nuclear Plant, License Renewal Application
ML052980038
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/24/2005
From: Morgan M
NRC/NRR/DRIP/RLEP
To: Harden P
Nuclear Management Co
morgan M NRR/NRC/DRIP/RLEP, 415-2232
References
TAC MC6433
Download: ML052980038 (6)


Text

October 24, 2005 Paul A. Harden Site Vice President Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) FOR THE REVIEW OF THE PALISADES NUCLEAR PLANT, LICENSE RENEWAL APPLICATION (TAC NO. MC6433)

Dear Mr. Harden:

By letter dated March 22, 2005, Nuclear Management Company, LLC, (NMC or the applicant) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54), to renew the operating license for Palisades Nuclear Plant (PNP), for review by the U.S. Nuclear Regulatory Commission (NRC). Subsequently, on May 5, 2005, the NRC received a supplement to the license renewal application. The NRC staff is reviewing the information contained in the license renewal application (LRA) and supplement and has identified, in the enclosure, areas where additional information is needed to complete the review.

The question was discussed with your staff, Mr. Robert Vincent, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2232 or via e-mail at MJM2@nrc.gov.

Sincerely,

/RA (L. Lund for/

Michael J. Morgan, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No.: 50-255

Enclosure:

As stated cc w/encl: See next page

ML052980038 Document Name: E:\\Filenet\\ML052980038.wpd OFFICE PM:RLEP LA:RLEP SC:RLEP NAME MMorgan (LLund for)

MJenkins LLund DATE 10/ 24 /05 10/ 24 /05 10/ 24 /05

Palisades Nuclear Plant cc:

Robert A. Fenech, Senior Vice President Nuclear, Fossil, and Hydro Operations Consumers Energy Company 1945 Parnall Rd.

Jackson, MI 49201 Arunas T. Udrys, Esquire Consumers Energy Company 1 Energy Plaza Jackson, MI 49201 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Supervisor Covert Township P.O. Box 35 Covert, MI 49043 Office of the Governor P.O. Box 30013 Lansing, MI 48909 U.S. Nuclear Regulatory Commission Resident Inspectors Office Palisades Plant 27782 Blue Star Memorial Highway Covert, MI 49043 Michigan Department of Environmental Quality Waste and Hazardous Materials Division Hazardous Waste and Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741 Michigan Department of Attorney General Special Litigation Division 525 West Ottawa St.

Sixth Floor, G. Mennen Williams Building Lansing, MI 48913 Manager, Regulatory Affairs Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043 Director of Nuclear Assets Consumers Energy Company Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 John Paul Cowan Executive Vice President & Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Jonathan Rogoff, Esquire Vice President, Counsel & Secretary Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Douglas E. Cooper Senior Vice President - Group Operations Palisades Nuclear Plant Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043 Robert A. Vincent Licensing Lead - License Renewal Project Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043

Palisades Nuclear Plant cc:

Darrel G. Turner License Renewal Project Manager Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Mr. Douglas F. Johnson Director, Plant Life Cycle Issues Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 Chairperson Michigan Public Service Commission PO Box 30221 Lansing, MI 48909-7721

DISTRIBUTION: Letter to P. Harden, Re: RAIs for Palisades LRA, Dated: October 24, 2005 ADAMS Accession No.: ML052980038 HARD COPY RLEP RF M. Morgan (PM)

E-MAIL:

RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li K. Winsberg (RidsOgcMailCenter)

R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff P. Lougheed, RIII J. Ellegood, RIII J. Geissner, RIII A. Stone, RIII L. Raghavan T. Mensah OPA

Enclosure PALISADES NUCLEAR PLANT (PNP)

LICENSE RENEWAL APPLICATION (LRA)

REQUEST FOR ADDITIONAL INFORMATION (RAI)

RAI 2.3.2.1(a)

In Section 2.3.2.1, you have provided a description of engineered safety features (ESF) electrical actuation subsystems. However, in Section 2.5, you did not include the scoping criteria for these electrical components. Provide a listing of each electrical component associated with ESF and provide scoping criteria for each component.

RAI 2.5.6-1 You have stated that safety functions RIAs 5, 6, 9,12,13,16, and 17 are Q-listed and are in the boundary of license renewal. Why are these systems not in-scope of license renewal? Provide appropriate check mark for 10 CFR 54.21(a) criteria.

RAI 2.5.6-2 When systems/components are in Q-list, why arent they in-scope of license renewal?

RAI 2.5.8 In Section 2.5.8, you have stated that station power system includes four 4160 volt buses, four 2400 volt buses, and several 480 volt load centers and 480 volt motor control centers. The subsystems are 4160 volts, 2400 volts, and 480 volts. Provide your justification of not including 120/208 volt ac, 120 volt ac (uninterruptible power), 125 volt dc, and 24 volt dc.

RAI 2.5.9-1 In Interim Staff Guidance-2 (ISG-2), the staff has determined that the plant system portion of the offsite power system that is used to connect the plant to the offsite power source should be included within the scope of the rule. This path typically includes the switchyard circuit breakers that connects to the offsite system power transformers (startup transformers), the transformer itself. In Section 2.5.9, you have provided license renewal boundaries of the switchyard. They included 345 kV Bus F, motor operated disconnect to the safeguard transformer and 345 kV Bus R and motor operated disconnect to the startup transformers.

(a)

Provide justification of not including the switchyard circuit breakers.

(b)

The 345 kV Bus F and R are not in scope for LR per Palisades Substation per drawing (LR-WD-1421-31). Clarify this discrepancy.

(c)

Revise the switchyard system function listing (SWY-01 to SWY-05) as appropriate.

RAI 2.5.9-2 The staff understands that dc power is required for motor operated disconnect (MOD). Provide your justification of not including components (battery, cables and connections) associated with MOD in-scope of license renewal.