Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Downshift Reactor Recirculation Pumps Task Number: 2029150101 Revision: NRC 2005 Approvals:
NA EXAMINATION SECURITY Date 1 General Supervisor Date Operations Training (Designee)
Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method: X P e r f o r m Simulate Evaluation Location:
Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:
Date:
NRC JPM 1 1
03/15/05
Recommended Start Location:
Simulator Simulator Set-up:
Reset to IC-44 Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as PasdFail. All steps are sequenced critical unless denoted by a e
- 2. During Evaluated JPM:
Self-verification shall be demonstrated.
- 3. During Training JPM:
Self-verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 1. N2-OP-29 G.l.O
- 2. NUREG K/A 202001 A4.01 3.7/3.7 Tools and Equipment:
- 1.
None Task Standard:
Recirculation pumps 1A and 1 B running in slow speed with their flow control valves full open.
NRC JPM 1 2
03/15/05
Initial Conditions:
- 1. The plant is at 41 o/o power.
- 2. The Rod line is at 60%.
- 3. Hydrogen injection has been secured.
- 4. Evaluator to ask the operator for any questions.
Initiating cue:
RO - (Operators name), Transfer Recirc Pumps from high speed to low speed per N2-0P-29 section G.1.0.
SRO - (Operators name), Transfer Recirc Pumps from high speed to low speed.
1 Performance Steps I Standard 1
Grade I
- 1. Provide repeat back of initiating cue.
o Proper communications used for repeat SatlUnsat Evaluator Acknowledge repeat back providing correction if necessary back (GAP-OPS-0 1 )
RECORD START TIME
- 2. Obtain a copy of the reference N2-OP-29 obtained. Precautions &
Sat/ Unsat procedure and review/utilize the correct section.
referenced Limitations reviewed and section G.l.O
- 3. Verify the following:
LI BRKR 1A/B control switches in o Observes BRKR 1A and 1 B control Sat/Unsat NORMAL.
switches in NORMAL o Observes BRKR 2A and 28 control Sat/Unsat 3 BRKR 2A/B are open AND control switches in NORMAL switches in NORMAL.
Observes BRKR 2N2B green lights - ON Sat/Unsat o Observes BRKR 2N2B red lights - OFF Sat/Unsat o LFMG generator AND pump motor lockout AND relays are reset at RECIRCULATION SYSTEM LFMG SET PO01 A( B).
Cue: When asked, report that LFMG generator & pump motor lockout and relays are reset AUXILIARY RELAY PANEL B35-
- 4. At 2NPS-SWG004 (SWG005), confirm Cue: Acknowledge request and report that breaker 1, REACTOR RECIRCULATION PUMP MOTOR 005 BRKR - 2A(B) 2RCS-M1A(B) is charged as indicated by yellow indicator on lower left of breaker.
breaker 1 on both NPS-SWGOO4 and are charged.
- 5. Position AND hold BRKR 5A(B) control o Rotates BRKR 5A control switch -
Pass/Fail switch to TRANSFER MG, THEN position the remaining BRKR 5B(A) o Rotates BRKR 5B control switch -
PasslFail control switch to TRANSFER MG TRANSFER MG TRANSFER MG The following annunciators alarm not requiring action:
o 603139 Reactor Water Level High (inlclear)
NRC JPM 1 3
03/15/05
I Performance Steps I Standard I
Grade 1 603218 OPRM Trip Enabted (clears) o 842310 HWC Trouble (reflashes) o 851456 Cnst System Trouble No Backup Pmp Available (inkleaf)
- 6. Observe the following:
u BRKR 5A trips.
o BRKR 5B trips.
o Observes BRKR 5A red light - OFF Sat/ Unsat Observes BRKR 5A green light - ON Sat/ Unsat o Observes BRKR 5B red light - OFF Sat/ Unsat o Observes BRKR 5B green light - ON Sat/ Unsat u BRKR 1A AND BRKR 1B close.
o Observes BRKR 1A red light - ON Sat/ Unsat Observes BRKR 1A green light - OFF Sat/ Unsat Observes BRKR 1B red light - ON Sat/ Unsat o Observes BRKR 1B green light - OFF Sat/Unsat c3 Pump speed lowers to between 460 Observes speed on B35-651A and B drop SaffUnsat AND 350 rpm.
e460 but >350 rpm J BRKR 2A AND BRKR 2B close.
Observes BRKR 2A red light - ON Sat/Unsat o Observes BRKR 2A green light - OFF Sat/Unsat o Observes BRKR 2A red light - ON Sat/Unsat o Observes BRKR 2A green light - OFF Sat/Unsat o Pump speed stabilizes at about 445 o Observes speed on 835-651A and B at Sat/Unsat rpm.
about 445 rpm
o Observe loop A VALVE POSITION at Sat/ Unsat about 85%
o Observe loop B VALVE POSTION at Sat/ Unsat about 95%
CONTROL stations, raise output signal to 100% (about 85 on A loop % VALVE PO S IT1 0 N i nd ica ted ).
The following annunciators alarm not requiring action:
o 60321 8 OPRM Trip Enabled alarms
- 8. Monitors recirculation pump and LFMG o Observe about 73 amps on AM-parameters.
2RCSA( B)60 o Observe 445 rpm on B35-R651A(B).
Dispatches an Auxiliary Operator to report LFMG generator voltage and am perage.
Sat/U nsa t Sat/Unsat Sat/Unsat Cue: As the Auxiliary Operator, report that LFMG A generator indicates 1250 volts and 95 amps. Also, LFMG B generator indicates 1250 volts and 94 amps.
NRC JPM 1 4
0311 5/05
1 Performance Steps I Standard I
Grade I
- 9. Reports that Recirc pumps have been transferred to slow speed.
Cue: Acknowledges the report.
TERMINATING CUE: Recirc pumps 1A and 1 B running in slow speed.
RECORD STOP TIME NRC JPM 1 5
0311 5/05
Initial Conditions:
- 1. The plant is at 41% power.
- 3. Hydrogen injection has been secured.
- 4. Evaluator to ask the operator for any questions.
- 2. The Rod line is at 60%.
Initiating cue:
RO - (Operators name), Transfer Recirc Pumps from hiGI I speed to low speed per P G. 1.O.
2-OP-29 section Can didate.-
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 1 6
03/15/05
Initial Conditions:
- 2. The Rod line is at 60%.
- 3. Hydrogen injection has been secured.
- 4. Evaluator to ask the operator for any questions.
- 1. The plant is at 41 YO power.
Initiating cue:
SRO - (Operators name), Transfer Recirc Pumps from high speed to low speed.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 1 7
03/15/05
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
RClC Injection With Oscillations (Faulted)
Revision: NRC 2005 Task Number:
21 791 501 01 Approvals :
Operations Training (Designee)
NA EXAMINATION SECURITY General Supervisor Date Operations (Designee)
NA EXAMINATON SECURITY Configuration Control Date Performer:
(RO/SRO)
Evaluation Method: X Perform Simulate Evaluation Location: -Plant X
Simulator Expected Completion Time: 15 min.
Time Critical Task:
No Alternate Path Task: Yes Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if 9 critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
02-OPS-SJE-217-2-05 NRC JPM 2 1
2/14/2005
Recommended Start Location:
Simulator Simulator Set-up:
- 1. Reset to any hot IC
- 2. RPV pressure >300 psig
- 3. Malfunction RC04, TRUE, Event Trigger 049 [Relatives]
- 4. Reactor in MODE 3 with Main Turbine off-line, or RCIC-Turbine trip bypassed.
FALSE, Event Trigger 050 Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated.
Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independentlpeer verifier.
Notes to Instructor / Evaluator:
1.
- 2.
- 3.
Critical steps are identified in grading areas as PasdFail. All steps are sequenced critical unless denoted by a e.
During Evaluated JPM:
. Self-verification shall be demonstrated.
During Training JPM:
Self-verification shall be demonstrated.
. Additional verification shall be demonstrated.
References:
- 1. N2-OP-35, Section F.2.0
- 2. NUREG WA 21 7000 A4.01 3.7/3.7 Tools and Equipment:
None Task Standard:
RClC Flow Controller in manual and with RClC injecting to RPV at approximately 600 gpm.
02-OPS-SJE-217-2-05 NRCJPM2 2
2/14/2005
Initial Conditions:
- 1. Reactor pressure is (report digital pressure reading on P603)
- 2. RPV level is lowering.
--. Initiating Cues:
(Operators name), initiate RCIC, inject into the RPV and establish rated flow, per N2-0P-35, Section F. 2.0.
Performance Steps Stand a rd Grade
- 1. Provide repeat back of initiating cue.
Proper communications used for repeat Sat/ Unsat Evaluator Acknowledge repeat back providing correction if necessary.
back (GAP-OPS-01)
RECORD START TIME
- 2. Obtain a copy of the reference N2-OP-35 obtained. Precautions &
Sat/ Unsat procedure and reviewhtilize the correct section of the procedure.
limitations reviewed and Section F.2.0 referenced.
- 3. Initiate RCIC.
- 4. Verify RClC System response.
02-OPS-SJE-217-2-05 At P601, rotate RCIC manual initiation pushbutton collar to armed position.
Pass/Fail Depress RClC manual initiation PasslFail pushbutton.
Verifies RClC has started properly by verifying the following:
0 Gland Seal System Air Compressor Satfunsat STARTS.
ICS*MOV116, Lube Oil Cooling Sat/ Unsat Water Supply, OPENS.
0 ICS*MOV120, Turbine Steam Sat/ Unsat Supply Valve, OPENS.
0 ICS*MOV126, RCIC Pump Sat/ Unsat discharge to the Reactor, OPENS.
ICS*MOV143, RClC Pump Sat/Unsat minimum flow to the Suppression Pool. OPENS and then CLOSES once discharge flow is greater than 220 gpm.
ICS*AOV 156 and 157, RCIC Injection Outboard and Inboard Isolation Valves, OPEN once System Pressure is greater than Sat/Unsat 2/14/2005 NRCJPM2 3
02-OPS-SJE-217-2-05
~
Reactor Pressure.
NRCJPM2 4
21 1412005
-~
Performance Steps Standard Grade
- 5. Observe and respond to failure of the RClC System flow controller in AUTO.
-\\--
- 6. Reports to the SM; RClC is injecting to the Reactor Vessel at 600 gpm in the MANUAL mode.
The Flow Controller, 21CS*FC101, IS NOT in the AUTOMATIC mode due to flow oscillations during startup of the RClC System.
Current Reactor Vessel Level.
0 Recognizes as RClC Flow is increasing that the flow to the Reactor Vessel is OSCILLATING.
0 Places ICS*FClOI, RClC Flow Controller in MANUAL and ESTABLISHES approximately 600 gpm flow rate.
CUE: As the SM, respond to the Candidates report on the RCIC System.
CUE: As the SM, respond to the Candidates report on the RClC System.
CUE: If asked, tell the Candidate that RClC flow is still required, and to monitor the RClC System for any further signs of malfunctions.
PasslFail PasslFail Sat/Unsat Sat/Unsat Terminating Cue:
The RClC System is injecting in the manual mode at rated flow conditions.
RECORD STOP TIME 02-OPS-SJE-217-2-05 NRC JPM 2 5
2/14/2005
Initial Conditions:
- 1. Reactor pressure is (report digital pressure reading on P603)
- 2. RPV level is lowering.
Initiating Cues:
(Operators name), initiate RClC per N2-OP-35, Section F.2.0, inject into the RPV and establish rated flow.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
02-OPS-SJE-217-2-05 NRCJPM2 6
211 412005
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Task Number: 20500301 01 Restart RHS in S/D Cooling Mode (Alternate)
Approvals:
7 h. k date Operations Training (Designee)
Revision: NRC 2005 NA EXAMINATION SECURITY General Supervisor Date Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X
Simulator Expected Completion Time: 10 Mins.
Time Critical Task:
NO Alternate Path Task: YES Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature:
Date:
NRC JPM 3 2/14/2005
Recommended Start Location:
Unit 2 Simulator Simulator Set-up:
- 1. Place Simulator in IC-24 Shut Down Cooling
- 2. Shutdown the 'B' RHS Loop per N2-OP-31, Section H.3.0
- 3. Set up the following I/O and Event Trigger: - (P14/35), ET#51.
- a. I/O 2RHS*MOV40B control switch (Page 14/36) in 'Neutral' and trigger (ET-51) with the red open indication for 2RHS*MOV40B.
(P601 -B22H-S44-A, RHR Shutdown Cooling Injection Is01 Vlv MOV 408, NEUTRAL ETOI)
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cuesasnecessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independenffpeer verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified in grading areas as PasslFail. All steps are sequenced critical unless denoted by a ".".
- 2. During Evaluated JPM:
0 Self-verification shall be demonstrated.
- 3. During Training JPM:
0 Self-verification shall be demonstrated.
Additional verification shall be demonstrated.
References:
- 1. N2-OP-31, Section H.3.0 and H.4.0
- 2. N2-ARP-01, Attachment 6, ARP for window 601648
- 3. NUREG 1123, 205000 A4.01 3.7/3.7 Shutdown Cooling System (RHR Shutdown Cooling Mode)
Tools and Equipment:
None required Task Standard:
RHS*Pl B tripped within 40 seconds of start NRC JPM 3 2/14/2005
Initial Conditions:
- 1. Plant is in mode 4.
- 2. SDC Loop B; has been shut down per N2-OP-31, section H.3.0.
- 3. SDC Loop B has been shut down for 15 minutes.
- 4. RDS Back fill is in service.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
RO-(Operators name), Restart RHS Loop B in Shut Down Cooling per N2-OP-31.
SRO- (Operators name), Restart RHS Loop B in Shut Down Cooling.
- 1. Provide repeat back of initiating cue.
Evaluator Acknowledge repeat back providing correction if necessaty.
I Performance Steps I Standard I
Grade I o Proper communications used for repeat SaUUnsat back (GAP-OPS-0 1 /Operations Manual).
RECORD START TIME
- 2.
- 3.
- a.
- b.
C.
- 4.
- 5.
Obtain a copy of the reference procedure and reviewhtilize the correct section of the procedure.
IF RDS Backfill Injection is out of service to one OR more RPV Level reference Legs in Mode 3, THEN perform the following:
Enter N2-OP-101 C, Attachment 1.
Perform concurrently with this Subsection to monitor for possible RPV level instrumentation notching.
IF observed, take the proper actions.
CAUTION: The RHR pump is without minimum flow protection, Minimum flow of > 1000 gpm must be established within 40 seconds of pump start. Use of a stopwatch is recommended to ensure the pump is tripped within the required time if minimum flow is not achieved. Do not allow pump to run for > 15 seconds deadheaded.
Start 2RHS*P1 B at Panel 601 NRC JPM 3 o N2-0P-31 obtained. Precautions &
limitations reviewed & section H.4.0 referenced.
Determines that RDS backfill is in service and no action is required, o Obtains stopwatch.
SatlUnsat SaVUnsat SatlUnsat R Rotates RHS*P1 B control switch to start PasslFail and releases to Normal-After-Start.
2/14/2005
- 6. Throttle open RHS*MOV40B, SDC B RETURN THROTTLE to > 1000 g Pm.
- 7. IF RHS*MOV40B does not begin to open in 15 seconds OR system flow is NOT > 1000 gpm 40 seconds after pump start. Place RHS*PI B control switch to STOP, THEN release to Normal-After-Stop.
- 8. Report to CRS inability to obtain required minimum flow on RHS*PI B and that the pump has been tripped.
0 0
0 0
0 0
0 0
0 0
Observes control switch red flagged.
Observes RHS*PI B red light - ON Observes RHS*PI B green light - OFF Places RHS*MOV40B control switch to OPEN (requires key).
Observes RHS*MOV40B red light - ON Observes RHS*MOV40B green light -
ON Observes no rising flow indication on meter E 12-R603B Prior to 40 seconds after RHS*PI B is started, places RHS*PI B control switch to STOP and releases to Normal-After-stop.
Report made to CRS of inability to obtain satisfactory min-flow and that RHS*P1 B has been tripped.
1 Performance Steps I Standard I Grade 1
Sat/ Unsat Starts the stopwatch Sat/ Unsat Sat/ Unsat Sat/ Unsat PasslFail SatlUnsat Sat/ Unsat SatlUnsat PasslFail Sat/Unsat Cue: As the CRS, Acknowledge the report.
~. Terminating Cue:
RECORD STOP TIME RHS*P1 B tripped within 40 seconds of start.
NRC JPM 3 2/14/2005
Initial Conditions:
- 1. Plant is in mode 4.
- 2. SDC Loop B; has been shut down per N2-0P-31, section H.3.0.
- 3. SDC Loop B has been shut down for 15 minutes.
- 4. RDS Back fill is in service.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
RO-(Operators name), Restart RHS Loop B in Shut Down Cooling per N2-OP-31.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 3 2114/2005
Initial Conditions:
- 1. Plant is in mode 4.
- 2. SDC Loop B; has been shut down per N2-OP-31, section H.3.0.
- 3. SDC Loop B has been shut down for 15 minutes.
- 4. RDS Back fill is in service.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
SRO- (Operators name), Restart RHS Loop B in Shut Down Cooling.
Candida f e ;
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 3 211 412005
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Initiate Containment Venting Through Standby Gas Treatment (GTS)
Revision: NRC 2005 Task Number: 2000070501 Approvals:
NA EXAMINATION SECURITY Oat&
General Supervisor Date
~~
Operations Training (Designee)
Operations.(Designee)
NA EXAMINATION SECURITY Configuration Control Date Perfor mer :
(ROISRO)
TrainerlEvaluator:
Evaluation Method:
X Perform Simulate Evaluation Location :
Plant X Simulator Time Critical Task: NO Alternate Expected Completion Time: 15 minutes Path Task: NO Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:
02-OPS-SJE-261-2-02 NRC JPM 4 1
03/15/05 Date:
Recommended Start Location:
Simulator Simulator Set-up:
This JPM can be run from any IC. No setup is required.
Directions to Operators:
Read Before Everv JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cuesasnecessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a
- 2. During Evaluated JPM:
- 3. During Training JPM:
<, I, 0
Self-verification shall be demonstrated.
0 Self-verification shall be demonstrated.
No other verification shall be demonstrated.
References :
- 1. N2-0P-61 A, Primary Containment Ventilation Purge & Nitrogen System, Section H. 1.O
- 2. NUREG K/A: 295024. EA1.20 3.5 / 3.6 Tools and Equipment:
None required Task Standard:
SBGTS Train A running, aligned to the Drywell in accordance with applicable procedures.
02-OPS-SJE-261-2-02 NRC JPM 4 2
0311 5105
Initial Conditions:
- 1. EOPs have been entered due to high suppression pool temperature.
- 2. Conditions require standby gas be placed on the drywell to reduce pressure.
- 3. Drywell and Suppression Chamber vent samples have been obtained and are satisfactory.
- 4. There is no Nitrogen makeup to the Primary Containment in progress.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
RO-SRO- (Operators name), place Standby Gas Train A on the Drywell.
(Operators name), place Standby Gas Train A on the Drywell per N2-OP-6lA, Section H.l.O.
- 1. Provide repeat back of initiating cue.
0 Evaluator Acknowledge repeat back providing correction if necessary.
RECORD START TIME
- 2. Obtain a copy of the reference 0
procedure and reviewhtilize the correct section of the procedure.
- 3. IF required, as determined by 0
Chemistry Supervision, notify Chemistry to sample the containment for the pre-vent acceptance criteria of ODCM Table D3.2.1-1 per Precaution and Limitation D.13.0 guidance:
- 4. IF time permits, concurrently with the o
following steps, fill out Attachment 3 for the valves operated (ODCM DSR 3.2.6.1). The listed position shall be the position of the valve following completion of the step.
- 5. IF desired to reduce Drywell or Suppression Chamber pressure, open the following:
ZI IAS*SOV168 at 2CEC*PNL851.
3 IAS*SOV180 at 2CEC*PNL851 L
02-OPS-SJE-261-2-02 NRC JPM 4 0
0 0
0 0
0 3
Proper communications used for SaWnsat repeat back (GAP-OPS-01 )
N2-0P-61A obtained. Precautions &
SaffUnsat Limitations reviewed & section H.l.O referenced.
Determines that Chemistry samples have been obtained and analysis is completed Cue operator that time does not permit the filling out of attachment 3.
Places IAS*SOVI 68 control switch PasslFail clockwise to OPEN.
Observes IAS*SOV168 red light - ON Sat/Unsat Observes IAS*SOV168 green light -
Sat/Unsat OFF Pass/Fail Places IAS*SOVI 80 control switch clockwise to OPEN Sat/ Unsat Observes IAS*SOV180 red light - ON Observes IAS*SOV180 green light -
OFF SaVUnsat 03/15/05
I Performance Steps 1 Standard I
Grade I
Start at least one of the GTS trains by 0 rotates the Train A Initiation switch PasslFail
- 6.
3 2
U 0
- 7.
- 8.
- 9.
placing TRAIN A (B) INITIATION Control Switch to START position at 2CEC*PNL870 (871) AND verify the following:
GTS*MOVIA (B), INLET FROM RX BLDG VENTILATION - Opens.
GTS*AOVZA (B), TRAIN A (B) INLET VLV - Opens.
GTS*AOV3A (B), FAN 1A (B) DISCH ISOL VLV - Opens.
GTS*FN 1 A (B), SBGTS FAN - Starts Verify that Chemistry is standing by to start the sampling required durinq the vent (ODCM Table D3.2.1-1).
IF GTS operation is affecting Reactor Building differential pressure, adjust controller 2GTS*PDIK5A (B),
REACTOR BLDG INLET/OUTLET DlFF PRESS, to throttle 2GTS*PV5A (B), RX BLDG PRESSURE CONTROL as necessary.
At CEC*PNL873, verify the following valves closed:
o CPS*AOV104 u CPS*AOV105 JCPS*AOVIIO J CPS*AOVI 1 1 o GTS*SOVI 02 u GTS*AOV 1 0 1 02-OPS-SJE-261-2-02 NRC JPM 4 4
0 0
0 0
0 0
0 0
0 clockwise to the start position Observes Train A Initiation red light -
ON Observes Train A Initiation green light Observes GTS*MOVI A red light - ON Observes GTS*MOVIA green light -
OFF Observes GTS*MOV2A red light - ON Observes GTS*MOV2A green light -
OFF Observes GTS*MOV3A red light - ON Observes GTSMOV3A green light -
OFF Observes GTS*FNIA red light - ON Observes GTS*FNIA green light -
OFF
- OFF o Requests Chemistry Technician commence sampling Cue: If requested, inform Operator that Chemistry has started sampling during the vent.
0 0
0 0
0 0
0 0
0 0
Verify Reactor Building pressure 5-.6 WG on GTS*PDIKSA.
If necessary, throttle pressure valve 2GTS*PDIK5A as necessary to maintain 5 -.6WG Reactor Building pressure.
Observe CPS*AOV104 green light -
ON Observe CPS*AOV104 red light -
OFF Observe CPS*AOV105 green light -
ON Observe CPS*AOVI 05 red light -
OFF Observe CPS*AOVI 10 green light -
ON Observe CPS*AOVI 10 red light -
OFF Observe CPS*AOVI 11 green light -
ON Observe CPS*AOVI 11 red light -
0311 5/05 Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat SatlUnsat SatlUnsat SatlUnsat SatlUnsat Satfunsat Sat/U nsa t Sat/Unsat Pass/Fail Sat/ Unsat Sat/ Unsat SaVUnsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/ Unsat Sat/Unsat Sat/Unsat SaVUnsat Sat/Unsat Sat/Unsat
- 10. At CEC*PNL875, verify the following o CPS*AOV106 valves closed:
o CPS*SOV132/AOVI 07 o CPS*AOV108 o CPS*SOV133/AOVI 09 Observe CPS*AOV102 green light -
ON o Observe CPS*AOV102 red light -
OFF o Observe CPS*AOV101 green light -
ON o Observe CPS*AOV101 red light -
OFF Observe CPS*AOV106 green light -
ON o Observe CPS*AOVlOG red light -
OFF o Observe CPS*SOVl32/AOV107 Observe CPS*SOVl32/AOV107 red green light - ON light - OFF Observe CPS*AOV108 green light -
ON Observe CPS*AOV108 red light -
OFF o Observe CPS*SOV133/AOVI 09 o Observe CPS*SOV133/AOV109 red green light - ON light - OFF
- 11. Notify Chemistry to start ODCM Cue: If requested, inform Operator that required sampling.
- 12. At CEC*PNL873, open 2GTS*SOV102.
0 0
- 13. At CEC*PNL873/875, open the aCPS*AOVI 08 following:
0 0
0 LICPS*AOVI 10 0
02-OPS-SJE-261-2-02 NRC JPM 4 5
Chemistry has started sampling during the vent.
Sat/ Unsat Sat/ Unsat Sat/ Unsat Sat/ Unsat Sat/ Unsat Sat/ Unsat Sat/ Unsat Sat/ Unsat Rotates 2GTS*SOV102 control switch PasslFail clockwise to - OPEN Observe 2GTS*SOV102 red light -
Sat/Unsat ON Sat/Unsat Observe 2GTS*SOVlO2 green light -
OFF Rotate CPS*AOV108 control switch PasslFail clockwise to OPEN Observe CPS*AOV108 red light - ON Sat/Unsat Observe CPS*AOV108 green light -
SaffUnsat OFF PasslFail Rotate CPS*AOVI 10 control switch clockwise to OPEN 0311 5/05
- 14. Reports that GTS Train A is running on Cue: Acknowledge the report the Drywell.
TERMINATING CUE: SBGTS Train "A" running on the Drywell.
RECORD STOP TIME 02-OPS-SJ E-26 1-2-02 NRC JPM 4 6
03/15/05
Initial Conditions:
- 1. EOPs have been entered due to high suppression pool temperature.
- 2. Conditions require standby gas be placed on the drywell to reduce pressure.
- 3. Drywell and Suppression Chamber vent samples have been obtained and are satisfactory.
- 4. There is no Nitrogen makeup to the Primary Containment in progress.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
RO-H. l.O.
(Operators name), place Standby Gas Train A on the Drywell per N2-0P-61A, Section 8
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
02-OPS-SJE-261-2-02 NRC JPM 4 7
0311 5/05
Initial Conditions:
- 1. EOPs have been entered due to high suppression pool temperature.
- 2. Conditions require standby gas be placed on the drywell to reduce pressure.
- 3. Drywell and Suppression Chamber vent samples have been obtained and are satisfactory.
- 4. There is no Nitrogen makeup to the Primary Containment in progress.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
SRO- (Operators name), place Standby Gas Train A an the Drywell.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
02-OPS-SJE-261-2-02 NRC JPM 4 8
0311 5\\05
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Task Number: 2000350501 Approvals:
Energize Reserve Station Transformer I B and NPS-SWG003. Revision: NRC 2005 Operations Training (Designee)
NA EXAMINATION SECURITY Configuration Control Date Perform e r :
(RO/SRO)
TrainedEvaluator:
Evaluation Method:
X Perform NA EXAMINATION SECURITY General Supervisor Date Operations (Designee)
Simulate Evaluation Location:
Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Eva I ua tor Signature:
Date:
NRC JPM 5 1
03/15/05
Recommended Start Location:
Simulator Simulator Set-up:
Reset to IC 46 Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1.
by a "0".
- 2.
During Evaluated JPM:
- 3.
During Training JPM:
Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted Self-verification shall be demonstrated.
0 Self-verification shall be demonstrated.
0 No other verification shall be demonstrated.
References:
- 1. N2-SOP-03 Tools and Equipment:
- 1. None Task Standard:
Reserve Transformer 1 B energized from Line 6 and NPS-SWG003 and NNS-SWG013 energized from Reserve Transformer 1 B.
NRC JPM 5 2
03/15/05
Initial Conditions:
- 1. The plant experienced a Loss of Line 6.
- 2. The plant was manually scrammed.
- 3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
- 4. Fault Identification and Isolation per Attachment 1 Section 1.4 are complete.
- 5. Power has been restored to Line 6 and Power Control has verified its reliability.
- 6. Ask the operator for any questions.
Performance Steps I Standard Initiating cue:
RO-I' (Operator's name), Energize Reserve Station Transformer 1 B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWGO13 per N2-SOP-3 Attachment 1 Section 1.5 Power Restor at ion. "
SRO-
" (Operator's name), Energize Reserve Station Transformer 1 B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWGO13 per N2-SOP-3."
Grade
- 1. Provide repeat back of initiating cue.
Evaluator Acknowledge repeat back providing correction if necessary RECORD START TIME
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
Obtain a copy of the reference procedure and reviewhtilize the correct section.
Review Attachment 1 Section 1.5 Power Restoration to determine applicable Attachment to Energize Reserve Transformer 1 B At Panel 808 (CB 288'), verify reset 86-2SPRYO1 (RES STA SER XFMR 1 B PRIM PROT LO RELAY).
At Panel 809 (CB 288'), verify reset 86-2SPRZ08 (RES STA SER XFMR 1 B BU PROT LOCKOUT RELAY).
Determine step 6.2 is N/A Determine section 6.3 is applicable o Proper communications used for Sat/Unsat repeat back (GAP-OPS-01) o N2-SOP-3 obtained. Precautions &
Limitations are reviewed and Section 1.5 referenced.
Sat/Unsat Per step 1.5.2, determines Sat/Unsat performance of Attachment 6 is required.
Verifies 86 device is reset Cue: If asked, inform the candidate that 86-SPRY01 is reset.
Verifies 86 device is reset Cue: If asked, inform the candidate that 86-SPRZO8 is reset.
Sat/Unsat Sat/Unsat o Marks N/A block for step 6.2 Sat/Unsat Carries out the actions of section Sat/Unsat 6.3 3
03/15/05 NRC JPM 5
- 9. Close MDS4 - (1 15 KV CIRCUIT o Places MDS4 control switch from PasslFail SWITCHER CKT SWITCH 38).
PULL-TO-LOCK to NORMAL-AFTE R-0 P E N o Places MDS4 control switch to PasslFail CLOSE SatlUnsat o Observes MDS4 red light - ON SatlUnsat o Observes MDS4 green light - OFF The following annunciators clear with no required action:
o 852421 MOT Operator CKT o 852435 RES STA SER XFMER 1 B Loss of Voltage 2Y U C-M DS4 I O. IF required, place in Normal-After-Trip o Places 3-1 control switch from PasslFail 2NPS-SWG003-1.
PULL-TO-LOCK to NORMAL-AFTER-TRI P.
o Observes 3-1 green light - ON Sat/Unsat
- 11. Return to Attachment 1 Section 1.5.
o Per step 1.5.8, determines SatlUnsat performance of Attachment 7 is required.
- 12. Step 7.1 Prerequisites Cue: If asked, 7.1.4 lockouts have been verified reset. Step 7.7, Prerequisites, are completed
- 12. Determines section 7.2 is applicable o Carries out the actions of section Sat/U nsa t 7.2
- 13. Place 3-14 in Pull-to-Lock.
Places 3-14 control switch in PasslFail o Observes 3-14 greedred lights -
SatlUnsat The following annunciator clears with no required action:
852560 13.8KV Bus NPS003 ACB 3-1/14/16 Auto Trip/FTC PULL-TO-LOCK OFF
- 14. Place the SYNC switch to ON Rotates the SYNC switch to ON PasslFail (SYNCHRONIZE RES STA SVCE XFMR 1 B).
- 15. Close 3-1.
Rotates 3-1 control switch to PasslFail NRC JPM 5 4
03/15/05
I Performance Steps I Standard I
Grade CLOSE Sat/ Unsat R
Observes 3-1 red light - ON SaVUnsat R
Observes 3-1 green light - OFF Numerous annuciators clear.
Numerous annunciators alarm.
Numerous annunciators reflash. None of these requires action.
- 16. Place the SYNC switch to OFF.
- 17. Close 13-6.
Rotates the SYNC switch to OFF PasslFail Rotates 13-6 control switch from PasslFail PULL-TO-LOCK to NORMAL-AFTER-TRI P.
Observes 13-6 green light - ON Sat/Unsat Rotates 13-6 control switch to PasslFail CLOSE Sat/Unsat Observes 13-6 red light - ON Sat/Unsat Observes 13-6 green light - OFF The following annunciator clears with no required action:
o 852527 4KV Bus NNS 013 Undervoltage
- 18. Return to Attachment 1 Section 1.5.
- 19. Reports that Reserve Station Transformer 1 B is energized from Line 6, and 2NPS-SWG003 & NNS-SWG013 are energized from Reserve Station Transformer 1 B Cue: Acknowledge report.
TERMINATING CUE: Reserve Station Transformer 1 B Powered from Line 6, and NPS-SWG003 &
NPS-SWGO13 are energized from Reserve Station Transformer 1 B.
RECORD STOP TIME NRC JPM 5 5
0311 5/05
Initial Conditions:
- 1. The plant experienced a Loss of Line 6.
- 2. The plant was manually scrammed.
- 3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
- 4. Fault Identification and Isolation per Attachment 1 Section 1.4 are complete.
- 5. Power has been restored to Line 6 and Power Control has verified its reliability.
- 6. Ask the operator for any questions.
Initiating cue:
RO-power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3 Attachment 1 Section 1.5 Power Restoration.
(Operators name), Energize Reserve Station Transformer 1 B from Line 6, then restore Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 5 6
03/15/05
Initial Conditions:
- 1. The plant experienced a Loss of Line 6.
- 2. The plant was manually scrammed.
- 3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
- 4. Fault Identification and Isolation per Attachment 1 Section 1.4 are complete.
- 5. Power has been restored to Line 6 and Power Control has verified its reliability.
- 6. Ask the operator for any questions.
Initiating cue:
SRO-(Operators name), Energize Reserve Station Transformer 1 B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3.
Candidate:
Direct ALL communications and announcernenfs through the JPM Evaluator, first.
NRC JPM 5 7
0311 5/05
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Task Number: 2129050201 PERFORM TURBINE CONTROL VALVE (CV1)
CY C L I N G S U RVE I L LANCE Revision: NRC 2005 Approvals:
NA EXAMINATION SECURITY Date" General Supervisor Date Operations 'Training (Designee)
Operations.(Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer :
(ROISRO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: YES Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Eva1 ua tor Signa tu re:
Date:
NRC JPM 6 1
03/15/05
Recommended Start Location:
Simulator Simulator Set-up:
- 1. Reset to a full power IC (such as IC-20).
- 2. Malfunction RP02,TRUE, QUEUED Directions to Evaluator:
- 1. Reduce recirc flow to reduce power to 85 YO by APRM's
- 2. Set the MAX COMBINED FLOW LIMITER to 7.50.
- 3. This JPM will require an instructor to role-play as a second RO. The second RO will hold the test pushbutton, allowing the candidate to verify indications.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional
/ concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used.
Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted
- 2. During Evaluated JPM:
- 3. During Training JPM:
by a ".".
0 Self-verification shall be demonstrated.
Self-verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 1. N2-OSP-RPS-Q001
- 2. NUREG KIA 212000 A2.03 3.U3.5 Tools and Equipment:
- 1. None Task Standard:
Cycle CV1 results in a RPS failure, then insert a manual trip of RPS A2 logic.
NRC JPM 6 2
0311 5/05
Initial Conditions:
- 1. The plant is at 85% power.
. No equipment is out of service.
3. A second RO is available to assist with surveillance performance.
- 4. Ask the operator for any questions.
Initiating cue:
(Operators name), Perform Turbine Control Valve Cycling per N2-OSP-RPS-QOOl.
I Performance Stem I Standard I
Grade 1
- 1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary RECORD START TIME
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
Provide candidate with a marked-up working copy of Surveillance Test N2-OSP-RPS-Q001.
NOTE:
Perform Step 8.1.1 only if Reactor and Turbine power are less than 30%.
NOTES:
Closing 2MSS-CV1 may cause bypass valve(s) to open to maintain pressure.
Closing 2MSS-CV1 will cause the following annunciators to alarm:
o 603104 RPS A TURB CONT VLV FAST CLOSE TRIP 3 6031 10 RPS A AUTO TRIP Verify no trip signals exist in RPS B Trip System.
Notify CSO of trip to be received in RPS A Trip System.
Depress and HOLD, CV-1 TEST pushbutton, (hold depressed until directed to release), when position indicator indicates valve is fully closed (0% indicated), verify following alarms and i nd i ca t ions :
Proper communications used for Sat/ Unsat repeat back (GAP-OPS-01) o N2-OSP-RPS-Q001 section 8.0 is Sat/ Unsat referenced Determines that step 8.1.1 is N/A - Rx SaffUnsat and Turbine power is greater than 30%.
Informs CRS and/or CSO of expected Sat/Unsat annunciators Cue: As the CRSKSO acknowledge the annunciator report.
o Observes no red annunciators lit on Sat/ Unsat panel 603 Notifies the CSO of expected half Sat/ Unsat scram initiation in RPS A Trip System.
Cue:Acknowledge that a half scram will be received.
o Depresses the CV-1 TEST Pass/Fail pushbutton on panel 2CEC*PNL842 Cue: Instructor role play to hold the TEST pushbutton allowing the candidate to verify indications.
NRC JPM 6 3
0311 5/05
I Performance Steps I Standard I
Grade I
o Annunciator 6031 04 RPS A TURB CONT o Observes 6031 04 annunciator window Satfunsat VLV FAST CLOSE TRIP alarmed.
is lit.
o Annunciator 6031 10 RPS A AUTO TRIP Observes 6031 10 annunciator window Satfunsat alarmed.
is extinguished.
PILOT SCRAM VALVE SOLENOIDS o Observes Pilot SCRAM valve Satfunsat A,C,E,G indicating lights on 2CEC*PNL603 are OFF.
ON solenoids white lights A, C, E 8, G -
o REACTOR SCRAM TRIP LOGIC A2 Cue: If asked, state that the Reactor Satfunsat indicating light on 2CEC*PNL609 is OFF.
SCRAM Trip Logic A2 white light Located on P609 is ON LI RECIRC PUMP TRIP SYSTEM B indicating Cue: If asked, state that the Recirc Satfunsat light C72A-DS13 on 2CEC*PNL609 is OFF, C72A-DS15 on 2CEC*PNL611 becomes brighter.
P611 is BRIGHTER.
Pump Trip System B light C72A-OS13 on P609 is OFF and C72A-OS15 on 3 Process points MSSUClO and RPSUC03 o Observes computer alarms Satfunsat are generated.
MSSUClO and RPSUC03 on the process computer
- 9. Reports to the SM that RPS A did not trip and/or Cue: As the SM, acknowledge the RPS A, C, E & G white lights are still ON.
report of the failure of RPS A to trip.
Satf Unsat Cue: If asked, inform the candidate to take the appropriate action.
IO. Obtains a copy of N2-SOP-97 flow chart.
o References N2-SOP-97 flow chart Sat/ U nsa t
- 11. Stop any half scram isolation testing Notifies the SM to stop half scram or Satfunsat isolation testing.
NOTE: The candidate may also notify the that the CRS, or just make the decision surveillance test has already been stopped and not inform anyone.
Cue: As the SM, acknowledge the request.
- 12. What was the cause?
o Determines the cause of the RPS Satfunsat failure is a FAILURE TO TRIP
- 24. Arm and Depress manual scram switches for Rotate REACTOR SCRAM A2 collar PasslFail Depress REACTOR SCRAM A2 Pass/Fail the affected channel clockwise to the ARMED position.
pushbutton.
NRC JPM 6 4
03/15/05
I Performance Steps I Standard I
Grade I
- 25. Verify the following indications:
o PILOT SCRAM SOLENOIDS A, C, E &G o Observes Pilot SCRAM valve Sat/Unsat indicating lights on 2CEC*PNL603 are OFF solenoids white lights A, C, E & G -
OFF o REACTOR SCRAM TRIP LOGIC A1 Sat/Unsat indicating light on 2CEC*PNL609 is OFF Cue: When asked, state that the Reactor SCRAM Trip Logic A2 white light located on P609 is OFF
- 26. Reports that RPS A is tripped.
CUE: Acknowledge the report.
TERMINATING CUE: Cycle CV1 results in a RPS failure, then insert a manual trip of RPS A2 logic.
RECORD STOP TIME NRC JPM 6 5
03/15/05
Initial Conditions:
1. The plant is at 85% power.
- 2. No equipment is out of service.
- 3. A second RO is available to assist with surveillance performance.
- 4. Ask the operator for any questions.
Initiating cue:
(Operators name), Perform Turbine Control Valve Cycling per N2-OSP-RPS-QO01.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 6 6
0311 5105
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Task Number: 27800401 01 Shift Running Instrument Air Compressors Revision: NRC 2005 Approvals:
I NA EXAMINATION SECURITY General Sipervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: Yes Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:
Date:
NRC JPM 7 1
03/15/05
Recommended Start Location:
Simulator Simulator Set-up:
- 1. Reset to IC20 or equivalent
- 2. Verify A-B-C air compressor line-up
- 3. Enter the following Malfunctions:
2 IA02A, 21AS-C3A Thermal Overload Trip, TUA = 5 sec 2
IA02B, 21AS-C3B Thermal Overload Trip, TUA = 1 min
- 4. Enter the following Instructor Overrides:
- I P851-1 B-21ASAO1 -A, Instrument Air Compressor Selector SW, POS-4, TUA = 15 sec ET77 (P11/21) cl P851-1 B-2IASAOl-A, Instrument Air Compressor Selector SW, POS-3, TUA = 15 sec ET91 (P11/21)
ET77 ET77 Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional
/ concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used Therefore, either another individual or I will act as the additional I concurrent verifier.
Notes to Instructor / Evaluator:
- 1.
- 2.
During Evaluated JPM:
- 3.
During Training JPM:
Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a el.
0 Self-verification shall be demonstrated.
0 Self-verification shall be demonstrated.
No other verification shall be demonstrated.
References :
- 1. N2-OP-19, Section F.2.0
- 3. NUREG K/A 29501 9 AA2.01 3.513.6
- 2. N2-SOP-19 Tools and Equipment:
- 1. None Task Standard:
IAS-C3C is running and IAS header pressure has recovered above alarm L-setpoint.
NRC JPM 7 2
03/15/05
Initial Conditions:
- 1. The plant is operating at 100°/~ power.
- 2. 21AS-C3A is operating but degraded.
- 4. Ask the operator for any questions.
- 3. IAS 120VAC remains energized.
Initiating cue:
RO -
(Operators name), Shift Instrument Air Compressors from A running to 6 running per N2-0P-I 9 Section SRO- (Operators name), Shift Instrument Air Compressors from A running to 6.
I Performance Steps I Standard I
Grade I
- 1. Provide repeat back of initiating cue.
F.2.0.
Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-01)
RECORD START TIME
- 2..Obtain a copy of the reference proceure and review/utilize the correct section.
- 3. For the oncoming 21AS -C3B:
Verify OFFIOPERATE switch in 0 P E RAT E Verify UNLOAD/NORMAL switch in NORMAL Confirm fault indicator lamps extinguished
- 4. Slowly open 2CCP-V523
- 6. Place 21AS-C36 control switch in Normal-After Start at P851 N2-OP-19 obtained. Precautions &
Limitations reviewed and section F.2.0 referenced.
o Requests an in-plant operator to verify that IAS-C36 is ready to start.
Cue: As an operator at the Air Compressor, report that the OFF/OPERATE switch is in OPERATE, the UNLOAD/NORMAL switch is in NORMAL, and all fault indicator lights are OFF Request that the in-plant operator slowly open 2CCP-V523 Cue: As an in-plant operator report that 2CCP-V523 is open Rotates Instrument Air Compressor Selector Switch to BCA position Rotates IAS-C36 control switch to START Observes IAS-C36 red light - ON Observes IAS-C36 green light - OFF Observes AM-21ASB03 amps - rise to 280 amps and drop back to 175 amps.
Releases IAS-C3B to the NORMAL-AFTE R-START Sat/Unsat SaUUnsat Sat/Unsat Sat/ U nsa t Pass/Fail Pass/Fail SaUUnsat SaUUnsat SaUUnsat PasdFail NRC JPM 7 3
03/15/05
I Performance Stem
- 7. IAS-C3A trips on thermal overload
- 8..Reports to the CRS that IAS-3CA has tripped on thermal overload/motor electrical fault
- 9..Obtains and references ARP 851228
- 10..IAS-C3B Trips
- 11..Reports to the CRS that IAS-3CB has tripped on thermal overload/motor electrical fault
- 12..Obtains and references N2-SOP-19
- 13..LOSS of all air compressors due to slow transfer or loss of control power?
- 14..Annunciator 851229, INSTR AIR SYSTEM TROUBLE sounds.
J Standard I
Grade I
Observes Annunciator 851 228, Sat/Unsat INSTR AIR CPSR 3A/36/3C AUTO START/ FAIL TO TRIP - LIT Observes IAS-C3A green light - ON Sat/Unsat o Observes IAS-C3A red light - OFF SatlUnsat R Observes AM-21ASA03 amps - 0 Sat/Unsat NOTE: Annunciators 851 259, INST AIR COMPRESSOR CLG WTR FLOW LOW, and 851260, INST AIR COMPRESSOR COOLING SYS TROUBLE may alarm. These annunciators are of no consequence to the JPM, and the candidates may not responds to them.
Cue: Acknowledge the report of /AS-C3A trip SaUUnsat o Enter N2-SOP-19 Sat/Unsat o May dispatch an operator to check the running and tripped air compressor Rotates and pulls IAS-C3A control Pass/Fail switch to PULL-TO-LOCK Sat/Unsat Verify the Instrument Air Compressor Selector in the BCA position NOTE: If IAS-C3A control switch is placed in PULL-TO-LOCK prior to the trip of IAS-C3B, annunciator 851228 will alarm.
o Observes IAS-C3B green light - ON SatlUnsat o Observes IAS-C3B rea light - OFF Sat/Unsat Cue: Acknowledge the report of /AS-C3B trip SatlUnsat o Determines the air compressors are Sat/Unsat tripped or degraded o Determines that electrical power and Sat/Unsat control power remain available o Recognizes that IAS pressure is less Sat/Unsat o Recognizes that IAS-C3C did not Sat/ Unsat that 90 psig.
automatically start.
NRC JPM 7 4
0311 5/05
I Performance Steps I Standard I Grade I
- 15..If required startherify auto started air compressors
- 16. Select IAS-C3C as the LEAD on the Instrument Air Compressor Selector Switch.
0 0
- 17. Place 21AS-C3C control switch in Normal-o After Start.
0 0
0 Rotates Instrument Air Compressor PasslFail Selector Switch to the CAB position.
Rotates IAS-C3C control switch to PasslFail START Observes IAS-C3C red light - ON SaVUnsat Observes IAS-C3C green light -
SaVUnsat OFF SaVUnsat Observes AM-21ASC03 amps - rise to 280 amps and drop back to 175 amps.
PasslFail u Releases IAS-C3C to the NORMAL-AFTER-START
- 18. Pressure Restored?
o Observes 21AS-PI101 pressure Sat/ Unsat indication rising.
- 19. Notifies the CRS Instrument Air Cue: As the CRS, Acknowledge the report Sat/U nsa t Compressor C did not start automatically.
Instrument Air Compressor C was manually started and Instrument Air pressure is recovering End of JPM TERMINATING CUE: IAS-C3C is running and IAS header pressure has recovered above alarm setpoint.
RECORD STOP TIME NRC JPM 7 5
0311 5/05
Initial Conditions:
- 1. The plant is operating at 100% power
- 2. 21AS-C3A is operating but degraded.
- 3. IAS 120VAC remains energized.
- 4. Ask the operator for any questions.
Initiating cue:
RO -
(Operators name), Shift Instrument Air Compressors from A running to B running per N2-OP-19 Section F.2.0.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 7 6
03/15/05
Initial Conditions:
- 1. The plant is operating at 100% power
- 2. 21AS-C3A is operating but degraded.
- 3. IAS I20VAC remains energized.
- 4. Ask the operator for any questions.
Initiating cue:
SRO- (Operators name), Shift Instrument Air Compressors from A running to B.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 7 7
0311 5/05
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Task Number: 28800201012 Manual Initiation of the Control Building Special Filter Train Revision: NRC 2005 Approvals:
NA EXAMINATION SECURITY Zne'ral Supervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Perform e r :
(RO/SRO)
TrainerEvahator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: NO Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:
Date:
NRC JPM 8 1
0311 5105
Recommended Start Location: (Completion time based on the start location)
Simulator Simulator Set-up (if required):
Any IC as long as no LOCA or LOOP exists that will automatically start Control Building Special Filter Train.
Directions to Operators:
Read Before Everv JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional /
concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used.
Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1.
- 2.
- 3.
Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a 0.
During Evaluated JPM:
Self-verification shall be demonstrated.
During Training JPM:
Self-verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 1. N2-OP-53A, Rev 08, Control Building Ventilation System
- 2. NUREG WA 290003 A4.01 (3.2/3.2), 295038 EA1.07 (3.6/3.8)
Tools and Equipment:
- 1. None Task Standard:
Control Building Special Filter Train A operating in the filtration mode NRC JPM 8 2
03/15/05
Initial Conditions:
- 1. EOP-MSL has been entered.
- 2. Control Building radiation levels are 6E-6 mcikc and rising
- 3. Ask the candidate if they have any questions.
Initiating Cues:
- 1. Provide repeat back of initiating cue.
Evaluator Acknowledge repeat back providing correction if necessary RECORD START TIME
- 2. Obtain a copy of the reference procedure and reviewhtilize the correct section of the procedure.
- 5. Start HVC*FN2A, CONTROL ROOM AC BOOSTER FAN at 2CEC*PNL870.
- 6. Observe 2HVC*FRIOA FILTER TRAIN HVC*FLTZA INLET AIR FLOW (red pen) should indicate approximately 63% of full scale (corresponds to approximately 2250 scfm).
- 7. Confirm that Control Room/Atmosphere, d/p is
> +0.125 in WG as read on 2HVC-PD1147, located in the Control Room behind 2CEC-PNL849.
0 0
0 0
0 0
0 0
0 0
0 0
0 Proper communications used for Sat/Unsat repeat back (GAP-OPS-0 1 )
N2-OP-53A obtained. Precautions &
SaVUnsat limitations reviewed & section H.6.0 referenced.
Places HVC*MOVl A control switch in Pass/Fail CLOSE.
Observe HCV*MOVlA green light -
Sat/ Unsat ON Sat/Unsat Observe HCV*MOVl A red light - OFF Places HVC*MOVl B control switch in Pass/Fail CLOSED Observe HVC*MOVI B green light -
Sat/Unsat ON Sat/Unsat Observe HVC*MOVI B red light - OFF Places and holds HVC*FN2A control PasslFail switch in START Observes HVC*FNZA red light - ON Sat/Unsat Observes HVC*FN2A green light -
Sat/U nsa t OFF PasslFail Returns the HVC*FN2A control switch to NORMAL-AFTER START.
Observes 2HVC*FRI OA FILTER SaVUnsat TRAIN HVC*FLT2A INLET AIR FLOW (red pen) indicates approximately 63%
of full scale.
Cue: When operator walks behind Fire Panel 2CEC-PNL849 provide cue that PD1147 indicates +0.2 inches WG.
Sat/Unsat NRC JPM 8 3
03/15/05
- 8. Observes the following at 2HVC*PNLCH7A:
o Dispatches Auxiliary Operator to verify SaffUnsat ON INDICATOR red light ON indications locally on 2HVC*PNLCH7A:
NOTE: May simulate going to the panel OVERTEMPERATURE INDICATOR instead of sending an Auxiliary Operator LOW AIRFLOW INDICATOR green light OFF green light OFF Cue: When asked, as the Auxiliary Operator Report:
o ON INDICATOR red light ON 0 LOW AIRFLOW INDICATOR green light OFF OVERTEMPERATURE INDICATOR green light OFF
- 9. Notify Radiation Protection to periodically Cue: Acknowledge the request.
sample the Control Room Atmosphere to ensure proper operation of the Special Filter Train in service.
(Simulate)
IO. Reports that Control Building Special Filter Train A has been initiated.
Cue: Acknowledge the report.
o TERMINATING CUE: Control Room Special Filter Train A initiated.
RECORD STOP TIME NRC JPM 8 4
03/15/05
Initial Conditions:
- 1. EOP-MSL has been entered.
- 2. Control Building radiation levels are 6E-6 mcilcc and rising
- 3. Ask the candidate if they have any questions.
Initiating Cues:
RO-53A, section H.6.0.
(Operators name), manually initiate Control Building Special Filter Train A per N2-OP-Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 8 5
03/15/05
Initial Conditions:
- 1.
EOP-MSL has been entered.
- 2.
- 3.
Control Building radiation levels are 6E-6 mci/cc and rising Ask the candidate if they have any questions.
Initiating Cues:
SRO- (Operators name), manually initiate Control Building Special Filter Train A Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 8 6
0311 5105
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Task Number: 2009620501. 2009620504 Vent Control Rod Overpiston Volume Revision: NRC 2005 Approvals:
$&I NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Perform e r:
(RO/SRO)
TrainedEvaluator:
Evaluation Method:
Perform X
Simulate Evaluation Location:
X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:
Date:
02-OPS-PJE-200-2-69 NRC JPM 9 1
03/16/05
Recommended Start Location: (Completion time based on the start location)
RP Access Area Simulator Set-up (if required):
None Directions to the Instructor/Evaluator:
Prior to the performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional /
concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used.
Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1.
- 2.
During Evaluated JPM:
- 3.
During Training JPM:
Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a..
Self-verification shall be demonstrated.
Self-verification shall be demonstrated.
No other verification shall be demonstrated.
References:
1, N2-EOP-6, Att. 14, Rev. 5, Alternate Rod Insertions, Sections 3.6
- 2. NUREG 1123, K/A 295015, AA.1.01 (3.8/3.9)
Tools and Equipment:
EOP box has a breakaway tie-wrap Task Standard:
Control Rod 26-59 at notch 00 and 2RDS*V1 shut.
02-OPS-PJE-200-2-69 NRC JPM 9 2
0311 6/05
Initial Conditions:
- 1. A scram has occurred.
- 2. Several rods have not fully inserted.
- 3. Communications are established with Control Room.
- 4. An OD-7, Print out of Rod Positions is NOT available.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
(Operators name) using EOP-6, Attachment 14, insert control rod locally venting its overpiston area.
26-59 to notch 00 by
- 1. Provide repeat back of initiating Proper communications used for repeat Sat/Unsat cue. Evaluator Acknowledge repeat back providing correction if necessary back (GAP-OPS-Ol/Operations Manual)
RECORD START TIME
- 2. Obtain a copy of the reference Open EOP box by removing breakaway Sat/Unsat procedure and reviewhtilize the correct section of the procedure enclosures. Reference EOP-6, Att. 14, tie-wrap and review procedure and Section 3.6 Describe and identify the tools necessary to perform the task, but do NOT remove the tools from the EOP Box
- 3. Locate the correct HCU (26-59).
Physically locate the correct HCU (26-Pass/Fail 59). Use Figure 14-1, RDS HCU LOCATIONS, as a guide, if required.
- 04. Remove Cap from 2 RDS*Vl,
AT HCU, use wrench to remove the Withdraw Line Vent Valve Cap.
PasdFail Withdraw Line Vent Valve Drain.
Cue: Simulate cap removal.
- 05. Connect adapter.
At HCU, connect adapter to the correct RDS*Vl by threading in the quick PasslFail Cue: Simulate drain adapter disconnect adapter.
connected.
02-OPS-PJE-200-2-69 NRC JPM 9 3
03/16/05
I Performance Stem I Standard I
Grade I
- 06. Connect hose.
At HCU, connect hose to the quick disconnect adapter and route to a drain.
Secure the hose at the drain against Pass/Fail Cue:
Simulate hose connected and routed. If the whip.
candidate starts to go down the ladder to secure the hose at the drain, tell them another operator has secured the bottom of the hose.
- 07. Uncap 2RDS*V1 Valve Operator, Cue:
Simulate cap removed.
At HCU, remove cap from RDS*Vl Valve Operator.
Pass/Fail
- 8. Insert rod.
Cue:
Simulate RDS*Vl opened.
At HCU, slowly open RDS*Vl by inserting PasslFail the T-handled HCU Vent Tool and rotating counter clockwise, venting the above piston area.
- 9. Report to Control Room.
Report that RDS*Vl is opened. Request Sat/Unsat rod position.
Cue:
Acknowledge report and inform the operator that control rod 26-59 has fully inserted. To restore 26-59 to normal.
- 10. Shut RDS*Vl.
At HCU, using the T-handled HCU Vent Tool shut RDS*Vl by rotating the Pass/Fail Cue:
Simulate RDS*Vl shut.
operator clockwise.
- 11. Replace the cap on 2RDS*V1 At HCU, replace the cap on RDS*Vl Sat/Unsat Valve Operator.
Valve Operator.
Cue:
Simulate cap replaced.
02-OPS-PJE-200-2-69 NRC JPM 9 4
03/16/05
NOTE:
At this time the JPM may be stopped.
End of JPM TERMINATING CUE: Control Rod 26-59 at notch 00 and 2RDS*V1 shut.
RECORD STOP TIME 02-OPS-PJ E-200-2-69 NRC JPM 9 5
03/16/05
Initial Conditions:
- 1. A scram has occurred.
- 2. Several rods have not fully inserted.
- 3. Communications are established with Control Room.
- 4. An OD-7, Print out of Rod Positions is NOT available.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
(Operators name) using EOP-6, Attachment 14, insert control rod locally venting its overpiston area.
26-59 to notch 00 by Can didate:
Direct ALL communications and announcements through the JPM Evaluator, first.
02-OPS-PJ E-200-2-69 NRC JPM 9 6
03/16/05
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Align Fire Water System to Inject to RHR A Task Number: 2009020504 Approvals:
G x e ra I S u pe rvis o r date Operations 'Training (Designee)
Revision: NRC 2005 NA EXAMINATION SECURITY General Supervisor Date Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Met hod :
Perform X
Simulate Evaluation Location:
X Plant Simulator Expected Completion Time: 25 minutes Time Critical Task: NO Alternate Path Task: NO Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:
Date:
L 02-OPS-PJE-205-2-02 NRC JPM 10 1
03/16/05
Recommended Start Location: (Completion time based on the start location)
RP Access Area Simulator Set-up (if required):
N /A Directions to the Instructor/Evaluator:
Prior to the performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used.
Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1.
- 2.
During Evaluated JPM:
- 3.
During Training JPM:
Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a (o.
Self-verification shall be demonstrated.
0 Self-verification shall be demonstrated.
0 No other verification shall be demonstrated.
References:
0311 6/05
Tools and Equipment:
- 1. PL-3 Key
- 2. EOP tool boxes are secured with a breakaway tie-wrap Task Standard:
Fire Water System is aligned to inject to RHR loop A per N2-EOP-6, Attachment 6.
02-OPS-PJE-205-2-02 NRC JPM 10 3
03/16/05
Initial Conditions:
- 1. All high pressure feed to the RPV is lost.
- 2. Alternate injection systems are being lined up.
- 3. Instructor to ask operator for any questions.
Initiating Cues:
(Operators name), Line-up the Fire Water System to RHR loop A, per EOP-6, Attachment 6.
- 1.
Provide repeat back of Proper communications used for repeat Sat/ Unsat initiating cue. Evaluator Acknowledge repeat back providing correction if necessary.
back (GAP-OPS-Ol/Operations Manual)
RECORD START TIME
- 02. Obtain a copy of the N2-EOP-6, Attachment 6 obtained.
Sat/ Unsat reference procedure and review/utilize the correct section of the procedure.
Section 3.1 referenced.
CUE: Steps 3.1.1, 3.1.2, 3.1.3 and 3.1.4 are complete.
NOTE: For simulation purposes, actual layout of hoses/flanges and connection to pump or plant equipment is not required.
Identification of hose/flange and use along with connection points is all that is required.
- 3.
Verify closed 2RHS*V70, 2RHS*V70, CONDENSATE FLUSH TO SaffUnsat CONDENSATE FLUSH TO A CONTMT SPRAY HDR.
Cue:
2RHS*V70 is closed A CONTMT SPRAY HDR is rotated in the clockwise direction to verify it is closed. (Rx Bldg EL 289).
02-OPS-PJE-205-2-02 NRC JPM 10 4
0311 6/05
- 4.
Close 2CNS-V621, CNS TO 2CNS-V621, CNS TO RHR SUPPLY SaUUnsat RHR SUPPLY ISOL.
Cue: 2CNS-V621 is closed ISOL is rotated in the clockwise direction to verify it is closed. (Rx Bldg, Northside E1289 above 2RHS*MOV24A, LPCl lnjection Valve).
- 5.
Remove test connection blind Blind Flange is properly removed using PasslFail flange from between valves the tools from the EOP gang box. (Rx 2CNS-V621 AND 2RHS*V70.
Bldg EL 289)
Cue: Blind flange is removed
- 6.
Install 2 '/2 inch fire hose Adapter installed to test connection PasslFail flange correctly using tools from the EOP gang box.
adapter to test connection.
Cue: Adapter is installed.
- 7.
Connect male end of 2 % inch Male end of 2 % inch fire hose from EOP PasslFail fire hose from EOP box to box is properly connected to test test connect ion flange connection flange adapter adapter.
Cue: Male end of 2 % inch fire hose is connected to test connection flange adapter.
- 8.
Disconnect firehose at FHR Firehose from EOP gangbox is properly PasslFail 93 connected to FHR 93 using tools from the EOP gang box. (Rx Bldg, EL 289, near North stairwell entrance)
Cue: Firehose is connected from FHR 93
- 9.
Connect 2 112 firehose from Firehose is properly connected to FHR PasslFail test connection flange adapter to FHR 93.
93 using tools from the EOP gang box Cue: Firehose is connected to FHR 93
\\
ANGLE VALVE is opened by rotating the handwheel in the counterclockwise direction.
Cue:
2FPW-V391 is open 02-OPS-PJE-205-2-02 NRC JPM 10 5
03/16/05
- 11. Unlock AND open 2RHS*V70 Using the PL-3 Key, unlock AND open Pass/Fail 2RHS*V70 by rotating the handwheel in the counterclockwise direction.
Cue: 2RHS*V70 is unlocked and open.
- 10. Notify control room that fire water is lined-up to inject via RHR A SaVUnsat End of JPM TERMINATING CUE: Fire Water System is aligned to inject to RHR loop A per N2-EOP-6,.
RECORD STOP TIME 02-OPS-PJ E-205-2-02 NRC JPM 10 6
03/16/05
Initial Conditions:
\\.
- 1. All high pressure feed to the RPV is lost.
- 2. Alternate injection systems are being lined up.
- 3. Instructor to ask operator for any questions.
Initiating Cues:
(Operators name), Line-up the Fire Water System to RHR loop A, per EOP-6, Attachment 6.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
02-OPS-PJE-205-2-02 NRC JPM 10 7
0311 6/05
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Task Number: 2640020101 Lower Control Building Operator During Control Room Evacuation Revision: NRC 2005 Approvals:
General Supervisor bat&
NA EXAMINATION SECURITY General Supervisor Date Operations Training (Designee)
Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Perform e r :
(RO/SRO)
Trainer/Evaluator:
Evaluation Method :
Perform X
Simulate Evaluation Location:
X Plant Simulator Expected Completion Time: 25 minutes Time Critical Task: NO Alternate Path Task: Yes Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:
Date:
NRC JPM 11 1
03/16/05
Recommended Start Location:
Control Building Elev. 261 in the vicinity of the Remote Shutdown or Diesel Generator
- i.
Rooms Simulator Set-up:
Directions to the Instructor/Evaluator:
N /A Prior to the performance of this JPM, obtain SM I CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used.
Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1.
- 2.
During Evaluated JPM:
- 3.
During Training JPM:
Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a ".".
0 Self-verification shall be demonstrated.
0 Self-verification shall be demonstrated.
0 No other verification shall be demonstrated.
References :
- 2. N2-OP-1 OOA Section H. 13
- 1. N2-SOP-78 Tools and Equipment:
- 1. None Task Standard: Division I Diesel Generator locally started and output breaker 101-1 locally closed.
NRC JPM 11 2
0311 6/05
Initial Conditions:
- 1. Plant has scrammed
- 2. Control Room Evacuation is required
- 3. You are the Lower Control Building Operator
- 4. Lower Control Building Operator immediate actions are in progress
- 5. 2VBS*PNLBIOO Breakers 3 and 4 have just been positioned to OFF.
- 6. Ask the operator for any questions.
Initiating cue:
(Operators name), complete the Immediate and Subsequent Actions of N2-SOP-78.
- 1. Provide repeat back of initiating Proper communications used for repeat Satfunsat cue. Evaluator Acknowledge back (GAP-OPS-01 )
repeat back providing correction if necessary RECORD START TIME
~...
- 2..Obtain a copy of the reference u
Obtain copy of N2-SOP-78.
procedure and reviewhtilize the correct section.
- 3. Reports to Remote o Reports to Remote Shutdown/Diesel Shutdown/Diesel Generator Generator Room Area Room Area Cue: When asked if the Division any Diesel Generator started, inform the Lower Control Building Operator (candidate) that Division I Diesel Generator did NOT start AND a loss of Offsite Line 5 has just occurred.
NOTE: ALL actions are to be SIMULATED. No equipment is to be operated by candidates.
Sat/ Unsat u Acknowledges Division I Diesel Satfunsat Generator did NOT start o Acknowledges loss of Line 5 occurred Satfunsat Determines Offsite power is lost to Satfunsat ENS*SWGlOl u Determines Division I Diesel Sat/U nsa t Generator must be started locally using N2-0P-1 OOA, section H. 13 and prestart checks and data recording is NOT required.
NRC JPM 11 3
03/16/05
- 4.
- 5.
- 6.
- 7.
.Obtain a copy of the reference procedure and reviewhtilize the correct section.
Verify Lube Oil AND Jacket 0
Water Temperatures are >75"F.
Cue: Lube oil and jacket water temperatures are 125°F.
Verify NO Lube Oil OR Jacket Water High Temperature Alarms exist o
At 2CES* I P N L407, GENERATOR CONTROL PANEL, perform the following:
3 Verify 2ENS*SWG101-13, CIRCUIT BREAKER PREFERRED OFFSITE, is open.
Cue: Circuit Breaker Preferred Offsite breaker green light is ON and red light is OFF.
3 Verify 2ENS*SWG101-10, CIRCUIT BREAKER ALTERNATE OFFSITE, is open.
Cue: Circuit Breaker Alternate Offsite breaker green light is OFF and red light is OFF.
Verify 2ENS*SWG101-N1, CIRCUIT BREAKER NEUTRAL, is closed.
Obtains copy of N2-OP-1 OOA and reviews section H. 13 Sat/ Unsat SIMULATE: Verifies Lube Oil AND Jacket Water Temperatures are
>75"F, by use of RTD Temperature Meter Selector switch selected to Point 1 and Point 5 Sat/Unsat Observes NO Lube Oil OR Jacket Water High Temperature annunciators lit at 2CES*IPNL406, ENGINE CONTROL PANEL Sat/Unsat Verifies 2ENS*SWG101-13, CIRCUIT Sat/Unsat BREAKER PREFERRED OFFSITE, is open by observing green light ON and red light OFF.
Verifies 2ENS*SWG101-10, CIRCUIT SaVUnsat BREAKER ALTERNATE OFFSITE, is open by observing both green and red lights OFF.
NOTE: 2ENS*SWG101-10 is a "cubicle only" arrangement. There is no breaker installed in this switchgear cubicle.
Verifies 2ENS*SWG101-NI1 CIRCUIT Sat/Unsat BREAKER NEUTRAL, is closed by observing green light OFF and red light ON.
NRC JPM 11 4
0311 6/05
u Verify GOVERNOR mode o Verifies GOVERNOR mode switch is Sat/Unsat switch is in ISOCH.
in ISOCH.
Cue: GOVERNOR mode switch is in ISOCH.
3 Verify VOLTAGE Verify VOLTAGE REGULATOR SaVUnsat REGULATOR MANUAL-AUTO switch is in AUTO.
MANUAL-AUTO switch is in AUTO.
Cue: VOLTAGE REGULATOR MANUAL-AUTO switch is in AUTO NOTE: A Service Water Pump will have to be started shortly after reenergizing the Bus to provide cooling to the Diesel Generator.
- 8. Perform prestart checks on a o Acknowledges prestart checks are SaVUnsat Division I Service Water Pump in accordance with N2-OP-11, Service Water System.
complete for Service Water Pump A.
Cue: Inform candidate that another operator has completed prestart checks on Service Water Pump A.
- 9. At 2CES*IPNL406, ENGINE CONTROL PANEL, perform the following:
u Place CONTROL MODE SIMULATE: Place CO switch in LOCAL AND verify the white LOCAL indicating switch in LOCAL ITROL MODE Pass/Fa light is illuminated.
o Verifies the white LOCAL indicating SaVUnsat light is illuminated Cue: CONTROL MODE NRC JPM 11 5
03/16/05
the white LOCAL indicating light is i II u m inated.
L) Depress ENGINE CONTROL START push button SIMULATE: Depresses ENGINE CONTROL START pushbutton PasdFail
- 10. At 2CES*IPNL407, verify the following Diesel Generator start indications:
Diesel Speed as indicated on o Confirms Diesel Speed as indicated Sat/Unsat 12ESI-2EGSA04 ENGINE SPEED, rises to 600 RPM.
on 12ESI-2EGSA04 ENGINE SPEED, rises to 600 RPM.
Cue: Diesel Speed is 600 RPM o Generator Voltage as o Confirms Generator Voltage as Sat/Unsat indicated on GVM-2EGPA22 VOLTS GENERATOR, rises to 4160 A-C VOLTS.
indicated on GVM-2EGPA22 VOLTS GENERATOR, rises to 4160 A-C VOLTS.
Cue: Generator Voltage is 41 60 Volts AC 3 Generator Frequency as Confirms Generator Frequency as Sat/ Unsat indicated on FM-2EGPA22 FREQUENCY FREQUENCY GENERATOR, rises to GENERATOR, rises to 60 HERTZ.
indicated on FM-2EGPA22 60 HERTZ.
Cue: Generator Frequency is 60 Hz Generator Field Current as Confirms Generator Field Current as Sat/Unsat indicated on GFAM-2EGPA21 AMPS FIELD, indicates about 91 DC AMPERES.
AMPERES.
indicated on GFAM-2EGPA21 AMPS FIELD, indicates about 91 DC Cue: Generator Field Current indicates about 91 DC AMPERES
- 11. At 2ENS*SWG101, manually SIMULATE: At 2ENS*SWG101, close 2ENS*SWG101-1, EMG.
GEN. 2EGS G1.
manually closes 2ENS*SWG101-1, EMG. GEN. 2EGS G1 PasslFail NRC JPM 11 6
03/16/05
I Performance steps I Standard I
Grade I
- 12. Start a Division I Service Water u Acknowledges Service Water Pump A SaVUnsat Pump in accordance with N2-OP-I 1.
has been started.
Cue: Inform candidate that another operator has started Service Water Pump A.
- 13. Locally verify 2SWP*MOV66A In Division I Diesel Generator Room, PasslFail (B), SERVICE WTR OUTLET, is open.
locally verifies 2SW P*MOV66A, SERVICE WTR OUTLET, is open Note: 2SWP*MOV66A position must be verified locally because 2CEC*PNL852 is in the Main Control Room.
Cue: SWP*MOV66A is Open.
- 14. Report Division I Diesel Generator is started and ENS*SWG101 is energized.
End of JPM TERMINATING CUE: Division I Diesel Generator locally started and output breaker 101-1 locally closed.
RECORD STOP TIME NRC JPM 11 7
03/16/05
Initial Conditions:
- 1. Plant has scrammed
- 2. Control Room Evacuation is required
- 3. You are the Lower Control Building Operator
- 4. Lower Control Building Operator immediate actions are in progress
- 5. 2VBS*PNLB100 Breakers 3 and 4 have just been positioned to OFF.
- 6. Ask the operator for any questions.
Initiating cue:
(Operators name), complete the Immediate and Subsequent Actions of N2-SOP-78.
NRC JPM 11 a
03/16/05