ML051370304

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual Unit 2
ML051370304
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 05/09/2005
From:
Susquehanna
To:
Office of Nuclear Reactor Regulation
References
Download: ML051370304 (27)


Text

May. 09, 2005 Page 1

of 2

MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2005-21302 EMPL#:028401 CA#:

0363 TO:

05/09/2005 LOCATION:

USNRC FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

TRM2 -

TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 04/26/2005 ADD MANUAL TABLE OF CONTENTS DATE: 05/06/2005 CATEGORY:

ID:

TEXT REMOVE:

DOCUMENTS TYPE: TRM2 2.2 REV:3 ADD:

REV: 4 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY An

May. 09, 2005 Page 2

of 2

REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL t,

Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:

05/06/2005 Procedure Name Rev Issue Date Change ID Change Number' TRM2 N/A 08/01/2003

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 (07/28/2003)

TEXT LOES 14

Title:

LIST OF EFFECTIVE SECTIONS 04/14/2005 TEXT TOC

Title:

TEXT 1.1

Title:

TEXT 2.1

Title:

TEXT 2.2

Title:

TEXT 3.0

Title:

5 02/04/2005 TABLE OF CONTENTS

{

0 11/19/2002 USE AND APPLICATION DEFINITIONS 1

02/04/2005 PLANT PROGRAMS AND SETPOINTS PLANVIPROGRAlS 4 I, 05/06/2005 PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE.

0 11/19/2002 APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY d

TEXT 3.1.1 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 1

03/10/2005

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE Page 1 of 15 Report Date: 05/06/05 Page I of 15 Report Date:'05/06/05

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.2.1 4

04/14/2005

Title:

CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)

TEXT 3.3.1

Title:

INSTRUMENTATION 0

11/19/2002 RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 0

11/19/2002

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 0

11/19/2002

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4

Title:

INSTRUMENTATION TEXT 3.3.5

Title:

INSTRUMENTATION TEXT 3.3.6

Title:

INSTRUMENTATION 0

11/19/2002 TRM POST-ACCIDENT MONITORING INSTRUMENTATION

- 0 11/19/2002 THIS PAGE INTENTIONALLY LEFT BLANK 1

10/22/2003 TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 0

11/19/2002

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8

Title:

INSTRUMENTATION TEXT 3.3.9

Title:

INSTRUMENTATION TEXT 3.3.10

Title:

INSTRUMENTATION TEXT 3.3.11

Title:

INSTRUMENTATION 1

10/22/2003 TRM RPS INSTRUMENTATION 1

11/22/2004 LPRM UPSCALE ALARM INSTRUMENTATION 1

12/14/2004 REACTOR RECIRCULATION PUMP MG SET STOPS 1

10/22/2003 MVP ISOLATION INSTRUMENTATION Page 2 of 15 Report Date: 05/06/05 Page 2 of 15 Report Date: 05/06/05

SSES MANUAL i

Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1

Title:

REACTOR 0

11/19/2002 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2

Title:

REACTOR TEXT 3.4.3

Title:

REACTOR TEXT 3.4.4

Title:

REACTOR TEXT 3.4.5

Title:

REACTOR TEXT 3.5.1 0

11/19/2002 COOLANT SYSTEM STRUCTURAL INTEGRITY 0

11/19/2002 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 1 12/14/2004 COOLANT SYSTEM REACTOR-RECIRCULATION FLOW AND ROD LINE LIMIT 0

11/18/2002 COOLANT SYSTEM REACTOR VESSEL MATERIALS

-1 02/04/2005

Title:

ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 0

11/19/2002

Title:

ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0

11/19/2002

Title:

ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0

11/19/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0

11/19/2002

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0

11/19/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0

11/19/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Page 3 of 15 Report Date: 05/06/05 Page 3 of 15 Report Date: 05/06/05

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.1

Title:

PLANT TEXT 3.7.2

Title:

PLANT TEXT 3.7.3.1

Title:

PLANT TEXT 3.7.3.2

Title:

PLANT 0

11/19/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)

SHUTDOWN 0

11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)

AND GROUND WATER LEVEL 0

11/19/2002 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 0

11/19/2002 SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3

Title:

PLANT TEXT 3.7.3.4

Title:

PLANT 0

11/19/2002 SYSTEMS C02 SYSTEMS 0

11/19/2002 SYSTEMS HALON SYSTEMS**

TEXT 3.7.3.5

Title:

PLANT TEXT 3.7.3.6

Title:

PLANT TEXT 3.7.3.7

Title:

PLANT TEXT 3.7.3.8

Title:

PLANT TEXT 3.7.4

Title:

PLANT TEXT 3.7.5.1

Title:

PLANT 0

11/19/2002 SYSTEMS FIRE HOSE STATIONS 0

11/19/2002 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0

11/19/2002 SYSTEMS FIRE RATED ASSEMBLIES 1

01/12/2004 SYSTEMS FIRE DETECTION INSTRUMENTATION 0

11/19/2002 SYSTEMS SOLID RADWASTE SYSTEM 0

11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR Page 4 of 15 Report Date: 05/06/05 Page 4 of 15 Report Date: 05/06/05

I

SSES',MANUAL
  • f Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.2

Title:

PLANT TEXT 3.7.5.3

Title:

PLANT TEXT 3.7.6

-Title: PLANT TEXT 3.7.7 0

11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0

11/19/2002 SYSTEMS LIQUID HOLDUP TANKS 1

03/01/2005 SYSTEMS ESSW PUMPHOUSE VENTILATION 0

11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 2

03/01/2005

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9

- 0 11/19/2002

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.8.1 2

02/04/2005

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 1

12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT 3.8.2.2

Title:

ELECTRICAL AUTOMATIC 2

12/14/2004 POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

TEXT 3.8.3 0

11/19/2002

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES TEXT 3.8.4 1

02/04/2005

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM Page 5 of 15 Report Date: 05/06/05 Page 5 of 15 Report Date: 05/06/05

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.5 0

11/19/2002

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 0

11/19/2002

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING.

TEXT 3.9.1 0

11/19/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0

11/19/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1

-0 11/19/2002

Title:

MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 0

11/19/2002

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 0

11/19/2002

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 0

11/19/2002

Title:

MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)

TEXT 3.11.1.1 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM Page 6 of 15 Report Date: 05/06/05 Page 6 of 15 Report Date: 05/06/05

I SSES MANUAL P" Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.4

Title:

RADIOACTIVE TEXT 3.11.2.1

Title:

RADIOACTIVE TEXT 3.11.2.6

Title:

RADIOACTIVE TEXT 3.11.4.2

Title:

RADIOACTIVE TEXT 3.11.4.3

Title:

RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1

12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 1

01/27/2004 DOSE RATE 2

12/14/2004 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 1

12/14/2004 LAND USE CENSUS 0

11/19/2002 INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0

11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 0

11/19/2002

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT B3.0 0

11/19/2002

Title:

APPLICABILITY BASES TECHNICALREQUIREMENT FOR OPERATION (TRO)

TEXT B3.1.1 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES. ANTICIPATED TRANSIENT WITHOUT ROD INJECTION (ATWS-ARI) INSTRUMENTATION APPLICABILITY SCRAM ALTERNATE TEXT B3.1.2 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 1

03/10/2005

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION Page 7 of 15 Report Date: 05/06/05 Page 7 of 15 Report Date: 05/06/05

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0

11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 0

11/19/2002

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 0

11/19/2002

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3

Title:

INSTRUMENTATION TEXT B3.3.4

Title:

INSTRUMENTATION TEXT B3.3.5

Title:

INSTRUMENTATION TEXT B3.3.6

Title:

INSTRUMENTATION TEXT B3.3.7

Title:

INSTRUMENTATION TEXT B3.3.8

Title:

INSTRUMENTATION TEXT B3.3.9

Title:

INSTRUMENTATION TEXT B3.3.10 1

02/04/2005 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 0

11/19/2002 BASES TRM POST ACCIDENT MONITORING (PAM)

INSTRUMENTATION 0

11/19/2002 BASES THIS PAGE INTENTIONALLY LEFT BLANK 2

12/14/2004 BASES TRM ISOLATION ACTUATION INSTRUMENTATION 0

11/19/2002 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1

10/22/2003 BASES TRM RPS INSTRUMENTATION 1

11/22/2004 BASES LPRM UPSCALE ALARM INSTRUMENTATION 0

11/19/2002

......J

Title:

INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS Page 8 of 15 Report Date:

05/05/05 Page 8 of 15 Report Date: 05/06/05

SSES. MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.11.

1 10/22/2003

Title:

INSTRUMENTATION BASES M4VP ISOLATION INSTRUMENTATION TEXT B3.4.1

Title:

REACTOR TEXT B3.4.2

Title:

REACTOR TEXT B3.4.3

Title:

REACTOR TEXT B3.4.4

Title:

REACTOR TEXT B3.4.5

Title:

REACTOR TEXT B3.5.1 0

11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 0

11/19/2002 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 0

11/19/2002 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0

11/19/2002 COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT

-0 11/19/2002 COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS 0

11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 0

11/19/2002

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 0

11/19/2002

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0

11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0

11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 0

11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION Page 9 of 15 Report Date: 05/06/05 Page 9 of 15 Report Date: 05/06/05

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.6.4 1

12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1

Title:

PLANT TEXT B3.7.2

Title:

PLANT TEXT B3.7.3.1

Title:

PLANT TEXT B3.7.3.2

Title:

PLANT TEXT B3.7.3.3

Title:

PLANT 0

11/19/2002 SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 11/19/2002 SYSTEMS BASES ULTIMATE HEAT SINK (UHS)

GROUND WATER LEVEL 0

11/19/2002 SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM 0

11/19/2002 SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS

-o 11/19/2002 SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4

Title:

PLANT TEXT B3.7.3.5

Title:

PLANT SYSTEMS BASES SYSTEMS BASES 0

11/19/2002 HALON SYSTEMS 0

11/19/2002 FIRE HOSE STATIONS TEXT B3.7.3.6

Title:

PLANT 0

1i/19/2002 YARD FIRE HYDRANTS AND SYSTEMS BASES HYDRANT HOSE HOUSES TEXT B3.7.3.7

Title:

PLANT TEXT B3.7.3.8

Title:

PLANT TEXT B3.7.4

Title:

PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0

11/19/2002 FIRE RATED ASSEMBLIES 1

01/12/2004 FIRE DETECTION INSTRUMENTATION 0

11/19/2002 SOLID RADWASTE SYSTEM Page 10 of 15 Report Date: 05/06/05 Page 10 of 15 Report Date: 05/06/05

x

-SSES MANUAL i

Manual Name: TRM2

%lanual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.5.1

Title:

PLANT TEXT B3.7.5.2

Title:

PLANT SYSTEMS BASES

-SYSTEMS BASES 0

11/19/2002 MAIN CONDENSER OFFGAS 0

11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3

Title:

PLANT TEXT B3.7.6

Title:

PLANT SYSTEMS BASES SYSTEMS BASES 0

11/19/2002 LIQUID HOLDUP TANKS 1

03/01/2005 ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 0

11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION T'EXT B3.7.8

<_f2

Title:

PLANT

- 1 12/14/2004 SYSTEMS BASES SNUBBERS TEXT B3.7.9 1

12/14/2004

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1 1

02/04/2005

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0

11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT B3.8.2.2 1

09/17/2004

Title:

ELECTRICAL POWER BASES MOTOR-OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION AUTOMATIC TEXT B3.8.3 0

11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES Page 11 of 15 Report Date: 05/06/05 Page 11 of 15 Report Date: 05/06/05

.SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.8.4 0

11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0

11/19/2002

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1

02/04/2005

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.9.1 0

11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0

11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0

11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 0

11/19/2002

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0

11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.10.4 0

11/19/2002

Title:

MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)

TEXT B3.11.1.1 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE Page 12 of 15 Report Date: 05/06/05 Page 12 of 15 Report Date: 05/06/05

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.1.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT'SYSTEM TEXT B3.11.1.4 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0

Title:

RADIOACTIVE EFFLUENTS BASES INSTRUMENTATION 11/19/2002 RADIOACTIVE LIQUID PROCESS MONITORING TEXT B3.11.2.1 1

12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0'

Title:

RADIOACTIVE EFFLUENTS BASES TEXT B3.11.2.3

- 0

Title:

RADIOACTIVE EFFLUENTS BASES PARTICULATES FORM TEXT B3.11.2.4 0

Title:

RADIOACTIVE EFFLUENTS BASES TEXT B3.11.2.5 2

Title:

RADIOACTIVE EFFLUENTS BASES 11/19/2002 DOSE -

NOBLE GASES 11/19/2002

-DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN 11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM 10/27/2004 VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION 1

BASES 01/27/2004 RADIOACTIVE GASEOUS EFFLUENT MONITORING TEXT B3.11.3

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.4.1

Title:

RADIOACTIVE EFFLUENTS 0

BASES 1

BASES 11/19/2002 TOTAL DOSE 12/14/2004 MONITORING PROGRAM TEXT B3.11.4.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS Page 13 of 15 Report Date: 05/06/05 Page 13 of 15 Report Date: 05/06/05

SSES MANUAL Manual Namm:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 I

TEXT B3.11.4.3

Title:

RADIOACTIVE EFFLUENTS TEXT B3.12.1

Title:

LOADS CONTROL PROGRAM 0

11/19/2002 BASES INTERLABORATORY COMPARISON PROGRAM 0

BASES 11/19/2002 CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0

11/19/2002

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS TEXT 3.11.1.5

Title:

RADIOACTIVE 1

12/14/2004 EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.2

Title:

RADIOACTIVE TEXT 3.11.2.3

Title:

RADIOACTIVE FORM TEXT 3.11.2.4

Title:

RADIOACTIVE TEXT 3.11.2.5

Title:

RADIOACTIVE TEXT 3.11.3

Title:

RADIOACTIVE TEXT 3.11.4.1

Title:

RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 0

11/19/2002 DOSE -

NOBLE GASES 0

11/19/2002 DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0

11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM 0

11/18/2002 VENTILATION EXHAUST TREATMENT SYSTEM 0

11/19/2002 TOTAL DOSE 1

12/14/2004 MONITORING PROGRAM TEXT 4.1 0

09/27/2003

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION Page 14 of 15 Report Date: 05/06/05 Page 14 of 15 Report Date: 05/06/05

x SSES MANUAL

% Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4. 2

Title:

TEXT 4.3

Title:

TEXT 4. 4

Title:

TEXT 4. 5

Title:

TEXT 4. 6

Title:

TEXT 4.7

Title:

ADMINISTRATIVE CONTROLS 0

ADMINISTRATIVE CONTROLS 0

ADMINISTRATIVE CONTROLS 0

ADMINISTRATIVE CONTROLS 0

ADMINISTRATIVE CONTROLS

-0 ADMINISTRATIVE CONTROLS 09/27/2003 REPORTABLE EVENT ACTION 09/27/2003 SAFETY LIMIT VIOLATION 09/27/2003 PROCEDURES & PROGRAMS 09/27/2003 REPORTING REQUIREMENTS 09/27/2003 RADIATION PROTECTION PROGRAM 09/27/2003 TRAINING Page 15 of 15 Report Date: 05/06/05 Page 15 of 15 Report Date: 05/06/ 05

Instrument Trip Setpoint Program PPL Rev. 4 2.2 2.0 PLANT PROGRAMS AND SETPOINTS 2.2 Instrument Trip Setpoint Table The Instrument Trip Setpoint Limits in Table 2.2-1 are the Trip Setpoint value limits that were contained in the Instrumentation Setpoint tables for protection systems and other functions important to safety that were included in the scope of the original Standard Technical Specifications. Actual instrument setpoints are established utilizing the Allowable Values specified in the Technical Specifications and Technical Requirements. Allowable Values are established in the Reference LCOs and TROs identified in this Table. TRO references are enclosed in square brackets.

Instrumentation process setpoints for the listed subsystems and trip functions are set consistent with the Trip Setpoint Limit Column of Table 2.2-1. Actual setpoints are established in accordance with engineering procedures.

Alarm setpoints and other non-protection system trip settings as may be found in the Technical Specifications or in the Technical Requirements are not included in this table.

Reference NDAP-QA-1104 Setpoint Change Control SUSQUEHANNA - UNIT 2

.TRM / 2.0-5 EFFECTIVE DATE 04/02/1999

Instrument Trip Setpoint Program 2.2 PPL Rev. 4 TABLE 2.2-1 (Page 1 of 8)

INSTRUMENTATION SETPOINTS I

SYSTEM/REFERENCE LCO [TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.1 Reactor Protection 2.2.1.1 3.3.1.1 Intermediate Range Monitor, Neutron Flux -

  • 1201125 divisions of full High scale 2.2.1.2 3.3.1.1 Average Power Range Monitor, Neutron Flux
  • 15% Qf RATED THERMAL POWER

- High Setdown 2.2.1.3 3.3.1.1 Average Power Range Monitor, Flow Biased See COLR - TRO 3.2 Simulated Thermal Power - High Two Loop Operation 2.2.1.4 3.3.1.1 Average Power Range Monitor, Flow Biased See COLR - TRO 3.2 Simulated Thermal Power - High Single Loop Operation 2.2.1.5

. 3.3.1.1 Average Power Range Monitor, Flow Biased

  • 113.5% of RATED THERMAL Simulated Thermal Power - High Flow POWER Clamped 2.2.1.6 3.3.1.1 Average Power Range Monitor, Fixed Neutron
  • 118% of RATED THERMAL POWER Flux - High 2.2.1.7 3.3.1.1 Reactor Vessel Steam Dome Pressure - High 51087 psig 2.2.1.8 3.3.1.1 Reactor Vessel Water Level - Low, Level 3 213.0 inches C' 2.2.1.9

.3.3.1.1 Main Steam Isolation Valve - Closure

5 10% closed 2.2.1.10 This Section Not Used 2.2.1.11 3.3.1.1 Drywell Pressure - High
  • 61 gallons

- Float Switch 2.2.1.14 3.3.1.1 Turbine Stop Valve - Closure 5.5% closed 2.2.1.15 3.3.1.1 Turbine Control Valve Fast Closure, Trip 2 500 psig Oil Pressure - Low (continued)

(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-6 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Program 2.2 PPL Rev. 4 V..

TABLE 2.2-1 (Page 2 of 8)

INSTRUMENTATION SETPOINTS l1 SYSTEM/REFERENCE LCO [TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.1.16 OPRM Instrumentation 2.2.1.16.1 3.3.1.3 Sp Cell Signal Amplitude See COLR -TRO 3.2 2.2.1.16.2 3.3.1.3 N2 Confirmation Count Permissive See COLR -TRO 3.2 2.2.1.16.3

[3.3.9]

TOL Period Confirmation Tolerance 0.10 sec 2.2.1.16.4

[3.3.9]

Ta Averaging Filter 5 sec 2.2.1.16.5

[3.3.9]

Fc Conditioning Filter Cutoff Frequency 1.5 Hz 2.2.1.16.6

[3.3.9]

Tmin Minimum Oscillation Period 1.0 sec 2.2.1.16.7

[3.3.9]

Tmax Maximum Oscillation Period 3.5 sec 2.2.1.16.8

[3.3.9]

Noise Floor Peak Discrimination Threshold I

2.2.1.16.9

[3.3.9]

Minimum LPRM/Cell Cell Operability 2

Requirement 2.2.1.16.10

[3.3.9]

S1 Peak Threshold Setpoint 1.20 2.2.1.16.11

[3.3.9]

S2 Valley Threshold Setpoint 0.85 2.2.1.16.12

[3.3.9]

Smax Max. Amplitude Trip Setpoint 1.50 2.2.1.16.13

[3.3.9]

DR3 Growth Rate Factor Setpoint 1.60 2.2.1.16.14

[3.3.9]

TI lo SI to S2Timer Range 0.5 sec 2.2.1.16.15

[3.3.9]

TI hi SI to S2 Timer Range 1.75 sec 2.2.1.16.16

[3.3.9]

T2 lo S2 to(S3 or Smax) Timer Range 0.5 sec 2.2.1.16.17

[3.3.9]

T2 hi S2 to(S3 or Smax) Timer Range 1.75 sec 2.2.2 Isolation Actuation Instrumentation-2.2.2.1 Primary Containment Isolation 2.2.2.1.1 3.3.6.1 Reactor Vessel Water Level Low, Level 3 13.0 Inches(a) 2.2.2.1.2 3.3.6.1 Reactor Vessel Water Level Low Low, Level 2

-38.0 Inches(a) 2.2.2.1.3 3.3.6.1 Reactor Vessel Water Level Low Low Low, 2 2 -129 inches(a)

Level I 2.2.2.1.4 3.3.6.1 Drywell Pressure - High s 1.72 psig 2.2.2.1.5

.3.3.6.143.3.6]

SGTS Exhaust Radiation - High s 23.0 mRfhr 2.2.2.1.6

[3.3.6]

Main Steam Line Radiation - High High s 15 x full power background without hydrogen injection (continued)

SUSQUEHANNA - UNIT 2 TRM / 2.0 EFFECTIVE DATE 11/15/2004

PPL Rev. 4 Instrument Trip Setpoint Program 2.2

-TABLE 2.2-1 (Page 3 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.2.2 2.2.2.2.1 2.2.2.2.2 2.2.2.2.3 2.2.2.2.4 2.2.2.2.5 Secondary Containment isolation 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 Reactor Vessel Water Level - Low Low, Level 2 Drywell Pressure - High Refuel Floor High Exhaust Duct Radiation -

High Railroad Access Shaft Exhaust Duct Radiation - High Refuel Floor Wall Exhaust Duct Radiation -

High 2-38.0 inches(')

S 1.72 psig s 18 mR/hr S5mRthr S 21 mR/hr 2.2.2.3 2.2.2.3.1 2.2.2.3.2 2.2.2.3.3 2.2.2.3.4 2.2.2.3.5 2.2.2.3.6 2.2.2.3.7 2.2.2.3.8 2.2.2.4 2.2.2.4.1 2.2.2.4.2 2.2.2.4.3 2.2.2.4.4 2.2.2.4.5 2.2.2.4.6 2.2.2.4.7 2.2.2.4.8 2.2.2.4.9 Main Steam Une Isolation 3.3.6.1 Reactor Vessel Water Level - Low Low Low, Level I 3.3.6.1 Main Steam Line Pressure - Low 3.3.6.1 Main Steam Line Flow-High 3.3.6.1 CondenserVacuum-Low 3.3.6.1 Reactor Building Main Steam Line Tunnel Termperature - High This Section Not Used

[3.3.6].

Reactor Building Main Steam Line Tunnel A Temperature - High

[3.3.6]

Turbine Building Main Steam Tunnel Temperature - High Reactor Water Cleanup System Isolation 3.3.6.1 Reactor Vessel Water Level - Low Low, Level2 2

3.3.6.1 RWCU A Flow-High 3.3.6.1 RWCU Flow-High 3.3.6.1 RWCU Penetration Area Temperature - High

[3.3.6]

RWCU Penetration Room Area A Temperature

- High 3.3.6.1 RWCU Pump Area Temperature - High

[3.3.6]

RWCU Pump Room Area A Temperature -

High 3.3.6.1 RWCU Heat Exchanger Area Temperature -

High

[3.3.6]

RWCU Heat Exchanger Room Area A Temperature - High 2 -129 inches(')

2 861 psig S 113 psid 2 9.0 inches Hg vacuum s 177TF s 990F S 1970F 2 -38 inches(a) s59gpm s 462 gpm s 1310F s 690F S 147°F s690F S147°F s 69°F I

(continued)

(a) See Figure 2.2-1 SUSQUEIHANNA - UNIT 2

.1TRM 1 2.0-8 EFFECTIVE DATE 12/03/2004

PPL Rev. 4 C

Instrument Trip Setpoint Program

.2.2 TABLE 2.2-1 (Page 4 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.2.5 Reactor Core Isolation Cooling System Isolation 2.2.2.5.1 3.3.6.1 RCIC Steam Une A Pressure - High 2.2.2.5.2 3.3.6.1 RCIC Steam Supply Une Pressure - Low 2.2.2.5.3 3.3.6.1 RCIC Turbine Exhaust Diaphragm Pressure

-High 2.2.2.5.4 3.3.6.1 RCIC Equipment Room Temperature - High 2.2.2.5.5 3.3.6.1 RCIC Pipe Routing Area Temperature - High 2.2.2.5.6 3.3.6.1 RCIC Emergency Area Cooler Temperature -

High 2.2.2.5.7 3.3.6.1 Drywell Pressure - High 2.2.2.5.8

[3.3.6]

RCIC Equipment Room A Temperature - High 2.2.2.5.9

[3.3.6]

RCIC Pipe Routing Area A Temperature -

High 2.2.2.6 High Pressure Coolant Injection System Isolation

  • 138 inches H20 2 60 psig
  • 10.0 psig
  • 167°F
  • 167°F
  • 1670F
  • 1.72 psig
  • 890F
  • 89°F
  • 370 inches H20 2 104 psig
  • 10 psig
  • 167°F
  • 167°F
  • 167°F
  • 1.72 psig
  • 890F
  • 891F

.1I 2.2.2.6.1 2.2.2.6.2 2.2.2.6.3 3.3.6.1 3.3.6.1 3.3.6.1 HPCI Steam Une A Pressure - High HPCI Steam Supply Une Pressure - Low HPCI Turbine Exhaust Diaphragm Pressure -

-High 2.2.2.6.4 3.3.6.1 HPCI Equipment Room Temperature - High 2.2.2.6.5 3.3.6.1 HPCr'EmergencyArea Cooler Temperature -

High 2.2.2.6.6 3.3.6.1 HPCI Pipe Routing Area Temperature-High 2.2.2.6.7 3.3.6.1 Drywell Pressure - High 2.2.2.6.8

[3.3.6]

HPCI Equipment Room A Temperature - High 2.2.2.6.9

[3.3.6]

HPCI.Pipe Routing Area A Temperature -

High 2.2.2.7 Shutdown Cooling/System Isolation 2.2.2.7.1

.3.3.6.1 2.2.2.7.2 3.3.6.1 2.22.7.3

[3.3.6]

2.2.3 ECCS Actuation 2.2.3.1 Core Spray System 2.2.3.1.1 3.3.5.1 Reactor Vessel Water Level - Low, Level 3 Reactor Vessel Steam Dome Pressure - High RHR Flow-High Reactor Vessel Water Level - Low Low Low, Level I Drywell Pressure - High Reactor Vessel Steam Dome Pressure - Low injection permissive 2 13.0 inc~hes°a

  • 98 psig
  • 25,000 gpm 2-129 inches(a)

S 1.72 psig 2 413, S427 psig 2.2.3.1.2 2.2.3.1.3 3.3.5.1 3.3.5.1 I(continued)

(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-9 EFFECTIVE DATE 11/15/2004

PPL Rev. 4 Instrument Trip Setpoint Program 2.2 TABLE 2.2-1 (Page 5 of 8)

INSTRUMENTATION SETPOINTS I

  • SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.3.2 LPCI Mode of RHR System 2.2.3.21 3.3.5.1 Reactor Vessel Water Level - Low Low Low, 2 -129 inches(

Level I 2.2.3.2.2 3.3.5.1 Drywell Pressure - High 1.72 psig 2.2.3.2.3 3.3.5.1 Reactor Vessel Steam Dome Pressure - Low, 2 413,

  • 427 psig injection permissive 2.2.3.2.4 3.3.5.1 Reactor Vessel Steam Dome Pressure - Low, 2 236 psig, decreasing Recirculation Discharge Valve permissive 2.2.3.3 HPCI System 2.2.3.3.1 3.3.5.1 Reactor Vessel Water Level - Low Low, 2 -38 Inches(*)

Level 2 2.2.3.3.2 3.3.5.1 Drywall Pressure - High

  • *1.72 psig 2.2.3.4.3 3.3.5.1 ADS Timer

< 102 seconds 2.2.3.4.4 3.3.5.1 Core Spray Pump Discharge Pressure - High

Ž135,

  • 129 psig Discharge Pressure - High 2.2.3.4.6 3.3.5.1 Reactor Vessel Water Level - Low, Level 3 2 13 Inches Confirmatory 2.2.3.4.7 3.3.5.1 ADS Drywell Pressure Bypass Timer
  • 420 seconds 2.2.3.5 Loss of Power - ECCS Actuation 2.2.3.5.1 4.16kv ESS Bus Undervoltage (Loss of Voltage <20%)

2.2.3.5.1.1 3.3.8.1 Bus Undervoltage

-823.2,

  • 856.8 Volts 2.2.3.5.1.2 3.3.8.1 Time delay

Ž 0.4, 5 0.6 seconds (continued)

(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM /2.010 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Program 2.2 PPL Rev. 4 TABLE 2.2-1 (Page 6 of 8)

INSTRUMENTATION SETPOINTS 1I SYSTEM/REFERENCE LCO 2.2.3.5.2 2.2.3.5.2.1 2.2.3.5.2.2 2.2.3.5.3 2.2.3.5.3.1 2.2.3.5.3.2 2.2.3.5.3.4 2.2.3.5.4 2.2.3.5.4.1 2.2.3.5.4.2 2.2.3.5.5 2.2.3.5.5.1 2.2.3.5.5.2 2.2.4 2.2.4.1 2.2.4.1 2.2.5 2.2.5.1 2.2.5.2 2.2.6 2.2.6.1 2.2.6.2 2.2.6.3

[TRO]

TRIP FUNCTION 4.16kV ESS Bus Undervoltage (Degraded Voltage < 65%)

3.3.8.1 Bus Undervoltage 3.3.8.1 Time delay 4.16kV ESS Bus Undervoltage (Degraded Voltage, < 93%)

3.3.8.1 Bus Undervoltage 3.3.8.1 Time Delay (Non-LOCA) 3:3.8.1 Time Delay (LOCA) 480V ESS Bus OB565 Undervoltage (Degraded Voltage, < 65%)

13.8.5]

480V Basis

[3.8.5]

Time Delay 480V ESS Bus OB565 Undervoltage (Degraded Voltage, < 92%)

[3.8.5]

480V Basis

[3.8.5]

Time Delay ATWS Atemate Rod Injection and Recirculation Pump Trip 3.3.4.213.1.1]

Reactor Vessel, Water Level - Low Low, Level 2 3.3.4.21[3.1.1]

Reactor Vessel Steam Dome Pressure-High End of Cycle Recirculation Pump Trip 3.3.4.1 Turbine Stop Valve-Closure 3.3.4.1 Turbine Control Valve - Fast Closure Reactor Core Isolation Cooling System Actuation 3.3.5.2 Reactor Vessel Water Level - Low Low, Level 2 3.3.5.2 Reactor Vessel Water Level - High, Level 5

C8 3.3.5.2 Condensate Storage Tank Level - Low TRIP SETPOINT 22641.1,

  • 2748.9 Volts 22.7,
  • 3.3 seconds 2 3829.3, *3906.7 Volts 2 4 minute, 30 seconds
  • 5 minute, 30 seconds 2 9,* 11 seconds 2 308.9, s 315.1 Volts 2 4.5, *5.5 seconds

Ž 437.6,

  • 446.4 Volts 2 9,*5 11 seconds

- -38 inches(a)

[l 1135 psig

  • 5.5% closed

-2500 psig 2 -38 Inches(')

  • 54 inches(a) 2 36.0 inches above tank bottom (continued)

(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-11 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Program

. 2.2 -

PPL Rev. 4 TABLE 2.2-1 (Page 7 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.7 Control Rod Block 2.2.7.1 Rod Block Monitor 2.2.7.1.1 3.3.2 Low Power Range Upscale - Two Loop

  • 0.58W + 52%

Operation 2.2.7.1.2 3.3.2 Low Power Range Upscale - Single Loop S 0.58W + 47%

Operation 2.2.7.1.3 Downscale 5%

2.2.7.2 APRM 2.2.7.2.1

[3.1.3]

Flow Biased Simulated Thermal Power-High See COLR - TRO 3.2

- Two Loop Operation 2.2.7.2.2

[3.1.3]

Flow Biased Simulated Thermal Power High See COLR - TRO 3.2

- Single Loop Operation 2.2.7.2.3

[3.1.3]

Flow Biased Simulated Thermal Power High

  • 108% of RATED THERMAL POWER

- High Flow Clamped 2.2.7.2.4

[3.1.3]

Downscale 2 5% of RATED THERMAL POWER 2.2.7.2.5

[3.1.3]

Neutron Flux - High Setdown

  • 12% of RATED THERMAL POWER 2.2.7.3 Source Range Monitors 2.2.7.3.1

[3.1.3]

Upscale

  • 2E5 cps 2.2.7.3.2

[3.1.31 Downscale 0.7 cps°1 2.2.7.4 Intermediate Range Monitors 2.2.7.4.1

[3.1.3]

Upscale

  • 1081125 divisions of full scale 2.2.7.4.2

[3.1.3]

Downscale -

5/125 divisions of full scale 2.2.7.5 Scram Discharge Volume 2.2.7.5.1 13.1.3]

Water Level - High

[3.1.3]

Upscale 114%

2.2.7.6.2

[3.1.3]

Comparator

  • 10%h flow deviation (continued) b) Provided signal-to-noise ratio is 2 2. Otherwise, 2 3 cps.

.8, SUSQUEHANNA - UNIT 2 TRM / 2.0-12 EFFECTIVE DATE 11/1512004

PPL Rev. 4

I Instrument Trip Setpoint Program 2.2 TABLE 2.2-1 (Page 8 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO T

F

[TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.8 CREOASS 2.2.8.1 3.3.7.1 Main Control Room Outside Air Intake

Level 2 2.2.8.1.2 3.3.7.1 Drywell Pressure - High

s 1.72 psig 2.2.8.1.3 3.3.7.1 Refuel Floor High Exhaust Duct Radiation s 18 mR/hr

- High 2.2.8.1.4 3.3.7.1 Railroad Access Shaft Exhaust Duct s 5 mR/hr Radiation - High 2.2.8.1.5 3.3.7.1 Refuel FloorWall Exhaust Duct Radiation s 21 mR/hr

-High 2.2.9 Feedwater/Main Turbine Trip System Actuation 2.2.9.1 3.3.2.2 Reactor Vessel Level - High S 54.0 inches(')

2.2.10 MVP Isolation 2.2.10.1

[3.3.11]

Main Steam Line Radiation - High High

  • S 15 x full power background without hydrogen Injection

') See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-13 EFFECTIVE DATE 11/15/2004

PPL Rev. 4 Instrument Trip Setpoint, Table 2.2 I

I I

WATER LEVEL INOENCLATURE HEIGHT5BOVE:

VESSEL ZERO-REAdIN(G 800 CIN.)

(7).

5S66.5 3

750 74

,ee

..{4) 557.5

+30 C2* 489.5,

-38 C) 398. 5

-127.

  • s ls : e

_ 4.*~

+ 0

+ 0 + 0

+

-- 5 5 7.S C )?-.

.C 8) 1 54

~ t 9 ' t ATER

.IN.TR V

[HRI SI(3 E1 SPE--

~

TZ R AO(

) I I I T E R I.

T D

FEED 4 O0 34985(1)--

S l

9.

CSAM

-i s o C N T R I B U T E T O I BA D S tTR:IS'ALE INC PLIS:

F I G U R 2. 2 - 1_

1 2 R E A C T RSVE S E L W T E RSEV E L SUSQUEHANNA -UNI2T M120 4

NIT 2

. C RDANID: F102.2.1 A

EFFECTIVE DATE 1111512004 TRM / 2.0-14