ML042190452
| ML042190452 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/23/2004 |
| From: | Spaulding D NRC/NRR/DLPM |
| To: | O'Connor W Detroit Edison |
| Spalding D, NRR/DLPM/LPD3-1, 415-2928 | |
| References | |
| TAC MC2920 | |
| Download: ML042190452 (3) | |
Text
SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION WARNING: Violation of Section 147 of the Atomic Energy Act, Safeguards Information is subject to Civil and Criminal Penalties July 23, 2004 Mr. William T. OConnor, Jr.
Vice President - Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166
SUBJECT:
FERMI, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION RE:
SAFEGUARDS CONTINGENCY PLAN AND SECTION 9.4.1 OF THE PHYSICAL SECURITY PLAN (TAC NO. MC2920)
Dear Mr. O'Connor:
In response to the April 29, 2003, Orders revising the design basis threat, you submitted a revised physical security plan, safeguards contingency plan, and training and qualification plan, including an implementation schedule, for Fermi, Unit 2.
The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of your Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan. Please respond to the enclosed RAI within 10 days from the receipt of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-2743.
Sincerely,
/RA/
Deirdre W. Spaulding, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-341
Enclosure:
As stated cc w/o encl: See next page NOTICE: The Enclosure contains Safeguards Information. Upon separation from the Enclosure, this letter is DECONTROLLED.
July 23, 2004 Mr. William T. OConnor, Jr.
Vice President - Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166
SUBJECT:
FERMI, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION RE:
SAFEGUARDS CONTINGENCY PLAN AND SECTION 9.4.1 OF THE PHYSICAL SECURITY PLAN (TAC NO. MC2920)
Dear Mr. O'Connor:
In response to the April 29, 2003, Orders revising the design basis threat, you submitted a revised physical security plan, safeguards contingency plan, and training and qualification plan, including an implementation schedule, for Fermi, Unit 2.
The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of your Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan. Please respond to the enclosed RAI within 10 days from the receipt of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-2743.
Sincerely,
/RA/
Deirdre W. Spaulding, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-341
Enclosure:
As stated cc w/o encl: See next page DISTRIBUTION:
SPRT R/F RidsNsirDns RidsNrrDlpm OGC ACRS D. Beaulieu L. Raghavan B. Ruland S. Reynolds, RIII ADAMS Accession Number: ML042190452 OFFICE SPRT/NRR/PM SPRT/NRR/LA SPRT/NSIR SPRT/NRR/SC NAME DSpaulding CHawes JPeralta JNakoski DATE 7/23/04 7/23/04 7/23/04 7/23/04 OFFICIAL RECORD COPY
Fermi 2 cc:
Mr. Peter Marquardt Legal Department 688 WCB Detroit Edison Company 2000 2nd Avenue Detroit, MI 48226-1279 Michigan Department of Environmental Quality Waste and Hazardous Materials Division Hazardous Waste and Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741 U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, MI 48166 Monroe County Emergency Management Division 963 South Raisinville Monroe, MI 48161 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Norman K. Peterson Director, Nuclear Licensing Detroit Edison Company Fermi 2 - 280 TAC 6400 North Dixie Highway Newport, MI 48166