Letter Sequence Other |
---|
|
|
MONTHYEARML0419701932004-06-28028 June 2004 RAI, Security Plan Sections 1 - 9 Project stage: RAI ML0420200702004-07-0909 July 2004 Request for Additional Information Training and Qualification Plan Project stage: RAI ML0421904522004-07-23023 July 2004 RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan Project stage: RAI ML0431200292004-10-29029 October 2004 Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat; and Revisions to Physical Security Plan, Training and Qualification Plan, Safeguards.. Project stage: Other ML0506205192005-01-25025 January 2005 Ltr. Administrative Changes to Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Pursuant Commission Order EA-03-086 (Tac No. MC2920) Project stage: Other 2004-07-23
[Table View] |
Ltr. Administrative Changes to Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Pursuant Commission Order EA-03-086 (Tac No. MC2920)ML050620519 |
Person / Time |
---|
Site: |
Fermi ![DTE Energy icon.png](/w/images/5/5b/DTE_Energy_icon.png) |
---|
Issue date: |
01/25/2005 |
---|
From: |
John Nakoski NRC/NRR/DLPM/LPD2 |
---|
To: |
O'Connor W Detroit Edison |
---|
Beaulieu, David, NRR/DLPM, 415-3243 |
References |
---|
EA-03-086, FOL No. NPF-43, SE Sec. 3.3, 3.7, 3.9, 4.1, TAC MC2920 |
Download: ML050620519 (6) |
|
Similar Documents at Fermi |
---|
Category:Letter
MONTHYEARIR 05000341/20230042024-02-0505 February 2024 Integrated Inspection Report 05000341/2023004 ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) ML23283A0222023-10-0909 October 2023 Follow Up to Fermi Unit 2 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval ML23276B4542023-10-0505 October 2023 Cyber Security Inspection Report 05000341/2023402 ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23248A2242023-09-0707 September 2023 Regulatory Audit in Support of Review of License Amendment Request for a Risk-Informed Approach for Addressing the Effects of Debris on ECCS Strainer Performance ML23223A2242023-08-29029 August 2023 Individual Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing (Exigent Circumstances) ML23237B4332023-08-25025 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI IR 05000341/20230052023-08-24024 August 2023 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2023005) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23219A1792023-08-0707 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Fermi Power Plant, Unit 2 IR 05000341/20230022023-08-0404 August 2023 Integrated Inspection Report 05000341/2023002 ML23216A1872023-08-0404 August 2023 Submittal of Relief Request RR-A25 for Extended License Period ML23206A1272023-07-26026 July 2023 NOED for Fermi Power Plant, Unit Two Technical Specification 3.7.2, Emergency Equipment Cooling Water Emergency Equipment Service Water System and Ultimate Heat Sink ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis IR 05000341/20230012023-06-28028 June 2023 Integrated Inspection Report 05000341/2023001 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements IR 05000341/20220102023-06-21021 June 2023 Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23158A1332023-06-0808 June 2023 Notice of Enforcement Discretion (NOED) for Fermi Power Plant, Unit Two (EPID L-2023-LLD-0000) Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/ Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink ML23130A1032023-05-17017 May 2023 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency IR 05000341/20234022023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23118A3612023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23114A1172023-05-0101 May 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23115A4152023-04-25025 April 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML23124A2032023-04-10010 April 2023 DTE Electric Company Submittal of Fermi 3 Periodic Reports ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter IR 05000341/20230112023-04-0606 April 2023 Triennial Fire Protection Inspection Report 05000341/2023011 IR 05000341/20234012023-03-17017 March 2023 Security Baseline Inspection Report 05000341/2023401 ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 IR 05000341/20220062023-03-0101 March 2023 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2022006) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22325A2992023-02-24024 February 2023 Audit Plan in Support of Review of License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency ML23039A1552023-02-14014 February 2023 Integrated Inspection Report 05000341/2022004 IR 05000341/20224032023-02-13013 February 2023 Security Baseline Inspection Report 05000341/2022403 ML23200A2162023-01-20020 January 2023 Outline Submittal Letter 2024-02-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFEGUARDS INFORMATION January25, 2005 Mr. William T. O'Connor, Jr.
Vice President - Nuclear Generation Detroit Edison Company Fermi, Unit 2 6400 North Dixie Highway Newport, Ml 48166
SUBJECT:
FERMI, UNIT 2 - CORRECTION OF ADMINISTRATIVE CHANGE TO LICENSE PAGE AND SAFETY EVALUATION REGARDING REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PURSUANT TO COMMISSION ORDER EA-03-086 (TAC MC2920)
Dear Mr. O'Connor:
By letter dated April 28, 2004, Detroit Edison Company submitted a supplemental response in accordance with Order EA-03-086, the Order requiring compliance with the revised design basis threat, dated April 29, 2003, (DBT Order) for the Fermi, Unit 2 (Fermi 2).
By letter dated October 29, 2004, the Nuclear Regulatory Commission (NRC) issued a safety evaluation (SE) documenting its approval of the Fermi 2 physical security plan, training and qualification plan, and safeguards contingency plan, and an administrative license change to the Fermi 2 Facility Operating License (FOL No. NPF-43) to incorporate the reference to the NRC-approved plans.
By letter dated November 12, 2004, you noted that the change to the license page did not reflect your lastest submittal and provided comments on the staff's SE to more accurately reflect, in your view, the Fermi 2 security plans as submitted. You noted that several of these comments were discussed with the NRC staff on November 3, 2004. For the most part, the inconsistencies you identified were either editorial in nature or clarified the SE with regard to statements made in the revised security plans. The corrections made to the SE did not affect the NRC staff's previous evaluation of the revised security plans. Most of the comments you proposed were NOTICE: The Enclosure 2 to this letter contains Safeguards Information. Upon separation from Enclosure 2, this letter and Enclosure 1 are DECONTROLLED.
SAFEGUARDS INFORMATION
W. T. O'Connor incorporated into the enclosed corrected pages to the SE (Safeguards Information). However, your comments on SE Sections 3.3, 3.7, 3.9.4.1 (10th paragraph), 3.9.5.2, and 5.5 were not incorporated since the staff concluded that the SE as written is consistent with your approved physical security plans.
Please replace the enclosed page to your FOL as indicated in Enclosure 1. Also, please replace the pages to your SE as indicated in Enclosure 2. We regret any inconvenience this may have caused. If there are any further questions, please call Mr. David Beaulieu at (301) 415-3243.
Sincerely, iJhn A. Nakoski, Chief, Section 1
\,rject Directorate 11 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-341
Enclosures:
- 1. Administrative Change to FOL No. NPF-43
- 2. Correction to Safety Evaluation Regarding the Security Plans (SAFEGUARDS INFORMATION) cc w/o end 2: See Mailing List cc w/encls: Joe Korte, Site Security Manager
Fermi 2 cc w/o encl. 2:
Mr. Peter Marquardt Legal Department 688 WCB Detroit Edison Company 2000 2nd Avenue Detroit, Ml 48226-1279 Michigan Department of Environmental Quality Waste and Hazardous Materials Division Hazardous Waste and Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P.O. Box 30241 Lansing, Ml 48909-7741 U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Ml 48166 Monroe County Emergency Management Division 963 South Raisinville Monroe, Ml 48161 Regional Administrator, Region Ill U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Norman K. Peterson Director, Nuclear Licensing Detroit Edison Company Fermi 2 - 280 TAC 6400 North Dixie Highway Newport, Ml 48166
CHANGES TO FACILITY OPERATING LICENSE NO. NPF-43 DOCKET NO. 50-341 Replace the following page of the Facility Operating License NPF-43 with the attached revised page as indicated. The revised page is identified by a revision date and contains marginal lines indicating the area of change.
Remove Page Insert Page 8 8 Enclosure 1
D. Exemptions from certain requirements of Appendices E and J to 10 CFR Part 50, are described in supplements to the SER. These include: (a) an exemption from the requirement of Section IV.F of Appendix E that a full participation emergency planning exercise be conducted within one year before issuance of the first operating license for full power and prior to operation above five percent of rated power (Section 13.3 of SSER #6); (b) an exemption from the requirement of Paragraph I I.C.2(b) of Appendix J, the testing of the main steam isolation valves at the peak calculated containment pressure associated with the design basis accident (Section 6.2.7 of SSER #5); and (c) an exemption from the requirement of Paragraph II.D.2(b)(ii) of Appendix J, the testing of containment air locks at times when containment integrity is not required (Section 6.2.7 of SSER #5).
These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest.
Therefore, these exemptions are hereby granted pursuant to 10 CFR 50.12.
With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Fermi 2 Physical Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan" submitted by letter dated September 9, 2004, and supplemented on October 7, 2004, and October 29, 2004.
F. Deleted G. The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
Amendment No. 163 Revised by letter dated Otctber .9 , 2004 January25, 2005 I
W. T. O'Connor January 25, 2005 incorporated into the enclosed corrected pages to the SE (Safeguards Information). However, your comments on SE Sections 3.3, 3.7, 3.9.4.1 (10th paragraph), 3.9.5.2, and 5.5 were not incorporated since the staff concluded that the SE as written is consistent with your approved physical security plans.
Please replace the enclosed page to your FOL as indicated in Enclosure 1. Also, please replace the pages to your SE as indicated in Enclosure 2. We regret any inconvenience this may have caused. If there are any further questions, please call Mr. David Beaulieu at (301) 415-3243.
Sincerely,
/RA/
John A. Nakoski, Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-341
Enclosures:
- 1. Administrative Change to FOL No. NPF-43
- 2. Correction to Safety Evaluation Regarding the Security Plans (SAFEGUARDS INFORMATION) cc w/o end 2: See Mailing List cc w/encls: Joe Korte, Site Security Manager DISTRIBUTION w/o Enclosure 2:
PUBLIC SPRT R/F OGC ACRS THarris DBeaulieu LRaghavan WRuland GHill (2) DLPM DPR TBoyce SReynolds, RI11