May. 09, 2005 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2005-21302 EMPL#:028401 CA#: 0363 TO: 05/09/2005 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 04/26/2005 ADD MANUAL TABLE OF CONTENTS DATE: 05/06/2005 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT 2.2 REMOVE: REV:3 ADD: REV: 4 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY An
May. 09, 2005 Page 2 of 2 REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL t, Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 05/06/2005 Procedure Name Rev Issue Date Change ID Change Number' TRM2 N/A 08/01/2003
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 (07/28/2003)
TEXT LOES 14 04/14/2005
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 5 02/04/2005
Title:
TABLE OF CONTENTS
{ ,
TEXT 1.1 0 11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANVIPROGRAlS TEXT 2.2 4 I, 05/06/2005
Title:
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE.
TEXT 3.0 0 11/19/2002
Title:
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY d '. .
TEXT 3.1.1 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 1 03/10/2005
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE Report Date: 05/06/05 Page I1 Page of of 15 15 Report Date:'05/06/05
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.2.1 4 04/14/2005
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
TEXT 3.3.1 0 11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 0 11/19/2002
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 0 11/19/2002
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 0 11/19/2002
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 . - 0 11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 1 10/22/2003
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 0 11/19/2002
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 1 11/22/2004
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION Report Date: 05/06/05 Page 22 of of 15 15 Report Date: 05/06/05
SSES MANUAL i Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)
TEXT 3.4.4 1 12/14/2004
Title:
REACTOR COOLANT SYSTEM REACTOR-RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 0 11/18/2002
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.5.1 -1 02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 0 11/19/2002
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/19/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0 11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Report Date: 05/06/05 Page 33 of of 15 15 Report Date: 05/06/05
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 0 11/19/2002
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 0 11/19/2002
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 0 11/19/2002
Title:
PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 0 11/19/2002
Title:
PLANT SYSTEMS HALON SYSTEMS**
TEXT 3.7.3.5 0 11/19/2002
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 0 11/19/2002
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 0 11/19/2002
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 1 01/12/2004
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 0 11/19/2002
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM TEXT 3.7.5.1 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR Report Date: 05/06/05 4
Page 4 of of 15 15 Report Date: 05/06/05
I ;SSES',MANUAL
- f Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 0 11/19/2002
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS -
TEXT 3.7.6 1 03/01/2005
-Title: PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 2 03/01/2005
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 - 0 11/19/2002
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.8.1 2 02/04/2005
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 1 12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 2 12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT 3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1 02/04/2005
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM Report Date: 05/06/05 Page 5 Page 5 of of 15 15 Report Date: 05/06/05
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.5 0 11/19/2002
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 0 11/19/2002
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING.
TEXT 3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 -0 11/19/2002
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 0 11/19/2002
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 0 11/19/2002
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 0 11/19/2002
Title:
MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)
TEXT 3.11.1.1 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM Report Date: 05/06/05 Page 6 Page 6 of of 15 15 Report Date: 05/06/05
I _:
SSES MANUAL P" Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.4 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.2.1 1 01/27/2004
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.6 2 12/14/2004
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.4.2 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 - 11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 0 11/19/2002
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT B3.0 0 11/19/2002
Title:
APPLICABILITY BASES TECHNICALREQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES. ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 1 03/10/2005
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION Report Date: 05/06/05 Page 7 7 of of 1515 Report Date: 05/06/05
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 0 11/19/2002
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 0 11/19/2002
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 1 02/04/2005
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 0 11/19/2002
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION ......J TEXT B3.3.5 0 11/19/2002
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 2 12/14/2004
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 0 11/19/2002
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003
Title:
INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 1 11/22/2004
Title:
INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 0 11/19/2002
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS Report Date: 05/05/05 Page 8 Page 8 of of 15 15 Report Date: 05/06/05
SSES. MANUAL
. Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.11. 1 10/22/2003
Title:
INSTRUMENTATION BASES M4VP ISOLATION INSTRUMENTATION TEXT B3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 -0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.5.1 0 11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 0 11/19/2002
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 0 11/19/2002
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION Report Date: 05/06/05 Page 9 of 15 Report Date: 05/06/05
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 -o 11/19/2002
Title:
PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 0 1i/19/2002
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 1 01/12/2004
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM Report Date: 05/06/05 10 Page 10 of of 15 15 Report Date: 05/06/05
x -SSES MANUAL i Manual Name: TRM2
%lanual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.5.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002
Title:
PLANT -SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 1 03/01/2005
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION T'EXT B3.7.8 - 1 12/14/2004
<_f2
Title:
PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 1 12/14/2004
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1 1 02/04/2005
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1 09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR-OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES Report Date: 05/06/05 Page 11 Page 11 of of 15 15 Report Date: 05/06/05
.SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.8.4 0 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0 11/19/2002
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1 02/04/2005
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 0 11/19/2002
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4 0 11/19/2002
Title:
MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)
TEXT B3.11.1.1 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE Report Date: 05/06/05 Page 12 12 of of 15 15 Report Date: 05/06/05
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT'SYSTEM TEXT B3.11.1.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0' 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 - 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES -DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 2 10/27/2004
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS Report Date: 05/06/05 Page 13 Page of of 15 15 Report Date: 05/06/05
SSES MANUAL Manual Namm: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 I
TEXT B3.11.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS TEXT 3.11.1.5 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 0 11/18/2002
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 4.1 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION Report Date: 05/06/05 Page 14 14 of of 15 15 Report Date: 05/06/05
x SSES MANUAL
% Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4. 2 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4 .3 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4. 4 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4. 5 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4. 6 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4 .7 -0 > 09/27/2003
Title:
ADMINISTRATIVE CONTROLS TRAINING Report Date: 05/06/05 Page 15 Page 15 of of 15 15 Report Date: 05/06/ 05
Instrument Trip Setpoint Program PPL Rev. 4 2.2 2.0 PLANT PROGRAMS AND SETPOINTS 2.2 Instrument Trip Setpoint Table The Instrument Trip Setpoint Limits in Table 2.2-1 are the Trip Setpoint value limits that were contained in the Instrumentation Setpoint tables for protection systems and other functions important to safety that were included in the scope of the original Standard Technical Specifications. Actual instrument setpoints are established utilizing the Allowable Values specified in the Technical Specifications and Technical Requirements. Allowable Values are established in the Reference LCOs and TROs identified in this Table. TRO references are enclosed in square brackets.
Instrumentation process setpoints for the listed subsystems and trip functions are set consistent with the Trip Setpoint Limit Column of Table 2.2-1. Actual setpoints are established in accordance with engineering procedures.
Alarm setpoints and other non-protection system trip settings as may be found in the Technical Specifications or in the Technical Requirements are not included in this table.
Reference NDAP-QA-1104 Setpoint Change Control SUSQUEHANNA - UNIT 2 .TRM / 2.0-5 EFFECTIVE DATE 04/02/1999
Instrument Trip Setpoint Program PPL Rev. 4 2.2 TABLE 2.2-1 (Page 1 of 8) I INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SETPOINT 2.2.1 Reactor Protection 2.2.1.1 3.3.1.1 Intermediate Range Monitor, Neutron Flux -
- 1201125 divisions of full High scale 2.2.1.2 3.3.1.1 Average Power Range Monitor, Neutron Flux
- 15% Qf RATED THERMAL POWER
- High Setdown 2.2.1.3 3.3.1.1 Average Power Range Monitor, Flow Biased See COLR - TRO 3.2 Simulated Thermal Power - High Two Loop Operation 2.2.1.4 3.3.1.1 Average Power Range Monitor, Flow Biased See COLR - TRO 3.2 Simulated Thermal Power - High Single Loop Operation 2.2.1.5 . 3.3.1.1 Average Power Range Monitor, Flow Biased
- 113.5% of RATED THERMAL Simulated Thermal Power - High Flow POWER Clamped 2.2.1.6 3.3.1.1 Average Power Range Monitor, Fixed Neutron
- 118% of RATED THERMAL POWER Flux - High 2.2.1.7 3.3.1.1 Reactor Vessel Steam Dome Pressure - High 51087 psig 2.2.1.8 3.3.1.1 Reactor Vessel Water Level - Low, Level 3 213.0 inches C' 2.2.1.9 .3.3.1.1 Main Steam Isolation Valve - Closure :5 10% closed 2.2.1.10 . This Section Not Used 2.2.1.11 3.3.1.1
- Drywell Pressure - High
- 1.72 psig 2.2.1.12 3.3.1.1 Scram Discharge Volume Water Level - High . *65 gallons Level Transmitter 2.2.1.13 3.3.1.1
- Scram Discharge Volume Water Level - High . *61 gallons
- Float Switch 2.2.1.14 3.3.1.1 Turbine Stop Valve - Closure . 5.5% closed 2.2.1.15 3.3.1.1 Turbine Control Valve Fast Closure, Trip 2 500 psig Oil Pressure - Low (continued)
(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-6 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Program PPL Rev. 4 V..
2.2 TABLE 2.2-1 (Page 2 of 8) l1 INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO] - TRIP FUNCTION . TRIP SETPOINT 2.2.1.16 OPRM Instrumentation 2.2.1.16.1 3.3.1.3 - Sp Cell Signal Amplitude See COLR -TRO 3.2 2.2.1.16.2 3.3.1.3 N2 Confirmation Count Permissive See COLR -TRO 3.2 2.2.1.16.3 . [3.3.9] TOL Period Confirmation Tolerance 0.10 sec 2.2.1.16.4 [3.3.9] Ta Averaging Filter 5 sec 2.2.1.16.5 [3.3.9] Fc Conditioning Filter Cutoff Frequency 1.5 Hz 2.2.1.16.6 . [3.3.9] Tmin Minimum Oscillation Period 1.0 sec 2.2.1.16.7 [3.3.9] Tmax Maximum Oscillation Period 3.5 sec 2.2.1.16.8 [3.3.9] Noise Floor Peak Discrimination Threshold I 2.2.1.16.9 [3.3.9] Minimum LPRM/Cell Cell Operability 2 Requirement 2.2.1.16.10 [3.3.9] S1 Peak Threshold Setpoint 1.20 2.2.1.16.11 [3.3.9] S2 Valley Threshold Setpoint 0.85 2.2.1.16.12 [3.3.9] Smax Max. Amplitude Trip Setpoint 1.50 2.2.1.16.13 [3.3.9] DR3 Growth Rate Factor Setpoint 1.60 2.2.1.16.14 [3.3.9] TI lo SI to S2Timer Range 0.5 sec 2.2.1.16.15 [3.3.9] TI hi SI to S2 Timer Range
- 1.75 sec 2.2.1.16.16 [3.3.9] T2 lo S2 to(S3 or Smax) Timer Range 0.5 sec 2.2.1.16.17 [3.3.9] T2 hi S2 to(S3 or Smax) Timer Range - 1.75 sec 2.2.2 Isolation Actuation Instrumentation-2.2.2.1 Primary Containment Isolation 2.2.2.1.1 3.3.6.1 Reactor Vessel Water Level Low, Level. 3 13.0 Inches(a) 2.2.2.1.2 3.3.6.1 Reactor Vessel Water Level Low Low, Level 2 -38.0 Inches(a) 2.2.2.1.3 3.3.6.1 Reactor Vessel Water Level Low Low Low, 2 2 -129 inches(a)
Level I 2.2.2.1.4 3.3.6.1 Drywell Pressure - High s 1.72 psig 2.2.2.1.5 .3.3.6.143.3.6] SGTS Exhaust Radiation - High s 23.0 mRfhr 2.2.2.1.6 [3.3.6] Main Steam Line Radiation - High High s 15 x full power background without hydrogen injection (continued)
SUSQUEHANNA - UNIT 2 TRM / 2.0 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Program PPL Rev. 4 2.2
-TABLE 2.2-1 (Page 3 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO
[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.2.2 Secondary Containment isolation 2.2.2.2.1 3.3.6.2 Reactor Vessel Water Level - Low Low, 2-38.0 inches(')
Level 2 2.2.2.2.2 3.3.6.2 Drywell Pressure - High S 1.72 psig 2.2.2.2.3 3.3.6.2 Refuel Floor High Exhaust Duct Radiation - s 18 mR/hr High 2.2.2.2.4 3.3.6.2 Railroad Access Shaft Exhaust Duct S5mRthr Radiation - High 2.2.2.2.5 3.3.6.2 Refuel Floor Wall Exhaust Duct Radiation - S 21 mR/hr High 2.2.2.3 Main Steam Une Isolation 2.2.2.3.1 3.3.6.1 Reactor Vessel Water Level - Low Low Low, 2 -129 inches(')
Level I 2.2.2.3.2 3.3.6.1 Main Steam Line Pressure - Low 2 861 psig 2.2.2.3.3 3.3.6.1 Main Steam Line Flow- High S 113 psid 2.2.2.3.4 3.3.6.1 CondenserVacuum- Low 2 9.0 inches Hg vacuum 2.2.2.3.5 3.3.6.1 Reactor Building Main Steam Line Tunnel s 177TF Termperature - High 2.2.2.3.6 This Section Not Used 2.2.2.3.7 [3.3.6] . Reactor Building Main Steam Line Tunnel s 990F A Temperature - High 2.2.2.3.8 [3.3.6] Turbine Building Main Steam Tunnel S 1970F I Temperature - High 2.2.2.4 Reactor Water Cleanup System Isolation 2.2.2.4.1 3.3.6.1 Reactor Vessel Water Level - Low Low, 2 -38 inches(a)
Level2 2 2.2.2.4.2 3.3.6.1 RWCU A Flow- High s59gpm 2.2.2.4.3 3.3.6.1 RWCU Flow- High s 462 gpm 2.2.2.4.4 3.3.6.1 RWCU Penetration Area Temperature - High s 1310 F 2.2.2.4.5 [3.3.6] RWCU Penetration Room Area A Temperature s 690F
- High 2.2.2.4.6 3.3.6.1 RWCU Pump Area Temperature - High S 147°F 2.2.2.4.7 [3.3.6] RWCU Pump Room Area A Temperature - s690 F High 2.2.2.4.8 3.3.6.1 RWCU Heat Exchanger Area Temperature - S147°F High 2.2.2.4.9 [3.3.6] RWCU Heat Exchanger Room Area s 69°F A Temperature - High (continued)
(a)See Figure 2.2-1 SUSQUEIHANNA - UNIT 2 .1TRM 12.0-8 EFFECTIVE DATE 12/03/2004
Instrument Trip Setpoint Program PPL Rev. 4 C
.2.2 TABLE 2.2-1 (Page 4 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO
[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.2.5 Reactor Core Isolation Cooling System Isolation 2.2.2.5.1 3.3.6.1 RCIC Steam Une A Pressure - High
- 138 inches H20 .1I 2.2.2.5.2 3.3.6.1 RCIC Steam Supply Une Pressure - Low 2 60 psig 2.2.2.5.3 3.3.6.1 RCIC Turbine Exhaust Diaphragm Pressure
- 10.0 psig
-High 2.2.2.5.4 3.3.6.1 RCIC Equipment Room Temperature - High
- 167°F 2.2.2.5.5 3.3.6.1 RCIC Pipe Routing Area Temperature - High
- 167°F 2.2.2.5.6 3.3.6.1 RCIC Emergency Area Cooler Temperature -
- 1670 F High 2.2.2.5.7 3.3.6.1 Drywell Pressure - High
- 1.72 psig 2.2.2.5.8 [3.3.6] RCIC Equipment Room A Temperature - High
- 890 F 2.2.2.5.9 [3.3.6] RCIC Pipe Routing Area A Temperature -
- 89°F High 2.2.2.6 High Pressure Coolant Injection System Isolation 2.2.2.6.1 3.3.6.1 HPCI Steam Une A Pressure - High
- 370 inches H20 2.2.2.6.2 3.3.6.1 HPCI Steam Supply Une Pressure - Low 2 104 psig 2.2.2.6.3 3.3.6.1 HPCI Turbine Exhaust Diaphragm Pressure -
- 10 psig
-High 2.2.2.6.4 3.3.6.1 HPCI Equipment Room Temperature - High
- 167°F 2.2.2.6.5 3.3.6.1 HPCr'EmergencyArea Cooler Temperature -
- 167°F High 2.2.2.6.6 3.3.6.1 HPCI Pipe Routing Area Temperature- High
- 167°F 2.2.2.6.7 3.3.6.1 Drywell Pressure - High
- 1.72 psig 2.2.2.6.8 [3.3.6] HPCI Equipment Room A Temperature - High
- 890F 2.2.2.6.9 [3.3.6] HPCI.Pipe Routing Area A Temperature -
- 891F High 2.2.2.7 Shutdown Cooling/System Isolation 2.2.2.7.1 .3.3.6.1 Reactor Vessel Water Level - Low, Level 3 2 13.0 inc~hes°a 2.2.2.7.2 3.3.6.1 Reactor Vessel Steam Dome Pressure - High
- 98 psig 2.22.7.3 [3.3.6] RHR Flow- High
- 25,000 gpm 2.2.3 ECCS Actuation 2.2.3.1 Core Spray System 2.2.3.1.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, 2-129 inches(a)
Level I 2.2.3.1.2 3.3.5.1 Drywell Pressure - High S 1.72 psig 2.2.3.1.3 3.3.5.1 Reactor Vessel Steam Dome Pressure - Low 2 413, S427 psig injection permissive
- . I(continued)
(a)See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-9 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Program PPL Rev. 4 2.2 TABLE 2.2-1 (Page 5 of 8) I INSTRUMENTATION SETPOINTS
- SYSTEM/REFERENCE LCO
[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.3.2 LPCI Mode of RHR System 2.2.3.21 3.3.5.1 Reactor Vessel Water Level - Low Low Low, 2 -129 inches(
Level I 2.2.3.2.2 3.3.5.1 Drywell Pressure - High 1.72 psig 2.2.3.2.3 3.3.5.1 Reactor Vessel Steam Dome Pressure - Low, 2 413,
- 427 psig injection permissive 2.2.3.2.4 3.3.5.1 Reactor Vessel Steam Dome Pressure - Low, 2 236 psig, decreasing Recirculation Discharge Valve permissive 2.2.3.3 HPCI System 2.2.3.3.1 3.3.5.1 Reactor Vessel Water Level - Low Low, 2 -38 Inches(*)
Level 2 2.2.3.3.2 3.3.5.1 Drywall Pressure - High .
- 1.72 psig 2.2.3.3.3 3.3.5.1 Condensate Storage Tank Level - Low 236.0 inches above tank bottom 2.2.3.3.4 3.3.5.1 Reactor Vessel Water Level - High, Level 8 S 54inches 2.2.3.4 Automatic Depressurization System (ADS) 2.2.3.4.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, 2 -129 inches Levell1 2.2.3.4.2 3.3.5.1 Drywell Pressure - High - * *1.72 psig 2.2.3.4.3 3.3.5.1 ADS Timer < 102 seconds 2.2.3.4.4 3.3.5.1
- Core Spray Pump Discharge Pressure - High Ž135,
- 155 psig 2.2.3.4.5 3.3.5.1 Low Pressure Coolant Injection Pump 2 121,
- 129 psig Discharge Pressure - High 2.2.3.4.6 3.3.5.1 Reactor Vessel Water Level - Low, Level 3 2 13 Inches Confirmatory 2.2.3.4.7 3.3.5.1 ADS Drywell Pressure Bypass Timer *420 seconds 2.2.3.5 Loss of Power - ECCS Actuation 2.2.3.5.1 4.16kv ESS Bus Undervoltage (Loss of Voltage <20%)
2.2.3.5.1.1 3.3.8.1 Bus Undervoltage -823.2,
- 856.8 Volts 2.2.3.5.1.2 3.3.8.1 Time delay Ž 0.4, 5 0.6 seconds (continued)
(a)See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM/2.010 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Program PPL Rev. 4 2.2 TABLE 2.2-1 (Page 6 of 8) 1I INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO
[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.3.5.2 4.16kV ESS Bus Undervoltage (Degraded Voltage < 65%)
2.2.3.5.2.1 3.3.8.1 Bus Undervoltage 22641.1,
- 2748.9 Volts 2.2.3.5.2.2 3.3.8.1 Time delay 22.7,
- 3.3 seconds 2.2.3.5.3 4.16kV ESS Bus Undervoltage (Degraded Voltage, < 93%)
2.2.3.5.3.1 3.3.8.1 Bus Undervoltage 2 3829.3, *3906.7 Volts 2.2.3.5.3.2 3.3.8.1 Time Delay (Non-LOCA) 2 4 minute, 30 seconds
- 5 minute, 30 seconds 2.2.3.5.3.4 3:3.8.1 Time Delay (LOCA) 2 9,* 11 seconds 2.2.3.5.4 480V ESS Bus OB565 Undervoltage (Degraded Voltage, < 65%)
2.2.3.5.4.1 13.8.5] 480V Basis 2 308.9, s 315.1 Volts 2.2.3.5.4.2 [3.8.5] Time Delay 2 4.5, *5.5 seconds 2.2.3.5.5 480V ESS Bus OB565 Undervoltage (Degraded Voltage, < 92%)
2.2.3.5.5.1 [3.8.5] 480V Basis Ž437.6,
- 446.4 Volts 2.2.3.5.5.2 [3.8.5] . - Time Delay 2 9,*5 11 seconds 2.2.4 ATWS Atemate Rod Injection and Recirculation Pump Trip 2.2.4.1 3.3.4.213.1.1] Reactor Vessel, Water Level - Low Low, - -38 inches(a)
Level 2 2.2.4.1 3.3.4.21[3.1.1] Reactor Vessel Steam Dome Pressure- High [l 1135 psig 2.2.5 End of Cycle Recirculation Pump Trip 2.2.5.1 3.3.4.1 Turbine Stop Valve-Closure
- 5.5% closed 2.2.5.2 3.3.4.1 Turbine Control Valve - Fast Closure -2500 psig 2.2.6 Reactor Core Isolation Cooling System Actuation 2.2.6.1 3.3.5.2 . Reactor Vessel Water Level - Low Low, 2 -38 Inches(')
Level 2 2.2.6.2 3.3.5.2 Reactor Vessel Water Level - High, Level
- 54 inches(a) 5 C8 2.2.6.3 3.3.5.2 Condensate Storage Tank Level - Low 2 36.0 inches above tank bottom (continued)
(a)See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-11 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint Program PPL Rev. 4 . 2.2 -
TABLE 2.2-1 (Page 7 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO
[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.7 Control Rod Block 2.2.7.1 Rod Block Monitor 2.2.7.1.1 3.3.2 Low Power Range Upscale - Two Loop
- 0.58W + 52%
Operation 2.2.7.1.2 3.3.2 Low Power Range Upscale - Single Loop S 0.58W + 47%
Operation 2.2.7.1.3 Downscale 5%
2.2.7.2 APRM 2.2.7.2.1 [3.1.3] Flow Biased Simulated Thermal Power-High See COLR - TRO 3.2
- Two Loop Operation 2.2.7.2.2 [3.1.3] Flow Biased Simulated Thermal Power High See COLR - TRO 3.2
- Single Loop Operation 2.2.7.2.3 [3.1.3] . Flow Biased Simulated Thermal Power High
- 108% of RATED THERMAL POWER
- High Flow Clamped 2.2.7.2.4 [3.1.3] Downscale 2 5% of RATED THERMAL POWER 2.2.7.2.5 [3.1.3] Neutron Flux - High Setdown
- 12% of RATED THERMAL POWER 2.2.7.3 Source Range Monitors 2.2.7.3.1 [3.1.3] Upscale
- 2E5 cps 2.2.7.3.2 [3.1.31 Downscale - 0.7 cps°1 2.2.7.4 Intermediate Range Monitors 2.2.7.4.1 [3.1.3] Upscale
- 1081125 divisions of full scale 2.2.7.4.2 [3.1.3] Downscale - 5/125 divisions of full scale 2.2.7.5 Scram Discharge Volume 2.2.7.5.1 13.1.3] Water Level - High
- 35.9 gallons 2.2.7.6 Reactor Coolant System Recirculation Flow 2.2.7.6.1 [3.1.3] Upscale . . 114%
2.2.7.6.2 [3.1.3] Comparator
- 10%h flow deviation (continued) b) Provided signal-to-noise ratio is 2 2. Otherwise, 2 3 cps.
. .8, SUSQUEHANNA - UNIT 2 TRM / 2.0-12 EFFECTIVE DATE 11/1512004
- I Instrument Trip Setpoint Program PPL Rev. 4 2.2 TABLE 2.2-1 (Page 8 of 8)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO T F
[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.8 CREOASS 2.2.8.1 3.3.7.1 Main Control Room Outside Air Intake
- 5 mR/hr Radiation Monitor 2.2.8.1.1 3.3.7.1 Reactor Vessel Water Level - Low Low, 2 -38.0 inches(')
Level 2 2.2.8.1.2 3.3.7.1 Drywell Pressure - High :s 1.72 psig 2.2.8.1.3 3.3.7.1 Refuel Floor High Exhaust Duct Radiation s 18 mR/hr
- High 2.2.8.1.4 3.3.7.1 Railroad Access Shaft Exhaust Duct s 5 mR/hr Radiation - High 2.2.8.1.5 3.3.7.1 Refuel FloorWall Exhaust Duct Radiation s 21 mR/hr
-High 2.2.9 Feedwater/Main Turbine Trip System Actuation 2.2.9.1 . 3.3.2.2 Reactor Vessel Level - High S 54.0 inches(')
2.2.10 MVP Isolation 2.2.10.1 [3.3.11] Main Steam Line Radiation - High High
- S 15 x full power background without hydrogen Injection
') See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-13 EFFECTIVE DATE 11/15/2004
Instrument Trip Setpoint,Table PPL Rev. 4 2.2 I
WATER LEVEL INOENCLATURE I HEIGHT5BOVE:
VESSEL ZERO- REAdIN(G 800 .. CIN .)
(7). 5S66.5 3 750 ,ee 74 ..{4) 557.5 +30 C2* 489.5, -38 C) 398. 5 -127.
I
- s ls : e +0 + 0_ +4.*~0 +
--5 57.S C )?-. .C8)1 54 ~ t 9' t ATER .. .IN.TR [HRI SI(3 V E1 TZ ~ SPE--
RAO( ) I I I TE R I . T D FEED4 O0 34985(1)-- l 9. SCSAM
- -i so C NTRIBUTE TO I BA DS tTR:IS'ALE INC PLIS:
FUIRG 2. 2- 1_ 12 RE ASCET L RSVE W TERSEV EL
. C RDANID: F102.2.1 . A SUSQUEHANNA NIT
-UNI2T 2 TRMM120 / 2.0-144 EFFECTIVE DATE 1111512004