Draft - Section B Operating Exam (Folder 2)
ML051320190
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/16/2005
From: Godley R
Constellation Energy Group
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
Download: ML051320190 (74)


Text

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Downshift Reactor Recirculation Pumps Revision: NRC 2005 Task Number: 2029150101 Approvals:

NA EXAMINATION SECURITY Date 1 General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: X P e r f o r m Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO

--- Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NRC JPM 1 1 03/15/05

Recommended Start Location:

Simulator Simulator Set-up:

Reset to IC-44 Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as PasdFail. All steps are sequenced critical unless denoted by a e
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. N2-OP-29 G . l .O
2. NUREG K/A 202001 A4.01 3.7/3.7 Tools and Equipment:
1. None Task Standard:

Recirculation pumps 1A and 1B running in slow speed with their flow control valves full open.

NRC JPM 1 2 03/15/05

Initial Conditions:

1. The plant is at 41 o/o power.
2. The Rod line is at 60%.
3. Hydrogen injection has been secured.
4. Evaluator to ask the operator for any questions.

Initiating cue:

RO - (Operators name), Transfer Recirc Pumps from high speed to low speed per N2-0P-29 section G.1.0.

SRO - (Operators name), Transfer Recirc Pumps from high speed to low speed.

1 Performance Steps I Standard 1 Grade I

1. Provide repeat back of initiating cue. o Proper communications used for repeat SatlUnsat Evaluator Acknowledge repeat back back (GAP-OPS-0 1) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference N2-OP-29 obtained. Precautions & Sat/Unsat procedure and review/utilize the correct Limitations reviewed and section G . l .O section. referenced
3. Verify the following:

LI BRKR 1A/B control switches in o Observes BRKR 1A and 1B control Sat/Unsat NORMAL. switches in NORMAL o Observes BRKR 2A and 2 8 control Sat/Unsat 3 BRKR 2A/B are open AND control switches in NORMAL switches in NORMAL.

Observes BRKR 2N2B green lights - ON Sat/Unsat o Observes BRKR 2N2B red lights - OFF Sat/Unsat o LFMG generator AND pump motor Cue: When asked, report that LFMG lockout AND relays are reset at generator & pump motor lockout and RECIRCULATION SYSTEM LFMG SET relays are reset AUXILIARY RELAY PANEL B35-PO01A( B).

4. At 2NPS-SWG004 (SWG005), confirm Cue: Acknowledge request and report that breaker 1, REACTOR breaker 1 on both NPS-SWGOO4 and RECIRCULATION PUMP MOTOR 005 BRKR - 2A(B) 2RCS-M1A(B) is are charged.

charged as indicated by yellow indicator on lower left of breaker.

5. Position AND hold BRKR 5A(B) control o Rotates BRKR 5A control switch - Pass/Fail switch to TRANSFER MG, THEN TRANSFER MG position the remaining BRKR 5B(A) o Rotates BRKR 5B control switch - PasslFail control switch to TRANSFER MG TRANSFER MG The following annunciators alarm not

. requiring action:

o 603139 Reactor Water Level High (inlclear)

NRC JPM 1 3 03/15/05

I Performance Steps I Standard I Grade 1 603218 OPRM Trip Enabted (clears) o 842310 HWC Trouble (reflashes) o 851456 Cnst System Trouble No Backup Pmp Available (inkleaf)

6. Observe the following:

u BRKR 5A trips. o Observes BRKR 5A red light - OFF Sat/ Unsat Observes BRKR 5A green light - ON Sat/Unsat o BRKR 5B trips. o Observes BRKR 5B red light - OFF Sat/Unsat o Observes BRKR 5B green light - ON Sat/ Unsat u BRKR 1A AND BRKR 1B close. o Observes BRKR 1A red light - ON Sat/ Unsat Observes BRKR 1A green light - OFF Sat/ Unsat Observes BRKR 1B red light - ON Sat/Unsat o Observes BRKR 1B green light - OFF Sat/Unsat c3 Pump speed lowers to between 460 Observes speed on B35-651A and B drop SaffUnsat AND 350 rpm. e460 but >350 rpm J BRKR 2A AND BRKR 2B close. Observes BRKR 2A red light - ON Sat/Unsat o Observes BRKR 2A green light - OFF Sat/Unsat o Observes BRKR 2A red light - ON Sat/Unsat o Observes BRKR 2A green light - OFF Sat/Unsat o Pump speed stabilizes at about 445 o Observes speed on 835-651A and B at Sat/Unsat rpm. about 445 rpm

7. Using RECIRC LOOP A AND B FLOW o Positions RECIRC LOOP A and B FLOW Pass/Fail CONTROL stations, raise output signal CONTROL to raise.

to 100% (about 85 on A loop % VALVE o Observe loop A VALVE POSITION at Sat/Unsat POS IT10N indicated ) . about 85%

o Observe loop B VALVE POSTION at Sat/ Unsat about 95%

The following annunciators alarm not requiring action:

o 603218 OPRM Trip Enabled alarms

8. Monitors recirculation pump and LFMG o Observe about 73 amps on AM- Sat/U nsat parameters. 2RCSA(B)60 o Observe 445 rpm on B35-R651A(B). Sat/Unsat Dispatches an Auxiliary Operator to Sat/Unsat report LFMG generator voltage and amperage.

Cue: As the Auxiliary Operator, report that LFMG A generator indicates 1250 volts and 95 amps. Also, LFMG B generator indicates 1250 volts and 94 amps.

NRC JPM 1 4 03115/05

1 Performance Steps I Standard I Grade I

9. Reports that Recirc pumps have been Cue: Acknowledges the report.

transferred to slow speed.

TERMINATING CUE: Recirc pumps 1A and 1B running in slow speed.

RECORD STOP TIME NRC JPM 1 5 03115/05

Initial Conditions:

1. The plant is at 41% power.

- 2. The Rod line is at 60%.

3. Hydrogen injection has been secured.
4. Evaluator to ask the operator for any questions.

Initiating cue:

RO - (Operators name), Transfer Recirc Pumps from hiGI speed to low speed per P 2-OP-29 section I

G. 1.O.

Candidate.- Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 1 6 03/15/05

Initial Conditions:

.._. 1. The plant is at 41 YO power.

2. The Rod line is at 60%.
3. Hydrogen injection has been secured.
4. Evaluator to ask the operator for any questions.

Initiating cue:

SRO (Operators name), Transfer Recirc Pumps from high speed to low speed.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 1 7 03/15/05

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

RClC Injection With Oscillations (Faulted) Revision: NRC 2005 Task Number: 21791 50101 Approvals :

NA EXAMINATION SECURITY General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATON SECURITY Configuration Control Date Performer: (RO/SRO)

Evaluation Method: X Perform Simulate Evaluation Location: -Plant X Simulator Expected Completion Time: 15 min. Time Critical Task: No Alternate Path Task: Yes Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if 9 critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

02-OPS-SJE-217-2-05 NRC JPM 2 1 2/14/2005

Recommended Start Location:

Simulator Simulator Set-up:

1. Reset to any hot IC
2. RPV pressure >300 psig
3. Malfunction RC04, TRUE, Event Trigger 049 [Relatives]

FALSE, Event Trigger 050

4. Reactor in MODE 3 with Main Turbine off-line, or RCIC-Turbine trip bypassed.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independentlpeer verifier.

Notes to Instructor / Evaluator:

1 . Critical steps are identified in grading areas as PasdFail. All steps are sequenced critical unless denoted by a e.

2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

. Self-verification shall be demonstrated.

Additional verification shall be demonstrated.

References:

1. N2-OP-35, Section F.2.0
2. NUREG WA 21 7000 A4.01 3.7/3.7 Tools and Equipment:

None Task Standard:

RClC Flow Controller in manual and with RClC injecting to RPV at approximately 600 gpm.

02-OPS-SJE-217-2-05 NRCJPM2 2 2/14/2005

Initial Conditions:

1. Reactor pressure is (report digital pressure reading on P603)
2. RPV level is lowering.

Initiating Cues:

(Operators name), initiate RCIC, inject into the RPV and establish rated flow, per N2-0P-35, Section F.2.0.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat Sat/Unsat Evaluator Acknowledge repeat back back (GAP-OPS-01) providing correction if necessary.

RECORD START TIME

2. Obtain a copy of the reference N2-OP-35 obtained. Precautions & Sat/ Unsat procedure and reviewhtilize the correct limitations reviewed and Section F.2.0 section of the procedure. referenced.

At P601, rotate RCIC manual initiation Pass/Fail

-. 3. Initiate RCIC. pushbutton collar to armed position.

Depress RClC manual initiation PasslFail pushbutton.

4. Verify RClC System response. Verifies RClC has started properly by verifying the following:

0 Gland Seal System Air Compressor Satfunsat STARTS.

ICS*MOV116, Lube Oil Cooling Sat/ Unsat Water Supply, OPENS.

0 ICS*MOV120, Turbine Steam Sat/ Unsat Supply Valve, OPENS.

0 ICS*MOV126, RCIC Pump Sat/ Unsat discharge to the Reactor, OPENS.

ICS*MOV143, RClC Pump Sat/Unsat minimum flow to the Suppression Pool. OPENS and then CLOSES once discharge flow is greater than 220 gpm. Sat/Unsat ICS*AOV 156 and 157, RCIC Injection Outboard and Inboard Isolation Valves, OPEN once System Pressure is greater than 02-OPS-SJE-217-2-05 NRCJPM2 3 2/14/2005

__ ~

Reactor Pressure.

02-OPS-SJE-217-2-05 NRCJPM2 4 211412005

-~

Performance Steps Standard Grade

-\--

5. Observe and respond to failure of the 0 Recognizes as RClC Flow is PasslFail RClC System flow controller in AUTO. increasing that the flow to the Reactor Vessel is OSCILLATING.

0 Places ICS*FClOI, RClC Flow PasslFail Controller in MANUAL and ESTABLISHES approximately 600 gpm flow rate.

6. Reports to the SM; RClC is injecting to the Reactor CUE: As the SM, respond to the Sat/Unsat Vessel at 600 gpm in the MANUAL Candidates report on the RCIC mode. System.

Sat/Unsat The Flow Controller, 21CS*FC101, IS CUE: As the SM, respond to the NOT in the AUTOMATIC mode due Candidates to flow oscillations during startup of report on the RClC System.

the RClC System.

Current Reactor Vessel Level.

CUE: If asked, tell the Candidate that RClC flow is still required, and to monitor the RClC System for any further signs of malfunctions.

Terminating Cue: The RClC System is injecting in the manual mode at rated flow conditions.

RECORD STOP TIME 02-OPS-SJE-217-2-05 NRC JPM 2 5 2/14/2005

Initial Conditions:

1. Reactor pressure is (report digital pressure reading on P603)
2. RPV level is lowering.

Initiating Cues:

(Operators name), initiate RClC per N2-OP-35, Section F.2.0, inject into the RPV and establish rated flow.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

02-OPS-SJE-217-2-05 NRCJPM2 6 211 412005

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Restart RHS in S/D Cooling Mode (Alternate) Revision: NRC 2005 Task Number: 2050030101 Approvals:

7h.k NA EXAMINATION SECURITY date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 10 Mins. Time Critical Task: NO Alternate Path Task: YES Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail

-NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

NRC JPM 3 2/14/2005

Recommended Start Location:

Unit 2 Simulator Simulator Set-up:

1. Place Simulator in IC-24 Shut Down Cooling
2. Shutdown the 'B' RHS Loop per N2-OP-31, Section H.3.0
3. Set up the following I/O and Event Trigger: - (P14/35), ET#51.
a. I/O 2RHS*MOV40B control switch (Page 14/36) in 'Neutral' and trigger (ET-51) with the red open indication for 2RHS*MOV40B.

(P601-B22H-S44-A, RHR Shutdown Cooling Injection Is01 Vlv MOV 408, NEUTRAL ETOI)

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cuesasnecessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independenffpeer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as PasslFail. All steps are sequenced critical unless denoted by a ".".
2. During Evaluated JPM:

0 Self-verification shall be demonstrated.

3. During Training JPM:

0 Self-verification shall be demonstrated.

Additional verification shall be demonstrated.

References:

1. N2-OP-31, Section H.3.0 and H.4.0
2. N2-ARP-01, Attachment 6, ARP for window 601648
3. NUREG 1123, 205000 A4.01 3.7/3.7 Shutdown Cooling System (RHR Shutdown Cooling Mode)

Tools and Equipment:

None required Task Standard: RHS*Pl B tripped within 40 seconds of start NRC JPM 3 2/14/2005

Initial Conditions:

- 1. Plant is in mode 4.

2. SDC Loop B; has been shut down per N2-OP-31, section H.3.0.
3. SDC Loop B has been shut down for 15 minutes.
4. RDS Back fill is in service.
5. Instructor to ask operator for any questions.

Initiating Cues:

RO- (Operators name), Restart RHS Loop B in Shut Down Cooling per N2-OP-31.

SRO- (Operators name), Restart RHS Loop B in Shut Down Cooling.

I Performance Steps I Standard I Grade I

1. Provide repeat back of initiating cue. o Proper communications used for repeat SaUUnsat Evaluator Acknowledge repeat back back (GAP-OPS-01/Operations providing correction if necessaty. Manual).

RECORD START TIME

2. Obtain a copy of the reference o N2-0P-31 obtained. Precautions & SatlUnsat procedure and reviewhtilize the limitations reviewed & section H.4.0 correct section of the procedure. referenced.
3. IF RDS Backfill Injection is out of Determines that RDS backfill is in SaVUnsat service to one OR more RPV Level service and no action is required, reference Legs in Mode 3, THEN perform the following:
a. Enter N2-OP-101C, Attachment 1.
b. Perform concurrently with this Subsection to monitor for possible RPV level instrumentation notching.

C. IF observed, take the proper actions.

4. CAUTION: The RHR pump is without o Obtains stopwatch. SatlUnsat minimum flow protection, Minimum flow of > 1000 gpm must be established within 40 seconds of pump start. Use of a stopwatch is recommended to ensure the pump is tripped within the required time if minimum flow is not achieved. Do not allow pump to run for > 15 seconds deadheaded.
5. Start 2RHS*P1 B at Panel 601 R Rotates RHS*P1B control switch to start PasslFail and releases to Normal-After-Start.

NRC JPM 3 2/14/2005

1 Performance Steps I Standard I Grade 1 0 Starts the stopwatch Sat/Unsat 0 Observes control switch red flagged. Sat/ Unsat 0 Observes RHS*PI B red light - ON Sat/ Unsat 0 Observes RHS*PI B green light - OFF Sat/ Unsat

6. Throttle open RHS*MOV40B, SDC B 0 Places RHS*MOV40B control switch to PasslFail RETURN THROTTLE to > 1000 OPEN (requires key).

g Pm. 0 Observes RHS*MOV40B red light - ON SatlUnsat 0 Observes RHS*MOV40B green light - Sat/ Unsat ON 7 . IF RHS*MOV40B does not begin to 0 Observes no rising flow indication on SatlUnsat open in 15 seconds OR system flow meter E 12-R603B is NOT > 1000 gpm 40 seconds after 0 Prior to 40 seconds after RHS*PI B is PasslFail pump start. Place RHS*PI B control started, places RHS*PI B control switch switch to STOP, THEN release to to STOP and releases to Normal-After-Normal-After-Stop. stop.

8. Report to CRS inability to obtain 0 Report made to CRS of inability to Sat/Unsat required minimum flow on RHS*PI B obtain satisfactory min-flow and that and that the pump has been tripped. RHS*P1B has been tripped.

Cue: As the CRS, Acknowledge the report.

~.

Terminating Cue: RHS*P1B tripped within 40 seconds of start.

RECORD STOP TIME NRC JPM 3 2/14/2005

Initial Conditions:

1. Plant is in mode 4.
2. SDC Loop B; has been shut down per N2-0P-31, section H.3.0.
3. SDC Loop B has been shut down for 15 minutes.
4. RDS Back fill is in service.
5. Instructor to ask operator for any questions.

Initiating Cues:

RO- (Operators name), Restart RHS Loop B in Shut Down Cooling per N2-OP-31.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 3 2114/2005

Initial Conditions:

1. Plant is in mode 4.
2. SDC Loop B; has been shut down per N2-OP-31, section H.3.0.
3. SDC Loop B has been shut down for 15 minutes.
4. RDS Back fill is in service.
5. Instructor to ask operator for any questions.

Initiating Cues:

SRO- (Operators name), Restart RHS Loop B in Shut Down Cooling.

Candidaf e; Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 3 211 412005

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Initiate Containment Venting Through Revision: NRC 2005 Standby Gas Treatment (GTS)

Task Number: 2000070501 Approvals:

NA EXAMINATION SECURITY

~~

Oat& General Supervisor Date Operations Training (Designee) Operations .(Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer : (ROISRO)

TrainerlEvaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

02-OPS-SJE-261-2-02 NRC JPM 4 1 03/15/05

Recommended Start Location:

Simulator Simulator Set-up:

This JPM can be run from any IC. No setup is required.

Directions to Operators:

Read Before Everv JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cuesasnecessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Traininq JPM Performance:

-.. During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a

<, I, 0 .

2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

0 Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. N2-0P-61A, Primary Containment Ventilation Purge & Nitrogen System, Section H. 1.O
2. NUREG K/A: 295024. EA1.20 3.5 / 3.6 Tools and Equipment:

None required Task Standard:

SBGTS Train A running, aligned to the Drywell in accordance with applicable procedures.

02-OPS-SJE-261-2-02 NRC JPM 4 2 03115105

Initial Conditions:

1. EOPs have been entered due to high suppression pool temperature.
2. Conditions require standby gas be placed on the drywell to reduce pressure.
3. Drywell and Suppression Chamber vent samples have been obtained and are satisfactory.
4. There is no Nitrogen makeup to the Primary Containment in progress.
5. Instructor to ask operator for any questions.

Initiating Cues:

RO- (Operators name), place Standby Gas Train A on the Drywell per N2-OP-6lA, Section H.l .O.

SRO- (Operators name), place Standby Gas Train Aon the Drywell.

1. Provide repeat back of initiating cue. 0 Proper communications used for SaWnsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-01 )

providing correction if necessary.

RECORD START TIME

2. Obtain a copy of the reference 0 N2-0P-61A obtained. Precautions & SaffUnsat procedure and reviewhtilize the correct Limitations reviewed & section H . l .O section of the procedure. referenced.
3. IF required, as determined by 0 Determines that Chemistry samples Chemistry Supervision, notify Chemistry have been obtained and analysis is to sample the containment for the pre- completed vent acceptance criteria of ODCM Table D3.2.1-1 per Precaution and Limitation D.13.0 guidance:
4. IF time permits, concurrently with the o Cue operator that time does not following steps, fill out Attachment 3 for permit the filling out of attachment 3.

the valves operated (ODCM DSR 3.2.6.1). The listed position shall be the position of the valve following completion of the step.

5. IF desired to reduce Drywell or Suppression Chamber pressure, open the following: 0 Places IAS*SOVI 68 control switch PasslFail ZI IAS*SOV168 at 2CEC*PNL851. clockwise to OPEN.

0 Observes IAS*SOV168 red light - ON Sat/Unsat 0 Observes IAS*SOV168 green light - Sat/Unsat OFF Pass/Fail 3 IAS*SOV180 at 2CEC*PNL851 0 Places IAS*SOVI 80 control switch clockwise to OPEN Sat/Unsat 0 Observes IAS*SOV180 red light - ON SaVUnsat 0 Observes IAS*SOV180 green light -

L OFF 02-OPS-SJE-261-2-02 NRC JPM 4 3 03/15/05

I Performance Steps 1 Standard I Grade I

6. Start at least one of the GTS trains by 0 rotates the Train A Initiation switch PasslFail placing TRAIN A (B) INITIATION clockwise to the start position Control Switch to START position at 0 Observes Train A Initiation red light - Sat/Unsat

. 2CEC*PNL870 (871) AND verify the ON Sat/Unsat following: 0 Observes Train A Initiation green light

- OFF Sat/Unsat 3 GTS*MOVIA (B), INLET FROM RX 0 Observes GTS*MOVI A red light - ON Sat/Unsat BLDG VENTILATION - Opens. Observes GTS*MOVIA green light -

OFF Sat/Unsat 2 GTS*AOVZA (B), TRAIN A (B) INLET 0 Observes GTS*MOV2A red light - ON SatlUnsat VLV - Opens. 0 Observes GTS*MOV2A green light -

OFF SatlUnsat U GTS*AOV3A (B), FAN 1A (B) DISCH 0 Observes GTS*MOV3A red light - ON SatlUnsat ISOL VLV - Opens. 0 Observes GTSMOV3A green light -

OFF SatlUnsat 0 GTS*FN 1A (B), SBGTS FAN - Starts 0 Observes GTS*FNIA red light - ON Satfunsat 0 Observes GTS*FNIA green light -

OFF

7. Verify that Chemistry is standing by to o Requests Chemistry Technician Sat/Unsat start the sampling required durinq the commence sampling vent (ODCM Table D3.2.1-1).

Cue: If requested, inform Operator that Chemistry has started sampling during the vent.

8. IF GTS operation is affecting Reactor 0 Verify Reactor Building pressure 5-.6 Sat/Unsat Building differential pressure, adjust WG on GTS*PDIKSA.

controller 2GTS*PDIK5A (B), 0 If necessary, throttle pressure valve Pass/Fail REACTOR BLDG INLET/OUTLET DlFF 2GTS*PDIK5A as necessary to PRESS, to throttle 2GTS*PV5A (B), RX maintain 5 -.6WG Reactor Building BLDG PRESSURE CONTROL as pressure.

necessary.

9. At CEC*PNL873, verify the following valves closed:

o CPS*AOV104 0 Observe CPS*AOV104 green light - Sat/ Unsat ON Sat/Unsat 0 Observe CPS*AOV104 red light - SaVUnsat u CPS*AOV105 OFF Sat/Unsat 0 Observe CPS*AOV105 green light - Sat/Unsat JCPS*AOVIIO ON Sat/Unsat 0 Observe CPS*AOVI 05 red light - Sat/ Unsat OFF Sat/Unsat J CPS*AOVI 1 1 Sat/Unsat 0 Observe CPS*AOVI 10 green light - SaVUnsat ON Sat/Unsat o GTS*SOVI 02 0 Observe CPS*AOVI 10 red light - Sat/Unsat OFF u GTS*AOV 10 1 0 Observe CPS*AOVI 11 green light -

ON 0 Observe CPS*AOVI 11 red light -

02-OPS-SJE-261-2-02 NRC JPM 4 4 03115/05

Observe CPS*AOV102 green light -

ON o Observe CPS*AOV102 red light -

OFF o Observe CPS*AOV101 green light -

ON o Observe CPS*AOV101 red light -

OFF

10. At CEC*PNL875, verify the following valves closed:

o CPS*AOV106 Observe CPS*AOV106 green light - Sat/ Unsat ON Sat/ Unsat o Observe CPS*AOVlOG red light -

o CPS*SOV132/AOVI 07 OFF Sat/ Unsat o Observe CPS*SOVl32/AOV107 Sat/ Unsat green light - ON Observe CPS*SOVl32/AOV107 red o CPS*AOV108 light - OFF Sat/ Unsat Sat/ Unsat Observe CPS*AOV108 green light -

o CPS*SOV133/AOVI 09 ON Sat/ Unsat Observe CPS*AOV108 red light -

OFF Sat/ Unsat o Observe CPS*SOV133/AOVI 09 green light - ON o Observe CPS*SOV133/AOV109 red light - OFF

11. Notify Chemistry to start ODCM Cue: If requested, inform Operator that required sampling. Chemistry has started sampling during the vent.
12. At CEC*PNL873, open 2GTS*SOV102. Rotates 2GTS*SOV102 control switch PasslFail clockwise to - OPEN 0 Observe 2GTS*SOV102 red light - Sat/Unsat ON Sat/Unsat 0 Observe 2GTS*SOVlO2 green light -

OFF

13. At CEC*PNL873/875, open the following: 0 Rotate CPS*AOV108 control switch PasslFail aCPS*AOVI08 clockwise to OPEN 0 Observe CPS*AOV108 red light - ON Sat/Unsat 0 Observe CPS*AOV108 green light - SaffUnsat OFF PasslFail LICPS*AOVI 10 0 Rotate CPS*AOVI 10 control switch clockwise to OPEN 02-OPS-SJE-261-2-02 NRC JPM 4 5 03115/05
14. Reports that GTS Train A is running on Cue: Acknowledge the report the Drywell.

TERMINATING CUE: SBGTS Train "A" running on the Drywell.

RECORD STOP TIME 02-OPS-SJE-26 1-2-02 NRC JPM 4 6 03/15/05

Initial Conditions:

1. EOPs have been entered due to high suppression pool temperature.
2. Conditions require standby gas be placed on the drywell to reduce pressure.
3. Drywell and Suppression Chamber vent samples have been obtained and are satisfactory.
4. There is no Nitrogen makeup to the Primary Containment in progress.
5. Instructor to ask operator for any questions.

Initiating Cues:

RO- (Operators name), place Standby Gas Train Aon the Drywell per N2-0P-61A, Section H . l .O.

8 Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

02-OPS-SJE-261-2-02 NRC JPM 4 7 03115/05

Initial Conditions:

1. EOPs have been entered due to high suppression pool temperature.
2. Conditions require standby gas be placed on the drywell to reduce pressure.
3. Drywell and Suppression Chamber vent samples have been obtained and are satisfactory.
4. There is no Nitrogen makeup to the Primary Containment in progress.
5. Instructor to ask operator for any questions.

Initiating Cues:

SRO- (Operators name), place Standby Gas Train A an the Drywell.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

02-OPS-SJE-261-2-02 NRC JPM 4 8 03115\05

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Energize Reserve Station Transformer IB and NPS-SWG003. Revision: NRC 2005 Task Number: 2000350501 Approvals:

NA EXAMINATION SECURITY General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performe r : (RO/SRO)

TrainedEvaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

EvaIuator Signature: Date:

NRC JPM 5 1 03/15/05

Recommended Start Location:

Simulator Simulator Set-up:

Reset to IC 46 Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a "0".
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

0 Self-verification shall be demonstrated.

0 No other verification shall be demonstrated.

References:

1. N2-SOP-03 Tools and Equipment:
1. None Task Standard:

Reserve Transformer 1B energized from Line 6 and NPS-SWG003 and NNS-SWG013 energized from Reserve Transformer 1B.

NRC JPM 5 2 03/15/05

Initial Conditions:

_- 1. The plant experienced a Loss of Line 6.

2. The plant was manually scrammed.
3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
4. Fault Identification and Isolation per Attachment 1 Section 1.4 are complete.
5. Power has been restored to Line 6 and Power Control has verified its reliability.
6. Ask the operator for any questions.

Initiating cue:

RO- I' (Operator's name), Energize Reserve Station Transformer 1B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWGO13 per N2-SOP-3 Attachment 1 Section 1.5 Power Restoration."

SRO- " (Operator's name), Energize Reserve Station Transformer 1B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWGO13 per N2-SOP-3."

Performance Steps I Standard Grade

1. Provide repeat back of initiating cue. o Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-01) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference procedure o N2-SOP-3 obtained. Precautions & Sat/Unsat and reviewhtilize the correct section. Limitations are reviewed and Attachment 1 Section 1.5 referenced.
3. Review Attachment 1 Section 1.5 Power Per step 1.5.2, determines Sat/Unsat Restoration to determine applicable performance of Attachment 6 is Attachment to Energize Reserve required.

Transformer 1B

4. At Panel 808 (CB 288'), verify reset 86- Verifies 86 device is reset Sat/Unsat 2SPRYO1 (RES STA SER XFMR 1B PRIM PROT LO RELAY). Cue: If asked, inform the candidate that 86-SPRY01 is reset.

5 . At Panel 809 (CB 288'), verify reset 86- Verifies 86 device is reset Sat/Unsat 2SPRZ08 (RES STA SER XFMR 1B BU PROT LOCKOUT RELAY). Cue: If asked, inform the candidate that 86-SPRZO8 is reset.

6. Determine step 6.2 is N/A o Marks N/A block for step 6.2 Sat/Unsat
7. Determine section 6.3 is applicable Carries out the actions of section Sat/Unsat 6.3 NRC JPM 5 3 03/15/05
9. Close MDS4 - (1 15 KV CIRCUIT o Places MDS4 control switch from PasslFail SWITCHER CKT SWITCH 38). PULL-TO-LOCK to NORMAL-AFTE R - 0PEN o Places MDS4 control switch to PasslFail CLOSE SatlUnsat o Observes MDS4 red light - ON SatlUnsat o Observes MDS4 green light - OFF The following annunciators clear with no required action:

o 852421 MOT Operator CKT 2YUC-MDS4 o 852435 RES STA SER XFMER 1B Loss of Voltage I O . IF required, place in Normal-After-Trip o Places 3-1 control switch from PasslFail 2NPS-SWG003-1. PULL-TO-LOCK to NORMAL-AFTER-TRIP.

o Observes 3-1 green light - ON Sat/Unsat

11. Return to Attachment 1 Section 1.5. o Per step 1.5.8, determines SatlUnsat performance of Attachment 7 is required.
12. Step 7.1 Prerequisites Cue: If asked, 7.1.4 lockouts have been verified reset. Step 7.7, Prerequisites, are completed
12. Determines section 7.2 is applicable o Carries out the actions of section Sat/U nsat 7.2
13. Place 3-14 in Pull-to-Lock. Places 3-14 control switch in PasslFail PULL-TO-LOCK o Observes 3-14 greedred lights - SatlUnsat OFF The following annunciator clears with no required action:

852560 13.8KV Bus NPS003 ACB 3-1/14/16 Auto Trip/FTC

14. Place the SYNC switch to ON Rotates the SYNC switch to ON PasslFail (SYNCHRONIZE RES STA SVCE XFMR 1B).
15. Close 3-1. Rotates 3-1 control switch to PasslFail NRC JPM 5 4 03/15/05

I Performance Steps I Standard I Grade CLOSE Sat/ Unsat R Observes 3-1 red light - ON SaVUnsat R Observes 3-1 green light - OFF Numerous annuciators clear.

Numerous annunciators alarm.

Numerous annunciators reflash. None of these requires action.

16. Place the SYNC switch to OFF. Rotates the SYNC switch to OFF PasslFail
17. Close 13-6. Rotates 13-6 control switch from PasslFail PULL-TO-LOCK to NORMAL-AFTER-TRIP.

Observes 13-6 green light - ON Sat/Unsat Rotates 13-6 control switch to PasslFail CLOSE Sat/Unsat Observes 13-6 red light - ON Sat/Unsat Observes 13-6 green light - OFF The following annunciator clears with no required action:

o 852527 4KV Bus NNS 013 Undervoltage

18. Return to Attachment 1 Section 1.5.
19. Reports that Reserve Station Transformer Cue: Acknowledge report.

1B is energized from Line 6, and 2NPS-SWG003 & NNS-SWG013 are energized from Reserve Station Transformer 1B TERMINATING CUE: Reserve Station Transformer 1B Powered from Line 6, and NPS-SWG003 &

NPS-SWGO13 are energized from Reserve Station Transformer 1B.

RECORD STOP TIME NRC JPM 5 5 03115/05

Initial Conditions:

1. The plant experienced a Loss of Line 6.
2. The plant was manually scrammed.
3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
4. Fault Identification and Isolation per Attachment 1 Section 1.4 are complete.
5. Power has been restored to Line 6 and Power Control has verified its reliability.
6. Ask the operator for any questions.

Initiating cue:

RO- (Operators name), Energize Reserve Station Transformer 1B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3 Attachment 1 Section 1.5 Power Restoration.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 5 6 03/15/05

Initial Conditions:

1. The plant experienced a Loss of Line 6.
2. The plant was manually scrammed.
3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
4. Fault Identification and Isolation per Attachment 1 Section 1.4 are complete.
5. Power has been restored to Line 6 and Power Control has verified its reliability.
6. Ask the operator for any questions.

Initiating cue:

SRO- (Operators name), Energize Reserve Station Transformer 1B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3.

Candidate: Direct ALL communications and announcernenfs through the JPM Evaluator, first.

NRC JPM 5 7 0311 5/05

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

PERFORM TURBINE CONTROL VALVE (CV1) Revision: NRC 2005 CYC L ING S URVEILLANCE Task Number: 2129050201 Approvals:

NA EXAMINATION SECURITY Date" General Supervisor Date Operations 'Training (Designee) Operations .(Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (ROISRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: YES Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

- Eva1uator Signatu re: Date:

NRC JPM 6 1 03/15/05

Recommended Start Location:

Simulator Simulator Set-up:

1. Reset to a full power IC (such as IC-20).
2. Malfunction RP02,TRUE, QUEUED Directions to Evaluator:
1. Reduce recirc flow to reduce power to 85 YO by APRM's
2. Set the MAX COMBINED FLOW LIMITER to 7.50.
3. This JPM will require an instructor to role-play as a second RO. The second RO will hold the test pushbutton, allowing the candidate to verify indications.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.

Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional

/ concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

by a ".".

1. Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted
2. During Evaluated JPM:

0 Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. N2-OSP-RPS-Q001
2. NUREG KIA 212000 A2.03 3.U3.5 Tools and Equipment:
1. None Task Standard:

Cycle CV1 results in a RPS failure, then insert a manual trip of RPS A2 logic.

NRC JPM 6 2 03115/05

Initial Conditions:

1. The plant is at 85% power.

. No equipment is out of service.

- - - - - 3. A second RO is available to assist with surveillance performance.

4. Ask the operator for any questions.

Initiating cue:

(Operators name), Perform Turbine Control Valve Cycling per N2-OSP-RPS-QOOl.

I Performance Stem I Standard I Grade 1

1. Provide repeat back of initiating cue. Evaluator Proper communications used for Sat/Unsat Acknowledge repeat back providing correction if repeat back (GAP-OPS-01) necessary RECORD START TIME
2. Provide candidate with a marked-up working o N2-OSP-RPS-Q001 section 8.0 is Sat/ Unsat copy of Surveillance Test N2-OSP-RPS-Q001. referenced NOTE:
3. Perform Step 8.1.1 only if Reactor and Turbine Determines that step 8.1.1 is N/A - Rx SaffUnsat power are less than 30%. and Turbine power is greater than 30%.

NOTES:

4. Closing 2MSS-CV1 may cause bypass valve(s) Informs CRS and/or CSO of expected Sat/Unsat to open to maintain pressure. annunciators Closing 2MSS-CV1 will cause the following Cue: As the CRSKSO acknowledge annunciators to alarm: the annunciator report.

o 603104 RPS A TURB CONT VLV FAST CLOSE TRIP 3 6031 10 RPS A AUTO TRIP

5. Verify no trip signals exist in RPS B Trip o Observes no red annunciators lit on Sat/ Unsat System. panel 603
6. Notify CSO of trip to be received in RPS A Trip Notifies the CSO of expected half Sat/Unsat System. scram initiation in RPS A Trip System.

Cue:Acknowledge that a half scram will be received.

7. Depress and HOLD, CV-1 TEST pushbutton, o Depresses the CV-1 TEST Pass/Fail (hold depressed until directed to release), when pushbutton on panel 2CEC*PNL842 position indicator indicates valve is fully closed (0% indicated), verify following alarms and Cue: Instructor role play to hold the indicat ions : TEST pushbutton allowing the candidate to verify indications.

NRC JPM 6 3 03115/05

I Performance Steps I Standard I Grade I o Annunciator 603104 RPS A TURB CONT o Observes 603104 annunciator window Satfunsat VLV FAST CLOSE TRIP alarmed. is lit.

o Annunciator 6031 10 RPS A AUTO TRIP Observes 6031 10 annunciator window Satfunsat alarmed. is extinguished.

PILOT SCRAM VALVE SOLENOIDS o Observes Pilot SCRAM valve Satfunsat A,C,E,G indicating lights on 2CEC*PNL603 solenoids white lights A, C, E 8, G -

are OFF. -

ON o REACTOR SCRAM TRIP LOGIC A2 Cue: If asked, state that the Reactor Satfunsat indicating light on 2CEC*PNL609 is OFF. SCRAM Trip Logic A2 white light Located on P609 is ON LI RECIRC PUMP TRIP SYSTEM B indicating Cue: If asked, state that the Recirc Satfunsat light C72A-DS13 on 2CEC*PNL609 is OFF, Pump Trip System B light C72A-OS13 C72A-DS15 on 2CEC*PNL611 becomes on P609 is OFF and C72A-OS15 on brighter. P611 is BRIGHTER.

3 Process points MSSUClO and RPSUC03 o Observes computer alarms Satfunsat are generated. MSSUClO and RPSUC03 on the process computer

9. Reports to the SM that RPS A did not trip and/or Cue: As the SM, acknowledge the Satf Unsat RPS A, C, E & G white lights are still ON. report of the failure of RPS A to trip.

Cue: If asked, inform the candidate to take the appropriate action.

IO. Obtains a copy of N2-SOP-97 flow chart. o References N2-SOP-97 flow chart Sat/ Unsat

11. Stop any half scram isolation testing Notifies the SM to stop half scram or Satfunsat isolation testing.

NOTE: The candidate may also notify the CRS, or just make the decision that the surveillance test has already been stopped and not inform anyone.

Cue: As the SM, acknowledge the request.

12. What was the cause? o Determines the cause of the RPS Satfunsat failure is a FAILURE TO TRIP
24. Arm and Depress manual scram switches for Rotate REACTOR SCRAM A2 collar PasslFail the affected channel clockwise to the ARMED position.

Depress REACTOR SCRAM A2 Pass/Fail pushbutton.

NRC JPM 6 4 03/15/05

I Performance Steps I Standard I Grade I

25. Verify the following indications:

o PILOT SCRAM SOLENOIDS A, C, E &G o Observes Pilot SCRAM valve Sat/Unsat indicating lights on 2CEC*PNL603 are OFF solenoids white lights A, C, E & G -

OFF o REACTOR SCRAM TRIP LOGIC A1 Sat/Unsat indicating light on 2CEC*PNL609 is OFF Cue: When asked, state that the Reactor SCRAM Trip Logic A2 white light located on P609 is OFF

26. Reports that RPS A is tripped. CUE: Acknowledge the report.

TERMINATING CUE: Cycle CV1 results in a RPS failure, then insert a manual trip of RPS A2 logic.

RECORD STOP TIME NRC JPM 6 5 03/15/05

Initial Conditions:

The plant is at 85% power.

- 2.3.

1.

No equipment is out of service.

A second RO is available to assist with surveillance performance.

4. Ask the operator for any questions.

Initiating cue:

(Operators name), Perform Turbine Control Valve Cycling per N2-OSP-RPS-QO01.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 6 6 03115105

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Shift Running Instrument Air Compressors Revision: NRC 2005 Task Number: 2780040101 Approvals:

I NA EXAMINATION SECURITY General Sipervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: Yes Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NRC JPM 7 1 03/15/05

Recommended Start Location:

Simulator Simulator Set-up:

1. Reset to IC20 or equivalent
2. Verify A-B-C air compressor line-up
3. Enter the following Malfunctions:

2 IA02A, 21AS-C3A Thermal Overload Trip, TUA = 5 sec ET77 2 IA02B, 21AS-C3B Thermal Overload Trip, TUA = 1 min ET77

4. Enter the following Instructor Overrides:
I P851-1B-21ASAO1-A, Instrument Air Compressor Selector SW, POS-4, TUA = 15 sec ET77 (P11/21) cl P851-1B-2IASAOl-A, Instrument Air Compressor Selector SW, POS-3, TUA = 15 sec ET91 (P11/21)

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.

Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional

/ concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used Therefore, either another individual or I will act as the additional I concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a el.
2. During Evaluated JPM:

0 Self-verification shall be demonstrated.

3. During Training JPM:

0 Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. N2-OP-19, Section F.2.0
2. N2-SOP-19
3. NUREG K/A 295019 AA2.01 3.513.6 Tools and Equipment:
1. None Task Standard: IAS-C3C is running and IAS header pressure has recovered above alarm L- setpoint.

NRC JPM 7 2 03/15/05

Initial Conditions:

1. The plant is operating at 100°/~power.
2. 21AS-C3A is operating but degraded.

- 3. IAS 120VAC remains energized.

4. Ask the operator for any questions.

Initiating cue:

RO - (Operators name), Shift Instrument Air Compressors from A running to 6 running per N2-0P-I 9 Section F.2.0.

SRO- (Operators name), Shift Instrument Air Compressors from A running to 6.

I Performance Steps I Standard I Grade I

1. Provide repeat back of initiating cue. Proper communications used for repeat Sat/Unsat Evaluator Acknowledge repeat back back (GAP-OPS-01) providing correction if necessary RECORD START TIME
2. .Obtain a copy of the reference proceure N2-OP-19 obtained. Precautions & SaUUnsat and review/utilize the correct section. Limitations reviewed and section F.2.0 referenced.
3. For the oncoming 21AS -C3B: o Requests an in-plant operator to Sat/Unsat Verify OFFIOPERATE switch in verify that IAS-C36 is ready to start.

0PERAT E Verify UNLOAD/NORMAL switch in Cue: As an operator at the Air NORMAL Compressor, report that the Confirm fault indicator lamps OFF/OPERATE switch is in OPERATE, extinguished the UNLOAD/NORMAL switch is in NORMAL, and all fault indicator lights are OFF

4. Slowly open 2CCP-V523 Request that the in-plant operator Sat/ Unsat slowly open 2CCP-V523 Cue: As an in-plant operator report that 2CCP-V523 is open
5. Select 21AS-C3B as LEAD on Instrument Rotates Instrument Air Compressor Pass/Fail Air Compressor Selector at P851 Selector Switch to BCA position
6. Place 21AS-C36 control switch in Normal- Rotates IAS-C36 control switch to Pass/Fail After Start at P851 START Observes IAS-C36 red light - ON SaUUnsat Observes IAS-C36 green light - OFF SaUUnsat Observes AM-21ASB03 amps - rise SaUUnsat to 280 amps and drop back to 175 amps.

PasdFail Releases IAS-C3B to the NORMAL-AFTE R-START NRC JPM 7 3 03/15/05

I Performance Stem J Standard I Grade I

7. IAS-C3A trips on thermal overload Observes Annunciator 851228, Sat/Unsat

-- INSTR AIR CPSR 3A/36/3C AUTO START/ FAIL TO TRIP - LIT Observes IAS-C3A green light - ON Sat/Unsat o Observes IAS-C3A red light - OFF SatlUnsat R Observes AM-21ASA03 amps - 0 Sat/Unsat NOTE: Annunciators 851259, INST AIR COMPRESSOR CLG WTR FLOW LOW, and 851260, INST AIR COMPRESSOR COOLING SYS TROUBLE may alarm. These annunciators are of no consequence to the JPM, and the candidates may not responds to them.

8. .Reports to the CRS that IAS-3CA has Cue: Acknowledge the report of /AS- SaUUnsat tripped on thermal overload/motor C3A trip electrical fault
9. .Obtains and references ARP 851228 o Enter N2-SOP-19 Sat/Unsat o May dispatch an operator to check the running and tripped air compressor Rotates and pulls IAS-C3A control Pass/Fail switch to PULL-TO-LOCK Sat/Unsat Verify the Instrument Air Compressor Selector in the BCA position NOTE: If IAS-C3A control switch is placed in PULL-TO-LOCK prior to the trip of IAS-C3B, annunciator 851228 will alarm.
10. .IAS-C3B Trips o Observes IAS-C3B green light - ON SatlUnsat o Observes IAS-C3B rea light - OFF Sat/Unsat
11. .Reports to the CRS that IAS-3CB has Cue: Acknowledge the report of /AS- SatlUnsat tripped on thermal overload/motor C3B trip electrical fault
12. .Obtains and references N2-SOP-19 o Determines the air compressors are Sat/Unsat tripped or degraded
13. .LOSS of all air compressors due to slow o Determines that electrical power and Sat/Unsat transfer or loss of control power? control power remain available
14. .Annunciator 851229, INSTR AIR o Recognizes that IAS pressure is less Sat/Unsat SYSTEM TROUBLE sounds. that 90 psig.

o Recognizes that IAS-C3C did not Sat/ Unsat automatically start.

NRC JPM 7 4 03115/05

I Performance Steps I Standard I Grade I

15. .If required startherify auto started air compressors
16. Select IAS-C3C as the LEAD on the 0 Rotates Instrument Air Compressor PasslFail Instrument Air Compressor Selector Selector Switch to the CAB position.

Switch.

0

17. Place 21AS-C3C control switch in Normal- o Rotates IAS-C3C control switch to PasslFail After Start. START 0 Observes IAS-C3C red light - ON SaVUnsat 0 Observes IAS-C3C green light - SaVUnsat OFF SaVUnsat 0 Observes AM-21ASC03 amps - rise to 280 amps and drop back to 175 amps. PasslFail u Releases IAS-C3C to the NORMAL-AFTER-START
18. Pressure Restored? o Observes 21AS-PI101 pressure Sat/ Unsat indication rising.
19. Notifies the CRS Instrument Air Cue: As the CRS, Acknowledge the Sat/Unsat Compressor C did not start automatically. report

-- Instrument Air Compressor C was manually started and Instrument Air pressure is recovering End of JPM TERMINATING CUE: IAS-C3C is running and IAS header pressure has recovered above alarm setpoint.

RECORD STOP TIME NRC JPM 7 5 03115/05

Initial Conditions:

1. The plant is operating at 100% power
2. 21AS-C3A is operating but degraded.
3. IAS 120VAC remains energized.
4. Ask the operator for any questions.

Initiating cue:

RO - (Operators name), Shift Instrument Air Compressors from A running to B running per N2-OP-19 Section F.2.0.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 7 6 03/15/05

Initial Conditions:

1. The plant is operating at 100% power
2. 21AS-C3A is operating but degraded.
3. IAS I20VAC remains energized.
4. Ask the operator for any questions.

Initiating cue:

SRO- (Operators name), Shift Instrument Air Compressors from A running to B.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 7 7 03115/05

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Manual Initiation of the Control Building Special Filter Train Revision: NRC 2005 Task Number: 28800201012 Approvals:

NA EXAMINATION SECURITY Zne'ral Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performe r : (RO/SRO)

TrainerEvahator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NRC JPM 8 1 03115105

Recommended Start Location: (Completion time based on the start location)

Simulator

- Simulator Set-up (if required):

Any IC as long as no LOCA or LOOP exists that will automatically start Control Building Special Filter Train.

Directions to Operators:

Read Before Everv JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.

Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional /

concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the additional / concurrent verifier.

- Notes to Instructor / Evaluator:

1. Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a 0 .
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. N2-OP-53A, Rev 08, Control Building Ventilation System
2. NUREG WA 290003 A4.01 (3.2/3.2), 295038 EA1.07 (3.6/3.8)

Tools and Equipment:

1. None Task Standard:

Control Building Special Filter Train A operating in the filtration mode NRC JPM 8 2 03/15/05

Initial Conditions:

1. EOP-MSL has been entered.
2. Control Building radiation levels are 6E-6 mcikc and rising
3. Ask the candidate if they have any questions.

Initiating Cues:

1. Provide repeat back of initiating cue. 0 Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back providing repeat back (GAP-OPS-0 1) correction if necessary RECORD START TIME
2. Obtain a copy of the reference procedure and 0 N2-OP-53A obtained. Precautions & SaVUnsat reviewhtilize the correct section of the limitations reviewed & section H.6.0 procedure. referenced.
3. Close HVC*MOVlA, CONTROL ROOM AC 0 Places HVC*MOVl A control switch in Pass/Fail FLT TRAIN BYP VLV at 2CEC*PNL870. CLOSE.

0 Observe HCV*MOVlA green light - Sat/ Unsat ON Sat/Unsat 0 Observe HCV*MOVl A red light - OFF

4. Close HVC*MOVl B, CONTROL ROOM AC 0 Places HVC*MOVl B control switch in Pass/Fail FLT TRAIN BYP VLV at 2CEC*PNL871 CLOSED 0 Observe HVC*MOVI B green light - Sat/Unsat ON Sat/Unsat 0 Observe HVC*MOVI B red light - OFF
5. Start HVC*FN2A, CONTROL ROOM AC 0 Places and holds HVC*FN2A control PasslFail BOOSTER FAN at 2CEC*PNL870. switch in START 0 Observes HVC*FNZA red light - ON Sat/Unsat 0 Observes HVC*FN2A green light - Sat/Unsat OFF PasslFail 0 Returns the HVC*FN2A control switch to NORMAL-AFTER START.
6. Observe 2HVC*FRIOA FILTER TRAIN 0 Observes 2HVC*FRI OA FILTER SaVUnsat HVC*FLTZA INLET AIR FLOW (red pen) TRAIN HVC*FLT2A INLET AIR FLOW should indicate approximately 63% of full (red pen) indicates approximately 63%

scale (corresponds to approximately 2250 of full scale.

scfm).

7. Confirm that Control Room/Atmosphere, d/p is Cue: When operator walks behind Fire Sat/Unsat

> +0.125 in WG as read on 2HVC-PD1147, Panel 2CEC-PNL849 provide cue that located in the Control Room behind 2CEC- PD1147 indicates +0.2 inches WG.

PNL849.

NRC JPM 8 3 03/15/05

8. Observes the following at 2HVC*PNLCH7A: o Dispatches Auxiliary Operator to verify SaffUnsat ON INDICATOR red light ON indications locally on 2HVC*PNLCH7A:

LOW AIRFLOW INDICATOR green light OFF NOTE: May simulate going to the panel OVERTEMPERATURE INDICATOR instead of sending an Auxiliary Operator green light OFF Cue: When asked, as the Auxiliary Operator Report:

o ON INDICATOR red light ON 0 LOW AIRFLOW INDICATOR green light OFF OVERTEMPERATURE INDICATOR green light OFF

9. Notify Radiation Protection to periodically Cue: Acknowledge the request.

sample the Control Room Atmosphere to ensure proper operation of the Special Filter Train in service.

(Simulate)

IO. Reports that Control Building Special Filter Cue: Acknowledge the report.

Train A has been initiated.

o TERMINATING CUE: Control Room Special Filter Train A initiated.

RECORD STOP TIME NRC JPM 8 4 03/15/05

Initial Conditions:

1. EOP-MSL has been entered.
2. Control Building radiation levels are 6E-6 mcilcc and rising
3. Ask the candidate if they have any questions.

Initiating Cues:

RO- (Operators name), manually initiate Control Building Special Filter Train A per N2-OP-53A, section H.6.0.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 8 5 03/15/05

Initial Conditions:

1. EOP-MSL has been entered.
2. Control Building radiation levels are 6E-6 mci/cc and rising
3. Ask the candidate if they have any questions.

Initiating Cues:

SRO- (Operators name), manually initiate Control Building Special Filter Train A Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 8 6 0311 5105

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Vent Control Rod Overpiston Volume Revision: NRC 2005 Task Number: 2009620501. 2009620504 Approvals:

$ & I NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performe r: (RO/SRO)

TrainedEvaluator:

Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

02-OPS-PJE-200-2-69 NRC JPM 9 1 03/16/05

Recommended Start Location: (Completion time based on the start location)

RP Access Area Simulator Set-up (if required):

None Directions to the Instructor/Evaluator:

Prior to the performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.

Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional /

concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1.

2.

by a ..

Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1, N2-EOP-6, Att. 14, Rev. 5, Alternate Rod Insertions, Sections 3.6

2. NUREG 1123, K/A 295015, AA.1.01 (3.8/3.9)

Tools and Equipment:

EOP box has a breakaway tie-wrap Task Standard: Control Rod 26-59 at notch 00 and 2RDS*V1 shut.

02-OPS-PJE-200-2-69 NRC JPM 9 2 03116/05

Initial Conditions:

1. A scram has occurred.
2. Several rods have not fully inserted.
3. Communications are established with Control Room.
4. An OD-7, Print out of Rod Positions is NOT available.
5. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name) using EOP-6, Attachment 14, insert control rod 26-59 to notch 00 by locally venting its overpiston area.

1. Provide repeat back of initiating Proper communications used for repeat Sat/Unsat cue. Evaluator Acknowledge back (GAP-OPS-Ol/Operations Manual) repeat back providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference Open EOP box by removing breakaway Sat/Unsat procedure and reviewhtilize the tie-wrap and review procedure and correct section of the procedure enclosures. Reference EOP-6, Att. 14, Section 3.6 Describe and identify the tools necessary to perform the task, but do NOT remove the tools from the EOP Box
3. Locate the correct HCU (26-59). Physically locate the correct HCU (26- Pass/Fail 59). Use Figure 14-1, RDS HCU LOCATIONS, as a guide, if required.
04. Remove Cap from 2 RDS*Vl , AT HCU, use wrench to remove the PasdFail Withdraw Line Vent Valve Drain. Withdraw Line Vent Valve Cap.

Cue: Simulate cap removal.

05. Connect adapter. At HCU, connect adapter to the correct PasslFail RDS*Vl by threading in the quick Cue: Simulate drain adapter disconnect adapter.

connected.

02-OPS-PJE-200-2-69 NRC JPM 9 3 03/16/05

I Performance Stem I Standard I Grade I

-__ 06. Connect hose. At HCU, connect hose to the quick Pass/Fail disconnect adapter and route to a drain.

Cue: Simulate hose connected Secure the hose at the drain against and routed. If the whip.

candidate starts to go down the ladder to secure the hose at the drain, tell them another operator has secured the bottom of the hose.

07. Uncap 2RDS*V1 Valve Operator, At HCU, remove cap from RDS*Vl Valve Pass/Fail Operator.

Cue: Simulate cap removed.

8. Insert rod. At HCU, slowly open RDS*Vl by inserting PasslFail the T-handled HCU Vent Tool and Cue: Simulate RDS*Vl rotating counter clockwise, venting the opened. above piston area.
9. Report to Control Room. Report that RDS*Vl is opened. Request Sat/Unsat rod position.

Cue: Acknowledge report and inform the operator that control rod 26-59 has fully inserted. To restore 26-59 to normal.

10. Shut RDS*Vl . At HCU, using the T-handled HCU Vent Pass/Fail Tool shut RDS*Vl by rotating the Cue: Simulate RDS*Vl shut. operator clockwise.
11. Replace the cap on 2RDS*V1 At HCU, replace the cap on RDS*Vl Sat/Unsat Valve Operator. Valve Operator.

Cue: Simulate cap replaced.

02-OPS-PJE-200-2-69 NRC JPM 9 4 03/16/05

NOTE: At this time the JPM may be stopped.

End of JPM TERMINATING CUE: Control Rod 26-59 at notch 00 and 2RDS*V1 shut.

RECORD STOP TIME 02-OPS-PJE-200-2-69 NRC JPM 9 5 03/16/05

Initial Conditions:

-_ 1. A scram has occurred.

2. Several rods have not fully inserted.
3. Communications are established with Control Room.
4. An OD-7, Print out of Rod Positions is NOT available.
5. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name) using EOP-6, Attachment 14, insert control rod 26-59 to notch 00 by locally venting its overpiston area.

Candidate:

Direct ALL communications and announcements through the JPM Evaluator, first.

02-OPS-PJE-200-2-69 NRC JPM 9 6 03/16/05

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Align Fire Water System to Inject to RHR A Revision: NRC 2005 Task Number: 2009020504 Approvals:

NA EXAMINATION SECURITY G x eraI Superviso r date General Supervisor Date Operations 'Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method : Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 25 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

L 02-OPS-PJE-205-2-02 NRC JPM 10 1 03/16/05

Recommended Start Location: (Completion time based on the start location)

RP Access Area Simulator Set-up (if required):

N/A Directions to the Instructor/Evaluator:

Prior to the performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a (o.
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

0 Self-verification shall be demonstrated.

0 No other verification shall be demonstrated.

References:

1. EOP-6, Rev. 7, Attachment 6, RHR Fire Water System Cross-Tie
2. NUREG 1123, 295031, EA1.08 3.8 / 3.9 02-OPS-PJE-205-2-02 NRC JPM 10 2 03116/05

Tools and Equipment:

1. PL-3 Key
2. EOP tool boxes are secured with a breakaway tie-wrap Task Standard:

Fire Water System is aligned to inject to RHR loop A per N2-EOP-6, Attachment 6.

02-OPS-PJE-205-2-02 NRC JPM 10 3 03/16/05

Initial Conditions:

1. All high pressure feed to the RPV is lost.
2. Alternate injection systems are being lined up.
3. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), Line-up the Fire Water System to RHR loop A, per EOP-6, Attachment 6.

1. Provide repeat back of Proper communications used for repeat Sat/ Unsat initiating cue. Evaluator back (GAP-OPS-Ol/Operations Manual)

Acknowledge repeat back providing correction if necessary.

RECORD START TIME

02. Obtain a copy of the N2-EOP-6, Attachment 6 obtained. Sat/ Unsat reference procedure and Section 3.1 referenced.

review/utilize the correct section of the procedure.

CUE: Steps 3.1.1,3.1.2,3.1.3 and 3.1.4 are complete.

NOTE: For simulation purposes, actual layout of hoses/flanges and connection to pump or plant equipment is not required.

Identification of hose/flange and use along with connection points is all that is required.

3. Verify closed 2RHS*V70, 2RHS*V70, CONDENSATE FLUSH TO SaffUnsat CONDENSATE FLUSH TO A CONTMT SPRAY HDR is rotated in A CONTMT SPRAY HDR. the clockwise direction to verify it is closed. (Rx Bldg EL 289).

Cue: 2RHS*V70 is closed 02-OPS-PJE-205-2-02 NRC JPM 10 4 03116/05

- 4. Close 2CNS-V621, CNS TO 2CNS-V621, CNS TO RHR SUPPLY SaUUnsat RHR SUPPLY ISOL. ISOL is rotated in the clockwise direction to verify it is closed. (Rx Bldg, Northside Cue: 2CNS-V621 is closed E1289 above 2RHS*MOV24A, LPCl lnjection Valve).

5. Remove test connection blind Blind Flange is properly removed using PasslFail flange from between valves the tools from the EOP gang box. (Rx 2CNS-V621 AND 2RHS*V70. Bldg EL 289)

Cue: Blind flange is removed

6. Install 2 '/2 inch fire hose Adapter installed to test connection PasslFail adapter to test connection. flange correctly using tools from the EOP gang box.

Cue: Adapter is installed.

7. Connect male end of 2 % inch Male end of 2 % inch fire hose from EOP PasslFail fire hose from EOP box to box is properly connected to test test connect ion flange connection flange adapter adapter.

Cue: Male end of 2 % inch fire hose is connected to test connection flange adapter.

8. Disconnect firehose at FHR Firehose from EOP gangbox is properly PasslFail 93 connected to FHR 93 using tools from the EOP gang box. (Rx Bldg, EL 289, Cue: Firehose is connected near North stairwell entrance) from FHR 93
9. Connect 2 112 firehose from Firehose is properly connected to FHR PasslFail test connection flange 93 using tools from the EOP gang box adapter to FHR 93.

Cue: Firehose is connected to FHR 93

10. Open 2FPW-V391, FHR 93 2FPW-V391, FHR 93 ANGLE VALVE PasslFail

\ ANGLE VALVE is opened by rotating the handwheel in the counterclockwise direction.

Cue: 2FPW-V391 is open 02-OPS-PJE-205-2-02 NRC JPM 10 5 03/16/05

11. Unlock AND open 2RHS*V70 Using the PL-3 Key, unlock AND open Pass/Fail 2RHS*V70 by rotating the handwheel in the counterclockwise direction.

Cue: 2RHS*V70 is unlocked and open.

10. Notify control room that fire SaVUnsat water is lined-up to inject via RHR A End of JPM TERMINATING CUE: Fire Water System is aligned to inject to RHR loop A per N2-EOP-6, Attachment 6.

RECORD STOP TIME 02-OPS-PJE-205-2-02 NRC JPM 10 6 03/16/05

Initial Conditions:

\.

1. All high pressure feed to the RPV is lost.
2. Alternate injection systems are being lined up.
3. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), Line-up the Fire Water System to RHR loop A, per EOP-6, Attachment 6.

Candidate:

Direct ALL communications and announcements through the JPM Evaluator, first.

02-OPS-PJE-205-2-02 NRC JPM 10 7 03116/05

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Lower Control Building Operator During Control Room Evacuation Revision: NRC 2005 Task Number: 2640020101 Approvals:

NA EXAMINATION SECURITY General Supervisor bat& General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performe r: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 25 minutes Time Critical Task: NO Alternate Path Task: Yes Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NRC JPM 11 1 03/16/05

Recommended Start Location:

Control Building Elev. 261 in the vicinity of the Remote Shutdown or Diesel Generator

i. Rooms Simulator Set-up:

N/A Directions to the Instructor/Evaluator:

Prior to the performance of this JPM, obtain SM I CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1.

2.

by a ".".

Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted During Evaluated JPM:

0 Self-verification shall be demonstrated.

3. During Training JPM:

0 Self-verification shall be demonstrated.

0 No other verification shall be demonstrated.

References :

1. N2-SOP-78
2. N2-OP-1OOA Section H. 13 Tools and Equipment:
1. None Task Standard: Division I Diesel Generator locally started and output breaker 101-1 locally closed.

NRC JPM 11 2 03116/05

Initial Conditions:

-_ 1. Plant has scrammed

2. Control Room Evacuation is required
3. You are the Lower Control Building Operator
4. Lower Control Building Operator immediate actions are in progress
5. 2VBS*PNLBIOO Breakers 3 and 4 have just been positioned to OFF.
6. Ask the operator for any questions.

Initiating cue:

(Operators name), complete the Immediate and Subsequent Actions of N2-SOP-78.

1. Provide repeat back of initiating Proper communications used for repeat Satfunsat cue. Evaluator Acknowledge back (GAP-OPS-01 )

repeat back providing correction if necessary RECORD START TIME

~... 2. .Obtain a copy of the reference u Obtain copy of N2-SOP-78. Sat/ Unsat procedure and reviewhtilize the correct section.

3. Reports to Remote o Reports to Remote Shutdown/Diesel Shutdown/Diesel Generator Generator Room Area Room Area Cue: When asked if the Division any Diesel Generator started, inform the Lower Control u Acknowledges Division I Diesel Satfunsat Building Operator Generator did NOT start (candidate) that Division I Diesel Generator did o Acknowledges loss of Line 5 occurred Satfunsat NOT start Determines Offsite power is lost to Satfunsat AND a loss of Offsite ENS*SWGlOl Line 5 has just occurred.

u Determines Division I Diesel Sat/Unsat NOTE: ALL actions are to be Generator must be started locally SIMULATED. No equipment is to using N2-0P-1OOA, section H. 13 and be operated by candidates. prestart checks and data recording is NOT required.

NRC JPM 11 3 03/16/05

- 4. .Obtain a copy of the reference Obtains copy of N2-OP-1OOA and Sat/ Unsat procedure and reviewhtilize the reviews section H. 13 correct section.

5. Verify Lube Oil AND Jacket 0 SIMULATE: Verifies Lube Oil AND Sat/Unsat Water Temperatures are >75"F. Jacket Water Temperatures are

>75"F, by use of RTD Temperature Cue: Lube oil and jacket Meter Selector switch selected to water temperatures are Point 1 and Point 5 125°F.

6. Verify NO Lube Oil OR Jacket o Observes NO Lube Oil OR Jacket Sat/Unsat Water High Temperature Alarms Water High Temperature exist annunciators lit at 2CES*IPNL406, ENGINE CONTROL PANEL
7. At 2CES* IPNL407, GENERATOR CONTROL PANEL, perform the following:

3 Verify 2ENS*SWG101-13, Verifies 2ENS*SWG101-13, CIRCUIT Sat/Unsat CIRCUIT BREAKER BREAKER PREFERRED OFFSITE, is PREFERRED OFFSITE, is open by observing green light ON and open. red light OFF.

Cue: Circuit Breaker Preferred Offsite breaker green light is ON and red light is OFF.

3 Verify 2ENS*SWG101-10, Verifies 2ENS*SWG101-10, CIRCUIT SaVUnsat CIRCUIT BREAKER BREAKER ALTERNATE OFFSITE, is ALTERNATE OFFSITE, is open by observing both green and red open. lights OFF.

Cue: Circuit Breaker NOTE: 2ENS*SWG101-10 is a Alternate Offsite "cubicle only" arrangement. There is breaker green light is no breaker installed in this switchgear OFF and red light is cubicle.

OFF.

Verify 2ENS*SWG101-N1, Verifies 2ENS*SWG101-NI1 CIRCUIT Sat/Unsat CIRCUIT BREAKER BREAKER NEUTRAL, is closed by NEUTRAL, is closed. observing green light OFF and red light ON.

NRC JPM 11 4 0311 6/05

u Verify GOVERNOR mode o Verifies GOVERNOR mode switch is Sat/Unsat switch is in ISOCH. in ISOCH.

Cue: GOVERNOR mode switch is in ISOCH.

3 Verify VOLTAGE Verify VOLTAGE REGULATOR SaVUnsat REGULATOR MANUAL- MANUAL-AUTO switch is in AUTO.

AUTO switch is in AUTO.

Cue: VOLTAGE REGULATOR MANUAL-AUTO switch is in AUTO NOTE: A Service Water Pump will have to be started shortly after reenergizing the Bus to provide cooling to the Diesel Generator.

8. Perform prestart checks on a o Acknowledges prestart checks are SaVUnsat Division I Service Water Pump complete for Service Water Pump A.

in accordance with N2-OP-11, Service Water System.

Cue: Inform candidate that another operator has completed prestart checks on Service Water Pump A.

9. At 2CES*IPNL406, ENGINE CONTROL PANEL, perform the following:

u Place CONTROL MODE SIMULATE: Place CO ITROL MODE Pass/Fa switch in LOCAL AND verify switch in LOCAL the white LOCAL indicating -

light is illuminated. o Verifies the white LOCAL indicating SaVUnsat light is illuminated Cue: CONTROL MODE NRC JPM 11 5 03/16/05

the white LOCAL indicating light is iIIu minated.

L) Depress ENGINE SIMULATE: Depresses ENGINE PasdFail CONTROL START CONTROL START pushbutton pushbutton

10. At 2CES*IPNL407, verify the following Diesel Generator start indications:

Diesel Speed as indicated on o Confirms Diesel Speed as indicated Sat/Unsat 12ESI-2EGSA04 ENGINE on 12ESI-2EGSA04 ENGINE SPEED, SPEED, rises to 600 RPM. rises to 600 RPM.

Cue: Diesel Speed is 600 RPM o Generator Voltage as o Confirms Generator Voltage as Sat/Unsat indicated on GVM-2EGPA22 indicated on GVM-2EGPA22 VOLTS VOLTS GENERATOR, rises GENERATOR, rises to 4160 A-C to 4160 A-C VOLTS. VOLTS .

Cue: Generator Voltage is 41 60 Volts AC 3 Generator Frequency as Confirms Generator Frequency as Sat/ Unsat indicated on FM-2EGPA22 indicated on FM-2EGPA22 FREQUENCY FREQUENCY GENERATOR, rises to GENERATOR, rises to 60 60 HERTZ.

HERTZ.

Cue: Generator Frequency is 60 Hz Generator Field Current as Confirms Generator Field Current as Sat/Unsat indicated on GFAM- indicated on GFAM-2EGPA21 AMPS 2EGPA21 AMPS FIELD, FIELD, indicates about 91 DC indicates about 91 DC AMPERES.

AMPERES.

Cue: Generator Field Current indicates about 91 DC AMPERES

11. At 2ENS*SWG101, manually SIMULATE: At 2ENS*SWG101, PasslFail close 2ENS*SWG101-1, EMG. manually closes 2ENS*SWG101-1, GEN. 2EGS G1. EMG. GEN. 2EGS G1 NRC JPM 11 6 03/16/05

I Performance steps I Standard I Grade I

12. Start a Division I Service Water u Acknowledges Service Water Pump A SaVUnsat Pump in accordance with N2- has been started.

OP-I 1.

Cue: Inform candidate that another operator has started Service Water Pump A.

13. Locally verify 2SWP*MOV66A In Division I Diesel Generator Room, PasslFail (B), SERVICE WTR OUTLET, is locally verifies 2SW P*MOV66A, open. SERVICE WTR OUTLET, is open Note: 2SWP*MOV66A position must be verified locally because 2CEC*PNL852 is in the Main Control Room.

Cue: SWP*MOV66A is Open.

14. Report Division I Diesel Generator is started and ENS*SWG101 is energized.

End of JPM TERMINATING CUE: Division I Diesel Generator locally started and output breaker 101-1 locally closed.

RECORD STOP TIME NRC JPM 11 7 03/16/05

Initial Conditions:

1. Plant has scrammed
2. Control Room Evacuation is required
3. You are the Lower Control Building Operator
4. Lower Control Building Operator immediate actions are in progress
5. 2VBS*PNLB100 Breakers 3 and 4 have just been positioned to OFF.
6. Ask the operator for any questions.

Initiating cue:

(Operators name), complete the Immediate and Subsequent Actions of N2-SOP-78.

NRC JPM 11 a 03/16/05