February 7, 2005 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 1 - UPCOMING STEAM GENERATOR TUBE INSERVICE INSPECTION (TAC NO. MC5629)
Dear Mr. Singer:
Inservice inspections of steam generator (SG) tubes play a vital role in assuring that adequate structural integrity of the tubes is maintained. As required by the plant Technical Specifications, reporting requirements range from submitting a special report within 15 days following completion of each inservice inspection of SG tubes, that identifies the number of tubes plugged and/or repaired; to submitting a special report within 12 months following completion of the inspection, that provides complete results of the SG tube inservice inspection. The special report containing the complete results shall include the following:
- 1. Number and extent of tubes inspected.
- 2. Location and percent of wall-thickness penetration for each indication of an imperfection.
- 3. Identification of tubes plugged and/or repaired.
A phone conference has been arranged with members of your staff to discuss the ongoing results of the SG tube inspections to be conducted during the upcoming Watts Bar Nuclear Plant, Unit 1 refueling outage. This phone call will occur after the majority of the tubes have been inspected, but before the SG inspection activities have been completed. Enclosed is a list of discussion points to facilitate this phone conference.
The staff plans to document a brief summary of the conference call as well as any material that you may have provided to the staff in support of the call.
Sincerely,
/RA/
Douglas V. Pickett, Senior Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-390
Enclosure:
List of Discussion Points cc w/encl: See next page
February 7, 2005 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 1 - UPCOMING STEAM GENERATOR TUBE INSERVICE INSPECTION (TAC NO. MC5629)
Dear Mr. Singer:
Inservice inspections of steam generator (SG) tubes play a vital role in assuring that adequate structural integrity of the tubes is maintained. As required by the plant Technical Specifications, reporting requirements range from submitting a special report within 15 days following completion of each inservice inspection of SG tubes, that identifies the number of tubes plugged and/or repaired; to submitting a special report within 12 months following completion of the inspection, that provides complete results of the SG tube inservice inspection. The special report containing the complete results shall include the following:
- 1. Number and extent of tubes inspected.
- 2. Location and percent of wall-thickness penetration for each indication of an imperfection.
- 3. Identification of tubes plugged and/or repaired.
A phone conference has been arranged with members of your staff to discuss the ongoing results of the SG tube inspections to be conducted during the upcoming Watts Bar Nuclear Plant, Unit 1 refueling outage. This phone call will occur after the majority of the tubes have been inspected, but before the SG inspection activities have been completed. Enclosed is a list of discussion points to facilitate this phone conference.
The staff plans to document a brief summary of the conference call as well as any material that you may have provided to the staff in support of the call.
Sincerely,
/RA/
Douglas V. Pickett, Senior Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-390
Enclosure:
List of Discussion Points cc w/encl: See next page Distribution:
PUBLIC PDII-2 r/f CKhan LLund CLauron OGC ACRS BClayton DPickett MMarshall SCahill, RII MMurphy DLPM DPR ADAMS ACCESSION NO. ML050140041 NRR-106 OFFICE PM:LPD2-2 LA:LPD2-2 SC:EMCB SC:LPD2-2 NAME DPickett BClayton LLund MMarshall DATE 01/ 19 /05 01/ 19 /05 01/ 27 /05 02/ 07 /05 OFFICIAL RECORD COPY
Mr. Karl W. Singer Tennessee Valley Authority WATTS BAR NUCLEAR PLANT cc:
Mr. Ashok S. Bhatnagar, Senior Vice President Nuclear Operations Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Larry S. Bryant, General Manager Nuclear Engineering Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. William R. Lagergren Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 General Counsel Tennessee Valley Authority ET 11A 400 West Summit Hill Drive Knoxville, TN 37902 Mr. John C. Fornicola, Manager Nuclear Assurance and Licensing Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Fredrick C. Mashburn Senior Program Manager Nuclear Licensing Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. Paul L. Pace, Manager Licensing and Industry Affairs Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 Mr. Jay Laughlin, Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 Senior Resident Inspector Watts Bar Nuclear Plant U.S. Nuclear Regulatory Commission 1260 Nuclear Plant Road Spring City, TN 37381 County Executive Rhea County Courthouse 375 Church Street Suite 215 Dayton, TN 37321 County Mayor P. O. Box 156 Decatur, TN 37322 Mr. Lawrence E. Nanney, Director Division of Radiological Health Dept. of Environment & Conservation Third Floor, L and C Annex 401 Church Street Nashville, TN 37243-1532 Ms. Ann P. Harris 341 Swing Loop Road Rockwood, Tennessee 37854
ENCLOSURE STEAM GENERATOR TUBE INSPECTION DISCUSSION POINTS PREPARED BY THE OFFICE OF NUCLEAR REACTOR REGULATION TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-390 The following discussion points have been prepared to facilitate the phone conference arranged with the Watts Bar licensee to discuss the results of the steam generator (SG) tube inspections to be conducted during the upcoming Watts Bar Nuclear Plant, Unit 1 refueling outage. This phone call is scheduled to occur towards the end of the planned SG tube inspection interval, but before the unit completes the inspections and repairs.
The staff plans to document a brief summary of the conference call as well as any material that is provided in support of the call.
1.
Discuss any trends in the amount of primary-to-secondary leakage observed during the recently completed cycle.
2.
Discuss whether any secondary side pressure tests were performed during the outage and the associated results.
3.
Discuss any exceptions taken to the industry guidelines.
4.
For each SG, provide a description of the inspections performed including the areas examined and the probes used (e.g., dents/dings, sleeves, expansion-transition, U-bends with a rotating probe), the scope of the inspection (e.g., 100 percent of dents/dings greater than 5 volts and a 20 percent sample between 2 and 5 volts), and the expansion criteria. Also, discuss the extent of the rotating probe inspections performed in the portion of tube below the expansion transition region (reference Nuclear Regulatory Commission (NRC) Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections).
5.
For each area examined (e.g., tube supports, dent/dings, sleeves, etc.), provide a summary of the number of indications identified to-date of each degradation mode (e.g.,
number of circumferential primary water stress corrosion cracking indications at the expansion transition). For the most significant indications in each area, provide an estimate of the severity of the indication (e.g., provide the voltage, depth, and length of the indication). In particular, address whether tube integrity (structural and accident induced leakage integrity) was maintained during the previous operating cycle. In addition, discuss whether any location exhibited a degradation mode that had not previously been observed at this location at this unit (e.g., observed circumferential primary water stress corrosion cracking at the expansion transition for the first time at this unit).
6.
Describe repair/plugging plans.
7.
Describe in situ pressure test and tube pull plans and results (as applicable and if available).
8.
Provide the schedule for SG-related activities during the remainder of the current outage.
9.
Discuss the following regarding loose parts:
- what inspections are performed to detect loose parts
- a description of any loose parts detected and their location within the SG
- if the loose parts were removed from the SG
- indications of tube damage associated with the loose parts
- the source or nature of the loose parts if known 10.
If you have Babcock and Wilcox (B&W) welded plugs installed in the SGs, be prepared to discuss the actions taken in response to Framatomes notification of the effect of tubesheet hole dilation on the service life of B&W welded plugs.
11.
If steam generators contain thermally treated tubing (Alloy 600 or 690), discuss actions taken (if any) based on Seabrooks recent findings (Reference NRC Information Notice 2002-21).