IHarold Chernoff - Point BeachCAP Page 1 He From: NRMM3@NRC.GOV" <rmm3@nrc.gov> fkW C 5 L -'

To: 'HKC@NRC.GOV <hkc@ nrc.gov> CA.Cerr ) Clay Date: Mon, Apr 26, 2004 8:51 AM

Subject:

Point BeachCAP y/A Y//-

- pi,id IHarold unemott 1-tarola Chemoff - UoCUment.pdt Uocument.pat ..Pace.li-A Nuclear Managemcnt Company Page I of2 EState Change Histo Initiate AR Pre-Screen Submit to Screening Team AR Screening Que 0 4I2302004 10:39:44 PM Owner (None) 0 by HARPER, RON

. 4/24120043:16:10 AM OwnerPBNPCAPAdmirn by MCCARTHY. JAMES .

E Section 1 Activity Request Id: CAP056015 Activity Type: CAP Submit Date: 4/23/2004 10:39:44 PM 16 One Une

Description:

Spent Fuel Pool Cooling Safety assessment

i. Detailed

Description:

4/2312004 10:39:44 PM - MCCARTHY, JAMES:

Discussions on 4/23M14 evening between the Director Site operations and members of the plant staff indicated that a safety assessment may not be performed for the spent fuel pool systems during a partial core offload s is scheduled for I UR28. This potential exists In part due to wording on the safety assessment checklist that Indicates that the assessment is required for afull core ofload.

The U1R28 schedule was planned to perform portions of the Bolted Fault project during the interval when the 1Reactor cavity is flooded and portions of the Unit 1 reactor core are off loaded to the spent fuel pool. Bolted fault work activities during this Interval were' scheduled to de-energize the power to one of the two Spent fuel cooling pumps. Discussions with the project engineer Indicated that this configuration had not been assessed from a safety perspective because a full core off load had not been performed.

Initiator: MCCARTHY. JAMES Initiator Department: S Site VPPB 12 Datemme of Dlscovery: 4/23/2004 10:12:45 PM DateTime of Occurrence: -4/2312004 10:12:45 PM Identified By: Site-ldentified System: (None)

Equipment # {ist): (None) Equipment Type (1s t): (None)

'Equipment#(2nd): (None) Equipment Type (2nd): (None)

Equipment # (3rd): (None) Equipment Type (3rd): (None)

Site/Unit: Point Beach - Unit I Why did this occur?: 4/2312004 10:39:44 PM - MCCARTHY, JAMES:

Unknown at this time.

Immediate Action Taken: 4/2312004 10:39:44 PM - MCCARTHY. JAMES:

The Plant Manager directed that a safety assessment be performed for the spent fuel pool function for the current state of the U1R28. The Plant Manager directed that the assessment be completed prior to fuel movement from Unit 1 reactor to the spent fuel pool.

Recommendations: 412312004 10:39:44 PM - MCCARTHY. JAMES:

1. Perform the assessment noted in Immediate action taken section.
2. Perform an assessment of the the boiled fault project to determine If the safety assessments for the project analyzed the Impact on spent fuel cooling during the partial core offload condition.

e Notfy Me During Eval?: N i SRO Review Required?: Y E Section 2 Operability Status: NA 4i Compensatory Actions: N Basis for Operability: .412412004 3:16:10 AM - HARPER. RON:

This CAP documents that the Plant Manager has directed that a safety assessment be performed for the spent fuel pool function for the current state of the U1R28. The Plant Manager directed that the assessment be completed prior to fuel movement from Unit I reactor to the spent fuel pool.

This Is not an equipment or SSC operability Issue since UI R28 fuel movement has not yet started.

w)Unplanned TSAC Entry: N ,&External Notlfication: IN

H1arold Chernof - Document pdf - -. Page 21

, Nuclear Management Company Page 2 of 2 E Section 3 Screened?: N 6 Significance Level: (None)

INPO OE Reqd?: N Potential MRFF?: iN 4 QAINuclear Oversight?: N 0 Licensing Review?: N Good CatchdWeli Doc'd?: NA E Section 4 Inappropriate Action:

'Process: (None) Activity: (None)

Human Error Type: (None) Human Perf Fail Mode: (None)

Equip Failure Mode: (None) Process Fall Mode: (None)

OrglMgt Failure Mode: (None) -3 Group Caursing Prob: (None)

Hot Buttons: (None)

E; Section 5 CAP AdmIn: PBNP CAP Admin Prescreener: (None) e Prolect: Corrective Actn Program (CAP) AR ( State: AR Screening Que fl Activenlnactlve: Active 0 Submitter: MCCARTHY, JAMES

  • Owner: PBNP CAP Admin W O Last Modified Date: 412il2004 3:16:10 AM.

d Last Modifier HARPER, RON EP a Last State Change Date: 4124/2004 3:16:10 AM OLast State'Changer: HARPER, RON a 0 CloseDate:

NUTRK ID:

  1. of Children: 0

References:

Update.

Prescreen Comments:

Import Memo Field:

OPR Completed?: N OLDACTION NUM:

sub-tsid: 0 originalprojectjd: 0 origlnaljssueid:

Site: Point Beach Cartridge and Frame:

8 Change History 412412004 3:16:10 AM by HARPER. RON Operabiity Status Changed Frorn (None) To NA Bas bor Operabilily Changed Fromr* To lAppended:lThis CAP documents that the Plant Manager has directed that a safety assessment be performed for the spent fuel pool function for the current state of the U1 R28. The Plant Manager directed that the assessment be completed prior to fuel mot.J.r State Changed From AR Pre-Screen To AR Screening Que Via Transition: Submlt to Screening Team Owner Changed From (None) To PBNP CAP Admin Last Modified Date Changed From 4123/2004 10:39:44 PM To 4124R2004 3:16:10 AM Last Modifer Changed From MCCARTHY. JAMES To HARPER, RON Last State Change Date Changed From 4123/2004 10:39:44 PM To 4124/2004 3:16:10AM Last State Changer Changed From MCCARTHY. JAMES To HARPER. RON