ML042570140

From kanterella
Jump to navigation Jump to search

Submittal of the Final, Revised Fermi 2 Physical Security Plan, Safeguards Contingency Plan, and Security Training and Qualification Plan
ML042570140
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/09/2004
From: O'Connor W
DTE Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-03-086, NRC-04-0071
Download: ML042570140 (3)


Text

William T. O'Connor, Jr.

Vice President, Nuclear Generation Fermi 2 6400 North Dixie ffi y., Newport, Michigan 48106 Tel: 734-586-5201 Fax: 734-5864172 DTE Energy-SAFEGUARDS INFORMATION September 9, 2004 NRC-04-0071 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001

References:

1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
2) Letter from S. J. Collins (NRC) to W. T. O'Connor, JR. (Detroit Edison dated April 29, 2003, "Issuance of Order Requiring Compliance With the Revised Design Basis Threat for Operating Power Reactors," EA-03-0086
3) Letter from W. T. O'Connor, Jr. (Detroit Edison) to the NRC dated April 28, 2004, "Supplemental Response to the April 29, 2003 Orders to Fermi 2"
4) Letter from W. T. O'Connor, Jr. (Detroit Edison) to the NRC dated August 26, 2004, "Response to the Requests for Additional Information Related to the Fermi 2 Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan -

Revised Wording"

Subject:

Submittal of the Final, Revised Fermi 2 Physical Security Plan, Safeguards Contingency Plan, and Security Training and Qualification Plan The NRC issued an Order dated April 29, 2003, requiring compliance with the revised design basis threat (Reference 2). Detroit Edison responded by submitting a completely revised Physical Security Plan, Safeguards Contingency Plan, and Security Training and Qualification Plan for Fermi Unit 2 (Reference 3) that NOTICE: Attachment 1 contains "Safeguards Information" Upon separation of Attachment 1, this letter is 'Decontrolled" SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION USNRC NRC-04-0071 Page 2 followed the outline of Nuclear Energy Institute (NEI)-03-012. The NRC subsequently asked that the plans be revised through four requests for additional information. Detroit Edison responded to each request separately, and ultimately submitted revised plan wording in Reference 4.

The NRC has verbally accepted the revised wording proposed in Reference 4.

Therefore, this letter transmits the final, revised Fermi 2 Physical Security Plan, Safeguards Contingency Plan, and Security Training and Qualification Plan, incorporating the Reference 4 wording with three exceptions, one typographical error, one wording modification that the NRC has agreed to in discussions with the NEI, and one wording modification to prevent misinterpretation. The first, in Section 5.5 of the Physical Security Plan (PSP) "Work Hours Control," involves a typographical error in NEI-03-012. The phrase "noncontributing factors" is being changed to "contributing factors." The second, in Section 6.2 of the PSP, "Protected Area Barriers," involves wording changes to more generic language that was agreed to by the NRC in discussions with the NEI. The third, in Section 7.0 of the PSP, "Protective Strategy Scenarios," is being made to prevent confusion by changing the word "funneled" to "directed".

If there are any questions regarding this response, please contact Mr. Norman K.

Peterson, Manager, Nuclear Licensing at (734) 5864258.

Sincerely, Attachment cc:

D. W. Spaulding w/Attachment G. M. Tracy w/o Attachment NRC Resident Office w/o Attachment Regional Administrator, Region III w/o Attachment NOTICE: The Attachment contains "Safeguards Information" Upon separation of the Attachment, this letter is 'Decontrolled'"

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION USNRC NRC-04-007 1 Page 3 I, WILLIAM T. O'CONNOR, JR, do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.

\\a7 iO4;) 'Go C(

WILLIAM T. O'CONNOR, JR.

(.J Vice President - Nuclear Generatiof-On this _

day of rAC V,

2004 before me personally appeared William T. O'Connor, Jr., being first duly sworn and says that he executed the foregoing as his free act and deed.

-1 Notary Public C-11,

< r"L,a Li b-8-tt_

?I~farv

.u-p I..

n

- Bt.y u IL NOTICE: The Attachment contains "Safeguards Information" Upon separation of the Attachment, this letter is 'Decontrolled".

SAFEGUARDS INFORMATION