ML052420681

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan 09/01/2005 - 03/31/2007
ML052420681
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/30/2005
From: Casto C
Division Reactor Projects II
To: Rosalyn Jones
Duke Energy Corp
Shared Package
ML052420677 List:
References
Download: ML052420681 (2)


Text

Page 1 of 2 Oconee 08/30/2005 16:22:04 Inspection / Activity Plan Report 22 09/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS1-RP - RP PREINSPECTION VISIT/ ISFSI 1 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 09/27/2005 09/29/2005 Baseline Inspections PS1-RP - RP OCCUPATIONAL BASELINE WK-1 3 1, 2, 3 IP 2515/161 Transportation of Reactor Control Rod Drives in Type A Packages 10/23/2005 10/27/2005 Safety Issues 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 10/23/2005 10/27/2005 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 10/23/2005 10/27/2005 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 10/23/2005 10/27/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/23/2005 10/27/2005 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 2 2 IP 7111108P Inservice Inspection Activities - PWR 10/31/2005 11/04/2005 Baseline Inspections EB3TI160 - 2515/160 U-2: PZR PENETRATION NOZZLES 1 2 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 10/31/2005 11/04/2005 Safety Issues EB3SGISI - STEAM GENERATOR ISI 2 2 IP 7111108P Inservice Inspection Activities - PWR 11/07/2005 11/10/2005 Baseline Inspections PS1-RP - RP OCCUPATIONAL BASELINE WK-2 3 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 11/07/2005 11/11/2005 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 11/07/2005 11/11/2005 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 11/07/2005 11/11/2005 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 11/07/2005 11/11/2005 Baseline Inspections EB350.59 - 50.59 CORRECTIVE ACTION 1 1, 2, 3 IP 71152 Identification and Resolution of Problems 12/05/2005 12/09/2005 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT 1 1, 2, 3 IP 7111121 Safety System Design and Performance Capability 01/16/2006 01/20/2006 Baseline Inspections EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY 6 1, 2, 3 IP 7111121 Safety System Design and Performance Capability 02/13/2006 02/17/2006 Baseline Inspections 1, 2, 3 IP 7111121 Safety System Design and Performance Capability 02/27/2006 03/03/2006 Baseline Inspections 1, 2, 3 IP 7111121 Safety System Design and Performance Capability 03/13/2006 03/17/2006 Baseline Inspections EB3-ISI - U3 INSERVICE INSPECTION 1 3 IP 7111108P Inservice Inspection Activities - PWR 05/08/2006 05/12/2006 Baseline Inspections EB3SGISI - U3 STEAM GENERATOR ISI 1 3 IP 7111108P Inservice Inspection Activities - PWR 05/15/2006 05/19/2006 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23216 OCONEE/EXAMS AT POWER FACILITIES 05/22/2006 05/26/2006 Not Applicable PS1-RP - RP BASELINE PUBLIC 4 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 06/19/2006 06/23/2006 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Oconee 08/30/2005 16:22:04 Inspection / Activity Plan Report 22 09/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS1-RP - RP BASELINE PUBLIC 4 1, 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 06/19/2006 06/23/2006 Baseline Inspections 1, 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/19/2006 06/23/2006 Baseline Inspections 1, 2, 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 06/19/2006 06/23/2006 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 06/19/2006 06/23/2006 Baseline Inspections OL EXAM - INITIAL EXAM 3 1 V23216 OCONEE/EXAMS AT POWER FACILITIES 06/19/2006 06/30/2006 Not Applicable PS2-EP - EP EXERCISE 3 1, 2, 3 IP 7111401 Exercise Evaluation 07/17/2006 07/21/2006 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/17/2006 07/21/2006 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 07/17/2006 07/21/2006 Baseline Inspections EB3-HS - HEAT SINK 2 1, 2, 3 IP 7111107B Heat Sink Performance 07/24/2006 07/28/2006 Baseline Inspections EB1-MODS - MODIFICATIONS/10CFR50.59 3 1, 2, 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 10/02/2006 10/06/2006 Baseline Inspections 1, 2, 3 IP 7111117B Permanent Plant Modifications 10/02/2006 10/06/2006 Baseline Inspections EB3-ISI - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/16/2006 10/20/2006 Baseline Inspections EB3SGISI - U1 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/23/2006 10/27/2006 Baseline Inspections EB3-MR - MR EFFECTIVENESS 2 1, 2, 3 IP 7111112B Maintenance Effectiveness 12/04/2006 12/08/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2, 3 IP 7111111B Licensed Operator Requalification Program 03/26/2007 03/30/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.