ATTACHMENT 2B Ma Technical Specification Pages BYRON STATION, UNITS I AND 2 FACILITY OPERATING LICENSE NOS. NPF-37 AND NPF-66 Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process REVISED TECHNICAL SPECIFICATIONS PAGES 1.4-2 3.0-2 3.0-6 3.13-1 3.3.4-1 3.4.11-1 3.4.12-2 3.4.15-1 3.4.15-2 3.4.16-1 3.5.3-1 3.18-1 3.7.4-1 3.7.5-1 33.8-2 33.9-2 33.9-3 3.7.9-4 3.8.1-1
1.4 Frequency DESCRIPTION (continued)
EXAMPLES The following examples illustrate the various ways that Frequencies are specified.
In these examples, the Applicability of the LCO (LCO not shown) is MODES 1, 2, and 3.
The examples do not reflect the potential application of LCO 3.0.4.b.
BYRON - UNITS 1 & 2 1.4 - 2 Frequency 1.4 The use of "met" or "performed" in these instances conveys specific meaning.
A surveillance is "met" only when the acceptance criteria are satisfied.
Known failure of the requirements of a Surveillance, even without a Surveillance specifically being "performed," constitutes a Surveillance not "met."
"Performance" refers only to the requirement to specifically determine the ability to meet the acceptance criteria.
SR 3.0.4 restrictions would not apply if both the following conditions are satisfied :
a.
The Surveillance is not required to be performed ; and b.
The Surveillance is not required to be met or, even if required to be met, is not known to be failed.
Amendment 141
3.0 LCO Applicability LCO Applicability 3.0 LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made :
b.
c.
When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time ;
After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate ; exceptions to this Specification are stated in the individual Specifications, or When an allowance is stated in the individual value, parameter, or other Specification.
This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment.
This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the required testing to demonstrate OPERABILITY.
BYRON - UNITS 1 & 2 3.0 - 2 Amendment 141
3.0 SR APPLICABILITY SR Applicability 3.0 SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater.
This delay period is permitted to allow performance of the Surveillance.
A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.
If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition s) must be entered.
When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition s) must be entered.
SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3.
When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.
This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
SR 3.0.5 SRs shall apply to each unit individually, unless otherwise indicated.
BYRON - UNITS 1 & 2 3.0 - 6 Amendment 141
3.3 INSTRUMENTATION 3.3.3 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3 The PAM instrumentation for each Function in Table 3.3.3-1 shall be OPERABLE.
APPLICABILITY :
According to Table 3.3.3-1 ACTIONS PAN Instrumentation 3.3.3
NOTE -------------------------------------
Separate Condition entry is allowed for each Function.
(continued)
BYRON - UNITS 1 & 2 3.3.3 - 1 Amendment 141 CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more Functions A.1 Enter the Condition Immediately with one or more referenced in required channels Table 3.3.3-1 for the inoperable.
channel B.
As required by B.1 Restore required 30 days Required Action A.1 channel to OPERABLE and referenced in status.
Table 3.3.3-1.
C.
Required Action and C.1 Initiate action in Immediately associated Completion accordance with Time of Condition B Specification 5.6.7.
not met.
3.3 INSTRUMENTATION 3.3.4 Remote Shutdown System LCO 3.3.4 The Remote Shutdown System Functions in Table 3.3.4-1 shall be OPERABLE.
APPLICABILITY :
MODES 1, 2, and 3.
ACTIONS
NOTE-___________________________________
Separate Condition entry is allowed for each Function.
A.
B.
Remote Shutdown System 3.3.4 BYRON --UNITS 1 & 2 3.3.4 - 1 Amendment 141 CONDITION REQUIRED ACTION COMPLETION TIME One or more required A.1 Restore required 30 days Functions inoperable.
Function to OPERABLE status.
Required Action and B.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
AND B.2 Be in MODE 4.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.11 Pressurizer Power Operated Relief Valves (PORVs)
Pressurizer POW 3.4.11 LCO 3.4.11 Each PORV and associated block valve shall be OPERABLE.
APPLICABILITY :
MODES 1, 2, and 3.
ACTIONS
NOTE____________________________________
Separate Condition entry is allowed for each PORV and each block valve.
A.
B.
(continued)
BYRON - UNITS 1 & 2 3.4.11 - 1 Amendment 141 CONDITION REQUIRED ACTION COMPLETION TIME One or more POW A.1 Close and maintain 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable and capable power to associated of being manually block valve.
cycled.
One PORV inoperable B.1 Close associated 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and not capable of block valve.
being manually cycled.
AND B.2 Remove power from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> associated block valve.
AND B.3 Restore PORV to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.
ACTIONS STOP System 3.4.12
NOTE -------------------------------------
LCO 3.0.4.b is not applicable when entering MODE 4.
(continued)
BYRON - UNITS 1 & 2 3.4.12 - 2 Amendment 141 CONDITION REQUIRED ACTION COMPLETION TIME A.
Two charging pumps A.1
NOTE--------
(centrifugal) capable Two charging pumps of injecting into the may be capable of RCS.
injecting into the RCS during pump swap OR operation for z 15 minutes.
One charging pump (positive displacement) capable Initiate action to Immediately of injecting into the verify a maximum of RCS.
one charging pump (centrifugal) is capable of injecting into the RCS.
B.
One or more SI pumps B.1 Initiate action to Immediately capable of injecting verify no SI pumps into the RCS.
are capable of injecting into the RES.
C.
An accumulator not C.1 Isolate affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolated when the accumulator.
accumulator pressure is greater than or equal to the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.
3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.15 RCS Leakage Detection Instrumentation a.
One containment sump monitor ; and RCS Leakage Detection Instrumentation 3.4.15 LCO 3.4.15 The following RCS leakage detection instrumentation shall be OPERABLE :
One containment atmosphere particulate radioactivity monitor.
(continued)
BYRON - UNITS 1 & 2 3.4.15 - 1 Amendment 141 APPLICABILITY :
MODES 1, 2, 3, and ACTIONS 4.
CONDITION REQUIRED ACTION COMPLETION TIME A.
Required containment A.1
NOTE--------
sump monitor Not required to be inoperable.
performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.
Perform SR 3.4.13.1.
AND Once per 24 A.2 Restore required hours containment sump monitor to OPERABLE status.
30 days
ACTIONS (continued)
RCS Leakage Detection Instrumentation 3.4.15 BYRON - UNITS 1 & 2 3.4.15 - 2 Amendment 141 CONDITION REQUIRED ACTION COMPLETION TIME B.
Containment atmosphere B.1.1 Analyze grab samples particulate of the containment radioactivity monitor atmosphere.
OR Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B.1.2
_________NOTE-_______
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.
Perform SR 3.4.13.1.
AND Once per 24 B.2 Restore containment hours atmosphere particulate radioactivity monitor to OPERABLE status.
30 days C.
Required Action and C.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
AND C.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> D.
All required monitors D.1 Enter LCO 3.0.3.
Immediately inoperable.
3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.16 RCS Specific Activity RCS Specific Activity 3.4.16 LCO 3.4.16 The specific activity of the reactor coolant shall be within the following limits :
ACTIONS CONDITION A.
DOSE EQUIVALENT 1-131 specific activity
> 1.0 pCi/gm.
a.
Dose Equivalent 1-131 specific activity 5 1.0 pEi/gm ;
and b.
Gross specific activity <1001 -E gCi/gm.
APPLICABILITY :
MODES 1 and 2, MODE 3 with RCS average temperature (Tag ) ? 5000F.
REQUIRED ACTION
____________NOTE-___________
LCO 3.0.4.c is applicable.
A.1 Verify DOSE EQUIVALENT 1-131 specific activity within the acceptable region of Figure 3.4.16-1.
AND A.2 Restore DOSE EQUIVALENT 1-131 specific activity to within limit.
COMPLETION TIME Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 48 hours (continued)
BYRON - UNITS 1 & 2 3.4.16 - 1 Amendment 141
3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.3 ECCS-Shutdown LCO 3.5.3 One ECCS train shall be OPERABLE.
APPLICABILITY :
MODE 4.
ECCS-Shutdown 3.5.3
____________________________NOTE-___________________________
A Residual Heat Removal (RHR) train may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned to the ECCS mode of operation.
ACTIONS
NOTE ---------------------------------
LCO 3.0.4.b is not applicable to ECCS high head subsystem.
BYRON - UNITS 1 & 2 3.5.3 - 1 Amendment 141 CONDITION REQUIRED ACTION COMPLETION TIME A.
Required ECCS RHR A.1 Initiate action to Immediately subsystem inoperable.
restore required ECCS RHR subsystem to OPERABLE status.
B.
Required ECCS B.1 Restore required ECCS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> centrifugal charging centrifugal charging subsystem inoperable.
subsystem to OPERABLE status.
C.
Required Action and C.1 Be in MODE 5.
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion Time of Condition B not met.
3.6 CONTAINMENT SYSTEMS 3.6.8 Hydrogen Recombiners LCO 3.6.8 Two hydrogen recombiners shall be OPERABLE.
APPLICABILITY :
MODES 1 and 2.
ACTIONS Hydrogen Recombiners 3.6.8 BYRDN --UNITS 1 & 2 3.6.8 - 1 Amendment 141 CONDITION REQUIRED ACTION COMPLETION TIME A.
One hydrogen A.1 Restore hydrogen 30 days recombiner inoperable.
recombiner to OPERABLE status.
B.
Two hydrogen B.1 Verify by 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> recombiners administrative means inoperable.
that the hydrogen AND control function is maintained.
Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND B.2 Restore one hydrogen 7 days recombiner to OPERABLE status.
C.
Required Action and C.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
3.7 PLANT SYSTEMS 3.7.4 Steam Generator (SG) Power Operated Relief Valves (PORVs)
LCO 3.7.4 Four SG PORV lines shall be OPERABLE.
APPLICABILITY :
MODES 1, 2, and 3.
ACTIONS SG POW 3.7.4 BYRON - UNITS 1 & 2 3.7.4 - 1 Amendment 141 CONDITION REQUIRED ACTION COMPLETION TIME A.
One SG PORV line A.1 Restore SG PORV line 30 days inoperable.
to OPERABLE status.
B.
Two or more SG PORV B.1 Restore all but one 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> lines inoperable.
SG PORV line to OPERABLE status.
C.
Required Action and C.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
AND C.2 Be in MODE 4.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I
-i-
3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AF) System LCO 3.7.5 Two AF trains shall be OPERABLE.
APPLICABILITY :
MODES 1, 2, and 3.
ACTIONS AF System 3.7.5
NOTE -------------------------------------
LCO 3.0.41 is not applicable when entering MODE 1.
BYRON - UNITS 1 & 2 3.7.5 - 1 Amendment 141 CONDITION REQUIRED ACTION COMPLETION TIME A.
One AF train A.1 Restore AF train to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable.
OPERABLE status.
B.
Required Action and B.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A AND not met.
B.2 Be in MODE 4.
12 [ours C.
Two AF trains C.1 -
NOTE--------inoperable LCO 3.0.3 and all other LCO Required Actions requiring MODE changes are suspended until one AF train is restored to OPERABLE status.
Initiate action to Immediately restore one AF train to OPERABLE status.
Al
ACTIONS (continued)
SX System 3.7.8 BYRON - UNITS 1 & 2 3.7.8 - 2 Amendment 141 CONDITION REQUIRED ACTION COMPLETION TIME B -
________NOTES-_______
B.1
________NOTES-_______
1. Only applicable to 1
Enter applicable Unit 1 during Conditions and replacement of the Required Actions SX suction of LCO 3.8.1, "AC isolation valves Sources-during Unit 2 Operating," for Refueling 11 while Emergency Diesel Unit 2 is in Generator made MODE 5, 6, or inoperable by SX.
defueled.
2.
Enter applicable 2. Only applicable to Conditions and Unit 2 during Required Actions replacement of the of LCO 3.4.6, SX suction "RCS Loops-isolation valves MODE 4," for during Unit 1 Residual Heat Refueling 13 while Removal loops Unit 1 is in made inoperable MODE 5, 6, or by SX.
defueled.
Restore unit-specific "144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br /> One unit-specific SX SX train to OPERABLE train inoperable.
status.
C.
Opposite-unit SX train C.1 Restore opposite-unit 7 days inoperable.
D.
Required Action and D.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A, B AND or C not met.
D.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />
UHS 3.7.9 (continued)
BYRON - UNITS 1 & 2 3.7.9 - 2 Amendment 141 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C.
One Essential Service C.1 Verify basin level 722 hours0.00836 days <br />0.201 hours <br />0.00119 weeks <br />2.74721e-4 months <br /> Water (SX) makeup pump for each tower is inoperable.
1 90%.
AND 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> thereafter AND C.2 Verify OPERABILITY of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> associated makeup source.
AND C.3 Restore SX makeup 7 days if both pump to OPERABLE units are in status.
MODE 1, 2, 3, or 4
AND 14 days if one unit is in MODE 5, 6 or defueled
ACTIONS (continued)
REQUIRED ACTION D.1 Verify basin level for each tower is
? 90%.
AND D.2 Verify OPERABILITY of at least one makeup source.
AND D.3 Verify OPERABILITY of second makeup source.
E.1 Verify Rock River water level is
> 664.7 ft MSL and flow ! 700 cubic feet per second MO CONDITION D.
Two SX makeup pumps inoperable.
E.
Rock River water level
! 670.6 ft Mean Sea Level (MSL).
COMPLETION TIME 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> thereafter 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 72 hours 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND 1 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> thereafter UHS 3.7.9 (continued)
BYRON --UNITS 1 & 2 3.7.9 - 3 Amendment 141
ACTIONS (continued)
REQUIRED ACTION F. l Verify basin level for each tower is 1 90%.
AND F.2 AND Verify OPERABILITY of at least one deep well pump.
F.3 Verify OPERABILITY of both deep well pumps.
G.1 Be in MODE 3.
AND G.2 Be in MODE 5.
F.
Required Action E not met.
OR CONDITION Rock River water level forecast to exceed 702.0 ft MSL by the National Weather Service (NWS).
OR Tornado Watch issued by the NWS that includes the Byron site.
G.
Required Action and associated Completion Time of Condition A, B, C, D, or F not met.
DR UHS inoperable for reasons other than Condition A, B, C, D, E, or F.
COMPLETION TIME
.- hour AND 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> thereafter 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 72 hours 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours UHS 3.7.9 BYRON - UNITS 1 & 2 3.7.9 - 4 Amendment 141
3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources-Operating LCO 3.8.1 ACTIONS a.
b.
APPLICABILITY :
MODES 1, 2, 3, and 4.
AC Sources-Operating 3.8.1 The following AC electrical sources shall be OPERABLE :
Two qualified circuits per bus between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System ; and Two Diesel Generators (DGs) capable of supplying the onsite Class H AC Electrical Power Distribution System.
NOTE -------------------------------------
LCO 3.0.4.b is not applicable to DGs.
A.
BYRDN - UNITS 1 & 2 (continued)
Amendment 141 CONDITION REQUIRED ACTION COMPLETION TIME One or more buses with A.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> one required qualified for the required circuit inoperable.
OPERABLE qualified AND circuits.
Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND A.2 Restore required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> qualified circuit s) to OPERABLE status.
AND 17 days from discovery of failure to meet LCO