Letter Sequence Request |
---|
TAC:MC2629, Increase Flexibility in Mode Restraints, Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P, Revise LCO 3.5.5 for RCP Seal Injection Flow Resistance (Approved, Closed) TAC:MC2630, Increase Flexibility in Mode Restraints, Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P, Revise LCO 3.5.5 for RCP Seal Injection Flow Resistance (Approved, Closed) |
|
MONTHYEARML0413103752004-05-18018 May 2004 Ltr, License Amendment Request for the Conversion of Current Technical Specifications to Improved Technical Specifications Project stage: Other ML0429308112004-12-14014 December 2004 Environmental Assessment Finding of No Significant Impact for the Proposed Conversion to the Improved Technical Specifications Project stage: Other ML0514405062005-04-15015 April 2005 Supplement to License Amendment Request - Conversion of Current Technical Specifications to Improved Technical Specifications Project stage: Supplement ML0511503492005-04-15015 April 2005 Transmittal of Donald C. Cook, Units 1 and 2 - Copy of NRC and Plant Improved Technical Specifications Conversion Website Project stage: Request ML0513202432005-04-15015 April 2005 Supplement to License Amendment Request - Conversion of Current Technical Specifications to Improved Technical Specifications Project stage: Supplement ML0511503802005-04-15015 April 2005 Units I and 2, Copy of Proposed Facility Operating Licenses, Improved Technical Specifications, and Improved Technical Specifications Bases Pages Project stage: Other ML0511105402005-04-15015 April 2005 Comments on Plant Draft Safety Evaluation for the Conversion to Improved Technical Specifications Project stage: Draft Other ML0511105322005-04-15015 April 2005 Comments on Plant Draft Safety Evaluation for the Conversion to Improved Technical Specifications Project stage: Draft Other ML0513200192005-05-17017 May 2005 Information Provided in E-Mail Dated April 20, 2005, for Donald C. Cook Nuclear Plant for the ITS Conversion Amendments Project stage: Other ML0506200342005-06-0101 June 2005 License Amendments, Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues (TAC Nos. MC2629, MC2630, Etc.) Project stage: Approval ML0515304402005-06-0101 June 2005 Technical Specifications, Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues (TAC Nos. MC2629, MC2630, Etc.) Project stage: Approval ML0519903592005-07-0505 July 2005 Correction of Administrative Error for Improved Technical Specifications Project stage: Other ML0522202662005-07-29029 July 2005 Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Project stage: Request ML0522803072005-08-0505 August 2005 Correction of Administrative Error for Improved Technical Specifications Project stage: Other ML0610805842006-04-21021 April 2006 Correction of Amendments Technical Specifications, Conversion to Improved Format Project stage: Acceptance Review 2005-06-01
[Table View] |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 2024-09-09
[Table view] |
Text
Indiana Michigan Power INDIANA Cook Nuclear Plant MICHIGAN One Cook Place Bridgman, MI 49106 POWER' AEP.com Aunit ofAmerican Electric Powver April 15, 2005 AEP:NRC:5901-02 10 CFR 50.90 Docket Nos. 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant, Units 1 and 2 COPY OF U. S. NUCLEAR REGULATORY COMMISSION AND DONALD C. COOK NUCLEAR PLANT IMPROVED TECHNICAL SPECIFICATIONS CONVERSION WEBSITE (TAC NOS. MC2629 AND MC2630)
References:
- 1. Letter from M. K. Nazar, Indiana Michigan Power Company, to Nuclear Regulatory Commission Document Control Desk, 'Donald C. Cook Nuclear Plant Unit 1 and Unit 2, License Amendment Request - Conversion of Current Technical Specifications (CTS) to Improved Technical Specifications (ITS)," AEP:NRC:4901, dated April 6, 2004.
- 2. Letter from J. N. Jensen, Indiana Michigan Power Company, to Nuclear Regulatory Commission Document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2, Supplement to License Amendment Request - Conversion of Current Technical Specifications (CTS) to Improved Technical Specifications (ITS),
(TAC Nos. MC2629 and MC2630)," AEP:NRC:5901, dated April 15, 2005.
Dear Sir or Madam:
By References 1 and 2, Indiana Michigan Power Company (I&M) submitted an original and supplemental application to amend Appendix A, Technical Specifications, of Donald C. Cook Nuclear Plant (CNP) Unit 1 and Unit 2 Facility Operating Licenses DPR-58 and DPR-74, respectively, revising the current Technical Specifications (CTS) to the Improved Technical Specifications (ITS) consistent with Improved Standard Technical Specifications as described in NUREG-1431, "Standard Technical Specifications - Westinghouse Plants," Revision 2, and certain generic changes to the NUREG.
Azon
U. S. Nuclear Regulatory Commission AEP:NRC:5901-02 Page 2 The purpose of this letter is to provide a complete copy of the joint U. S. Nuclear Regulatory Commission (NRC) and CNP ITS Conversion Website (Attachment 1) suitable for posting on the CNP Unit 1 and Unit 2 docket, Docket Nos. 50-315 and 50-316, respectively. This is necessary because the information provided on the NRC and CNP ITS Conversion Website was used by I&M in the development of Reference 2, and documents the NRC review process for approving the requested amendments to the CNP Unit 1 and Unit 2 Facility Operating Licenses.
As noted in Reference 2, the supplemental changes to the original ITS submittal remain within the scope of the original conversion from CTS to ITS. I&M has evaluated this proposed change, including the supplemental changes described in Reference 2, in accordance with 10 CFR 50.91(a)(1) using the criteria of 10 CFR 50.92(c), and has concluded that the determination of no significant hazards considerations for the original ITS submittal remains valid. In addition, 1&M has determined that the proposed license amendment, including this supplement to the original ITS submittal described in Reference 2, continues to meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(b), and no environmental impact statement or environmental assessment need be prepared in connection with the proposed license amendment. The determination of no significant hazards consideration and environmental assessment, including revisions where applicable, are also included in Reference 2.
As part of the NRC review of Reference 1, NRC questions were provided using the NRC and CNP ITS Conversion Website. The NRC and CNP ITS Conversion Website was developed specifically to expedite NRC review and minimize the time delay between NRC review and posting of NRC questions, development and posting of I&M responses, and acceptance and closure of each identified NRC question by the responsible NRC reviewer. As agreed to between the NRC and I&M, entry of NRC questions and I&M responses to the NRC and CNP ITS Conversion Website is protected so that only the NRC reviewers and I&M staff can enter infornation into the associated database fields for each item. In addition, only the NRC reviewers and I&M staff can attach additional electronic documentation associated with an NRC question or I&M response. However, the public can fully access all infonmation on the NRC and CNP ITS Conversion WVebsite at any time, including NRC questions, l&M responses, and any attached electronic documentation.
Attachment I includes all NRC questions that have been closed by the NRC reviewers as of February 16,2005, along with l&M responses in the NRC and CNP ITS Conversion Website database and all associated attachments, and is arranged chronologically by the dates of the original NRC questions. As of the date of this letter, no outstanding open items are anticipated to require any change to the document provided as Attachment 1. , "Affinmation," provides an oath and affirmation affidavit regarding the statements made and matters set forth in this submittal.
U. S. Nuclear Regulatory Commission AEP:NRC:5901-02 Page 3 This letter contains no commitments. If you have any questions or require additional information, please contact Mr. Richard J. Grumbir, Project Manager, ITS, at (269) 697-5141.
Sincerely, M. K. Nazar Senior Vice President d Chief Nuclear Officer GW/rdw
Enclosure:
- 1. Affirmation
Attachment:
- 1. U. S. Nuclear Regulatory Commission (NRC) and Donald C. Cook Nuclear Plant (CNP)
Improved Technical Specification (ITS) Conversion Website (As of February 16, 2005)
NOTE A single copy of this cover letter, enclosure, and attachment is being submitted to the NRC Document Control Desk. In addition, a single CD-ROM suitable for use for entry of this complete submittal into the NRC Agencywide Documents Access and Management System (ADAMS) is being provided. The single copy of the submittal and CD-ROM provided meet the applicable requirements of Regulatory Issue Summary (RIS) 2001-05, "Guidance on Submitting Documents to the NRC by Electronic Information Exchange or on CD-ROM." Additional CD-ROMs are provided for the persons designated below.
c: T. H. Boyce, NRC Washington, DC, w/o attachment, with CD-ROM J. L. Caldwell, NRC Region III, w/o attachment, with CD-ROM K. D. Curry, Ft. Wayne AEP, w/o enclosure/attachment J. N. Donohew, NRC Washington, DC, w/o attachment, with CD-ROM P. C. Hearn, NRC Washington, DC, w/o attachment, with CD-ROM J. T. King, MPSC, w/o enclosure/attachment C. F. Lyon - NRC Washington DC, w/o attachment, with CD-ROM MDEQ - WHMD/HWRPS, w/o enclosure/attachment NRC Resident Inspector, w/o attachment, with CD-ROM
Enclosure 1 to AEP:NRC:5901-02 AFFIRMATION 1, Mano K. Nazar, being duly sworn, state that I am Senior Vice President and Chief Nuclear Officer of American Electric Power Service Corporation and Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.
American Electric Power Service Corporation ry I.W a M. K. Nazar Senior Vice President 1/ Chief Nuclear Officer SWORN TO AND SUBSCRIBED BEFORE ME THIS 1!112 DAY OFp A \i , 2005 "A.16AA
&ItayPublic My Commission Expires Le~"e,I I
.. ..