SAFEGUARDS INFORMATION July 9, 2004 Mr. William T. OConnor, Jr.

Vice President - Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

FERMI, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION RE: TRAINING AND QUALIFICATION PLAN (TAC NO. MC2920)

Dear Mr. O'Connor:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted a revised physical security plan, safeguards contingency plan, and training and qualification plan, including an implementation schedule, for Fermi, Unit 2.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined based on its review of your Training and Qualification Plan that a request for additional information (RAI) is necessary in order to complete its evaluation. Please respond to the enclosed RAI within 10 working days from the date of receipt. If circumstances result in the need to revise the target response date, please contact me at (301)415-2743.

Sincerely,

/RA/

Deirdre W. Spaulding, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

As stated cc w/o encl: See next page WARNING: Violation of Section 147 of the Atomic Energy Act, Safeguards NOTICE: The Enclosure contains Safeguards Information is subject to Civil and Information. Upon separation from the Enclosure, this Criminal Penalties letter is DECONTROLLED.

SAFEGUARDS INFORMATION

July 9, 2004 Mr. William T. OConnor, Jr.

Vice President - Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

FERMI, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION RE: TRAINING AND QUALIFICATION PLAN (TAC NO. MC2920)

Dear Mr. O'Connor:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted a revised physical security plan, safeguards contingency plan, and training and qualification plan, including an implementation schedule, for Fermi, Unit 2.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined based on its review of your Training and Qualification Plan that a request for additional information (RAI) is necessary in order to complete its evaluation. Please respond to the enclosed RAI within 10 working days from the date of receipt. If circumstances result in the need to revise the target response date, please contact me at (301)415-2743.

Sincerely,

/RA/

Deirdre W. Spaulding, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

As stated cc w/o encl: See next page DISTRIBUTION:

SPRT R/F RidsNsirDns RidsNrrDlpm OGC ACRS D. Beaulieu L. Raghavan B. Ruland S. Reynolds, RIII ADAMS Accession Number: ML042020070 OFFICE SPRT/NRR/PM SPRT/NRR/LA SPRT/NSIR SPRT/NRR/SC NAME DSpaulding CHawes JPeralta JNakoski DATE 7/8/04 07/09/04 7/9/04 7/8/04 OFFICIAL RECORD COPY

3 Oconee Nuclear Station cc:

Ms. Lisa F. Vaughn Mr. R.L. Gill, Jr.

Duke Energy Corporation Manager - Nuclear Regulatory Mail Code - PB05E Issues and Industry Affairs 422 South Church Street Duke Energy Corporation P.O. Box 1244 526 South Church Street Charlotte, North Carolina 28201-1244 Mail Stop EC05P Charlotte, North Carolina 28202 Anne W. Cottingham, Esquire Winston and Strawn Mr. Richard M. Fry, Director 1400 L Street, NW Division of Radiation Protection Washington, DC 20005 North Carolina Department of Environment, Health, and Natural Resources Manager, LIS 3825 Barrett Drive NUS Corporation Raleigh, North Carolina 27609-7721 2650 McCormick Drive, 3rd Floor Clearwater, Florida 34619-1035 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Senior Resident Inspector Westinghouse Electric Company U.S. Nuclear Regulatory Commission 6000 Fairview Road 7812B Rochester Highway 12th Floor Seneca, South Carolina 29672 Charlotte, North Carolina 28210 Mr. Henry Porter, Director Henry Barron Division of Radioactive Waste Management Group Vice President, Nuclear Generation Bureau of Land and Waste Management and Chief Nuclear Officer Department of Health and Environmental P.O. Box 1006-EC07H Control Charlotte, NC 28201-1006 2600 Bull Street Columbia, South Carolina 29201-1708 Mr. Ronald A. Jones Vice President, Oconee Site Mr. Michael A. Schoppman Duke Energy Corporation Framatome ANP 7800 Rochester Highway 1911 North Ft. Myer Drive Seneca, SC 29672 Suite 705 Rosslyn, VA 22209 Mr. B.G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, South Carolina 29672 Ms. Karen E. Long Assistant Attorney General North Carolina Department of Justice P.O. Box 629 Raleigh, North Carolina 27602