SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION September 21, 2004 Mr. William T. OConnor, Jr.

Vice President - Nuclear Generation Detroit Edison Company Fermi, Unit 2 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

SECURITY PLAN PROVISIONS FOR ENHANCED OWNER CONTROLLED AREA SURVEILLANCE AND RESPONSE (TAC NO. MC2920)

Dear Mr. OConnor:

On May 14, 2004, the U. S. Nuclear Regulatory Commissions (NRC) staff completed an evaluation of lessons learned from the pilot expanded force-on-force exercises. As a result of this evaluation, surveillance and response in the owner controlled area (OCA) was identified as one aspect of security at nuclear power plant facilities that required further improvement. On August 13, 2004, the Commission directed the staff to work with industry toward voluntary implementation of enhanced OCA surveillance and response measures.

The NRC staff worked with the industrys Security Working Group and the Nuclear Energy Institute to develop appropriate provisions to be included in physical security plans. These provisions have been discussed with your staff for incorporation into your facilitys physical security plan. Specific revised security plan language developed to achieve this objective is included as an enclosure to this letter.

Thank you for your cooperation in resolving this issue. Should you have further questions on this matter, please call Juan Peralta at (301) 415-6689 or me at (301) 415-7083.

Sincerely,

/RA/

Scott A. Morris, Chief Reactor Security Section Division of Nuclear Security Office of Nuclear Security and Incident Response

Enclosure:

As stated cc: See next page Docket No.: 50-341 WARNING: Violation of Section 147 of the Atomic Energy Act, Safeguards Information is subject to Civil and Criminal Penalties NOTICE: Enclosure transmitted herewith contains Safeguards Information. When separated from Enclosure(s) this Cover Document is DECONTROLLED

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION September 21, 2004 Mr. William T. OConnor, Jr.

Vice President - Nuclear Generation Detroit Edison Company Fermi, Unit 2 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

SECURITY PLAN PROVISIONS FOR ENHANCED OWNER CONTROLLED AREA SURVEILLANCE AND RESPONSE (TAC NO. MC2920)

Dear Mr. OConnor:

On May 14, 2004, the U. S. Nuclear Regulatory Commissions (NRC) staff completed an evaluation of lessons learned from the pilot expanded force-on-force exercises. As a result of this evaluation, surveillance and response in the owner controlled area (OCA) was identified as one aspect of security at nuclear power plant facilities that required further improvement. On August 13, 2004, the Commission directed the staff to work with industry toward voluntary implementation of enhanced OCA surveillance and response measures.

The NRC staff worked with the industrys Security Working Group and the Nuclear Energy Institute to develop appropriate provisions to be included in physical security plans. These provisions have been discussed with your staff for incorporation into your facilitys physical security plan. Specific revised security plan language developed to achieve this objective is included as an enclosure to this letter.

Thank you for your cooperation in resolving this issue. Should you have further questions on this matter, please call Juan Peralta at (301) 415-6689 or me at (301) 415-7083.

Sincerely,

/RA/

Scott A. Morris, Chief Reactor Security Section Division of Nuclear Security Office of Nuclear Security and Incident Response

Enclosure:

As stated cc: See next page Docket No.: 50-341 DISTRIBUTION:

SPRT R/F RFretz DHuyck JCreed BBenney BVaidya ACRS OGC MBurrell DSpaulding RManili PPeduzzi MChernoff DBeaulieu LRaghavan WRuland SReynolds, RIII ADAMS Accession Number: ML042680378 OFFICE SPRT/LA SPRT SPRT SPRT NAME CHawes JPeralta JNakoski SMorris DATE 9/20/04 9/20/04 9/20/04 9/20/04 OFFICIAL RECORD COPY

Fermi 2 cc:

Mr. Peter Marquardt Legal Department 688 WCB Detroit Edison Company 2000 2nd Avenue Detroit, MI 48226-1279 Michigan Department of Environmental Quality Waste and Hazardous Materials Division Hazardous Waste and Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741 U.S. Nuclear Regulatory Commission Resident Inspectors Office 6450 W. Dixie Highway Newport, MI 48166 Monroe County Emergency Management Division 963 South Raisinville Monroe, MI 48161 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Norman K. Peterson Director, Nuclear Licensing Detroit Edison Company Fermi 2 - 280 TAC 6400 North Dixie Highway Newport, MI 48166 Mr. William T. OConnor, Jr.

Vice President - Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166