ML052010471

From kanterella
Jump to navigation Jump to search

Request for Additional Information for the Review of the Palisades Nuclear Plant, License Renewal Application
ML052010471
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/20/2005
From: Morgan M
NRC/NRR/DRIP/RLEP
To: Harden P
Nuclear Management Co
Morgan M, NRR/DRIP/RLEP, 415-2232
References
TAC MC6433
Download: ML052010471 (6)


Text

July 20, 2005 Paul A. Harden Site Vice President Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) FOR THE REVIEW OF THE PALISADES NUCLEAR PLANT, LICENSE RENEWAL APPLICATION (TAC NO. MC6433)

Dear Mr. Harden:

By letter dated March 22, 2005, Nuclear Management Company, LLC, (NMC or the applicant) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54), to renew the operating license for Palisades Nuclear Plant (PNP), for review by the U.S. Nuclear Regulatory Commission (NRC). Subsequently, on May 5, 2005, the NRC received a supplement to the license renewal application. The NRC staff is reviewing the information contained in the license renewal application (LRA) and supplement and has identified, in the enclosure, areas where additional information is needed to complete the review.

These questions were discussed with your staff, Mr. Robert Vincent, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2232 or e-mail MJM2@nrc.gov.

Sincerely,

/RA/

Michael J. Morgan, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No.: 50-255

Enclosure:

As stated cc w/encl: See next page

ML052010471 Document Name: E:\\Filenet\\ML052010471.wpd OFFICE PM:RLEP LA:RLEP SC:RLEP NAME MMorgan MJenkins (J.Zimmerman for)

SLee DATE 07/ 20 /05 07/ 20 /05 07/ 20 /05

Palisades Nuclear Plant cc:

Robert A. Fenech, Senior Vice President Nuclear, Fossil, and Hydro Operations Consumers Energy Company 1945 Parnall Rd.

Jackson, MI 49201 Arunas T. Udrys, Esquire Consumers Energy Company 1 Energy Plaza Jackson, MI 49201 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Supervisor Covert Township P.O. Box 35 Covert, MI 49043 Office of the Governor P.O. Box 30013 Lansing, MI 48909 U.S. Nuclear Regulatory Commission Resident Inspectors Office Palisades Plant 27782 Blue Star Memorial Highway Covert, MI 49043 Michigan Department of Environmental Quality Waste and Hazardous Materials Division Hazardous Waste and Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741 Michigan Department of Attorney General Special Litigation Division 525 West Ottawa St.

Sixth Floor, G. Mennen Williams Building Lansing, MI 48913 Manager, Regulatory Affairs Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043 Director of Nuclear Assets Consumers Energy Company Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 John Paul Cowan Executive Vice President & Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Jonathan Rogoff, Esquire Vice President, Counsel & Secretary Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Douglas E. Cooper Senior Vice President - Group Operations Palisades Nuclear Plant Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043 Robert A. Vincent Licensing Lead - License Renewal Project Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043

Palisades Nuclear Plant cc:

Darrel G. Turner License Renewal Project Manager Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Mr. Douglas F. Johnson Director, Plant Life Cycle Issues Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 Chairperson Michigan Public Service Commission PO Box 30221 Lansing, MI 48909-7721

DISTRIBUTION: Letter to P. Harden, Re: RAI for Palisades LRA, Dated: July 20, 2005 ADAMS Accession No.: ML052010471 HARD COPY RLEP RF M. Morgan (PM)

E-MAIL:

RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li K. Winsberg (RidsOgcMailCenter)

R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff P. Lougheed, RIII J. Ellegood, RIII M. Garza, RIII A. Stone, RIII L. Raghavan T. Mensah OPA

Enclosure PALISADES NUCLEAR PLANT LICENSE RENEWAL APPLICATION (LRA)

REQUEST FOR ADDITIONAL INFORMATION (RAI)

RAI 4.6-1 In Section 4.6.1, provide the missing information in the second paragraph of the summary.

RAI 4.6-2 The Analysis subsection in Section 4.6.2 reproduces the corresponding paragraphs of the Analysis subsection in Section 4.6.1. Provide confirmation that this conforms with trhe corresponding section in FSAR 5.8.6.4.1.