PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 SEP 0 1 2004 LR-N04-0328 O PSEG NuclearLLC United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-001 INSERVICE INSPECTION ACTIVITIES - 90 DAY REPORT SIXTEENTH REFUELING OUTAGE SALEM GENERATING STATION UNIT I DOCKET NO. 50-272 FACILITY OPERATING LICENSE NO. DPR-70 This letter submits the ninety (90) day report for Inservice Inspection (151) activities conducted at the Salem Generating Station Unit 1 during the sixteenth refueling outage.

This report is submitted in accordance Article IWA-6000 of Section Xi of the ASME Boiler and Pressure Vessel Code, 1998 Edition, 2000 Addenda.

The enclosures to this letter are as follows:

Enclosure I Salem Unit I (RFO#16) ISI Summary S1 RFO#16, Form OAR-1 Owners Activity Report Form OAR-1, Table 1 Salem Nuclear Generating Station Unit 1 ISI Program Long Term Plan RFO #16 ISI Examination Results Form OAR-1, Table 1 Salem Nuclear Generating Station, Unit 1 ISI Program Long Term Plan RFO #16 IWE Examination Results Form OAR-1, Table 1 Salem Nuclear Generating Station Unit 1 ISI Long Term Plan RFO #16 Flywheel Examination Results Form OAR-1, Table 1 Salem Nuclear Generating Station Unit 1 ISI Long Term Plan Inservice Inspection Summary for the Third Interval Form OAR-1, Table 1 Salem Nuclear Generating Station Unit 1 ISI Long Term Plan IWE/IWL Examination Summary for the First Interval Form OAR-I, Table 2 - Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service.

Form OAR-1, Table 3 - Abstract of Repairs, Replacements or

_ Corrective Measures Required for Continued Service.

4`7OW 95-2168 REV. 7/99

LR-N04-0328 2

Document Control Desk

'SEP 0 1 2004 Should you have any questions regarding this request, please contact Michael G.

Mosier at 856-339-5434.

Sinc>rly Christina L. Perino Director - Nuclear Safety and Licensing Enclosures (9)

LR-N04-0328 3

!PEP 0 1 2004 Document Control Desk C

Mr. S. Collins, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. D. Collins, Project Manager - Hope Creek U.S. Nuclear Regulatory Commission Mail Stop 08C2 Washington, DC 20555-0001 USNRC Senior Resident Inspector - Salem (X24)

Mr. K. Tosch Manager IV Bureau of Nuclear Engineering P. O. Box 415 Trenton, NJ 08625 Mr. Milton Washington Chief Inspector NJ Department of Labor Division of Public Safety, Occupational Safety and Health Bureau of Boiler and Pressure Vessel Compliance P. 0. Box 396 101 South Broad Street Trenton, NJ 08625-0392

LR-N04-0328 Document Control Desk ENCLOSURE I (Pages-15)

SALEM UNIT 1 (RFO#16) ISI

SUMMARY

SALEM, UNIT I INSERVICE INSPECTION FINAL

SUMMARY

REPORT 3rd INTERVAL l1st PERIOD / 2nd OUTAGE REFUELING OUTAGE 16 Spring 2004 VOLUME I OF 9 FINAL REPORT WITH APPENDICES Spring 2004 Prepared by:

6 ~1;,_

~9-el/

Peter D. Durant Reviewed by:

R.O'Neil I fProgram Administrat r Reviewed by:

Way9 benlinger

/

ISI NDE Specialist Reviewed by:

David Lu dttgen (ANtI)

HSB-CT Approve iSlliam P. Treston ISM/ST Supervisor Copies to:

DDG (1 COPY, transmitted under W.O.# 50059638)

Is, (1 COPY, Original)

SALEM UNIT I (RFO#16) ISI

SUMMARY

SALEM UNIT I (RFO#16) ISI ABSTRACT This report represents an accumulation of information pertaining to the ISI activities conducted during Salem Unit 1 Refueling Outage 16 An inservice examination (ISI) of selected Class 1, Class 2,Class 3, and Class MC, components of Public Service Electric Nuclear Power (PSEG) Salem Generating Station, Unit 1 (Salem 1), was performed by PSEG, Framatome ANP (FTI), Magnaflux Quality Services (MQS), Wesdyne, and Southwest Research personnel during March, 30 2004 -

June, 3 2004 (65 days). These examinations constituted the Sixteenth (1st Period, 2nd Outage) refueling outage at Salem Unit 1 This Final Report covers the time period (approximately 18 months) between breaker closure after RFO#15 through breaker closure after RFO#16.

PSEG Nuclear submitted documentation to the NRC and update Salem Unit 1 Code Edition from the 1995 Edition 1996 Addenda to 1998 Edition 2000 Addenda in order to align all Plants to the same Edition and Addenda of the Code.

Exams were performed in accordance with the ASME Section Xl 1998 Edition 2000 Addenda, Appendix Vill exams were performed to the 1998 Edition 2000 Addenda as amended by Final Rule and 1998 Edition, IWE / IWL 1998 Addenda of ASME Section XI and the Salem Inservice Inspection Program Long Term Plan.

ISI was performed utilizing visual (VT), magnetic particle (MT), liquid penetrant (PT), and manual ultrasonic (UT), nondestructive examination techniques.

This report also contains augmented examinations required by the Salem Technical Specifications, and Regulatory Commitments, Circulars and Bulletins issued by the United States Nuclear Regulatory Commission.

Page 1

SALEM UNIT 1 (RFO#16) ISI

SUMMARY

SALEM UNIT I (RFO#16) ISI

SUMMARY

During the spring 2004 refueling outage (RFO16), PSEG, MQS, FTI, Wesdyne, and Southwest Research personnel performed nondestructive examinations (NDE) of selected Class 1, Class 2, and Class 3 components for Salem Generating Station, Unit 1.

These examinations constituted the sixteenth (1st Period, 2nd Outage) In-service Inspection that occurred during the Third Ten Year Inspection Interval, of commercial operation. In addition, Class MC components for Salem Generating Station, Unit 1 were completed.

The detailed Salem Unit 1 ISI report is presented in 9 volumes as follows:

Volume 1 - Summary Report with Appendices A through P Volume 2 - Appendix Q through U Visual Examination Field Data Reports Ultrasonic Report of RCP Shaft, and Valve Bolting.

Volume 3 - Appendix V System Pressure Test Field Data Reports Volume 4 - Reactor Pressure Vessel Upper and Lower Head Visual Examinations.

Volume 5-ISI Salem 1 RFO# 16 Boric Acid Corrosion Final Report Volume 6 - Framatome 2004 Section Xl Inservice Inspection Final Report Revision: 0 PSEG Salem Nuclear Generating Station Unit #1 RFO #16 (3rd Interval, Vt Period2nd Outage).

Volume 7,8,&,9 - Wesdyne Reactor Pressure Vessel Upper Head Penetrations This report is available for review in the ISI office.

A.

Applicable Documents The ISI was conducted in accordance with the following documents:

Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code, "Rules for Inservice Inspection of Nuclear Power Plant Components", 1998 Edition 2000 addenda, Appendix Vil exams were performed to the 1998 Edition 2000 Addenda as amended by Final Rule and 1998 Edition, 1998 addenda (IWE/IWL).

10-Year Inservice Inspection Program for Salem Nuclear Generating Station Unit #1 (Third Interval) Initial Issue.

PSEG's Salem Nuclear Generating Station Unit 1,Outage ISI Examination Plan (Rev.0), Third Interval, First Period, Second Outage (03/30/2004 thru 06/03/2004).

Page 2

SALEM UNIT I (RFO#16) ISI

SUMMARY

A.

Applicable Documents (Cont.)

ASME SECTION Xi Appendix VIII examinations were performed in accordance with ASME Section Xi, Div. 1,1998 Edition, 2000 Addenda Appendix VIII, as amended by the Federal Register Notice 67FR60520 through 67FR60542 dated September 26, 2002.

B.

ISI Section Xl examinations performed by Framatome Framatome ANP (FTI) under the direction of the PSEG ISI Group, conducted no mechanized ultrasonic, 59 manual ultrasonic, 3 liquid penetrant, 2 magnetic particle examinations.

During 1R16, PSEG Nuclear implemented Risk Informed Inservice Inspection (RI-ISI) of Nuclear Class 1 and 2 Piping Welds, formerly known as ASME Section Xl Exam Category B-F, B-J, C-F-1 and C-F-2. The bases of the Salem Unit 1 RI-ISI Program are documented in the Salem Nuclear Generating Station - Final Report -

Risk Informed Inservice Inspection Application (VTD-326046).

Examinations were performed on the following components and systems:

Class I Vessels Pressurizer Steam Generator Piping Reactor Coolant Safety Injection Residual Heat Removal Class 2 Vessels Steam Generator Piping Boiler Feed Main Steam Chemical Volume Control Auxiliary Feed Page 3

SALEM UNIT I (RFO#16) ISI

SUMMARY

B.

ISI Section Xl examinations performed by Framatome (Cont)

Class 3 Piping Service Water C.

ISI Section Xl Visual examinations on valves and bolting PSEG's ISI Group conducted Thirty-one (31) Class 1 bolting exams and Two Class 1 valve internal exams.

ISI Section Xl examinations were conducted on the following systems:

Safety Injection Reactor Coolant Residual Heat Removal Chemical Volume There were no unacceptable indications identified.

D.

ISI Section Xl Visual examination of components supports PSEG conducted Twenty-nine 29 Class 1, 2 & 3 component support visual VT-3 examinations.

ISI Section Xl examinations were conducted on the following systems:

-Auxiliary Feed

-Component Cooling

-Residual Heat Removal

-Safety Injection

-Chemical Volume

-Reactor Coolant There were no unacceptable indications identified.

E.

RCP Flywheel Examination per USNRC RequlatorV Guide 1.14 There were four (4) RCP Flywheel Examinations performed this Outage.

Period examinations were performed on three (3) Flywheels Interval examination were performed on one (1) Flywheel Page 4

SALEM UNIT I (RFO#16) ISI

SUMMARY

There were no unacceptable indications identified.

F.

ISI Section Xl System Leakage Examinations PSEG's ISI Group conducted forty six (46) System Pressure Tests during a System Leakage or on Nuclear Class 1, 2 and 3, in accordance with ASME Section Xl.

A system leakage exam was performed in accordance with ASME Section XI on all Class 1 Systems. The system leakage test was performed with the Reactor Coolant System in Mode 3 (normal operating temperature and pressure) with the insulation installed. No pressure boundary leakage was detected.

Notifications were initiated to correct minor mechanical leakage that was not corrected during the system walkdowns.

Class 2 and 3 System Pressure Tests were conducted on the following systems:

Auxiliary FeedWater Station Air Component Cooling Spent Fuel Cooling Containment Spray Safety Injection Chemical Volume & Control Sampling Demineralized Water Service Water Fire Protection Ventilation Control Main Steam Waste Liquid Reactor Coolant There were no unacceptable results identified.

G.

Augmented Volumetric Examinations of High Energy Piping Welds per Risk Informed Break Exclusion Region (RI-BER) Branch Technical Position MEB 3-1 During 1 R16, PSEG Nuclear implemented Risk Informed Break Exclusion Region (RI-BER) of Nuclear Class 1 and 2 Piping Welds, formerly known as MEB-3-1 Program. The bases of the Salem Unit 1 RI-BER Program are documented in the Salem Nuclear Generating Station - Final Report Risk Informed Inservice Inspection Application (VTD-326046).

Page 5

SALEM UNIT 1 (RFO#16) ISI

SUMMARY

H.

Augmented System Leakage tests per NUREG 0578 "TMI Lessons Learned" PSEG's ISI Group conducted twenty eight (28) system leakage tests in accordance with NUREG 0578 on the following systems:

Safety Injection Residual Heat Removal Chemical and Volume Control Containment Spray Sampling Liquid Radwaste Waste Gas Waste Liquid There were no unacceptable indications identified.

I.

Augmented Bolted Connection Exams per ISI Code Case N-533-1 PSEG's ISI Group conducted eighty-eight (88) Class 1 bolted connection VT-2's in accordance with the ISI Long Term Plan Program Code Case N-533-1.

The following components were repaired as result of the VT-2 examinations performed:

Augmented Bolted Connection Exams per ISI Code Case N-533-1 ITEM COMPONENT NOTIFICATION#

DISCREPANT NO.

Sum#

IDENTIFICATION CONDITION DESCRIPTION

1.

196000 1RH-1 20183815 Flange Leaking

2.

197500 11 SJ 156 20185500 Flange Leaking There were no other unacceptable indications identified.

J.

Preservice Examinations on Various Bolting Material Replacements There were no pre-service examinations of bolting performed this outage.

K.

Pre-Service Examination Other than Bolting There were no pre-service examinations other than bolting performed this outage.

Page 6

SALEM UNIT I (RFO#16) ISI

SUMMARY

L.

Erosion I Corrosion UT Thickness Program In response to NRC Bulletin 87-01 and PSEG Engineering Directive MEC-94-1071, 153 components were scheduled for UT thickness examinations.

The following Components were replaced, due to the results of the erosion / corrosion UT examinations performed.

ITEM SYSTEM COMPONENT COMPONENT NO.

ID DESCRIPTION

1.

Turbine Drain J-33 11E Drain Manifold

2.

MSR Drain C-57 3" Pipe As a result of these repair/ replacement activities, and procedural requirements for readings less than 70% of nominal wall, an examination expansion of 27 components was performed. This increased the total number of examinations to 180 components. The following is a break down of these examinations.

a.

2 components were replaced.

b.

178 components were acceptable for continued service, based on minimum wall design requirements.

There were no other unacceptable indications identified.

M.

Technical Specification 4.7.9 (c) Functional Testing of Selected Hydraulic and Mechanical Snubbers Hydraulic Snubbers (First Test Sample)

Large bore Hydraulic snubbers were tested in accordance with station Technical Specification 4.7.9(c), 10% sample plan by Wyle Laboratories API in-place snubber test machine as follows:

-One (1) MSIV 200 Kip Paul Monroe Snubber was replaced due to its end of seal life. Old snubber found degraded and engineering evaluated acceptable to the acceptance criteria. No further sampling required.

Page 7

SALEM UNIT I (RFO#16) ISI

SUMMARY

The following Lisega Hydraulic snubbers were tested using the Wyle Labatories model 150 snubber test machine.

-Two (2) Lisega small hydraulic snubber, Mechanical Snubbers (First Test Sample)

Mechanical snubbers were tested in accordance with station Technical Specification 4.7.9(c), 10% sample plan on the Wyle Labatories model 150 snubber test machine as follows:

-One (1) Mechanical Large (PSA-35)

-Ten (10) mechanical medium (PSA-1,3 and 10's)

-One (1) mechanical small (PSA-1/4 and 1/2's)

-One (1) mechanical small (PSA-1/2) previous failure retest and its shared partner snubber.

-Two (2) mechanical medium (PSA-1) non-tech spec. turbine snubbers were functional tested as the line they were attached to was replaced.

All snubbers were tested and found within acceptable standards.

N.

ISI Section Xl Visual Examination for Containment Integrity.

There were no IWL Visual Examinations performed and 164 IWE Visual Examinations were performed this outage.

There were no unacceptable indications identified.

0.

Reactor Coolant Pump Shaft Inspection.

Due to industry issues concerning Reactor Coolant Pump shaft cracking there were two (2) Augmented Ultrasonic examinations performed on Reactor Coolant Pump Shafts #13 and #14.

There were no unacceptable indications identified.

Page 8

SALEM UNIT I (RFO#16) ISI

SUMMARY

P.

Reactor Pressure Vessel Closure and Low Head Inspection.

There were no unacceptable indications identified.

There were no unacceptable indications identified.

Q.

Reactor Pressure Vessel Closure and Low Head Inspection.

There were no unacceptable indications identified.

R.

Visual Examination on Alloy 600 welds.

During Sl-RFO16 PSEG Nuclear personnel performed Bare metal visual examinations on the following components.

Sum#

Component I.D.

006081 Flux Thimbles welds 1-58 047250

  1. 14 Hot leg Thermal Welds 048275
  1. 13 Hot leg Thermal Welds 050850
  1. 12 Hot leg Thermal Welds 052625
  1. 11 Hot leg Thermal Welds 052626
  1. 11-STG Channel Head 054350
  1. 14 Cold leg Thermal Welds 054351
  1. 14-STG Channel Head 055750
  1. 13 Cold leg Thermal Welds 055751
  1. 13-STG Channel Head 057350
  1. 12 Cold leg Thermal Welds 057351
  1. 12-STG Channel Head 058650
  1. 11 Cold leg Thermal Welds There were no unacceptable indications identified.

Page 9

SALEM UNIT I (RFO#16) ISI

SUMMARY

S.

Visual Examinations on Accumulator Instrumentation Nozzles During Sl-RFO16 PSEG Nuclear personnel performed Bare metal visual examinations on the following components due to industry events at Surry Nuclear Station and NUCR 70027086.

Sum#

Component l.D.

197250 1 SJE6 #11 Accumulator Instrumentation Nozzle Penetrations 198150 1SJE7 #12 Accumulator Instrumentation Nozzle Penetrations 198950 1SJE8 #13 Accumulator Instrumentation Nozzle Penetrations 199750 1SJE9 #14 Accumulator Instrumentation Nozzle Penetrations There were no unacceptable indications identified.

T.

Visual Examination on Pressurizer Instrumentation Nozzles.

During Sl-RFO16 PSEG Nuclear personnel performed Bare metal visual examinations on eight (8) Pressurizer instrumentation nozzle penetrations due to industry events at Crystal River Nuclear Station.

There were no unacceptable indications identified.

Page 10

SALEM UNIT I (RFO#16) ISI

SUMMARY

U.

List of Acronym's ABBREVIATION A-E AF ASME BF BIT BR CA CC CCW CHR CRC CRD CS CW CV DG DR ECCS DESCRIPTION AUGMENTED EXAM AUXILIARY FEEDWATER SYSTEM AMERICAN SOCIETY OR MECHANICAL ENGINEERS STEAM GENERATOR MAIN FEEDWATER SYSTEM BORIC ACID INJECTION TANK BORIC ACID RECOVERY SYSTEM CONTROL AIR SYSTEM COMPONENT COOLING SYSTEM COUNTER CLOCK WISE CONTAINMENT HEAT REMOVAL SYSTEM CORROSION RESISTANT CLAD CONTROL ROD DRIVE CONTAINMENT SPRAY SYSTEM CLOCK WISE CHEMICAL VOLUME AND CONTROL SYSTEM DIESEL GENERATORS AND AUXILIARIES DEMINERALIZED WATER - RESTRICTED EMERGENCY CORE COOLING SYSTEM Page I 1

SALEM UNIT I (RFO#16) ISI

SUMMARY

U.

List of Acronym's (Cont'd)

ABBREVIATION DESCRIPTION EXAM EXAMINATION FO DIESEL GENERATOR FUEL OIL SYSTEM FB FLANGE BOLTING FLG FLANGE FP FIRE PROTECTION SYSTEM FW MAIN FEED WATER PUMP & PIPING GB STEAM GENERATOR BLOWDOWN SYSTEM HT HEAD TANK IA INTEGRAL ATTACHMENT INSIG INSIGNIFICANT ISi INSERVICE INSPECTION LD LONGITUDINAL SEAM WELD EXTENDING DOWNSTREAM LDI LONGITUDINAL SEAM WELD EXTENDING DOWNSTREAM ON THE INSIDE RADIUS OF AN ELBOW LDO LONGITUDINAL SEAM WELD EXTENDING DOWNSTREAM ON THE OUTSIDE RADIUS OF AN ELBOW LGS LUGS LO ZERO REFERENCE LOCATION LTP LONG TERM PLAN Page 12

SALEM UNIT I (RFO#16) ISI

SUMMARY

U.

List of Acronym's (Cont'd)

ABBREVIATION LU LUI LUO MS M-UT MT NDE NDT NPS NRC PR PS PSAR PSEG PSI PT PZR DESCRIPTION LONGITUDINAL SEAM WELD EXTENDING UPSTREAM LONGITUDINAL SEAM WELD EXTENDING UPSTREAM ON THE INSIDE RADIUS OF AN ELBOW LONGITUDINAL SEAM WELD EXTENDING UPSTREAM ON THE OUTSIDE RADIUS OF AN ELBOW MAIN STEAM SYSTEM MECHANIZED ULTRASONIC EXAMINATION MAGNETIC PARTICLE EXAMINATION NONDESTRUCTIVE EXAMINATION NONDESTRUCTIVE TESTING NOMINAL PIPE SIZE NUCLEAR REGULATORY COMMISSION PRESSURIZER RELIEF SYSTEM PRESSURIZER SPRAY SYSTEM PRELIMINARY SAFETY ANALYSIS REPORT PSEG NUCLEAR LLC PRESERVICE INSPECTION LIQUID PENETRANT EXAMINATON PRESSURIZER Page 13

SALEM UNIT I (RFO#16) ISI

SUMMARY

U.

List of Acronym's (Cont'd)

ABBREVIATION RC RCP REV RHR RPV RPVCH RX SCAN PLAN SA SF SJ SW UFSAR UT VT WL DESCRIPTION REACTOR COOLANT SYSTEM REACTOR COOLANT PUMP REVISION RESIDUAL HEAT REMOVAL SYSTEM REACTOR PRESSURE VESSEL REACTOR PRESSURE VESSEL CLOSURE HEAD REACTOR MECHANIZED EXAMINATION PLAN STATION AIR SYSTEM SPENT FUEL POOL COOLING & FILTERING REFUELING CANAL & FUEL TRANSFER TUBE SPENT FUEL POOL SAFETY INJECTION SYSTEM SERVICE WATER SYSTEM UPDATED FINAL SAFETY ANALYSIS REPORT MANUAL ULTRASONIC EXAMINATION VISUAL EXAMINATION WASTE LIQUID SYSTEM Page 14

LR-N04-0328 Document Control Desk ENCLOSURE 2 (Pages - 1)

S1 RFO#16 FORM OAR-1 OWNERS ACTIVITY REPORT

SI RFO#1 6 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: SJRFO#16 Owner: PSEG Nuclear LLC Plant:

Salem Nuclear Generating Station Unit No: 1 Commercial Service Date:

07/01/77.

Refueling Outage No.: RFO #16 Current inspection interval: Third Current inspection period: First Edition and Addenda of Section Xi applicable to the inspection plan: 1998 Edition 2000 Addenda,-

Appendix Vil exams were performed to the 1998 Edttion 2000 Addenda as amended by Final Rule - and IWE/IWL was performed to thel 998 Edition. 1998 Addenda Date and revision of inspection plan: 11/2003 Rev. 1 Change 0 Edition and Addenda of Section Xi applicable repairs and replacements, if different than the inspection plan: Class 1. 2, & 3-1995 Edition. 1996 Addenda Class CCIMC-1992 Edition / 1992 Addenda.

CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section Xi.

Certificate of Authord

/A Expiration Date: N/A Signed XIZ//

j 57,c-f;o.

Z

-/r 7 Date 67Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION.

I the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure VesselInspectors and the State or providence of New Jersey and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, during the period 11/06/02 to 06/03/04, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injur or property damage or a loss of any kind arising from or connected with this inspecti ti Commissions M0Q3'i)

, A* 7&6 Inspectors Signaturel National Board; State, Province, and Endorsements Date 07/2c7oY

LR-N04-0328 Document Control Desk ENCLOSURE 3 (Pages -24)

Form OAR-1, Table 1 SALEM NUCLEAR GENERATING STATION UNIT I RFO #16 ISI EXAMINATION RESULTS

Salem Nuclear Generating Station, Unit I ISI Program Long Term Plan RFO #16 ISI Examination Results Page 1 of 24 Revision I

.r%....nnn..*-1fl



I

>:1 I rn-g

-,,^.-1.; >-

..-.-.-... ) Or 1 >;;.;-;,

006070 I 1-CRDM I VT-2

.W/O# 50059638

~.

.: ~

~

x%%

006071 1 -CRDUH UT AUG Accept

Ultrasonic examination of the vessel head penetrations was 0

RV L H

.performed by Wesdyne under order # 50059071 006080 RPVLOWERHEAD-2 AUG Accept VT-2 Visual Examination Performed By PSEG Personnel Under W/O# 50059638

-M x:..x.. x.$..,..............

006081

.Flux Thimble Welds 1-58 VT-2 OWN Accept VT-2 Visual Examination Performed By PSEG Personnel Under Examined 58 Flux thimble dissimilar metal welds.

W/O# 50059638 I007000 4PRN-1100-IRS UT-70°S ISI Accept

.Ultrasonic Examinaton performed by Framatone Personnel under sW/O# 50059638 c...........

f.

s

.UT-60S IS Accept

Ultrasonic Examination performed by Framatome Personnel under Accep W/O# 50059638....

UT-SS Accept Ultrasonic Examination performed by Framatome Personnel under W/O# 50059638 UT-70S Accept Ultrasonic Examination performed by Framatome Personnel under 3..

W/O# 50059638 1 007400 j4-PSN-1131-IRS UT-70°S s

I Accept UltrasonicExaminationperformedbyFramatomePersonnel under I

1

~ ~~~~WIO#

50059638 UT-50S ISI Accept Ultrasonic Examination performed by Framatome Personnel under UT-50'S ISI Accept Ultrasonic Examination performed by Framatone Personnel under

W/O# 50059638 3007820 PZR BOLTING MANWAY VT-2 AUG Accept VT-2 Visual Examination Performed By PSEG Personnel Under

- 3 3

3 3W/O# 50059638 3

/

./.

..~

/~......~

007825 PZR lnsbr Penetabons VT-2 OWN Accept VT-2 Bare Metal Vsual Examinaton Performed By PSEG Personnel 3/
3.

3 3Under W/O# 50059638 3

008790 311-STG-OMB 3VT-i IS Accept VT-I Visual Examination Performed By PSEG Personnel Under

W/O# 50059638

£ : _ _..........

VT-2 AUG Accept 3VT-2 Visual Examination Performed By PSEG Personnel Under W/O# 50059638 008795

.11-STG-iMB

.VT-I IS Accept 3VT-i Visual Examination Performed By PSEG Personnel Under sW/O# 50059638

}.VT-2 AUG Accept VT-2 Visual Examinaton Performed By PSEG Personnel Under 3

s _:

3 3

W/O# 50059638

m Nuclear Generating Station, Unit I ISI Program Long Term Plan RFO #16 ISI Examination Results Page 2 of 24 Revision 1 008901

,31-RCN-1140-IRS UT-25*L ISI Accept Ultrasonic Examination p

.W/O# 50059638 Framatome under l

UT-39°L ISI1 Accept

,Ultrasonic Examination performed by Framatom~e Personnel under W/O# 50059638 009001

,29-RCN-1140-IRS I UT-25°L iIS Accept

.Ultrasonic Examination performed by Framatome Personnel under W/O# 5005 963 8 UT-39°L ISI Accept

,Ultrasonic Examination performed by Framatome Personnel under

'W/O# 50059638 1-1 Accept

.VT-I Visual Examination Performed By PSEG Personnel Under

W/O# 50059638 0096

,12-STG-IMB

.VT-I 1I Accept

, VT-i Visual Examination Performed By PSEG Personnel Under

_ ',W/O# 50059638 VT-2 AUG Accept

,VT-2 Vsual Examination Performed By PSEG Personnel Under WIO# 50059638 010550 13-STGOMB VT-I 1II Accept VT-I Visual Examination Performed By PSEG Personnel Under WIO# 50059638 0

.VT-2 AUG Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under

,W/O#

50059638 010575

,13-STG-IMB

.VT-i IS Accept VT-i Visual Examination Performed By PSEG Personnel Under WIO# 50059638 C.._

-4...

c----._

i

.VT-2 AUG Accept zVT-2 Visual Examination Performed By PSEG Personnel Under

_______i

W/O# 50059638

.......... x...:..::.Z'

.~.

. ~

~......

.....,,,~::z......

011450 j14-STG-OMB jVT-2 AUG Accept VVT-2 Visual Examination Performed ByPSEG Personnel Under

W/O# 50059638 VT-1 ISI Accept

.VT-1 Visual Examination Performed By PSEG Personnel Under W/O# 50059638 011475

14-STG-IMB VT-2 AUG Accept jVT-2 Vsual Examination Performed ByPSEG Personnel Under
W/O#50059638 VT-i l_.8_.___._.1 IAccept V-VuaEminatonPeroredByPSEGPeonne Und
vr f

W/O# 50059638 3

IUT-45S I 1 Accept

Ultrasonic Examination performed by Framatome Personnel under W/O# 50059638

..~.~..

. ~ ~~

....... _....~

_._~__.......

~

._~..._~~~

~~_....~..

Salem Nuclear Generating Station, Unit I ISI Program Long Term Plan RFO #16 ISI Examination Results Page 3 of 24 Revision 1 UU j-LviiJi

.W/O# 50059638 2......

,.2.2..2:o.

.~...............

X:::

~~.....'.'.'..".'.2>~.......

013300

  • 3-CV-1143-12

,UT45S 1I Accept Ultrasonic Examination performed by Framatome Personnel under t:

  • W/O# 50059638 013400 3-CV-1143-13

,UT4°S ISI Accept Ultrasonic Examination performed by Framatome Personnel under 018400 3-CV-1133-16 UT-45S ISI Accept Ultrasonic Examination performed by Framatome Personnel under AG W/O# 50059638 023300 6-PR 1105-IIFB VT-2 Accept

,VT-2 Visual Examination Performed By PSEG Personnel Under W/O# 50059638

.2,.

024500

.6-PR-1104-11 FB

.VT-2 AUG Accept VT-2 Visual Examination Performed By PSEG Personnel Under

'W/O# 50059638 2...a...............

~

025800

.6-PR-1103-I2FB VT-2 AUG Accept VT-2Visual Examination PerFormed ByPSEG Personnel Under WIO# 50059638 029701 14-PS-1131-2

,VT-2 11 Accept

,VT-2 Bare Metal Visual Examinaion PerformedBy SE Personnel Under W/O# 50059638 029800

.14PS-1131-3

.UT-45°S 1

Accept

Ultrasonic Examination performed by Framatome Personnel under

§

W/O# 50059638 033501

,4-PS1131-29 VT-2 ISI Accept

,VT-2 Bare Metal Visual Examination Performed By PSEG Personnel Ae Under W/O# 50059638

'037400 31-RC-t140-3 UT-45S 1I c

Ultrasonic Examination performed by Framatome Personnel under Examination limited to 50% of code required coverage W/O# 50059638 Due to Acoustic Properties of the Cast Elbow.

I A

UT-45S I

Accept Ultrasonic Examination performed by Framatome Personnel under

Examination limited to 50% of code required coverage W/O# 50059638 Due to Acoustic Properties of the Cast Elbow.

~

2.

037500 i31-RC-1140-4 UT-45*S ISI Accept

'Ultrasonic Examination performed byFramatome Personnel under IExamination limited to 50% of code required coverage

W/O# 50059638 Due to Acoustic Properties of the Cast Elbow.

s I~~~~~~

.~............ ~.

........ ~.....

....... ~,,,~,

UT-45S ISI Accept Ultrasonic Examination performed by Framatome Personnel under Examination limited to 50% of code required coverage W/O# 50059638

.Due to Acoustic Properties of the Cast Elbow.

1............................................................................................... I................................................................................................................

Salem Nuclear Generating Station, Unit I ISI Program Long Term Plan RFO #16 ISI Examination Results Page 4 of 24 Revision I 1

....... A.........

~

14 HOT LE............

047250 14HTLGThermal Welds IVT 2OWN Accept

VT 2 Bare Metal Visual Examination Performed By PSEG Personnel:

048275 13 HOT LEG Thermal Welds

VT 2 OWN Accept
VT 2 Bare Metal Visual Examination Performed By PSEG Personnel' UnerW/O# 50059638 052625 119 HOT30-LEWhra ed T-452 j OW Accept VUtr2 areMealViua Examination performed by PSEGtom Personnelune A ~

Under:W/O# 50059638 I

0530 1 ODLGTemlWelds VT, OWN Accept IVT-2 Br ea Visual Examination Performed By PSEG Personnel:Ude

!. ~

~

~

Ude W/O# 50059638 054351a4nSTG Head OWN Accept VT-1 Visual Examination Performed By PSEG Personnel Under W/O# 80069995 In Regards to Alloy 600/82/1 82 Industry Issues as

______________per NEI letter dated 02/03/2004 A

.~.

1 05500 2 5-R-1 10-2 U-45 ISI Accet Ulra2sonic Examination Performed By FramtGm Personnel Under

~~fs&,t,,AA/t,~.2:y,.~a~.AWfl~-.,?Af~n VAAAAA'z*AA//::W

/O# 50059638 rl'/

.A.

A

't

.4 AAA AASAAf5 1054575 13CLI E hra ed T2ON Acp V7-2 ar M etlVsual Examination Performed By PSEG PersonnelUne W/O# 80069995 In Regards to Alloy 600/821182 Industry Issues as

___________:per NEI letter dated 02/03/2004 075 12CHOL LEG Thermal Welds

VT-2 OWN Accept IVT-2 Bare Metal Visual Examination Performed By PSEG Personnel:

.j.........................

A...:Under W /O# 50059638

/A W~.~....

075 12SGCanlHaVTIOWN Acet VT-I Visual ExamInation Performed By PSEG Personnel Under W/O 80069995 In Regards to Alloy 600/82/1182 Industry Issues as per NEI letter dated 0210312004

Salem Nuclear Generating Station, Unit I ISI Program Long Term Plan RFO #16 ISI Examination Results Page 5 of 24 Revision I S

~.

.n e.....

6 8 WO

.0059638 093400

.1 4R-11 -12 Thermal Wed ISI2 OW Accept

.T-Ubar Metlonica Examinabo Performed by Frmao e

G Personnel

drEanlmt~n u oPp etan UnerW/O# 50059638

,./#50568..u.t.iql iedAcs j ~~~~~~~

~~1.

/#.0563..u t

iglledAcs 0972600

.14-RH-1 141 -19

.UT-45'S ISI

.Accept

, Ultrasonic Examination performed by Framatome Personnel under fi j

W/O# 50059638 0930

,0S-1141-20 UT-45'S ISI Accept

Ultrasonic Examinabion performed by Framatome Personnel under*5 t

W/O# 50059638 0910.0S-13-6:-5S l

S cet Ultrasonic Examination performed by Framatome Personnel under ExmlitiodutoPpReran j

  • W/O# 50059638 1096500 1-J11 -1!

T42 s

S cet.Ultrasonic Examinabion performed by Framatome Personnel under I Examinabion limited to 50% of code required coverage 9

W/0# 50059638 9Due to Single Sided Access9 9

U-5S 9

II 9Accept 9 Ulb asonic Examinatlon performed by Framatome Personnel under 9Examinabion limited to 50% of code required coverage 9

9.W10#

50059638

.9Due to Single Sided Access9 039700 910-SJ-1141-19 2UT-45*S ISI 9Accept 9Ultrasonic Examination performed by Framatome Personnelunder 9xmntolmtdo5ocdrqiecvrgde i

9 9

l 9

9~~~~W/O#

50059638 9o"ieeerbn 9

000 90S-1141-20 9UT-450S II 9Accept gUltrasonic Examination performed by Framatome Personnel under 9

W/O# 50059638 9,

,190 98S-1131-16 9UT-450S ISI 9Accept 9Ultrasonic Examination performed by Framatome Personnel underi9

..........,,,,,,,.,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,9,,,,,,,

W/O#.........50059638 gI050593

Salem Nuclear Generating Station, Unit I ISI Program Long Term Plan RFO #16 ISI Examination Results Page 6 of 24 Revision I 18-SJ Accept

.Ultrasonic Examinauon performed by i-ramatome Personnel under

.W/O# 50059638 110100

,8-SJ-1152-8

,UT-45' ISI Accept Ultrasonic Examination performed by Framatome Personnel under

.l

  • W/O# 50059638 110500

,8-SJ-1152-12 UT-45S ISI Accept Ultrasonic Examination performed by Framatome Personnel under

.~

.W/O# 50059638 110600

.8-SJ-1152-13 UT-45'S ISI Accept

':Ultrasonic Examination performed by Framatome Personnel under I Examination limited to 95.68% of code required coverage

W/O# 50059638 due to 2'pipe penetration located 1.2 from toe of weld.

C :

lE 110700

,8-SJ 1152-14 UT-451S ISI I

Accept

.Ultrasonic Examination performed by Framatome Personnel under I

.. W '

W/O# 50059638

/ ~.W

.44444W.45WflA444YXW.4.&4...........~m~

  • X:.

4444444444944 49

,~~~~~.

a.:

~

>4.;.....4 I 110800 8-SJ-1152-15

.UT45S IS[

Accept I Ultrasonic Examination performed by Framatome Personnel under g

,l W/O# 50059638 135100 3-SJ-1192-10 PT ISI Accept I Penetrant Examination performed by Framatome Personnel under I Examined weld and base metal for 4.25w of the 7.5t ii,:. i:.

.W/O# 50059638 requirement due to adjacent weld.

135200

  • 3-SJ-1192-11 ISI Accept enetrant Examination performed by Framatome Personnel under Examined weld and base metal for 4.25' of the 7.5' 4.

.W/O# 50059638 requirement due to adjacent weld.

4....

4 44.

136100

.2-SJ-1149-2FB

.VT-2 AUG Accept VT-2 Visual Examination Performed By PSEG Personnel Under W/O# 50059638 141500

.2-SJ-1147-8FB

.VT-2 AUG

.Accept

,VT-2 Visual Examination Performed By PSEG Personnel Under

.1

.0.

50059638 143700

.2-SJ-1139-2FB VT-2 AUG Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under 3

3W/O#

50059638 15400

,2-SJ-119-2FB VT-2 AUG i Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under

  • 3 i

3

  • W/O# 50059638 3

_~

154700

'2 SJ 13721-2FB VT2 AUG IAccept

VT-2 Visual Examination Performed By PSEG Personnel Under fl 4 fl4'flW44444W44W..4AA~l~.~

N'V.4.4.449f/44/4 44.44.

W/O# 50059638 155500

,2-SJ-1128-2FB

.3VT-2 AUG I Accept

,VT-2 Visual Examination Performed By PSEG Personnel Under j

3__

3_.'W/O#

50059638 3

Salem Nuclear Generating Station, Unit 1 ISI Program Long Term Plan RFO #16 ISI Examination Results Page 7 of 24 Revision I AUG Accept

,VT-2 Visual Examin

.W/O# 50059638 drorme j 165800

  • 2SJ-1 18-4FB

.VT-2 AUG Accept

  • VT-2 Visual Examination Performed By PSEG Personnel Under
  • WO#50059638

-x:::::::::

_x::::...~..<x c;170760,1 1/2-SJ-1 142-7FB

.VT-2 AUG

  • VT-2 Visual Examination Performed By PSEG Personnel Under

'W/O# 50059638 i

181100

,1.5-SJ1122-S8F VT-2 AUG Accept VT-2 Visual Examination Performed By PSEG Personnel Under

.W

.WINO#

50059638 185900

.15-SJ-1112-7FB VT-2 j AUG Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under

W/O# 50059638

<i9000 11-MP-OLT 1-4

.T-2AUG Acep

,VT2ViualExainaon erfrme BySEGPeronnel Under W/O# 50059638 190800 11-PMP-BOLTS 1-24 VT-2 AUG Accept VT-2 Visual Examinaton Performed By PSEG Personnel Under

W/O# 50059638 191600

.12-PMPBOLTS 1-24 VT-2 AUG I

Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under

W/O# 50059638 j

985.1 C

HF T}

O N

.Accept

  • [Ultrasonic Examinalion performed by Wesdyne Personnel under c

. ~

A.:W/O# 50059638 193200 1-PMPBOLTS 124 VT-2 R

AUG Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under W/O# 50059638 192855

.#13 RCP SHAFT

.UT OWN

.Accept Ultrasonic Examination performed by Wesdyne Personnel under WIO# 50059638 5

1932005

.11MJ BOLTS 1-24S

,Accept AVT-3 Visual Examination Performed By PSEG Personnel Under

l Sc:W/O#

50059638

Salem Nuclear Generating Station, Unit 1 IS[ Program Long Term Plan RFO #16 ISI Examination Results Page 8 of 24 Revision 1 "II" ersonnel Under 19U4000 1 QV 77

.VT2 At Accept

.: vr-2 visual Examr W/O# 50059638 drormnea

  • V-1IS_

Accept

I910 8 vsV-U Accept :.Vr-2 Visual Examination Performed By PSEG Personnel1Under

50059638 1910.

V2.r2s AG

.Accept

.Vr-2 Visual Examination Performed By PSEG Personnel Under as WIO# 50059638

Vr-1 s:S cet Vr-lVisual Examinafon Performed By PSEG Personnel Under

¢

    • W/O#

50059638 194140

,1 CV 75

  • r2AUG
  • Accreot

.vr7-2 Visual Examination Performed By PSEG Personnel Under

.I W/O# 50059638 s

~~~~~~~~~~~~~~..............................................................................................................:......

s

.:W/O#

50059638 920.

V7 rzAG

.Accept

.Vr-2 Visual Examination Prerformed By PSEG Personnel Under

.-W/O# 50059638' s

VT1 IS ccep

  • V-1 isual Examination Performed By PSEG Personnel Under v

50059638 194300 1 CV80v-2S AUG 3Accept

.Vr-I ISI Accept

.Vr-I Vsual Examination Performed By PSEG Personnel Under S

.W/O# 50059638 194400 :' CV 274 vr-2 AUG

.Accept vr-2 VMsual Examinalion Performed By PSEG Personnel Under S;

  • W/O#

50059638i

Vr-1 ISI
  • Accept
  • Vr-1 Visual Examination Performed By PSEG Personnel Under

.W/O# 50059638

¢ 950 1v7 r1II Accept sVr-I Msual Dtam~nation Performed By PSEG Personnel Under E

  • W/O# 50059638 s......

r2AG

.Accrept

.vr-2 Visual Exmminallon Performed By PSEG Personnel Under W/O# 50059638 M=-W 194600

CV 277

,vr-1 ISI I Accept

.:vr-1lVisual Examinat~orlPerformed By PSEG Personnel Under Ss

.WIO#

50059638 Vr-2 AUG

.Accept

.vr-2 Visual Examination Performed By PSEG Personnel Under

  • W/O# 50059638

^

.. ~ ~~.

...~ ~._

_~......

....... ~~

...~

... ~

.._~._~~.._._.................................

_..~~..._..........................

..................... -...... ~

.. ~...

Salem Nuclear Generating Station, Unit I ISI Program Long Term Plan RFO #16 ISI Examination Results Page 9 of 24 Revision 1

.194700

.1 PR1V-1 ISI Accept

Vr-1 Visual Exaiao~romd'PE~sndne E

.W/O# 50059638 F..

......... ~..

5.Vr-2 AUG IAccept

.:vr-2 \\Asual Examination Performed By PSEG Personnel Unde W/O# 50059638 s 94800

.1 PR 2 Vr-1 ISI Accep

Vlr-VisualExaminationPerformnedByPSEGPersonnedUnder W/O# 50059638 W ~-2 AUG iAccept jVr-2 Visual Examination Performed By PSEG Personnel Under ji

.i...W/O#

50059638ii 194900 i1 PR3 iVT2 AUG ccp iV i-sual Examination Peror By PSEG PersonnelUnlder S;

i i

iW/O#50059638j ii)..

9510-0 i 1 PR 4 i\\VT-2 AUG iAccept i VT-2 Visual Examination Performed By PSEG Pe~rsonnel Under ii i

i~~W/O# 50059638j f

~~~~~~~~~~~~~~~~~~~.................................................

SiVT7-2 AUG Accept iVT-2 Visual Examination Performed By PSEG Personnel Under ii S;

i Bs i:W/O#

50059638ii 51930 iPR7iT1ISI Accept iVT-1 Visual Examination Performed By PSEG Personnel Under i

i i

W/O-# 50059638ii iVT2 UGi Accept iVT-2 VisualExaminabon Performed By PSEG Personnd Under S
WIO# 50059638ii 5
VT-1 l

S cetiT1Vsual Examination Performed By PSEG Personnel Under S j 5 i i:W/O# 50059638 i.i

~~~~~

i ~ 0568..*...i 5 ~~~~":0..

i-1II iAccept iVT-1 Visua Exmnton Performed By PSEG Personnel Under t

j t

i

W/O# 50059638ii

Salem Nuclear Generating Station, Unit I ISI Program Long Term Plan RFO #16 ISI Examination Results Page 1 0 of 24 Revision 1 195600

.1 PS 24

.VT-1 ISI Accept VT-Visual Examination Pedred By PSEG Personnel Under i

.W/O# 50059638 t _.~._.............e...............~... _.. _.. :_..............

W& _.

_._2Jsulxa;~wF

.WtO# 50059638 1970 1P25.VT-2 AUG Accept

.VT-2 Visual Examination PerFormed By PSEG Personnel Under W/O# 50059638 c~~~~~~~~~~~~

....s........ Wu 1ame eBP sn n

,~~...

...W/O.50563

,150 1P 8.VT-1 ISI Accept
  • VT-1 Visual Examination Perforrned By PSEG Personnel Under

}

.W/O# 50059638

,,.VT7-2 AUG Accept

VT-2 Visual Examinatlon PerFormed By PSEG Personnel Under

.W/O#

50059638

150 1P 9.VT-12S Accept
  • VT7-1 Visual Exam'Inaffon-Performed By PSEG Personnel Under i

W/O# 50059638 t- _

- _ - ~ _

f __rie dm_

f 2

fr_

__ s ~ f __

ff S S__

  1. -# t--*-----

.VTS29\\r-2 AUG Accept

.VT-2 Visual Examination PerFormed By PSEG Personnel Under

¢

.'W/O#

50059638

\\

900 1RH1V-2 AU Aepete

.VT-2 Visual Examination PerFormed ByPE esnel Under jT2xmn~noe ekgaonfa~

I...*W/O#

50059638

  • nrotification# 201 8381 5 was generated c ; ;......

.......4 AUG Accept

VT-2 Visual Examination Performed By PSEG Personnel Under

.VT7-2 examination performed after repairs during class

    • W/O#

50059638

  • one waikdown and was found acceptable.

196100

.-IRH 2

.VT-2 AUG IAccept

.V1-2 Msual ExaminationPerform~ed By PSEG PersonnelUrtder i

l

.:W/O#

50059638 196200 i1 RH 26 VT2 AUG Accept iV-2VisualExamninafonPerformedByPSEGPersonnelUnder g

E i

i

  • W/O# 50059638 jiEiW050568.

i...................

196300 ASJ 12 jVr-2 AUG Accept

Vr-2MisualExaminationPerformedByPSEGPersonneI rider i

i i:W/O#

50059638*

VT-1 ISI X c-cept Vr-I Visual Examination Performed By PSEG Persornne Uner...

S E

i i~~W/O#

50059638...

iv196 00i 1

SJ 1 5I V-U Accept I VT-2 Visual Examination Performed By PSEG Personnel Under...

i i

iW/O#

50059638 f

AM:~:M

Salem Nuclear Generating Station, Unit 1 ISI Program Long Term Plan RFO #16 ISI Examination Results Page 1 1 of 24 Revision 1 j~~

......./#5093

.V-.S Accept

.V-.....

amnfnPrfre yPSGProne ne W/O# 50059638 g

990 1 J 0.T-U Accept

.VT-2 Visual Examination PerFormed By PSEG Personnel Under j

W/O# 50059638......

197000

  • .11SJ 43 V-AUG cet.VT-2 Visual Examination PerFormed By PSEG Personnel Under a

.W/O#

50059638

. K 197100

  • 11 SJ 43

.VT-2 AUG Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under i

t

,:W/O#

50059638 10

/#.0 59 3

'2197100

.1SJE-6

  • VT-2 AUG Accepot

.VT-2 Visual Examination Performed By PSEG Personnel Under g

.:*W/O#

50059638 197200

,1I1 SJ 554 T-AUG

  • Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under j

g i

i i:W/O#

50059638ii E-940 11J6 iV-2 OW AG i

Accept i:VT-2VisualExaminaUonPerformnedByPSEGPersonnel nder i

f

,j j

3

,W/0# 50059638ji 19750 i1 SJ156 VT-AUG i Recte iV-2Viual~amiatio~erorme~yPEG~esonel~ner iT-2xamiatinnotdlekageroudflage.

j~ ~ ~

~

~ ~~~~~:i

,j 50563

.ntfcto#0850wseee i

[ ~~~~~M..

... _Unprfre.ftrrpir.ng

}~~~~

~

~~~~~~~~

0568ineakonadws on cetbe 35 1990T1S4VT-2 AUG jAccept TVT-2 Visual Examination Performed By PSEG Personnel Under jj i

,i i

W/O# 50059638ii 1980006

-.1SJ4 56VT-2 3AUG i

Ac:"cept iVT-2 Visual Examination PerFormed By PSEG Personnel Under jj l

j l

i W/O# 50059638i 197500 il 156J5I iVT-2 2AUG I Rejctept 3VT-2 Visual Examination Performed By PSEG Personnel Under 31-ejmnto oe ekg rudfag 3

i 3

3:W/O#

50059638i

Salem Nuclear Generating Station, Unit I ISI Program Long Term Plan RFO #16 ISI Examination Results Page 12 of 24 Revision 1 Accept

. Vr-2 visual Examin WfO# 50059638 dtormed 5^ :.................. _ffi_................. ~

198200 12 SJ 55

,V-2 AUG Accept

.Vr-2 Visual Examination Performed By PSEG Personnel Under

.W/O#

50059638 198300 I12 SJ 56

, VT-2 AUG Accept Vr-2 Visual Examination Performed By PSEG Personnel Under W/O# 50059638

=

-A~l~

/M_

1rG

.Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under I

W/O# 50059638 198900

.13 SJ 5

.v-2 AUG Accept Vr-2 Visual Examination Performed By PSEG Personnel Under

,W/O#

50059638 198950 1SJ 83

.v-2 OAG Accept.Vr-2 Visual Examination Performed By PSEG Personnel Under 5

t WIO# 50059638 1989000

,13 SJ 55

'vT-2 j

U Accept 5vr2Visual Examination PerFormed By PSEG PersonnelUne fl~*

W.

b.W'.

.'W/0#500598 198910

.1 SJE6 5vT-i OWN Accept VT-2 Visual Examination PerFormed By PSEG Personnel Under W/O# 50059638 VT-2 AUG Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under 5

5

.W/O# 50059638 199100 13 SJ 56 VT-2 ISA Accept

,VT-1 Visual Examination Performed By PSEG Personnel Under

,W/O# 50059638 15 1

VT-2 AUG Acceopt

, VT-2 Visual Examination Performed By PSEG Personnel Under W/O# 50059638 199600

,1 SJ 43 VT 2 AUG

.Accept

'VT2 Vsual Examination PerFormed By PSEG Personnel Under t

5 i

W/O# 50059638 19950

,14 SJ 5 VT-2 AUG Accept VT-2 Visual Examination Performed By PSEG Personnel Under W/O# 50059638

'51960 14SJ4 V-2AG

,Accepot VT-2 Visual Examination PerFormed By PSEG Personnel Unde~r ffi 5

5 W/O# 50059638'

~~

I970 1

J5 V-U Accept

.:VT-2 Visual Examination PerFormed By PSEG Personnel Under 5{

5 W/O# 50059638

Salem Nuclear Generating Station, Unit 1 ISI Program Long Term Plan RFO #16 ISI Examination Results Page 13 of 24 Revision 1 Accept jVT-2 Visuai Examinf

.W/O# 50059638 rsonnel Under 199800

[14 SJ 55

\\VT-2 AUG Accept VT-2 Visual Examination Performed By PSEG Personnel Under

'W/O# 50059638 199900

,14 SJ 56 V:\\T-2 AUG Accept

,VT-2 Visual Exmmination Performed By PSEG Personnel Under

¢ W

XrW.

WO# 50059638 200000 14 SJ 156

.VT-2 AUG I Accept iVT-2 Visual Examination Performed By PSEG Personnel Under i

}

W/O# 50059638

............... xX........

1990100 4.11 538 VT-2 AUG Accept VT-2 Visual Examination Performed By PSEG Per Under i

g W/O# 50059638

.W/O# 50059638

.VG

.Accept VT-2 Visual Eaminaton Pe d By PSE Personnel Uner f

W/O#

50059638 200000

.145 156 VT-2 AUG Accept VT-2 Visual Examination Performed By PSEG Personnel Under

'W/O#

50059638 203601 11-STGJ23 8

UT-61s ISI Accept

.Ultrasonic Examination performed by Framatome Personnel under

~

.0

W/O# 50059638 2020UT146SS ISI V

Accept

.Ultrasonuc Examination performed by Framatome Personnel under

,'WIO# 50059638 g

y 2060

,i1SG2 UT-61 S IS!

Accept

,Ultrasonic Examination performed by Framatome Personnel under W/O# 50059638 g 203701 I11 -STG-24 UT-46L ISI Accept Ultrasonic Examination performed by Framatome Personnel under Examination limited to 98.43% of code required coverage X

W/O# 50059638 due to 2 weld pads and 4 nozzle penetrations UT-61 js ISI Accept Ultrasonic Examination performed by Framatome Personnel under Examination limited to 98.43% of code required coverage W/O# 50059638 due to 2 weld pads and 4 nozzle penetrations o

.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:a::C.

203701

,11-STG-24 UT-46S ISI Accept

Ultrasonic Examination performed by Framatome Personnel under Examination limited to 98.43% of code required coverage W/O# 50059638
due to 2 weld pads and 4 nozzle penetrations.

i210590

  • 14-BF2141-21 UT-4&S IS Accept Ultrasonic Examination performed by Framatome Personnel under a

.:W/O#

50059638

-C

_f'W/l' C.

m...AC

_5_CCCCCWCA A4A54~A~.AAW~.~4AA.

Salem Nuclear Generating Station, Unit 1 ISI Program Long Term Plan RFO #16 ISI Examination Results Page 14 of 24 Revision 1 9I&

Accept I Ultrasonic Examination performed by Framatome Personne under

.W/O# 50059638 227900

.32-MS 2141-2PS-2

MT ISI Accept Magnetic Particle Examination performed by Framatome Personnel Examination limited to 62% of code required coverage due under W/O# 50059638 to penetration obstructions and adjacent pipe.

~

230000 32 MS-2121-2PS-2 MT ISI Accept Magnetic Particle Examination performed by Framatoe Personnel Examination limited to 56% of code required coverage due.

.under W/O# 50059638 ito penetration obstructions and adjacent pipe.

3 8

UT-69t ISI Accept Ultrasonic Examination performed by Framatome Personnel under

.W/O# 50059638 UT-45S ISI Accept

Ultrasonic Examination performed by Framatome Personnel under W/O# 50059638 263534

' 8-RH-2126-14 UT-6t ISI

, Accept Ultrasonic Examination performed by Framatome Personnel under W/O# 50059638 UT-46S ISI Accept

,Ultrasonic Examination performed by Framatome Personnel under ai.

.::W/O#

50059638

.a.....".....'...

263536

.8-RH-2126-15

.UT-45S ISI Accept

Ultrasonic Examination performed byFramatome Personnel under W/O# 50059638 I UT-69°1 ISI Accept

,Ultrasonic Examination performed by Framatome Personnel under

W/O# 50059638 263540 8-RH2126-17 UT-455 IS!

Accept Ultrasonic Examination performed byFramatome Personnel under 1

  • W/O#

50059638 UT-69L ISI Accept

,Ultrasonic Examination performed by Framatome Personnel under W/O# 50059638 263542

,8R-161 T4° S

cet ::Ultrasonic Examination performed by Framatome Personnel under.

S

.:W/O#

50059638*

0 263541 UT-6L ISI Accept Ultrasonic Examination performed by Framatome Personnel under WIO# 50059638 263544

__8-RH-2126-19 UT-45_S IS!

cept Ultrasonic Examination performed by Framatome Personnel under j

Accept O# 50059638 UT-69't IS!

Accept

!Ultrasonic Examination performed by Framatome Personnel under

W/O# 50059638

Salem Nuclear Generating Station, Unit I ISI Program Long Term Plan RFO #16 ISI Examination Results Page 15 of 24 Revision 1 Accept

.Ultrasonic Examination pertormed ny Framatome Personnel under

.W/O# 50059638 UT-69L ISI Accept Ultrasonic Examination performed by Framatome Personnel under

'.W/O# 50059638 U-tISI Accept

Ultrasonic Examin-atio-n-pe~r'formed by Framatome Personnel under 279210 jl.S-192U-S11 Accept Ultrasonic Examination pefrdbyFaanePrsnludr

_.WIO#

50059638 5

UT-69t ISI Accept Ultrasonic Examination performed by Framatome Personnel under W/O# 50059638 UT-O0L ISI Accept I Ultrasonic Examination performed by Framatome Personnel under

W/O# 50059638 M

M.............*

4:

~x.,..

Si279540 10-SW-2141-5 UT-0L I

Accept Ultrasonic Examination performed by Framatome Personnel under Examination limited to 50% of code required coverage due

W/O#I50059638 to single sided access due to flange.

U S

1 Accept :trasonic Examination performed by Framatome Personnel under Examination liited to 50% of code required covrage due

WIO# 50059638 to single sided access due to flange.

UT-69tL ISI Accept Ultrasonic Examination performed by Framatome Personnel under Examination limited to 50% of code required coverage due

W/0# 50059638 to single sided access due to flange.

II:

§ 279550 I0-SW-2141-6

.UT-69°L Accept Ultrasonic Examination performed by Framatome Personnel under i___:

'WIO# 50059638 iI

.UT-45S ISI Accept

Ultrasonic Examination performed by Framatome Personnel under
WIO# 50059638 UT-OtL iSi Accept I Ultrasonic Examination performed by Framatome Personnel under WIO# 50059638 UT-45° ISI Accept UltasonicExaminatonperformedbyFramatomePesonneunder
WIO# 50059638

'UT-69°L ISI Accept Ultrasonic Examination performed by Framatome Personnel under

W/0O#50059638 ccep Ulrsoic Exctminatiort performed by Framatome Personnel under

$:.W/O#

50059638*

A_.__

_A

Salem Nuclear Generating Station, Unit I ISI Program Long Term Plan RFO #16 ISI Examination Results Page 16 of 24 Revision 1 i

A I

be.-.,

Ad I,,

.. a.

-...- a:a....

>:.-..;a... ;.-.....

I 279620 I -S.183-UT-O3 1 Accept

.: Ultrasonic Examination performed by Framatome Personnel under WIO# 50059638

Examination limited to 50%1 of code required coverage due;

.to single sided access due to flange.

I UT-45'S ISI

.Accept iUlb asonic Examinabion performed by Framatome Personnel under Examinabion limited to 50% of code required coverage due' W/O# 50059638

.to single sided access due to flange.

.UTr-69°L ISI

.Accept

Ultrasonic Examinabion performed by Framatome Personnel under
  • Examinabion limited to 50% of code required coverage due:-

.W/O#

50059638 to single sided access due to flange.

279810

  • 10-SW-2103-2

.UT-69°L ISI I Accept I*Ultrasonic Examinabion performed by FramatomnePersonnel under*

5 W/0# 50059638*

IUT-0°L ISI Accept

Ultrasonic Examinabon performed byFramatome Personnel under S

.:W/O# 50059638*

.:UT-45°S ISI Accept Ultrasonic Examinatlon performed by Framatome Personnel under

  • 5
  • W/0# 50059638*

500360 1AFG-193

.:VT-3 ISI Accept

.VT-3 Visual Examinabion Performed By PSEG Personnel Under t

W/0# 50059638*.

513.1-C-2.VT3 IS

  • Accept
  • VT-3 Vlsual Examination Performed By PSEG Personnel Under f

W/O# 50059638 5050 1-C-0-A*T1IS

  • Accept

.VT-3 Visual Examinabion Performed By PSEG Personnel Under W/O# 50059638 5095.ACC-0 r3l II Accept IVT-3 Visual Examinabion Performed By PSEG Personnel Under g

.:W/O#

50059638 5090 1-VG54.T3C IS Accept

VT-3 Visual Examinabion Performed By PSEG Personnel Under

}

  • W/O#

50059638 505065

  • 1IC-PSH-001

.VT-II Acp

.V-Viual Examinabion Performed By PSEG Personnel Under WO5059638*

505155.C-PRH-2t vr-3 II Acceot Vr-3 Viual Examination Performed By PSE esne ne E

  • W/#

5059638 556.1CPG25.T3 II

.Accept

  • .T3Vsual xam nato Pefrd By PSEG Personnel Under 5
  • W/O# 50059638 505350.1C-11IRHA-005 VT-3 ISI Acceot VT-3 Visual Examination Performed By PSEG Personnel Under *.............................
  • !**/#0568*..........

Salem Nuclear Generating Station, Unit 1 ISI Program Long Term Plan RFO iM16 ISI Examination Results Page 17 of 24 Revision 1

,7A-II MKI1-U IV

,V I-J

.- v-3 Visual ExaminationI

W/O# 50059638 Li Personnel Under w,

,ael.

f

/Ol0593

~~~.....

.....WO

..593 5056550

.1A-112RHRA-009

.VT-3

[ SI

,Accepot

.,VT-3 Visual Examination PerFormed By PSEG Personnel Under l

gW/O#

50059638 8..

5059680

,1A-11RHRS-03

.T-2 ISI

.Accept

.Vr-3 Visual Examination Performed By PSEG Personnel Under g

'W/O# 50059638 XMi 50633

.11SG53

,VT-ISI Aceo

,V-Vsa Exmnto Pefre BySE PesoneUde i~:

505720

.1-IA-PS42H01

.:VT-3 ISI

.Accept

.:VT-3Visual Examination Performed By PSEG Personnel Under 5

'W/O# 50059638 M,

/O 0093 5057180 1-SA-11RH 09-

[SI

.Accept

,VT-3 Visual Examination Performed By PSEG Personnel Under g

}

W/0# 50059638 5079 IA12RHRH-002 AVT-3 ISI Accept j\\/T-3Visual Examination Performed By PSEG Personnel Under i

a l

.W/O#

50059638 i

i Z

W/O# 50059638*

5083 7

j 1ASG-1 jV S

cet j VT-3 Visual Examination Performed By PSEG Personnel Under l

,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,',,,,,,,,,,,,,,,,,,t,,,,,,,,,,,,,,,,,,,,,,,,,,,,,'W9650593

Salem Nuclear Generating Station, Unit 1 ISI Program Long Term Plan RFO #16 ISI Examination Results Page 18 of 24 Revision 1 Accept VT-3 visual Examin

.WlO# 50059638 Wformled 586 1-I-2VT3 II Accept Vr-3 Visual Examination Performed By PSEG Personnel Under W/O# 50059638 508060 IA SIA 220 VT-3 ISI Accept VT-3 Visual Examination Performed By PSEG Personnel Under

WIO# 50059638 r-------------..-..........$

4,

.<rm m 4~44 4

A M ""~

508135

,P-SI-012

.VT-3 IS1 Accept

.VT-3 Visual Examination Performed ByPSEG Personnel Under

.W/O# 50059638 508140

,P-515-006 VT-3 IS Accept

,VT-3 Visual Examination Performed By PSEG Personnel Under

W/O# 50059638 511501 1CVE1I-VS-1 PT 181 Accept I Penetrant Examination performed by Framatome Personnel under I

t

,W/O# 50059638 511505 1CVE18

.VT-3 151 Accept VT-3 Visual Examination Performed By PSEG Personnel Under

,:W/O#

50059638 511506 1CVEI8-SWIJ

.UT-691 I51 Accept Ultrasonic performed by Framatome Personnel under Examination limited to 63.17% of code required coverage

W/O# 50059638 due to welded attachment and flange.

UT-45I IS1 Accept

  • Ultrasonic Examination performed by Framatome Personnel under Examination limited to 63.17% of code required coverage
W/O# 50059638 due to welded attachment and flange.

,UT-0° 18 Accept Ultrasonic Examination performed by Framatome Personnel under

.Examination limited to 63.17% of code required coverage

W/O# 50059638
due to welded attachment and flange.

511507 1CVE18-SWIJ-2 2 UT-0L Personnel

  • W/O#

50059638 towel ed atachmenL.

UT-45°S IS1 Accept Ultrasonic Examination performed by Framatome Personnel under Examination limited to 64% of code required coverage due

W/O# 50059638 to welded attachmenL U2000 1ACCA-05.T-3 I

Accept VTr-3 Visual Examination Performed By PSEG Personnel Under E

l J

.W/O# 50059638 520080 IAVC 00

.VT-3 11N Accept VT-3 Visual Examination Performed By PSEG Personnel Under W/O# 50059638 X

44:4 A4 920 W22VT 3-WbcetyT3VsalEaiaio efre BPSEG Personnel Under 932150 IVV-203 VT-3 OWN Accept

,VT-3 Visual Examination Performed By PSEG Personnel Under

,W/O# 50059638

Salem Nuclear Generating Station, Unit I ISI Program Long Term Plan RFO #16 ISI Examination Results Page 19 of 24 Revision I

,vI-3

V I-3 Visual Examin;
W/O# 50059638 Perorom

,ersonnel Under 9325 IVI20

.T-l O

N

  • Accept

.VT-3 Visual Examination Performed By PSEG Personnel Under W/O# 50059638 9300.VI30 T3i O

N Accept

Vr-3 Visual Examination Performed By PSEG Personnel Under W/O# 50059638 950000 iSPT-1-RC-001

,VT-2 ISI Accept

VT-2 Visual Examination Performed By PSEG Personnel Under IThe following Notifications were generated 20190767
W/O# 50059638 I1SS107 Packing Leak. 20190562 1PS29 Packing leak, a

20190546 lSS104 Packing leak, 20190542 lSS124 t,

,tubing leak.

950150

  • SPT-1-AF-003
Vr-2 ISI Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under l

  • W/O# 50059638 9522 ST--F-~tV-2II Accept

,VT-2 Visual Examination Performed By PSEG Personnel Under

.W/0# 50059638 9523 ST--B-02 VT2IS

  • Accept VT-2 Visual Examination Performed By PSEG Personnel Under

.::W/O#

50059638 9523.PT1-F-03.

T-l IS Accept

, VT-2 Visual Examination Performed By PSEG Personnel Under B

W/O# 50059638 9524.SP-1BF00

.T-X ISI

  • Accept

,VT-2 Visual Examination Performed By PSEG Personnel Under

W/O# 50059638 9526,PT1-A-02.V-2IS Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under

W/O# 50059638

_X.......

95020.SPT1 -C-00

. T-2 IS ccet

,VT7-2 Visual Examination Performed By PSEG Personnel Under t '

,W/O# 50059638 95000,ST--C-03 VT2 II1 Accept

, VT-2 Visual Examination Performed By PSEG Personnel Under i

g

.W/O# 50059638 950800

,SPT-1-CS-004 V-S cet.T2Vsa xmnto efre yPE esne ne 900 SP--S04VT-2 ISI Accept

.VT-2MVsual Examination Performed By PSEG Personnel Under

.W/O# 50059638

Salem Nuclear Generating Station, Unit 1 ISI Program Long Term Plan RFO #16 ISI Examination Results Page 20 of 24 Revision 1 I...

, C d e!;

a E~aii T pe Req ired:

tatus

~aK 950900

  • SPT-1-CV-002

,VT2 ISI Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under W/O# 50059638 951200

, SPT-1 -FP-001

.VT-2 ISI Accept VT-2 Visual Examination Performed By PSEG Personnel Under s

,t

.2.W/O#

50059638 951250

,SPT 1 GB-001 VT-2 ISI Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under s

.W/O# 50059638 951300

.SPT-1-MS-001

.\\VT-2 ISI Accept

,VT-2 Visual Examination Performed By PSEG Personnel Under

W/O# 50059638

__....M...

951350

.SPT-1-MS-002

.VT-2 ISI Accept VT-2 Visual Examination Performed By PSEG Personnel Under

W/O# 50059638 5...I.'5

'9 5 5' 5 w x. ~

  • 5

/

y l m f ~ m.' ~ n ~ l f

A ~ O A 'f...............

-"ss.s 951750

.SPT-1-SF-001 VT-2 ISI Accept

,VT-2 Visual Examination Performed By PSEG Personnel Under

aln

.W O

5....59.........

W/.50593 951850

.SPT-1-SJ-002

.VT-2 ISI Accept VT-2 Visual Examination Performed By PSEG Personnel Under W/O# 50059638 4

~~.

s..4..s4..

1 951900

.SPT-1-SJ-003

.VT-2 ISI Accept

,VT-2 Visual Examination Performed By PSEG Personnel Under

W/O# 50059638

¢ 9220

,SPT-t-SJ-009

.VT-2 II

'Acp T2Vsa xmnto efrndB SGPron ne 95250 SPT1-S-00

. T-2 gs 13I1 Accept VT-2 Visual Examination Performed By PSEG Personnel Under

-':s:4:4:::5:::

952250

,SPT-1-SS-001 VT-2 ISI I

Accept I VT-2 Visual Examination Performed By PSEG Personnel Under

_____.___.W/O#

50059638

<9550,ST1

-SS-00

. T2 i

II

,Acp T2Vsual Examination Performed By PSEG Personnel Under

'w t..

3

'.W/O#S/

50059638 952450 SPT-1 SS-005 VT-2 ISI Accept VT-2 Visual Examination Performed By PSEG Personnel Under

.WIO# 50059638 A

A 952500

SPT-1-SS-006 VT 13 Accept V-2 Visual Examination Performed By PSEG Personnel Under 33-007cVTp2 V1-2 Visual Examination Performed By PSEG Personnel Under 95255 SPTI f 31 AceptWIO# 50059638

Salem Nuclear Generating Station, Unit I ISI Program Long Term Plan RFO #16 ISI Examination Results Page 21 of 24 Revision 1

.4*4*4'4w::

44

.44.4.:.44..4.44..,,...:.

n CMd 952600 ISPT-1-SS-008 VT-2 IsI Accept jVT-2 Visual Examination Performed By PSEG Personnel Under

.W/O# 50059638

, NOWUIICdUOn f U 103001 WdS geneateu LU uocument

VT-2 Visual Examination Performed By PSEG Personnel Under W/O# 50059638 952700 SPT 1 8-010

  • VT 2 11 Accept VT-2 Visual Examination Performed By PSEG Personnel Under

.W/O# 50059638 9575.P-1SS01 V-2II

.Accept IVT-2 Visual Examination Performed By PSEG Personnel Under i

.W/O# 50059638 Mo

..:.4..4.4:444....

952750

.SPT 1 8-011*

VT-2 11 Accept VT-2 Visual Examination Performed By PSEG Personnel Under W/O# 50059638 952850

.PT 1 88-013 VT 2I Accept VT-2 Visual Examination Performed By PSEG Personnel Under 952900

SPT-1-SW-014
VT 2 181 Accept V`1-2 Visual Examination PeromdBPE esne ne

.W/O# 50059638 953000 SPT 148-016 VT-2 1I Accept VT-2 Visual Examination Performed ByPSEG Personne Under I

.4 W/O# 50059638 953300. SPT-1

-SW-006

.VT-2 18I Accept VT-2 Visual Examination Performed By PSEG Personnel Under Notlflcation# 20183565 was generated to document 4

.W/O# 50059638 at weld to pipe interface at valve 158W-228 953450

.SPT SW-009 VT-2 I181 Accept VT-2 Visual Examination Performed By PSEG Personnel Under

W/O# 50059638 9 4 44444. VT-2 4

I Accept Visual....

.x.............

P Und 953750 SPT-1-SW-025 VT-2 IS1 Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under 3:W/O# 50059638 953800 SPT I 8W-OlO aVT 2 181S Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under YtW/O# 50059638 444a4444444444444444444 444444044Wf42$.44l444Z4 4

A 4 4 4 4 4 4 4 4 W444444444444,4 953850 SPT I 8W-017 VT 2 181 Accept VT-2 Visual Examination Performed By PSEG Personnel Under 954150 8PT I 8W-023 VT-2 181S Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under

    • i*WIO#

50059638 444 44W 44Wl444 4444444'll44444444f 4 4 4'4 4444W4444

Salem Nuclear Generating Station, Unit I ISI Program Long Term Plan RFO #16 ISI Examination Results Page 22 of 24 Revision I IFBBS{W-,WI...,..

.S l........

'M 9550,ST1-W3

.V-V..is..xaiaio efomdByPE Prone ne R.uir d

$t fls.............1s 1

<I 945.ST1SW4034 VT-2 ISI

,Accept

,VT-2 Visual Examination Performed By PSEG Personnel Under W/O# 50059638 t

.9.'

954655

.SPT-1-SWVC40 VT-2 3

IS!

Accept

.VT 2Visual Examination PefrndBPSEG Personnel Under

  • i 5005 954750 iSPT- -VC-002 VT-2 ISI Accept VT-2 Visual Examination Performed By PSEG Personnel Under

____________W/O#

50059638 O M M

M

.. ~~y::::::

M.

954950

!SPT-1-WV-006

VT-2 IS!

Accept Vr-2 Visual Examination Performed By PSEG Personnel Under W/O# 50059638 i

955200 iSPT-1 WL-003 jVT-2 ISI Accept VT-2 Visual Examination Performed By PSEG Personnel Under W/0#50059638..

i 955250

,SPT-1-WL-04 VT-2 3

ISI Accept VT-2 Visual Examination Perforned By PSEG Personnel Under 3W/o# 50059638 P

95801 0 3 NR-SPT-1-BR-001 3 VT-2 AUG 3Accept 3VT-2 Visual Examination Performed.ByPSEG Personnel Under

3.

3W/O#

30076929

.3__

1 958020 3NRSPT-1-0S401 3VT-2 AUG Accept Vr-2 Visual Examination Performed By PSEG Personnel Under a

.W/0#

500595638i 958030 i

-SPT-1-W 400 IVT-2 IAUG i

Accept jVT-2 Visual Examination Performed By PSEG Personnel Under W/O# 30049511

.......~vv

~

'"~~

W 44 Wfflf

.- no.e...........

958040

'jNR-SPT-1 -CV4010i VT-2 s3 AUG fiAccept

'iVT-2 Visual Exmnao Pefre By PSEG Personnel Under 3

vwfW0#0749 958050

!NRSPT-1-CV-02 iVT-2 AUG Accept VT-2 Visual Examination Performed By PSEG Personnel Under

$$~
i i

.W/O# 30077180 P

958060 jNR-SPT-1-CV-03 jVT-2 AUG Accept

-2 2VisualExaminaioneGPersonnel Under Notification#20180566wasgeneratedtodocument2 S

M<fA i'~:.:.:.:.:.:.r~

j""'~"~'

j~W/0# 30073177

,DPMleakonvalve1CV-299 j

958070 NR-SPT-1-CV-04 VT-2 AUG Accept VT-2 Visual Examination Performed ByPSEG Personnel Under W/O# 30075840 958030...........

NR.SPT..1.CS..002 r-AU Accept...........................

Visual... Examination Performed. By..........

PSEG Personnel Under.,

Salem Nuclear Generating Station, Unit 1 ISI Program Long Term Plan RFO #16 ISI Examination Results Page 23 of 24 Revision I I

T 958080

.NR-SPT-1-CV-005

.VT-2 AUG Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under W/O# 30077387 958090

  • NRSPT-1-CV-006 VT2 AUG

.Accept

,VT2 Visual Examination Performed By PSEG Personnel Under 30071240

.X

/

X.......

95800 NR-SPT-1-CV-007 VT-2 AUG Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under

W/O# 30078567 958120 NR-SPT-1-RH4002

.VT-2 AUG

.Accepot eVT-2 Visual ExaminationPerformed By PSEG Personnel Under M.

.WO# 3007851 1 958130

.NR-SPT-1-RH-001 VT-2 AUG Accept

,VT-2 Visual Examination Performed By PSEG Personnel Under A,

,W/IO# 30078650 958140

.NR-SPT-1-SI-001

,VT-2 AUG I Accept

.VT-2 Visual Examination Performed By PSEG Personnel Under

.W/O# 30078568

,flrn ln m

cc.. cM

~ cc:ccc:.c........

f 958120 iNR-SPT-1-SI-02 VTAc-2V2sualExaminationPerformedByiSEGPersonnelUnder t

E i

i WIO# 300785184 958130

,NR-SPT-1-SI-003

,VT-2 AUG Accept VT-2 Visual Examination Performed By PSEG Personnel Under Notiflcation#20186882wasgeneratedtodocument1 3

____3_

W/O# 30078499 DPM leak on 60lve ISJ-178 I 958160 NRSPT-1-SS-001 iVT-2 AUG Accept iVT-2 Visual Examination Performed By PSEG Personnel Under

,Notifcation# 20178513 was generated to document Dried,

.c~0O~t 3MAcccMc W/0# 30075676 ronPonvalM 1SS-33 g 95170iNRSPT1-S402iVT2 AG 3Accpt VT 2 Visual Examination Performed By PSEG Personnel Under 3,3 3

WIO# 30077565 958180 3NR SPT-1-SS-03 VT22 AUG Accept

VT 2VisualExamination PerformedByPSEGPersonnel Under 3

3W/O#

30076071 ccc~c0~0cx~~xc0.<~.~nm &wA~

I`c c

ccc.

958190 jNR SPT-1-SS-004 3VT 2 j AUG Accept iVT 2 Visual Examination Performed By PSEG Personnel Under NR ii~cc$~

3

.~

W/O 300721 1

958200 NRSPT-1-WG-O01 jVT-2 AG Accept jT2iulxmntnefre~PE~ronlne AUG W/O# 30093656 Pefre By PSGProne ne 958210

!NR SPT-1-WG-002 VT-2 AUG Accept VT-2 Visual Examination Performed By PSEG Personnel Under 3

W/O# 30074795 3

.3 9517 V1-Visa Eainto Pefre yP esne ne

Salem Nuclear Generating Station, Unit 1 ISI Program Long Term Plan RFO #16 ISI Examination Results Page 24 of 24 Revision I

,vI-Z MUu Accept

  • -VI-Z VlSUal tXat~TII

',W/O# 30095232

,"UxmeCU U rlff5u"nul urfuer 9523 N-PT1-G-0 v-2AG Accept

vT7-2 VMsual Examinatlons Perfoxmed By PSEG Perscrtnel Under

.'WIO#

30076273 9524 N-PT1-G-0 v-2AG Accept IvT-2 Visual Examination Performed By PSEG Personnel1 Under

.W/O# 30074996 95850,N-ST-*WG00

.vT2 AG

.Acctept

.'vT-2 v'isual Examinatlort Performed By PSEG Personnel Under i

W/O# 30075040 95860, R-ST-

-G-07

'T-AG

  • ,Accept.vT-2 'visual Examinatiort Performed By PSEG Personnel Under

,W/O# 30075542 95865. R-PT1-G-08, T-AG

,Acceptt

.vT-2 Visual Examinattcrt Performed By PSEG Personnel Under l

,W/O# 30075195 95870. N-ST-1-W-00

,vT-AG

'Accept

.vT-2 Visual Examinatiort Performed By PSEG Persontnel Under

~

.W/O# 30076290

LR-N04-0328 Document Control Desk ENCLOSURE 4 (Pages - 33)

Form OAR-1, Table I SALEM NUCLEAR GENERATING STATION UNIT 1 RFO #16 IWE EXAMINATION RESULTS

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan RFO #16 IWE Examination Results Page 1 Revision 0 UUtUAk4dN I A FROM 78 TO 100 OOOA-078 Performed Under Order#

50059638 INSIDEtU CONTAINMENT: Containment uner insulated 78' to 100', Notification 20184798 rust floor area.

examination performed this exam can only be performed from Inside containment 820100 LNR-S1-QUAD-QUADRANT B MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: EI.78', A13, Floor to liner, OUTSIDE CONTAINMENT: No outside OOOB-078 FROM 78 TO 100 Performed Under Orderu exposed rust through coated surface (medium),

examination performed this exam can only be 50059638 Rusting <Grade 7-2, Notification 20064308 generated performed from inside containment previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1RF17 820200 LNR-S1-QUAD-QUADRANT C MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Containment Uner OUTSIDE CONTAINMENT: No outside OOOC-078 FROM 78 TO 100 Performed Under Orderff insulated 78' to 100, Notification 20184798 rust floor examination performed this exam can only be 50059638

area, performed from inside containment 820300 LNR-S1-QUAD-QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: El.92' by Elevator, OUTSIDE CONTAINMENT: No outside OOOD-078 FROM 78 TO 100 Performed Under Order#

stairway landing, exposed Liner coated surface area examination performed this exam can only be 50059638 has light rust. Rusting <Grade 7-2, Notification performed from inside containment 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 820400 LNR-S1-QUAD-QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Containment Uner OUTSIDE CONTAINMENT: No outside OOOA-100 FROM 100 TO 130 Performed Under Order#

insulated 100, up to 110:. Above 110' liner has misc examination performed this exam can only be 50059638 rust areas(<Grade 7-2) and paint Is chipped performed from Inside containment Notification 20064308 generated Nuts order 80028034 created, to perform eval. Notification 20199451 generated to Iniiate NUCM for Impilmentatlon during 1RF17 820500 LNR-S1-QUAD-QUADRANT B MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

EI.110' Above SW FC OUTSIDE CONTAINMENT: No outside OOOB-100 FROM 100 TO 130 Performed Under Order#

pipe(13SW65) Debri in area of Inspection 4' xl' high examination performed this exam can onlybe 50059638 behind Y2 piping that Is cut off and abandoned. Loc.

performed from inside containment A13. Notification 20064308 generated previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during IRF17

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan Page 2 Revision 0 LNX-S1-QT OOOC-100 QUADRANT C

FROM 100 TO 130 v-1-G Visual Examination Performed Under Order#

50059638 INSIDE CONTAINMENT: Containment Uner Insulated 100' up to 110'. Above 110' linerhas misc rust areas(<Grade 7-2) and paint Is chipped off.

Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during IRF17 OUTSIDE CONTAINMENT: No outside examination performed this exam can only be performed from inside containment.

820700 LNR-S1-QUAD-QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Containment Uiner OUTSIDE CONTAINMENT: No outside OOOD-100 FROM 100 TO 130 Performed Under Order#

insulated 100' up to 1 10. Above 110' liner has misc examination performed this exam can only be 50059638 rust areas (<Grade 7-2) and paint Is chipped off.

performed from Inside containment.

Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during I RF17 820800 LNR-S1-QUAD-QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: EI.130' to EI.160' Behind OUTSIDE CONTAINMENT: No outside OOOA-130 FROM 130 TO 218 Performed Under Order#

Fan Coil Units Coating is chipped, light to medium rust examination performed this exam can only be 50059638

(<Grade 7-2), and liner coated surfaces are stained.

performed from Inside containment.

Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for Implimentation during 1RF17 820900 LNR-S1-QUAD-QUADRANT B MC Visual vT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

EI.130' to EI.160' Behind OUTSIDE CONTAINMENT: No outside 0008-130 FROM 130 TO 218 Performed Under Order#

Fan Coil Units Coating Is chipped, light to medium rust examination performed this exam can only be 50059638

(<Grade 7-2), and liner coated surfaces are stained.

performed from inside containment.

Notification 20064308 generated previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for implimentation during I RF17

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan RFO #16 IWF Fxaminatinn Reisuts Page 3 Revision 0 UUADRANI L

FROM 130 TO 218 000C-130 v I-G visual Examination Performed Under Order#

50059638 INSIDU UUN I AINMEN T: E:.14W Next to Equipment Hatch Cover storage location. 2 studs 1/4" x 2 1/2" heavy rust attached to liner and 2 studs 1/4' x 1" heave nust attached to liner, No recordable loss of metal Not 20064412, generated previous Identified condition still exists. Nuts order 80028037 created, to perform eval.

Notification 20199451generated to Initiate NUCM for implimentation during 1RF17 OUTSIDEL~ CUNTAINMEN T: NO outside examination performed this exam can only be performed from Inside containment 821100 LNR-S1-QUAD-QUADRANT D MC Visual VT-G Accept VT-G Vsual Examination INSIDE CONTAINMENT: El.134,comingoutof OUTSIDE CONTAINMENT: Nooutside OOOD-130 FROM 130 TO 218 Performed Under Order#

airlock to right past vent duct 4 %" studs protruding fr. examination performed this exam can only be 50059638 Wall. Heavy rust but no measurable depth Not.

performed from Inside containment 20064412, generated previous Identified condition still exists. Nuts order 80028037 created, to perform eval.

Notification 20199451generated to initiate NUCM for Implimentation during 1RF17 821200 LNR-S1-QUAD-QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Welded attachments to OUTSIDE CONTAINMENT: No outside OOOA-218 FROM 218 TO 288 Performed Under Order#

liner are rusted. Not 20064412. generated previous examination performed this exam can only be 50059638 Identified condition still exists. Nuts order 80028037 performed from inside containment created, to perform eval. Notification 20199451generated to initiate NUCM for Implimentation during IRF17 821300 LNR-Sl-QUAD-QUADRANT B MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Welded attachments to OUTSIDE CONTAINMENT: No outside OOOB-218 FROM 218 TO 288 Performed Under Order#

liner are rusted. Not 20064412, generated previous examination performed this exam can only be 50059638 Identified condition still exists. Nuts order 80028037 performed from Inside containment.

created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1RF17 821400 LNR-S1-QUAD-QUADRANT C MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Welded attachments to OUTSIDE CONTAINMENT: No outside 000C-218 FROM 218 TO 288 Performed Under Order#

liner are rusted.Not 20064412, generated previous examination performed this exam can only be 50059638 Identified condition still exists. Nuts order 80028037 performed from Inside containment.

created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan RFO #i16 IWE Exmintfion Resiuts Page 4 Revision 0 LNO-21 8-OOOD-218 FROM 218 TO 288 Vi -u visuai axamination Performed Under Order#

50059638 INSIDE UUN1AINMLNi: weiaed attacnments to liner are rusted. Not. 20064412, generated previous identified condition still eodsts. Nuts order 80028037 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 examination performed this exam can only be performed from Inside containment.

821600 MBR-S1-QUAD-QUAD A MOIST MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:EI.78' to 90 from Pen 1-33 OUTSIDE CONTAINMENT: No outside OOOA-078 BAR 78 EL 270/0 Performed Under Order#

to 1-56 Insulation cover stained with rust and Insulation examination performed this exam can only be DEG 50059638 hold down studs deteriorated and missing. Not.

performed from Inside containment.

20064417, generated previous Identified condition still exists. Nuts order 80028037 created, to perform eval.

Notification 20199451generated to Initiate NUCM for Implimentafton during IRFI7 821700 MBR-S1-QUAD-QUAD B MOIST MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:EI. 78' to 92, from Pen 1-4 OUTSIDE CONTAINMENT: No outside OOOB-078 BAR 78 EL 0/90 Performed Under Order#

to Al1 insulation hold down studs deteriorated and examination performed this exam can only be DEG 50059638 missing. Not. 20064417, Order 60020583 WIP performed from Inside containment.

04/23/04 for hold down stud Issue, Nuts order 80028037 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 821800 MBR-S1-QUAD-QUAD C MOIST MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:EI. 78' to 90', A5, 20' wide OUTSIDECONTAINMENT: No outside OOOC-078 BAR 78 EL 90/180 Performed Under Order area insulation hold down studs deteriorated and examination performed this exam can only be DE 50059638 missing Not. 20064417. generated previous Identified performed from inside containment condition still exists. Nuts order 80028037 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during I RF17 821900 MBR-S1-QUAD-QUAD D MOIST MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:general maintenance OUTSIDE CONTAINMENT: No outside OOOD-078 BAR 78 EL.

Performed Under Order#

required for caulking, Not 20064417, generated examination performed this exam can only be 1801270 DEG 50059638 previous Identified condition still exists. Nuts order performed from Inside containment.

80028037 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during IRF17

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan RFO #16 IWE Examination Results Page 5 Revision 0 MECH PEN AT 108 EL.

VT-G Visual Examination Performed Under Order#

50059638 INSIDE CONTAINMENT: Coated area is peeling or no longer exdsts. No loss of metal Is noted. Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to Initiate NUCM for implimentation during 1RF17 OUTID1UE CONTAINMENT:

Medium rUst, no measurable loss of metal. Not 20064414, previous Identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to initiate NUCM for Implimentation during 1RF17 822100 PEN-S1-M-02 QUADRANT B MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coated area Is peeling or OUTSIDE CONTAINMENT:

Blistering rust MECH PEN AT 108 Performed Under Order#

no longer exists. No loss of metal Is noted. Notification > Grade 7-2(ASTM D 610), no measurable EL 50059638 20064308 generated previous identified condition still loss of metal.NoL 20064392, -previous exists. Nuts order 80028034 created, to perform eval. Identified condition still exdsts. Nuts order Notification 20199451generated to initiate NUCM for 80028034 created, to perform eval.

implimentation during 1 RF17 Notification 20199451generated to Initiate NUCM for Implimentation during 1 RF17 822200 PEN-S1-M-03 QUADRANT D MC Visual vT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coated area Is peeling or OUTSIDE CONTAINMENT: Medium rust, MECH PEN AT 108 Performed Under Order#

no longer exists. No loss of metal Is noted.

no measurable loss of metal. Not 20064414, EL 50059638 Notification 20064308 generated previous Identified previous Identified condition still exists. Nuts condition still exists. Nuts order 80028034 created, to order 80028034 created, to perform eval.

perform eval. Notification 20199451generated to Notification 20199451generated to Initiate initiate NUCM for Implimentation during IRF17 NUCM for Implimentation during 1RF17 822300 PEN-S1-M-04 QUADRANT C MC Visual vT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coated area Is peeling or OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 108 Performed Under Order#

no longer exists. No loss of metal Is noted.

EL.

50059638 Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during IRF17

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan RFO t

6l IW FyExmination Resuilts Page 6 Revision 0 822400 WUAUINIM4I A

MECH PEN AT 107 EL.

V I-G visual ExaminaUon Performed Under Order#

50059638 INSIDE OUNTAINMENT: Coated area Is peeling or no longer exdsts. No loss of metal Is noted.

Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 OUSID CO~i UNTAINMENT:

MeOium ruSt, no measurable loss of metal. Not 20064414,

-previous Identified condition still exists.

Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 822500 PEN-S1-M-06 QUADRANT B MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Blistering rust MECH PEN AT 96 Performed Under Order#

(ASTM D 610) Notification 20064308 generated

> Grade 7-2(ASTM D 610), no measurable EL 50059638 previous Identified condition still exists. Nuts order loss of metal. Paint peeling on bottom.Not 80028034 created, to perform eval. Notification 20064392 -previous Identified condition still 20199451 generated to initiate NUCM for exists. Nuts order 80028034 created, to implimentation during IRF17 perform eva!. Notification 20199451generated to initiate NUCM for implimentation during 1RF17 822600 PEN-S1-M-07 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Acceptable MECH PEN AT 96 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL.

50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 822700 PEN-S1-M-08 QUADRANT C MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Blistering rust MECH PEN AT 96 Performed Under Order#

(ASTM D 610) Notification 20064308 generated

> Grade 7-2(ASTM D 610), no measurable EL 50059638 previous Identified condition still exists. Nuts order loss of metal.Not 20064392 -previous 80028034 created, to perform eval. Notification identified condition still exIsts. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

implimentation during I RF17 Notification 20199451 generated to Initiate NUCM for Implimentation during 1RF17 822800 PEN-S1-M-09 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during IRF17

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan RFO #16 IWE Examination Results Page 7 Revision 0 MECH PEN AT 85 EL V I-visual Examination Performed Under Order#

50059638 INSIDE CON I INMtN I:.CoatUng c Grade 7-2 (ASTM D 610) Notification 20064308 generated previous Identified condition still exdsts. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 823000 PEN-S1-M-11 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Acceptable MECH PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 823100 PEN-S1-M-12 QUADRANT D MC Visual vT-G Accept VT-G Visual ExamInation INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Blistering rust MECH PEN AT 85 Performed Under Order#t (ASTM D 610) Notification 20064308 generated

> Grade 7-2(ASTM D 610), no measurable EL 50059638 previous identified condition still exists. Nuts order loss of metal.Not 20064392 -previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 20199451 generated to Initiate NUCM for 80028034 created, to perform eval.

Implimentation during 1RF17 Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 823200 PEN-S1-M-13 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Blistering rust MECH PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated

> Grade 7-2(ASTM D 610), no measurable EL 50059638 previous Identified condition still exists. Nuts order loss of metal.Not. 20186505.

80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 823300 PEN-SI-M-14 QUADRANT D MC Visual VT-G Accept VT-G Visual ExamInation INSIDE CONTAINMENT: CoaUng < Grade 7-2 OUTSiDE CONTAINMENT: Acceptable MECH PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL.

50059638 previous Identified condition still exdsts. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during IRF1_7

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan RFO #16 IWE Examination Results Page 8 Revision 0 I........................

MECH PEN AT 88 EL VT-U Visual Examination Performed Under Order#

50059638 INSIDE CONTAINMENT:

Coating < Grade 7-2 (ASTM D 610) Notification 20064308 generated previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451 generated to Initiate NUCM for Implimentation during 1RF17 823500 PEN-S1-M-16 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Acceptable MECH PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL 50059638 previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during IRF17 823600 PEN-S1-M-17 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1RF17 823700 PEN-S1-M-18 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating <Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 88 Performed Under Order (ASTM D 610) Notification 20064308 generated EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1RF17 823800 PEN-S1-M-19 QUADRANT D MC Visual VT-G Accept Vr-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Blistering rust MECH PEN AT 124 Performed Under Order#

(ASTM D 610) Notification 20064308 generated

> Grade 7-2(ASTM D 610), no measurable EL 50059638 previous Identified condition still exists. Nuts order loss of metal.Not 20064392 -previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

implimentation during 1RF17 Notification 20199451generated to initiate NUCM for Implimentation during 1RF17 Not. 20186622 Guard coat peeling off

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan RFA l16A IWF Fxnminntifnn RPaidtf Page 9 Revision 0 UUADRANT D MECH PEN AT 124 EL VT-G visual Examinaton Performed Under Order#

50059638 INSIDE CUNTAINMENT:

Coating < Grade 7-2 (ASTM D 610) Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 OUTSIDE CONTAINMENT: Paint Peeling, Blistering rust > Grade 7-2(ASTM D 610),

no measurable loss of metal.Not 20064392.

previous Identified condition still exdsts. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to Initiate NUCM for Implimentation during 1 RF17 Not. 20186622 Guard coat peeling off 824000 PEN-S1-M-21 QUADRANT D MC Visual Vr-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Acceptable MECH PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL.

50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during IRF17 824100 PEN-S1-M-22 QUADRANT D MC Visual VT-G Accept Vr-G Visual Examination INSIDE CONTAINMENT:

Coating <Grade 7-2 OUTSIDE CONTAINMENT:

Acceptable, MECH PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Not 20186624 - GUARD COAT EL.

50059638 previous Identified condition still exists. Nuts order RUSTING/SCALING 80028034 created, to perform eval. Notification 20l99451generated to Initiate NUCM for Implimentation during 1RF17 824200 PEN-S1-M-23 QUADRANT D MC Visual VT-G Accept VT-G Visual Examinaton INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 88 Performed Under Order#

(ASTM D610) Notification 20064308 generated EL.

50059638 previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 824300 PEN-S1-M-24 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Acceptable MECH PEN AT 85 Performed Under Order#

(ASTM D610) Notification 20064308 generated EL.

50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1RF17

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan RFO #16 IWE Examination Results Page 10 Revision 0 AUrUN4 IU MECH PEN AT 85 EL V I -D

-lUdlClliidU Performed Under Order#

50059638 INSIDE CONTAINMENT: Coating < Grade 7-2 (ASTM D 610) Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during IRF17 824500 PEN-S1-M-26 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Acceptable MECH PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL 50059638 previous Identified condition still exdsts. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for Implimentation during 1RF17 824600 PEN-S1-M-27 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL 50059638 previous Identified condition still endsts. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 824700 PEN-S1-M-28 QUADRANT A MC VT-G Visual Examination INSIDE CONTAINMENT:

Inaccessible, Containment OUTSIDE CONTAINMENT: Inaccessible, MECH PEN AT 70 Performed Under Order#

Sump Containment Sump EL 50059638 824800 PEN-S1-M-29 QUADRANT D MC VT-G Visual Examination INSIDE CONTAINMENT: Inaccessible, Containment OUTSIDE CONTAINMENT: Inaccessible, MECH PEN AT 70 Performed Under Order#

Sump Containment Sump EL.

50059638 824900 PEN-S1-M-30 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Coating <

MECH PEN AT 50 Performed Under Order#

(ASTM D 610) SJ44 vIv roomNotification 20064308 Grade 7-2 (ASTM D 610) Notification EL 50059638 generated previous Identified condition still exists.

20064308 generated previous Identified Nuts order 80028034 created, to perform eval.

condition still exists. Nuts order 80028034 Notification 20199451 generated to Initiate NUCM for created, to perform eval. Notification implimentatIon during 1RF17 20199451generated to Initiate NUCM for Implimentation during 1RF17

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan RFO 16 IWE Examination Results Page I 1 Revision 0

UUAUKANI, I

U MECH PEN AT 50 EL vT-G Visual Examination Performed Under Order#

50059638 P40ILJbIr.

N I AlINMtN4 1:

uoaung c. '

e (ASTM D 610) SJ44 vAv room Notification 20064308 generated previous identified condition still exists.

Nuts order 80028034 created, to perform eval.

Notification 20199451generated to initiate NUCM for Implimentatlon during 1RF17 UU I ::ilUt bUN ItiIiNIVIt4 1:

sauIg Grade 7-2 (ASTM D 610) Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during IRF17 825100 PEN-S1-M-32 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 88 Performed Under Order#

(ASTM D 610) Not. 20064308, Nuts order created, EL 50059638 previous Identified condition still exists.

825200 PEN-S1-M-33 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Acceptable MECH PEN AT 85 Performed Under Order#

(ASTM D 610)

Notification 20064308 generated EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451 generated to Initiate NUCM for implimentation during 1RF17 825300 PEN-S1-M-34 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coabng < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for implimentation during 1RF17 825400 PEN-S1-M-35 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coatng < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL.

50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1 RF1 7 825500 PEN-S1-M-36 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:EI.85', Stairwell by Elevator, OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 85 Performed Under Order#

Pen 1-36, Two pitted areas Identified. Neither have a EL 50059638 depth greater than 1116' deep and are from exisUng welding that was performed on the penetration

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan PFI

  1. 16 IWF Fxaminatinn Resuits Page 12 Revision 0 QUADRANT D MECH PEN AT 90 EL.

v I-G visual Examinaton Performed Under Order#

50059638 (ASTM D 610) Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notiflcation 20199451generated to Initiate NUCM for implimentation during 1RF17 825700 PEN-S1-M-38 QUADRANT D MC vT-G Visual Examination INSIDE CONTAINMENT:lnaccessible, requires OUTSIDE CONTAINMENT:

Inaccessible, FUEL TRANS TUBE Performed Under Order#

removal of Concrete Plug requires removal of Concrete Plug AT 91 EL 50059638 825750 PEN-S1-M QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

No recordable findings OUTSIDE CONTAINMENT: Acceptable BLIND FLANGE FUEL TRANS TUBE Performed Under Order#

AT 91 EL 150059638 825800 PEN-S1-M-39 QUADRANT D MC Visual VT-G Accept T-G Visual Examinaton INSIDE CONTAINMENT:

Coatng < Grade 7-2 OUTSIDE CONTAINMENT:

Paint Peeling, MECH PEN AT 88 Performed Under Order (ASTM D 610) Notification 20064308 generated Blistering rust < Grade 7-2(ASTM D 610),

EL.

50059638 previous Identified condition still exists. Nuts order no measurable loss of metal. Notification 80028034 created, to perform eval. Notification 20064308 generated previous Identified 20199451generated to Initiate NUCM for condition still exists. Nuts order 80028034 implimentation during 1RF17 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during IRF17 Not 20186625 Guard coat peeling off 825900 PEN-S1-M-40 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 124 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 826000 PEN-S1-M-41 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL.

50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan DEr1 4an r Ad RIw 00 m;5 n1.ri Dic! lVi-to Page 13 Revision 0 i u MECH PEN AT 88 EL V 1'NJ VisUal LAI IIIIMAu I

Performed Under Order#

50059638 ItIt UUNLjr IIl 11%1IN~rtN 1:' %;oalmg

< weae {-e (ASTM D 610) Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 826200 PEN-S1-M-43 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL 50059638 previous Identified condition still exdsts. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 826300 PEN-S1-M-44 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating c Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Service water Insulation EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 826400 PEN-S1-M-45 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Service water insulation EL 50059638 previous Identfied condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1RF17 826500 PEN-S1-M-46 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 90 Performed Under Order#

(ASTM D610) Notification 20064308 generated Service water Insulation EL.

50059638 previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 826600 PEN-S1-M-47 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 88 Performed Under Order#

(ASTM D610) Notification 20064308 generated Service water Insulation EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1RF17

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan RFC) #IA IWF Fvnminnfinn RP:atilf Page 14 Revision 0 MECH PEN AT 85 EL VT-G Visual Examination Performed Under Order#

50059638 INSIDE CONTAINMENT: Coating < Grade 7-2 (ASTM D 610) Notification 20064308 generated previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 OUTSIDE CUNTAINME Service water Insulation 826800 PEN-S1-M49 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Service water Insulation EL.

50059638 prevIous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during IRF17 826900 PEN-S1-M-50 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Service water Insulation EL.

50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1RF17 827000 PEN-S1-M-51 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coatng < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Service water Insulation EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 827100 PEN-SI-M-52 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Service water Insulation EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for Implimentation during 1RF17 827200 PEN-S1-M-53 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Acceptable MECH PEN AT 85 Performed Under Order#

(ASTM D610) Notification 20064308 generated Service water Insulation EL 50059638 previous Identified condition sUtI exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during IRF17

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan RFA #f1 IWF xFamination Resuitsc Page 15 Revision 0 MECH PEN AT 88 EL VI -G visual Examination Performed Under Order#

50059638 INSIDE CUNTAINMENT: Coaing < Grade 7-2 (ASTM D 610) Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 OUTSIDE CONTAINME Service water Insulation 827400 PEN-S1-M-55 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentatlon during 1RF17 827500 PEN-S1-M-56 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable, MECH PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Not. 20186627 Guard coat Is scaling In EL 50059638 previous Identified condition still exists. Nuts order areas 80028034 created, to perform eval. Notification 20199451 generated to Initiate NUCM for Implimentation during IRF17 827600 PEN-S1-M-57 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1RF17 827700 PEN-S1-M-58 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 90 Performed Under Order#

(ASTM D 610) Not. 20064309, generated previous EL 50059638 Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1RF17 4 nuts/ threads not fully engaged Not.20187586 generated 827800 PEN-S1-M-59 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coatng < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 90 Performed Under Orderf (ASTM D 610) Notification 20064308 generated EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan Page 16 Revision 0 QUADRANT D MECH PEN AT 88 EL.

VT-G Visual Examination Performed Under Order#

50059638 INI't40ILi

'.%.J'4 It41Vi A

I l; S.aug e

(ASTM D 610) Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentatlon during 1RF17 828000 PEN-S1-M-61 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for Implimentatlon during 1RF17 828100 PEN-S1-M-62 QUADRANT D MC Visual Vr-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating <Grade 7-2 OUTSIDE CONTAINMENT: Blistering rust MECH PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated

< Grade 7-2(ASTM D 610), no measurable EL 50059638 previous Identified condition still exists. Nuts order loss of metal. Not 20064308, Not 80028034 created, to perform eval. Notification 20186629 Guard coatring Is loss In areas 20199451generated to initiate NUCM for and rusting implimentation during 1RF17 828200 PEN-S1-M-63 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable, MECH PEN AT 90 Performed Under Order#

(ASTM D610) Notification 20064308 generated Not 20186628 Guard coating Is loss In EL.

50059638 previous Identified condition still exists. Nuts order areas and rusting 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17.

828300 PEN-S1-M-64 QUADRANT D MC VT-G Visual Examination INSIDE CONTAINMENT:

NWS(not in IWE OUTSIDE CONTAINMENT:

NWS(Not FUEL TRANS TUBE Performed Under Order#

program)

\\ithin scope of IWE)

AT 91 EL 50059638 828400 PEN-S1-M-65 QUADRANT D MC VT-G Visual Examination INSIDE CONTAINMENT: NWS(not In IWE OUTSIDE CONTAINMENT:

NWS(Not MECH PEN AT 91 Performed Under Order#

program)

\\ithin scope of IWE)

EL 50059638 828500 PEN-S1-M-66 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL.

50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451 generated to Initiate NUCM for implimentation during IRF17

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan A

~~~.

I.

Page 17 Revision 0 QUADRANT D MECH PEN AT 88 EL.

V U-W VIbUdI

-A I IIIIAuUI Performed Under Order#

50059638 (ASTM D 610) Notification 20064308 generated previous Identified condition sIll exdsts. Nuts order 80028034 created, to perform eval. Notiflcation 20199451generated to Initiate NUCM for Implimentation during IRF17 828700 PEN-S1-M-68 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Acceptable MECH PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL 50059638 previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for Implimentation during 1RF17 828800 PEN-SI-M-69 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coatng < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 90 Performed Under Order (ASTM D 610) Notification 20064308 generated EL.

50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for implimentation during 1RF17 828900 PEN-S1-M-70 QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL.

50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1RF17 829000 PEN-S1-M-71 QUADRANT D MC Visual VT-G Accept VT-G Visual Examinafton INSIDE CONTAINMENT:

Coatng < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable MECH PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL 50059638 previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for Implimentation during 1 RF17 829200 PEN-S1-E-01 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Inaccesible, ELECT PEN AT 90 Performed Under Order (ASTM D 610) Notification 20064308 generated Covered by fire sheilding EL.

50059638 previous Identified condition still exists. Nuts order 80028034 created, to perforrmi eval. Notification 20199451generated to initiate NUCM for implimentation during IRF17

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan RFO #16 IWE Examination Results Page 18 Revision 0 U uArU i'd I /A ELECT PEN AT 90 EL VT-G Visual Examination Performed Under Order#

50059638 INSIDE COU I AINMJEN I:

Coating < Grade 7-L (ASTM D 610) Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1RF17 UU I Ut:

UN1IANM1N1: minor paint chipping, no measurable loss of metal Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to Initiate NUCM for Implimentation during I RF17 829400 PEN-S1-E-03 QUADRANT A MC Visual VT-G Accept vT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

Implimentation during 1 RF17 Notification 20199451generated to initiate NUCM for Implimentation during 1 RF17 829500 PEN-S1-E-04 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: CoaUng <Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

Implimentation during 1RF17 Notification 20199451generated to initiate NUCM for Implimentation during IRF17 829600 PEN-SI-E-05 QUADRANT A MC Visual Vr-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating c Grade 7-2 OUTSIDE CONTAINMENT:

Minor paint ELECT PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451 generated to initiate NUCM for 80028034 created, to perform eval.

Implimentation during 1RF17 Notification 20199451generated to Initiate NUCM for Implimentation during IRF17

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan RFO #16 IWE Examination Results Page 19 Revision 0 QUADKANI A ELECT PEN AT 90 EL Performed Under Order#

50059638 INSIDE J

..UN Ai NNMWIN : Coaung -crade,-z (ASTM D 610) Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for implimentation during IRF17 UU I OIUL SA.UNI I Al"M4INf 1:

IVIIIIU paldit chipping, no measurable loss of metal Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451 generated to Initiate NUCM for implimentation during 1RF17 829800 PEN-S1-E-07 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coatng Grade 7-2 OUTSIDE CONTAINMENT: Acceptable.

ELECT PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL.

50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for Implimentation during IRF17 829900 PEN-S1-E-08 QUADRANT A MC

\\Vsual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating <Grade 7-2 OUTSIDE CONTAINMENT:

Inaccesible, ELECT PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Covered by fire sheilding EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for implimentation during IRF17.

830000 PEN-S1-E-09 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDECONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Minor paint ELECT PEN AT 90 Performed Under Order (ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 20199451 generated to initiate NUCM for 80028034 created, to perform eval.

Implimentation during 1RF17 Notification 20199451generated to Initiate NUCM for Implimentation during 1 RF17 830100 PEN-S1-E-10 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

No recordable findings OUTSIDE CONTAINMENT:

Minor paint ELECT PEN AT 90 Performed Under Order#

chipping. no measurable loss of metal EL 50059638 Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to initiate NUCM for Implimentation during 1RF17

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan RFO #16 IWE Examination Results Tyi*pi Page 20 Revision 0 UUAUKANTI A ELECT PEN AT 90 EL Performed Under Order#

50059638 INSIDE CONTAINMENT: Elec. Pen 1-11, Electrical Protective Cover Is off; Pen surface has light rust no measurable loss of metal noted. Not.20064590, Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 JU I bIUt G

4 I tlNII 1:

M r

IVaIfl" PIln chipping, no measurable loss of metal Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 830300 PEN-S1-E-12 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 88 Performed Under Order (ASTM D610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451generated to initiate NUCM for 80028034 created, to perform eval.

implimentation during IRF17 Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 830400 PEN-Sl-E-13 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451generated to initiate NUCM for 80028034 created, to perform eval.

Implimentation during IRF17 Notification 20199451generated to Initiate NUCM for Implimentation during 1 RF17 830500 PEN-S1-E-14 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Inaccesible, ELECT PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Covered by fire sheiding EL.

50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1RF17 830600 PEN-S1-E-15 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Inaccesible, ELECT PEN AT 90 Performed Under Order#

(ASTM D610) Notification 20064308 generated Covered by fire sheilding EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1 RF1 7

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan RFO #16 IWE Fxamination Results Page 21 Revision 0 QUADRANT A ELECT PEN AT 85 EL VT-G Visual Examination Performed Under Order#

50059638 INSIDE CONTAINMENT:

Coating <Grade 7-2 (ASTM D 610) Notification 20064308 generated previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 U ~~~~.;.

twiz;;.Sv OUTSIDE CONTAINMENT:

Minor paint chipping, no measurable loss of metal Notification 20064308 generated previous identified condition still e)dsts. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to Initiate NUCM for Implimentation during I RF17 830800 PEN-S1-E-17 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform mval.

Implimentation during 1 RF17 Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 830900 PEN-S1-E-18 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDECONTAINMENT:

Coating <Grade 7-2 OUTSIDE CONTAINMENT:

Minor paint ELECT PEN AT 90 Performed Under Order (ASTM D610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

Implimentation during IRFI7 Notification 20199451generated to initiate NUCM for implimentation during 1 RF17 831000 PEN-S1-E-19 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating <Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

Implimentation during 1 RF17 Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan RFO #16 IWE Examination Results

.. A.,..

Page 22 Revision 0 UUAURANT A ELECT PEN AT 90 EL.

VT-G Visual Examination Performed Under Order#

50059638 INSIDE CUNUAINMENT: Coatng < Grade 7-2 (ASTM D 610) Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451 generated to Initiate NUCM for implimentation during 1 RF17 OUTSIDE CONTAINMENT: Minor paint chipping, no measurable loss of metal Notification 20064308 generated previous identified condition still eidsts. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 831200 PEN-S1-E-21 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

Implimentation during 1RF17 Notification 20199451generated to Initiate NUCM for Implimentation during 1 RF17 831300 PEN-S1-E-22 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 88 Performed Under Order#

(ASTM D610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

Implimentation during 1RF17 Notification 20199451generated to initiate NUCM for Implimentation during 1 RF1 7 831400 PEN-S1-E-23 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Inaccesible, ELECT PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Covered by fire sheilding EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 831500 PEN-S1-E-24 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDECONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Minor paint ELECT PEN AT 88 Performed Under Order#

(ASTM D610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

implimentation during IRF17 Notification 20199451generated to initiate NUCM for Implimentatlon during 1RF17 4

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan RFO #16 IWE Examination Results

,GI N1O_

Page 23 Revision 0 tiUMrU4N I A ELECT PEN AT 88 EL VT-G Visual Examination Performed Under Order#

50059638 INPDUt CUN I AINMtN I: CoOaung c rade -z (ASTM D 610) Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451 generated to Initiate NUCM for implimentation during IRF17 chipping, no measurable loss of metal Notification 20064308 generated previous identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451 generated to Initiate NUCM for implimentation during 1 RF17 831700 PEN-S1-E-26 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coaling < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

Implimentation during 1RF17 Notification 20199451generated to initiate NUCM for Implimentation during 1 RF1 7 B31800 PEN-S1-E-27 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDECONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Minor paint ELECT PEN AT 85 Performed Under Order#

(ASTM D610) Notification 20064308 generated chipping, no measurable loss of metal EL.

50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identfied condition still exists. Nuts order 20199451 generated to Initiate NUCM for 80028034 created, to perform eval.

Implimentation during 1 RF17 Notification 20199451 generated to Initiate NUCM for Implimentation during 1RF17 B31900 PEN-S1-E-28 QUADRANT A MC Visual VT-G Accept VT-G Visual Examinabon INSIDE CONTAINMENT:

CoaUng < Grade 7-2 OUTSIDE CONTAINMENT:

Minor paint ELECT PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL.

50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

implimentation during 1RF17 Notification 20199451generated to Initiate NUCM for Implimentation during 1 RF1 7 632000 PEN-S1-E-29 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Inaccessible, ELECT PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Covered by fire shielding EL 50059638 previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1RF17

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan RFO #16 IWE Examination Results Page 24 Revision 0 QUADRANT A ELECT PEN AT 85 EL.

VT-G Visual ExaminaUon Performed Under Order#

50059638 INSID0E CONTAINMENT: Coatng < Urade 7-2 (ASTM D 610) Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for implimentatlon during 1RF17 chipping, no measurable loss of metal.Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to initiate NUCM for Implimentation during 1 RF1 7 832200 PEN-S1-E-31 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Minor paint ELECT PEN AT 88 Performed Under Order#

(ASTM D610) Notification 20064308 generated chipping, no measurable loss of metal EL.

50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

Implimentation during IRF17 Notification 20199451generated to Initiate NUCM for Implimentatlon during 1RF17 832300 PEN-SI-E-32 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Elec. Pen 1-32, Electical OUTSIDE CONTAINMENT:

Minor paint ELECT PEN AT 88 Performed Under Orderff Protective Cover is off. Pen surface has dark rust, no chipping, no measurable loss of metal EL 50059638 measurable loss of metal noted. Not. 20062731.

Notification 20064308 generated previous Closed with no additional follow up required.

identified condition still exists. Nuts order Not.20064590 -previous Identified condition still 80028034 created, to perform eval.

exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate Notification 20199451generated to Initiate NUCM for NUCM for implimentation during 1RF17 implimentation during IRF17 832400 PEN-S1-E-33 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Acceptable.

ELECT PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 832500 PEN-S1-E-34 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identfied condition still exists. Nuts order 20199451 generated to Initiate NUCM for 80028034 created, to perform eval.

implimentatlon during 1RF17 Notification 20199451generated to Initiate NUCM for Implimentation during IRFI7

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan oufn -9enr 11IwCr~~n+n Drnu-lli Page 25 Revision 0 B32600 QUADRANT A ELECT PEN AT 88 EL vI1 -%a visIual c;a61IIHauA Performed Under Order#

50059638 1PI0ILL$ Q.

JI1 I 1 IVI 1'I I.

  • w.. UIng l

u e I-(ASTM D 610) Notification 20064308 generated previous Identified condition still e~dsts. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during IRF17 uu lJJ Sst/I.

al llVVid mIVIs

,viI~lJ 1011 tlwA chipping, no measurable loss of metal Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to Initiate NUCM for implimentation during 1 RF17 832700 PEN-S1-E-36 QUADRANT A MC Visual vT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coabng < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 85 Performed Under Order#

(ASTM D 610) Notiflcation 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

implimentation during 1 RF17 Notification 20199451generated to Initiate NUCM for implimentation during 1 RF17 832800 PEN-SI-E-37 QUADRANT A MC Visual vT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coaing < Grade 7-2 OUTSIDE CONTAINMENT:

Minor paint ELECT PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous identified condition still exdsts. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

implimentation during 1 RF17 Notification 20199451generated to initiate NUCM for implimentation during 1 RF17 832900 PEN-S1-E-38 QUADRANT -A-MC Visual vT-G Accept vT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Minor paint ELECT PEN AT 88-Performed Under Order#

(ASTM D 610) Notificaton 20064308 generated chipping, no measurable loss of metal EL 50059638 previous identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

implimentation during 1 RF17 Notification 20199451generated to Initiate NUCM for implimentation during 1RF17

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan RFO #16 1WF Examination Resuilts Page 26 Revision 0 AUARANTI

/A ELECT PEN AT 88 EL V i-G visual Examinauon Performed Under Order#

50059638 INSIDE CONTAINMENT: Coating < Grade 7-2 (ASTM D 610) Notification 20064308 generated previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for implimentation during 1RF17 UUTI COUJ UNTI NMENT: Minor paint chipping, no measurable loss of metal Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 833100 PEN-S1-E-40 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451generated to initiate NUCM for 80028034 created, to perform eval.

implimentation during 1RF17 Notification 20199451generated to Initiate NUCM for implimentation during IRF17 833200 PEN-S1-E-41 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Inaccesible, ELECT PEN AT 85 Performed Under Order#

(ASTM D610) Notification 20064308 generated Covered by fire sheilding EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notfication 2019451generated to initiate NUCM for implimentation during IRF17 833300 PEN-S1-E-42 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 88 Performed Under Order (ASTM D610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 2019945tgenerated to initiate NUCM for 80028034 created, to perform eval.

implimentation during 1RF17 Notification 20199451generated to initiate NUCM for Implimentation during 1 RF17 833400 PEN-S1-E-43 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Inaccesible, ELECT PEN AT 85 Performed Under Order#

(ASTM D610) Notification 20064308 generated Covered by fire sheilding EL.

50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during IRF17

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan RFC )HI IWF Fxvqminsftinn Ra:cilfcs Page 27 Revision 0 UUAUKANI A ELECT PEN AT 85 EL.

I VT-G Visual Examination Performed Under Order#

50059638 INSIDE CONTAINMENT:

Coating < Grade 7-2 (ASTM D 610) Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for Implimentation during 1RF17 OUTSIDE CONTAINMENT: Minor paint chipping, no measurable loss of metal Notification 20064308 generated previous identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 833600 PEN-S1-E-45 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Minor paint ELECT PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous identified condition still exdsts. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

Implimentation during 1 RF17 Notification 20199451 generated to Initiate NUCM for Implimentation during IRF17 833700 PEN-S1-E-46 QUADRANT A MC Visual vT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT.

Minor paint ELECT PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451generated to initiale NUCM for 80028034 created, to perform eval.

Implimentation during 1RF17 Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 833800 PEN-S1-E-47 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 20199451generated to initiate NUCM for 80028034 created, to perform eval.

implimentation during 1RF17 Notification 20199451generated to Initiate NUCM for implimentation during I RF1 7

Salem Nuclear Generating Station, Unit I Containment ISI Program Long Term Plan RFO #16 IWE Examination Results Page 28 Revision 0 QUADRANT A ELECT PEN AT 85 EL.

vI -U Visuail r-.411W mUA Io Performed Under Order#

50059638 INI' ILI

'.,I.JN I I4I'4IVIMCN l; VUdUrI'g Le 4

(ASTM D 610) Notification 20064308 generated previous Identified condition still exdsts. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 vJF Ie o s tflJI'4 l flh IVIcLM..

I VU daA IL chipping, no measurable loss of metal Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to Initiate NUCM for implimentation during I RF17 834000 PEN-S1-E-49 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Minor paint ELECT PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

Implimentation during IRF17 Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 834100 PEN-Sl-E-50 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 88 Performed Under Order#

(ASTM D610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

Implimentation during 1 RF17 Notification 20199451 generated to Initiate NUCM for implimentation during 1 RF1 7 834200 PEN-S1-E-51 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDECONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Minor paint ELECT PEN AT 85 Performed Under Order#

(ASTM D610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

Implimentation during IRF17 Notification 20199451generated to initiate NUCM for Implimentation during 1RF17

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan RFO #16 IWE Examination Results Page 29 Revision 0

%iAUPjrurtpAd I A ELECT PEN AT 85 EL VT-G Visual Examination Performed Under Order#

50059638 INSIDE CONTAINMENT: Coating < Grade 7-2 (ASTM D 610) Notification 20064308 generated previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notiflcation 20199451generated to Initiate NUCM for Implimentation during IRF17 OUTSIDE CONTAINMENT: Minor paint chipping, no measurable loss of metal Notification 20064308 generated previous identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 834400 PEN-S1-E-53 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 85 Performed Under Orderft (ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

implimentation during 1RF17 Notification 20199451generated to initiate NUCM for Implimentation during IRF17 834500 PEN-S1-E-54 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Insulation, ELECT PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated acceptable EL 50059638 previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during IRF17 B34600 PEN-S1-E-55 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Insulation, ELECT PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated acceptable EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for implimentation during 1RF17 834700 PEN-S1-E-56 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

implimentation during IRF17 Notification 20199451generated to Initiate NUCM for Implimentation during 1 RF17

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan DUN'r Ala4 18IA

_~__s_

@9 Page 30 Revision 0 UUAUDANI A

ELECT PEN AT 85 EL.

VT-G Visual Examination Performed Under Order#

50059638 INSIDE CONTAINMENT: Coating < Grade 7-2 (ASTM D610) Notification 20064308 generated previous Identified condition still endsts. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 OUTSIDE CONTAINMENT:

Minor paint chipping, no measurable loss of metal Notification 20064308 generated previous identified condition still exists. Nuts order B0028034 created, to perform eval.

Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 834900 PEN-S1-E-58 QUADRANT A MC Visual VT-1 Accept VT-1 Preservice visual INSIDE CONTAINMENT: Acceptable.

OUTSIDE CONTAINMENT: Acceptable.

ELECT PEN AT 85 examination on new bolt was EL performed under orders 50059638 834900 PEN-S1-E-58 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDECONTAINMENT:

Coating c Grade 7-2 OUTSIDE CONTAINMENT:Minor paint ELECT PEN AT 85 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal. Stud EL 50059638 previous Identified condition still exdsts. Nuts order

  1. 3,10,11,12 not fullyengaged, Stud #4 80028034 created, to perform eval. Notification Painted red (non-nuke) and B8 matil. Not.

20199451generated to Initiate NUCM for 20186514, weld area not coated - has light Implimentation during IRF17 rust 835000 PEN-S1-E-59 QUADRANT A MC Visual Vr-G Accept Vr-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Inaccesible, ELECT PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Covered by fire sheilding EL 50059638 previous Identified condition still exdsts. Nuts order 80028034 created, to perform eval. Notification 20199451generated to initiate NUCM for Implimentation during 1RF17 835100 PEN-S1-E-60 QUADRANT A MC Visual VT-G Accept VW-G Visual Examination INSIDE CONTAINMENT:

Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Minor paint ELECT PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification Identified condition still exists. Nuts order 20199451generated to Initiate NUCM for 80028034 created, to perform eval.

implimentation during 1RF17 Notification 20199451generated to initiate NUCM for Implimentation during 1 RF17

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan RFO #16 IWE Examination Results Page 31 Revision 0 ELECT PEN AT 85 EL v I -- V -I-Performed Under Order#

50059638 INSIDE CONTAINMENT: Coating < Grade 7-2 (ASTM D 610) Notification 20064308 generated previous Identified condition still exdsts. Nuts order 80028034 created, to perform eval. Notification 2l0199451generated to initiate NUCM for Implimentation during 1RF17 OUTSIDE CONTAINMENT:

Minor paint chipping, no measurable loss of metal Notification 20064308 generated previous identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to initiate NUCM for implimentation during 1RF17 835300 PEN-S1-E-62 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDECONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT:

Inaccesible, ELECT PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Covered by fire sheilding EL 50059638 previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for Implimentation during 1RF17 835400 PEN-S1-E-63 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Inaccesible, ELECT PEN AT 90 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Covered by fire sheilding EL 50059638 previous Identified condition still exists. Nuts order 80028034 created, to perforni eval. Notification 20199451 generated to Initiate NUCM for implimentation during 1RF17 835500 PEN-S1-E-64 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Minor paint ELECT PEN AT 90 Performed Under Order (ASTM D 610) Notification 20064308 generated chipping, no measurable loss of metal EL 50059638 previous Identified condition still exists. Nuts order Notification 20064308 generated previous 80028034 created, to perform eval. Notification identified condition still exists. Nuts order 20199451generated to initiate NUCM for 80028034 created, to perform eval.

implimentation during 1 RF17 Notification 20199451 generated to Initiate NUCM for implimentation during 1 RF17 835600 PEN-S1-E-65 QUADRANT A MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Coating < Grade 7-2 OUTSIDE CONTAINMENT: Inaccesible, ELECT PEN AT 88 Performed Under Order#

(ASTM D 610) Notification 20064308 generated Covered by fire sheilding EL 50059638 previous identified condition still exists. Nuts order 80028034 created, to perform eval. Notification 20199451generated to Initiate NUCM for implimentation during 1RF17

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan RFO #16 IWE Examination Results Page 32 Revision 0 AIRLOCK UUAURANI U

MECH PEN AT 100 EL V -G visual Examinauon Performed Under Order#

50059638 recordable issues OUTSIDE CONTAINMENT:

Minor paint chipping, no measurable loss of metal Notification 20064308 generated previous identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451generated to initiate NUCM for Implimentation during IRF17 835800 ALK-S1-130-QUADRANT D MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:

Airlock 130' No OUTSIDE CONTAINMENT:

Minor paint AIRLOCK MECH PEN AT 130 Performed Under Order#

recordable Issues chipping, no measurable loss of metal EL.

50059638 Notification 20064308 generated previous Identified condition still exists. Nuts order 80028034 created, to perform eval.

Notification 20199451 generated to Initiate NUCM for Implimentation during 1RF17 835900 HCH-S1-130-QUADRANT C MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT:Equipment Hatch Cover OUTSIDE CONTAINMENT: No outside EQ.HATCH EQUIPMENT Performed Under Order#

(14) bolting/nutslwashers - coating Is chipped off of examination performed this exam can only be HATCH AT 130 EL.

50059638 bolts; Only traces of coating appear on nuts. No performed from Inside containment.

rejectable Items noted on the Inspection of boiting/nutslwashers. Acceptable for continued use.

NoL20064589. Order 60030902 WIP 836000 PNL-S1-242-1 EMBEDDED LEAK MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Accessible areas Intact OUTSIDE CONTAINMENT: No outside CHASE CHANNEL Performed Under Order#

examination performed this exam can only be PANEL 242-1 50059638 performed from Inside containment 836100 PNL-S1-243-1 EMBEDDED LEAK MC Visual VT-G Accept VT-G Visual Examination INSIDECONTAINMENT: Accessible areas intact OUTSIDE CONTAINMENT: No outside CHASE CHANNEL Performed Under Order#

examination performed this exam can only be PANEL 243-1 50059638 performed from inside containment.

836200 PNL-S1-244-1 EMBEDDED LEAK MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: Accessible areas intact OUTSIDE CONTAINMENT: No outside CHASE CHANNEL Performed Under Order#

examination performed this exam can only be PANEL 244-1 50059638 performed from inside containment.

836300 PNL-SI-343-1 TUBING FROM MC Visual VT-G Accept VT-G Visual Examination INSID CONTAINMENT:

Accessible areas intact OUTSIDE CONTAINMENT: No outside FUEL XFER TUBE Performed Under Order#

examination performed this exam can only be TO PNL 343-1 50059638 performed from inside containment

Salem Nuclear Generating Station, Unit 1 Containment ISI Program Long Term Plan RFO #16 IWE Examination Results Page 33 Revision 0 TUBING VT-G visual Examination Performed Under Order#

50059638 examination performed this exam can only be performed from Inside containment 836500 ALK-S1-130-130 AIRKOCK TEST MC Visual VT-G Accept VT-G Visual Examination INSIDE CONTAINMENT: No recordable findings OUTSIDE CONTAINMENT: No outside TUBING TUBING Performed Under Order#

examination performed this exam can only be 50059638 performed from Inside containment.

LR-N104-0328 Document Control Desk ENCLOSURE 5 (Pages - 1)

Form OAR-1, Table 1 SALEM NUCLEAR GENERATING STATION, UNIT 1 RFO#16 FLYWHEEL EXAMINATION RESULTS

Salem Nuclear Generation Station, Unit 1 ISI Program Long Term Plan RFO #16 Flywheel Examination Results Page 1 Revision 1 s001000 ilS-75P790 1#14 RCP Motor Flywheel Volumetric jUT ultrasonic examination

,Accept

!order# 50059638 amatome under

,Examined while at the #14 RCP Positioned

.Ultrasonic examination performed by Framatome under SO 0300

.3S-75P790

  1. 1 1 RCP Motor Flywheel Volumetric UT
Accept

!order# 50059638

.Examined while at the #11 RCP Positioned

.UItrasonic examination performed by Framatome under 009000

.1S-D003

§#12 RCP Motor Flywheel Volumetnoc

'UT

Accept torder# 50059638 Examined while at the #12 RCP Positioned 0.4 4.

Interval Ultrasonic examination performed by Framatome At

.the Framatome Facitity during RCP Motor rebuild under

Examined performed on spare RCP pump and 004000 4S-75P790
  1. 13 RCP Motor Flywheel Volumetric UT
  • Accept Iorder# 50059638 Installed at #13 RCP Positioned

.Interval Ultrasonic examination performed by Framatome At fthe Framatome Facility during RCP Motor rebuild under

[Examined performed on spare RCP pump and

~004000

,4S-75P790

  1. 13 RCP Motor Flywheel Surface MT

'Accept iorder# 50059638 Installed at #13 RCP Positioned Interval Ultrasonic examination performed by Framatome At

'the Framatome Facility during RCP Motor rebuild under

Examined performed on spare RCP pump and

=04000 48-75P790

  1. 13 RCP Motor Flywheel Surface PT Accept Jorder# 50059638 installed at #13 RCP Positioned

LR-N04-0328 Document Control Desk ENCLOSURE 6 (Pages - 1)

Form OAR-1, Table 1 SALEM NUCLEAR GENERATING STATION, UNIT 1 ISI LONG TERM PLAN INSERVICE INSPECTION

SUMMARY

FOR THIRD INTERVAL

Salem Nuclear Generating Station, Unit 1 ISI Program Long Term Plan Table 1 Inservice Inspection Examination Summary For The Third Interval ASME 1998 Code Edition - 2000 Addenda I

PFRIOD I I

PFRIOD 2 I

PERIOD 3 l

Page 1 B-A 29 29 1

4%

0 0%

0 0%

4%

See Note #1 B-B 8

5 1

20%

0 0%

0 0%

20%

See Note #4 B-D 33 30 4

13%

0 0%

0 0%

13%

See Note #2 B-G-1 12 8

0 0%

0 0%

0 0%

0%

See Note #1 B-G-2 83 83 30 36%

0 0%

0 0%

36%

B-K 62 13 7

54%

0 0%

0 0%

54%

See Note#1 &

B-L-1 4

1 1

25%

0 0%

0 0%

25%

Note #4 See Note#3 &

B-L-2 4

1 0

0%

0 0%

0 0%

0%

Note #4 See Note#1 &

B-M-1 2

1 0

0%

0 0%

0 0%

0%

Note #4 See Note#3&

B-M-2 30 4

4 14%

0 0%

0 0%

14%

Note #4 B-N-1 3

3 1

34%

0 0%

0 0%

34%

B-N-2 1

1 0

0%

0 0%

0 0%

0%

See Note #1 B-N-3 14 14 0

0%

0 0%

0 0%

0%

See Note#1 B-0 1

1 0

0%

0 0%

0 0%

0%

See Note #1 B-P 3

3 3

100%

0 0%

0 0%

100%

B-P/C-H 2

2 2

100%

0 0%

0 0%

100%

C-A 55 21 8

38%

0 0%

0 0%

38%

See Note #4 C-B 22 8

2 25%

0 0%

0 0%

25%

See Note #4 C-C 251 31 12 38%

0 0%

0 0%

38%

See Note #4 C-D 9

2 1

50%

0 0%

0 0%

50%

See Note #4 C-G 24 3

1 33%

0 0%

0 0%

33%

See Note #4 C-H 57 171 57 33%

0 0%

0 0%

33%

C-H/D-B 4

12 4

33%

0 0%

0 0%

33%

D-A 217 33 13 39%

0 0%

0 0%

39%

D-B 52 156 52 33%

0 0%

0 0%

33%

F-A 1842 307 108 35%

0 0%

0 0%

35%

R-A 3125 160 49 31%

0 0%

0 0%

31%

Notes

1)

Deferral Permissible B-A B-G-1 B-E B-L-1 B-N-2 B-0 B-M-1 B-N-3

2)

Ref. Table IWB-2500-1, Exam Category B-D, Program (B) Note 2

3)

To Be Examined Only If Disassembled for Maintenance, Repair or Volumetric Exam. (Reference-ISI Program)

For multiple pumps, valves, and vessels of similar design.

4) service, and function only one of the multiple components shall be selected for examination.

LR-N04-0328 Document Control Desk ENCLOSURE 7 (Pages -1)

Form OAR-1, Table 1 SALEM NUCLEAR GENERATING STATION UNIT 1 IWE/IWL EXAMINATION

SUMMARY

FOR THE FIRST INTERVAL

IWE / IWL Salem Nuclear Generating Station, Unit I ISI Program Long Term Plan Examination Summary for the 1st Interval, 2nd Period ASME 1998 Code Edition No Addenda PERIOD I I

PERIOD 2 l

PERIOD 3 l

Notes

1)

Inaccessible components will be examined when accessible.

LR-N04-0328 Document Control Desk ENCLOSURE 8 (Pages - 1)

Form OAR-1, Table 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE

SlRFO#16 TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Item Item Flaw Flaw or Relevant Condition Found:

Category Number Description Characterization During Scheduled Section Xl Examination or Test (Yes or No)

DURING SALEM 1 RFO #16 THERE WERE NO ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE I

I

SlRFO#16 TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE For the period 11/6/2002 to 06/03/2004 Flaw or Relevant Condition Found During Scheduled Section Xl Repair Examination or Repair Replacement, Test (Yes or Replacement Code or Corrective Item No)

Date Plan Number Class Measure Description Description of work Complete RR Plan CJP#

2 Replaced 11 RHR Replacement of Bolting No Open 60031566 70029088 Heat Exchanger Materials S1 RHG-1 RHE3 3

Corrective Measure-Component Cooling Use-As-ls No Replacement 60029891 70029984 Analyzed Variable Support Evaluation Scheduled for S1 CC-1 CCH-22 1 R18 3

Replaced 12 CC HX Drain Root Replace Valve by No 4/28/04 60044863 70038815 Valve Welding SI SW-12SW967 3

Replaced 14 CFCU Motor Cooler Replace Valve by No 5/11/04 60045222 70039282 SW Valve Welding SI SW-14SW67 3

Corrective Measure-Refueling Water Storage Reanalysis of Pressure No 06/03/04 60042961 80068486 Evaluation / Repair Tank Boundary S1SJ-1SJE5 Repair Weep Hole