4/5/05, Braidwood - TS 134 - License Amd to Increase Flexibility in Mode Restraints
ML051120286
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/05/2005
From:
NRC/NRR/DLPM/LPD3
To:
Dick G F, NRR/DLPM, 415-3019
Shared Package
ML050610393 List:
References
TAC MC3020, TAC MC3021, TAC MC3022, TAC MC3023
Download: ML051120286 (17)


Text

ATTACHMENT 3A Retyped Technical Specification Pages BRAIDWOOD STATION, UNITS I AND 2 FACILITY OPERATING LICENSE NOS . NPF-72 AND NPF-77 Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process REVISED TECHNICAL SPECIFICATIONS PAGES 1 .4-2 3.0-2 3.0-6 3 .3.3-1 3 .3 .4-1 3 .4.11-1 3.4.12-2 3 .4 .15-1 14.15-2 3 .4 .16-1 3.5 .3-1 3.6 .8-1 17 .4-1 3 .7 .5-1 3.7 .8-2 3 .8.1-1

Frequency 1 .4 1 .4 Frequency DESCRIPTION (continued)

The use of "met" or "performed" in these instances conveys specific meaning . A surveillance is "met" only when the acceptance criteria are satisfied . Known failure of the requirements of a Surveillance, even without a Surveillance specifically being "performed," constitutes a Surveillance not "met ." "Performance" refers only to the requirement to specifically determine the ability to meet the acceptance criteria . SR 3 .0 .4 restrictions would not apply if both the following conditions are satisfied :

a. The Surveillance is not required to be performed ; and
b. The Surveillance is not required to be met or, even if required to be met, is not known to be failed .

EXAMPLES The following examples illustrate the various ways that Frequencies are specified . In these examples, the Applicability of the LCO (LCO not shown) is MODES 1, 2, and 3 . The examples do not reflect the potential application of LCO 3 .0 .4 .b .

BRAIDWOOD - UNITS 1 & 2 1 .4 - 2 Amendment 134

LCO Applicability 3 .0 3 .0 LCO Applicability LCO 3 .0 .4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made :

When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time ;

b. After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate ; exceptions to this Specification are stated in the individual Specifications, or
c. When an allowance is stated in the individual value, parameter, or other Specification .

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit .

LCO 3 .0 .5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment . This is an exception to LCO 3 .0 .2 for the system returned to service under administrative control to perform the required testing to demonstrate OPERABILITY .

BRAIDWOOD - UNITS 1 & 2 3 .0 - 2 Amendment 134

SR Applicability 3 .0 3 .0 SR APPLICABILITY SR 3 .0 .3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> or up to the limit of the specified Frequency, whichever is greater . This delay period is permitted to allow performance of the Surveillance . A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> and the risk impact shall be managed .

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition s) must be entered .

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition s) must be entered .

SR 3 .0 .4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3 .0 .3 . When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3 .0 .4 This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit .

SR 3 .0 .5 SRs shall apply to each unit individually, unless otherwise indicated .

BRAIDWOOD - UNITS 1 & 2 3 .0 - 6 Amendment 134

PAM Instrumentation 3 .3 .3 3 .3 INSTRUMENTATION 3 .3 .3 Post Accident Monitoring (PAM) Instrumentation LCO 3 .3 .3 The PAM instrumentation for each Function in Table 3 .3 .3-1 shall be OPERABLE .

APPLICABILITY : According to Table 3 .3 .3-1 .

ACTIONS


NOTE -------------------------------------

Separate Condition entry is allowed for each Function .

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A .1 Enter the Condition Immediately with one or more referenced in required channels Table 3 .3 .3-1 for the inoperable . channel .

B. As required by B .1 Restore required 30 days Required Action A .1 channel to OPERABLE and referenced in status .

Table 3 .3 .3-1 .

C. Required Action and C .1 Initiate action in Immediately associated Completion accordance with Time of Condition B Specification 5 .6 .7 .

not met .

(continued)

BRAIDWOOD - UNITS 1 & 2 3 .3 .3 - 1 Amendment 134

Remote Shutdown System 3 .3 .4 3 .3 INSTRUMENTATION 3 .3 .4 Remote Shutdown System LCO 3 .3 .4 The Remote Shutdown System Functions in Table 3 .3 .4-1 shall be OPERABLE .

APPLICABILITY : MODES 1, 2, and 3 .

ACTIONS


NOTE-___________________________________

Separate Condition entry is allowed for each Function .

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A .1 Restore required 30 days Functions inoperable . Function to OPERABLE status .

B. Required Action and B .1 Be in MODE 3 . 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> associated Completion Time not met . AND B .2 Be in MODE 4 . 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> BRAIDWOOD - UNITS 1 & 2 3 .3 .4 - 1 Amendment 134

Pressurizer POW 3 .4 .11 3 .4 REACTOR COOLANT SYSTEM (RCS) 3 .4 .11 Pressurizer Power Operated Relief Valves (PORVs)

LCO 3 .4 .11 Each PORV and associated block valve shall be OPERABLE .

APPLICABILITY : MODES 1, 2, and 3 .

ACTIONS


NOTE-___________________________________

Separate Condition entry is allowed for each PORV and each block valve .

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more POW A .1 Close and maintain 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable and capable power to associated of being manually block valve .

cycled .

B. One PORV inoperable B .1 Close associated I hour and not capable of block valve .

being manually cycled .

AND B .2 Remove power from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> associated block valve .

AND B .3 Restore PORV to 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> OPERABLE status .

(continued)

BRAIDWOOD - UNITS 1 & 2 3 .4 .11 - 1 Amendment 134

LTOP System 3 .4 .12 ACTIONS


NOTE -------------------------------------

LCO 3 .0 .41 is not applicable when entering MODE 4 . 1 CONDITION REQUIRED ACTION COMPLETION TIME A. Two charging pumps A .1 ---------NOTE--------

(centrifugal) capable Two charging pumps of injecting into the may be capable of RCS . injecting into the RCS during pump swap DR operation for

<_ 15 minutes .

One charging pump ---------------------

(positive displacement) capable Initiate action to Immediately of injecting into the verify a maximum of RCS . one charging pump (centrifugal) is capable of injecting into the RCS .

B. One or more SI pumps B .1 Initiate action to Immediately capable of injecting verify no SI pumps into the RCS . are capable of injecting into the RCS .

C. An accumulator not C .1 Isolate affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolated when the accumulator .

accumulator pressure is greater than or equal to the maximum RCS pressure for existing cold leg temperature allowed in the PTLR .

(continued)

BRAIDWOOD - UNITS 1 & 2 3 .4 .12 - 2 Amendment 134

RCS Leakage Detection Instrumentation 3 .4 .15 3 .4 REACTOR COOLANT SYSTEM (RCS) 3 .4 .15 RCS Leakage Detection Instrumentation LCO 3 .4 .15 The following RCS leakage detection instrumentation shall be OPERABLE :

a. One containment sump monitor ; and
b. One containment atmosphere particulate radioactivity monitor .

APPLICABILITY : MODES 1, 2, 3, and 4 .

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required containment A .1 ---------NOTE--------

sump monitor Not required to be inoperable . performed until 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> after establishment of steady state operation .

Perform SR 3 .4 .13 .1 . Once per 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> AND A .2 Restore required 30 days containment sump monitor to OPERABLE status .

(continued)

BRAIDWOOD - UNITS 1 & 2 3 .4 .15 - 1 Amendment 134

RCS Leakage Detection Instrumentation 3 .4 .15 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Containment atmosphere B .1 .1 Analyze grab samples Once per 24 particulate of the containment hours radioactivity monitor atmosphere .

inoperable .

OUR B .1 .2 _________NOTE-_______

Not required to be performed until 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> after establishment of steady state operation .

Perform SR 3 .4 .13 .1 . Once per 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> AND B .2 Restore containment 30 days atmosphere particulate radioactivity monitor to OPERABLE status .

C. Required Action and C .1 Be in MODE 3 . 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> associated Completion Time not met . AND C .2 Be in MODE 5 . 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br /> D. All required monitors D .1 Enter LCO 3 .0 .3 . Immediately inoperable .

I I BRAIDWOOD - UNITS 1 & 2 3 .4 .15 - 2 Amendment 134

RCS Specific Activity 3 .4 .16 3 .4 REACTOR COOLANT SYSTEM (RCS) 3 .4 .16 RCS Specific Activity LCO 3 .4 .16 The specific activity of the reactor coolant shall be within the following limits :

Dose Equivalent 1-131 specific activity ! 1 .0 pCi/gm ;

and

b. Gross specific activity <_ 1001 -E p0/gm .

APPLICABILITY : MODES 1 and 2, MODE 3 with RCS average temperature (T, vg ) ~! 504F .

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. DOSE EQUIVALENT 1-131 ____________NOTE-___________

specific activity LCO 3 .0 .4 .c is applicable .

> 1 .0 PCi/gm .

A .1 Verify DOSE Once per 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> EQUIVALENT 1-131 specific activity within the acceptable region of Figure 3 .4 .16-1 .

AND A .2 Restore DOSE 48 hours2 days <br />0.286 weeks <br />0.0658 months <br /> EQUIVALENT 1-131 specific activity to within limit .

(continued)

BRAIDWOOD - UNITS 1 & 2 3 .4 .16 - 1 t 134

ECCS-Shutdown 3 .5 .3 3 .5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3 .5 .3 ECCS-Shutdown LCO 3 .5 .3 One ECCS train shall be OPERABLE .

____________________________NOTE-___________________________

A Residual Heat Removal (RHR) train may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned to the ECCS mode of operation .

APPLICABILITY : MODE 4 .

ACTIONS


NOTE ---------------------------------

LCO 3 .0 .41 is not applicable to ECCS high head subsystem .

CONDITION REQUIRED ACTION COMPLETION TIME A. Required ECCS RHR A .1 Initiate action to Immediately subsystem inoperable . restore required ECCS RHR subsystem to OPERABLE status .

B. Required ECCS B .1 Restore required ECCS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> centrifugal charging centrifugal charging subsystem inoperable . subsystem to OPERABLE status .

C. Required Action and C .1 Be in MODE 5 . 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> associated Completion Time of Condition B not met .

BRAIDWOOD - UNITS 1 & 2 3 .5 .3 - 1 Amendment 134

Hydrogen Recombiners 3 .6 .8 3 .6 CONTAINMENT SYSTEMS 3 .6 .8 Hydrogen Recombiners LCO 3 .6 .8 Two hydrogen recombiners shall be OPERABLE .

APPLICABILITY : MODES 1 and 2 .

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One hydrogen A .1 Restore hydrogen 30 days recombiner inoperable . recombiner to OPERABLE status .

B. Two hydrogen B .1 Verify by 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> recombiners administrative means inoperable . that the hydrogen AND control function is maintained . Once per 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> thereafter AND B .2 Restore one hydrogen days recombiner to OPERABLE status .

C. Required Action and C .1 Be in MODE 3 . 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> associated Completion Time not met .

BRAIDWOOD - UNITS 1 & 2 3 .6 .8 - 1 Amendment 134

SG POW 3 .7 .4 3 .7 PLANT SYSTEMS 3 .7 .4 Steam Generator (SG) Power Operated Relief Valves (PORVs)

LCO 3 .7 .4 Four SG PORV lines shall be OPERABLE .

APPLICABILITY : MODES 1, 2, and 3 .

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One SG PORV line A .1 Restore SG PORV line 30 days inoperable . to OPERABLE status .

B. Two or more SG PORV B .1 Restore all but one 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> lines inoperable . SG PORV line to OPERABLE status .

C. Required Action and C .1 Be in MODE 3 . 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> associated Completion Time not met . AND C .2 Be in MODE 4 . 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> I -L-BRAIDWOOD - UNITS 1 & 2 3 .7 .4 - 1 Amendment 134

AF System 3 .7 .5 3 .7 PLANT SYSTEMS 3 .7 .5 Auxiliary Feedwater (AF) System LCO 3 .7 .5 Two AF trains shall be OPERABLE .

APPLICABILITY : MODES 1, 2, and 3 .

ACTIONS


NOTE ---------------------------------

LCO 3 .0 .4 .b is not applicable when entering MODE 1 .

CONDITION REQUIRED ACTION COMPLETION TIME A. One AF train A .1 Restore AF train to 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> inoperable . OPERABLE status .

B. Required Action and B .1 Be in MODE 3 . 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> associated Completion Time of Condition A AND not met .

B .2 Be in MODE 4 . 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> C. Two AF trains C .1 ---------NOTE--------

inoperable . LCO 3 .0 .3 and all other LCO Required Actions requiring MODE changes are suspended until one AF train is restored to OPERABLE status .

Initiate action to Immediately restore one AF train to OPERABLE status .

BRAIDWOOD - UNITS 1 & 2 3 .7 .5 - 1 Amendment 134

SX System 3 .7 .8 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B- ________NOTES-_______ B .1 ________NOTES-_______

Only applicable to 1. Enter applicable Unit 1 during Conditions and replacement of the SX Required Actions suction isolation of LCO 3 .8 .1, VC valves during Unit 2 Sources-Refueling 11 while Operating," for Unit 2 is in MODE 5, Emergency Diesel 6, or defueled . Generator made


inoperable by SX .

One unit-specific SX 2. Enter applicable train inoperable . Conditions and Required Actions of LCO 3 .4 .6, "RCS Loops-MODE 4," for Residual Heat Removal loops made inoperable by SX .

Restore unit-specific 44 hours1.833 days <br />0.262 weeks <br />0.0603 months <br /> SX train to OPERABLE status .

C. Opposite-unit SX train C .1 Restore opposite-unit days inoperable . SX train to OPERABLE status .

D. Required Action and D .1 Be in MODE 3 . 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> associated Completion Time of Condition A, B AND or C not met .

D .2 Be in MODE 5 . 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br /> BRAIDWOOD - UNITS 1 & 2 3 .7 .8 - 2 Amendment 134

AC Sources-Operating 3 .8 .1 3 .8 ELECTRICAL POWER SYSTEMS 3 .8 .1 AC Sources-Operating LCO 3 .8 .1 The following AC electrical sources shall be OPERABLE :

a. Two qualified circuits per bus between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System ; and
b. Two Diesel Generators (DGs) capable of supplying the onsite Class 1E AC Electrical Power Distribution System .

APPLICABILITY : MODES 1, 2, 3, and 4 .

ACTIONS


NOTE ---------------------------------

LCO 3 .0 .4 .b is not applicable to DGs .

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more buses with A .1 Perform SR 3 .8 .1 .1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> one required qualified for the required circuit inoperable . OPERABLE qualified AND circuits .

Once per 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br /> thereafter AND A .2 Restore required 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> qualified circuit s) to OPERABLE status . AND 17 days from discovery of failure to meet LCO (continued)

BRAIDWOOD - UNITS 1 & 2 3 .8 .1 - 1 Amendment 134