|
---|
Category:Letter type:L
MONTHYEARL-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-24-004, Submittal of 10 CFR 72.48 Report for Monticello Nuclear Generating Plant (MNGP)2024-04-17017 April 2024 Submittal of 10 CFR 72.48 Report for Monticello Nuclear Generating Plant (MNGP) L-MT-24-002, Submittal of Revision 41 to the Updated Safety Analysis Report2024-04-17017 April 2024 Submittal of Revision 41 to the Updated Safety Analysis Report L-MT-24-006, Subsequent License Renewal Application Annual Update 1 and Supplement 92024-02-29029 February 2024 Subsequent License Renewal Application Annual Update 1 and Supplement 9 L-MT-24-007, Response to NRC Request for Additional Information on Proposed Inservice Inspection Alternative RR-002 for the Sixth Ten-Year ISI Interval2024-02-15015 February 2024 Response to NRC Request for Additional Information on Proposed Inservice Inspection Alternative RR-002 for the Sixth Ten-Year ISI Interval L-MT-24-001, 10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval2024-01-30030 January 2024 10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval L-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 L-MT-23-030, Subsequent License Renewal Application Supplement 32023-07-0404 July 2023 Subsequent License Renewal Application Supplement 3 L-MT-23-025, Subsequent License Renewal Application Supplement 22023-06-26026 June 2023 Subsequent License Renewal Application Supplement 2 L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report L-MT-23-020, Submittal of 2022 Annual Radioactive Effluent Release Report2023-05-10010 May 2023 Submittal of 2022 Annual Radioactive Effluent Release Report L-MT-23-021, Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 322023-05-0202 May 2023 Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 L-MT-23-017, 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2023-04-18018 April 2023 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-23-010, Subsequent License Renewal Application Supplement 12023-04-0303 April 2023 Subsequent License Renewal Application Supplement 1 L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 32023-03-28028 March 2023 Core Operating Limits Report (COLR) for Cycle 31, Revision 3 L-MT-23-012, Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 22023-03-17017 March 2023 Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 L-MT-23-008, 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003)2023-02-0707 February 2023 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) L-MT-23-004, CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program2023-01-23023 January 2023 CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088)2023-01-0606 January 2023 Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) L-MT-22-049, Industry Groundwater Protection Initiative Special Report2022-12-15015 December 2022 Industry Groundwater Protection Initiative Special Report L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative2022-12-15015 December 2022 L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462022-12-13013 December 2022 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-22-048, Update to the Monticello Technical Specification Bases2022-11-28028 November 2022 Update to the Monticello Technical Specification Bases L-MT-22-047, Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval2022-11-10010 November 2022 Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package L-MT-22-030, Sixth Interval Inservice Testing (1ST) Plan2022-09-0606 September 2022 Sixth Interval Inservice Testing (1ST) Plan L-MT-22-037, Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency2022-08-29029 August 2022 Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency L-MT-22-007, Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007)2022-07-22022 July 2022 Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007) 2024-07-09
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 L-MT-23-025, Subsequent License Renewal Application Supplement 22023-06-26026 June 2023 Subsequent License Renewal Application Supplement 2 L-MT-23-010, Subsequent License Renewal Application Supplement 12023-04-0303 April 2023 Subsequent License Renewal Application Supplement 1 ML23009A3542023-01-0909 January 2023 Subsequent License Renewal Application Sections 1 - 4 and Appendices a - D L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency2022-03-18018 March 2022 License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency L-MT-21-072, License Amendment Request: Revise MNGP Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank2021-12-13013 December 2021 License Amendment Request: Revise MNGP Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank L-MT-21-067, Update to the Monticello Technical Specification Bases2021-11-29029 November 2021 Update to the Monticello Technical Specification Bases ML21320A2262021-11-15015 November 2021 License Amendment Request: Standard Emergency Plan and Consolidated Emergency Operations Facility for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant L-MT-21-043, Supplement to License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-06-30030 June 2021 Supplement to License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-MT-20-023, License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR2020-11-0303 November 2020 License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR L-MT-20-018, License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-22022 September 2020 License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements L-MT-20-003, License Amendment Request: Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4b2020-03-30030 March 2020 License Amendment Request: Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4b ML20058F9432020-02-27027 February 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - License Amendment Request: Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules Revision 4 L-MT-18-073, Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee...2018-11-20020 November 2018 Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee... L-MT-18-009, License Amendment Request: Revise Limiting Condition for Operation (LCO) of Specification 3.5.1, Emergency Core Cooling System - Operating, to Remove the LCO Note2018-11-12012 November 2018 License Amendment Request: Revise Limiting Condition for Operation (LCO) of Specification 3.5.1, Emergency Core Cooling System - Operating, to Remove the LCO Note L-MT-18-060, License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.12018-11-12012 November 2018 License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.1 L-MT-18-051, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control,2018-09-11011 September 2018 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, L-MT-18-006, Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements2018-07-0303 July 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements L-MT-18-020, Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Control2018-04-24024 April 2018 Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Control L-MT-18-010, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2018-03-28028 March 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-MT-17-083, License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2017-12-19019 December 2017 License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program L-MT-17-058, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-10-20020 October 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML17095A1142017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 2 of 5 ML17095A1202017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 5 of 5 ML17090A2012017-03-31031 March 2017 License Amendment Request to Revise Technical Specification for Plant/Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML17095A1152017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 3 of 5 ML17095A1132017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 1 of 5 ML17095A1182017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 4 of 5 ML17095A1122017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attach. 1, EAL Comparison Matrix Document (Deviations & Differences) and Attachments 2 & 3, Red-Line & Clean Versions of EAL Technical Bases Document L-MT-16-031, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code2016-07-28028 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code L-MT-16-014, License Amendment Request: Revise Battery Charger Surveillance Requirement 3.8.4.22016-04-0404 April 2016 License Amendment Request: Revise Battery Charger Surveillance Requirement 3.8.4.2 ML16047A2722016-02-10010 February 2016 License Amendment Request: Revise Technical Specification 5.5.11 to Provide a Permanent Extension of the Integrated Leakage Rate (Type a) Test Frequency from Ten to Fifteen Years L-MT-15-032, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure2015-09-0202 September 2015 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure L-MT-15-048, License Amendment Request: Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-07-15015 July 2015 License Amendment Request: Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process L-MT-14-043, License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical Specification2014-05-30030 May 2014 License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical Specification ML14126A7272014-05-0505 May 2014 Supplement to License Amendment Request (LAR) for Cyber Security Plan Implementation Date Extension L-MT-14-009, License Amendment Request: Revision to Required Actions for Technical Specification 3.5.1, Emergency Core Cooling System (ECCS)2014-04-0404 April 2014 License Amendment Request: Revision to Required Actions for Technical Specification 3.5.1, Emergency Core Cooling System (ECCS) ML14072A3902014-03-13013 March 2014 License Amendment Request for Fuel Storage Changes, Supplement to Propose a Spent Fuel Pool Boral Monitoring Program Technical Specification ML13333B6742013-11-27027 November 2013 License Amendment Request (LAR) for Northern States Power Company, Minnesota (NSPM) Cyber Security Plan Implementation Date Extension L-MT-13-081, Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses2013-08-14014 August 2013 Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses L-MT-13-055, License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methodology2013-07-15015 July 2013 License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methodology L-MT-13-046, License Amendment Request for Fuel Storage Changes, Supplement to Respond to NRC Staff Requests for Additional Information2013-05-16016 May 2013 License Amendment Request for Fuel Storage Changes, Supplement to Respond to NRC Staff Requests for Additional Information L-MT-13-030, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs2013-04-19019 April 2013 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs L-MT-13-010, License Amendment Request: Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits2013-03-11011 March 2013 License Amendment Request: Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits L-MT-12-102, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month.2013-01-0404 January 2013 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month. L-MT-12-078, License Amendment Request: Modification to the MNGP Emergency Plan Concerning a Revision to the Emergency Action Level Setpoint for the Turbine Building Normal Waste Sump Monitor2012-12-21021 December 2012 License Amendment Request: Modification to the MNGP Emergency Plan Concerning a Revision to the Emergency Action Level Setpoint for the Turbine Building Normal Waste Sump Monitor 2024-01-11
[Table view] |
Text
NMC CommMed to NudearExeAnm oMonticello Nudear Generating Plant Operated by Nuclear Management Company, LLC PROPRIETARY INFORMATION ENCLOSED September 15,,2005 Pursuant to 10 CFR 2.390, withhold the proprietary compact L-MT-05-093 disc for the calculations listed inEnclosure 10 from public 10 CFR 50.90 disclosure. Upon separation of the proprietary CD, the 10 CFR 50.67 remainder of this letter may be decontrolled. 10 CFR 50.12 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Monticello Nuclear Generating Plant Docket 50-263 License No. DPR-22 License Amendment Request - Full Scope Application of an Alternative Source Term Pursuant to 10 CFR 50.90, 10 CFR 50.67 and 10 CFR 50.12 Nuclear Management Company, LLC (NMC) hereby proposes to amend Appendix A of Facility Operating License, DPR-22, Technical Specifications, by incorporating a revision to the licensing basis of the Monticello Nuclear Generating Plant (MNGP). This submittal supports a full scope application of an Altemative Source Term (AST) methodology. Associated, proposed Technical Specification (TS) changes, which are supported by the AST analyses, are included in this application for a license amendment. In addition, NMC is requesting a specific exemption from 10 CFR 50.54(o) and the requirements of Sections Ill.A and Ill.B of 10 CFR 50, Appendix J, Option B, for MNGP.
10 CFR 50.67, "Accident Source Term," provides a mechanism for currently licensed nuclear power reactors to replace the traditional source term used in design basis accident analyses with an alternative source term. Under this provision, licensees who seek to revise the accident source term in design basis radiological consequence analyses must apply for a license amendment under 10 CFR 50.90.
By letter dated April 29, 2004, as supplemented by letters dated November 23, 2004, January 20, January 31, February 28 and April 12, 2005, NMC requested a license amendment for MNGP to support a Selective Scope Application of an Alternative Source Term Methodology for Re-evaluation of the Fuel Handling Accident. This submittal for a Full Scope AST assumes the approval of the previous MNGP license amendment request, therefore the changes associated with the previous submittal were not included in this submittal. However, several of the input criteria associated with the previous submittal have been re-evaluated for this submittal (See Enclosure 3).
1O 2807 West County Road 75
- Monticello, Minnesota 55362-9637 Telephone: 763.295.5151
USNRC Page 2 The Full Scope AST analyses were performed by NMC in accordance with the guidance in Regulatory Guide 1.183, "Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors," July 2000. NMC performed AST analyses for the design basis accidents that could potentially result in significant control room and offsite doses. These include the Loss of Coolant Accident, the Main Steam Line Break Accident, Fuel Handling Accident and the Control Rod Drop Accident. The analyses demonstrate that using AST methodologies, post-accident control room and offsite doses remain below 10 CFR 50.67 and Regulatory Guide 1.183 acceptance limits.
NMC proposes implementation of this proposed change through a change to the MNGP licensing basis, including the TS and associated Bases. Upon approval, conforming changes will be made to the MNGP Updated Safety Analysis Report (USAR) and submitted to the NRC staff in accordance with 10 CFR 50.71 (e) as part of the regular USAR update process.
The use of an AST results in changes to the design basis accident radiological consequences; however, the AST methodology has no direct impact on the probability or initiation of the evaluated design basis accidents. Application of AST methodology and the other changes requested by this application for a license amendment do not increase the core damage frequency or the large early release frequency. Therefore, this request for a revision to MNGP's licensing basis is not being submitted as a "risk-informed licensing action," as defined by Regulatory Guide 1.174, 'An Approach For Using Probabilistic Risk Assessment In Risk-Informed Decisions On Plant-Specific Changes To The Licensing Basis," Revision 1, 2002.
By letter dated June 29, 2005, NMC submitted a License Amendment Request (LAR) converting MNGP custom TS to Improved Technical Specifications (ITS) (ADAMS Accession No. ML051960175). Upon approval of the ITS LAR, NMC will provide a supplemental submittal updating this AST LAR with revised marked-up and retyped ITS pages. contains a description and summary safety assessment of each proposed TS change. Enclosure 2 contains a request for a regulatory exemption that NMC requests the NRC staff grant concurrently with the license amendment. Enclosure 3 contains the AST Technical Analysis for MNGP, which was used in the development of this submittal. Enclosure 4 contains a Table of Commitments made in this Submittal. provides a comparison of the MNGP AST analysis assumptions with Regulatory Guide 1.183. Enclosure 6 contains the marked-up Technical Specification pages. Enclosure 7 contains the page change instructions and the retyped Technical Specification pages. Enclosure 8 contains the marked-up Technical Specification Bases pages (provided for information only). Enclosure 9 contains the Non-Proprietary version of the calculations that support the Safety Assessment and Technical Analysis.
Enclosure 10 provides the Proprietary version of the calculations provided by Applied Analysis Corp. The calculations in Enclosure 10 are clearly marked as Proprietary and should be withheld from public disclosure in accordance with 10 CFR 2.390. Applied Analysis Corp. affidavit for proprietary information is also contained within Enclosure 10.
USNRC Page 3 The Technical Support Center (TSC) project is ongoing at the time of this submittal with a resolution tentatively scheduled for 2006. Therefore, aTSC 30-day dose analysis is not being provided with this transmittal, but the analysis results will be reported after project completion.
The MNGP Plant Operations Review Committee has reviewed this application. A copy of this submittal, along with the Determination of No Significant Hazards Consideration, is being forwarded to our appointed state official pursuant to 10 CFR 50.91 (b)(1).
Nuclear Management Company, LLC requests approval of the amendment by January 4, 2007, to support the currently scheduled March 2007 Refueling Outage. Once approved the amendment will be implemented within 60 days.
NMC has concluded, as described in Section 5 of Enclosure 1,that the proposed license amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and that pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment Commitments provided by this letter are included in Enclosure 4.0.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on September 15. 2005.
n Tonway Site Vice President, Monticello Nuclear Generating Plant Nuclear Management Company, LLC Enclosures (10) cc: Administrator, Region l1l, USNRC (w/o Enclosure 10)
Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC (w/o Enclosure 10)
Minnesota Department of Commerce (w/o Enclosure 10)
ATTACHMENT Subject Enclosed is NMC's License Amendment Request for the Monticello Nuclear Generating Plant's Application of an Alternative Source Term.
Request to Withhold from Public Disclosure The files on Disk 2 titled "(Proprietary) MNGP AST Calculation," contain proprietary information and NMC requests that the information contained on this disk be withheld from public disclosure.
Contact Name John Fields Mailing Address 2807 West County Road 75 Monticello, Minnesota 55362-9637 E-Mail Address John.Fields(~nmcco.com Phone Number 763-295-1663 Documents Components:
A total of two (2) CD-ROMs are included in this submittal. The CD-ROMs contain the information listed below:
CD (1) titled, "License Amendment Request for Alternative Source Term,"
including the scanned cover letter, complete MNGP application, and Non-Proprietary Calculations. The following file in Adobee PDF format is provided on the CD:
- 001 MNGP AST LAR.pdf, approximately 4 MB CD (2) titled, "(Proprietary) MNGP AST Calculations" which includes Enclosure 10 with proprietary versions of six calculations. The following file and folders are provided on the CD:
- 001 AST FSA Enclosure 10.pdf, approximately 0.4 MB
- 002 CA-04-036 RI (OS XQ, Proprietary) - Complete calculation with functional attachments. Contains approximately 10.5 MB (88
files), including one document (full calculation text) as well as non-document content (calculation attachments primarily associated with PAVAN computer program use including text files, spreadsheets, and signature pages).
- 003 CA-04-037 R2 (CR XQ, Proprietary) - Complete calculation with functional attachments. Contains approximately 6.2 MB (88 files), including one document (full calculation text) as well as non-document content (calculation attachments primarily associated with PAVAN and ARCON96 computer program use including text files, spreadsheets, and signature pages).
- 004 CA-04-038 RO (LOCA, Proprietary) - Complete calculation with functional attachments. Contains approximately 4.3 MB (46 files),
including one document (full calculation text) as well as non-document content (calculation attachments primarily associated with RADTRAD computer program use including text files, spreadsheets, and signature pages).
- 005 CA-04-039 RO (MSLBA, Proprietary) - Complete calculation with functional attachments. Contains approximately 2.4 MB (81 files), including one document (full calculation text) as well as non-document content (calculation attachments primarily associated with RADTRAD computer program use including text files, spreadsheets, and signature pages).
- 006 CA-04-040 RO (CRDA, Proprietary) - Complete calculation with functional attachments. Contains approximately 2.5 MB (63 files), including one document (full calculation text) as well as non-document content (calculation attachments primarily associated with RADTRAD and MicroShield computer program use including text files, spreadsheets, and signature pages).
- 007 CA-04-041 R1 (FHA, Proprietary) - Complete calculation with functional attachments. Contains approximately 2.1 MB (43 files),
including one document (full calculation text) as well as non-document content (calculation attachments primarily associated with RADTRAD computer program use including text files, spreadsheets, and signature pages).