MONTHYEARBW230024, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2023-05-12012 May 2023 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report BW220029, Annual Radiological Environmental Operating Report, 1 January Through 31 December 20212022-05-31031 May 2022 Annual Radiological Environmental Operating Report, 1 January Through 31 December 2021 BW220028, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2022-05-13013 May 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report BW220026, Annual Radioactive Effluent Release Report (ARERR)2022-04-29029 April 2022 Annual Radioactive Effluent Release Report (ARERR) BW210060, National Pollutant Discharge Elimination System2021-08-20020 August 2021 National Pollutant Discharge Elimination System ML21118A8322021-05-0101 May 2021 Annual Radioactive Effluent Release Report (ARERR) BW200037, Annual Radiological Environmental Operating Report2020-05-31031 May 2020 Annual Radiological Environmental Operating Report ML19121A4632018-12-31031 December 2018 Annual Radioactive Effluent Release Report ML18145A0852018-05-25025 May 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report ML17135A1412017-05-15015 May 2017 National Pollutant Discharge Elimination System (NPDES) Permit No. IL0048321 ML17118A0572017-04-28028 April 2017 Transmittal of 2016 Radioactive Effluent Release Report ML16137A0552016-05-16016 May 2016 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report ML16132A1732016-05-11011 May 2016 Transmittal of 2015 Annual Radiological Environmental Operating Report ML16118A3742016-04-27027 April 2016 Transmittal of 2015 Radioactive Effluent Release Report ML15134A2952015-05-31031 May 2015 Annual Radiological Environmental Operating Report, 1 Janaury Through 31 December 2014 ML15118A8732015-04-30030 April 2015 Radioactive Effluent Release Report ML14136A3132014-05-14014 May 2014 2013 Annual Radiological Environmental Operating Report ML13137A1052013-05-14014 May 2013 Submittal of 2012 Annual Radiological Environmental Operating Report ML13134A0492013-04-30030 April 2013 Submittal of 2012 Radioactive Effluent Release Report ML14030A2732013-02-28028 February 2013 Kankakee River Fish Monitoring Program, 2012 RS-14-029, Braidwood Station, Kankakee River Fish Monitoring Program, 20122013-02-28028 February 2013 Braidwood Station, Kankakee River Fish Monitoring Program, 2012 ML14030A2742012-07-31031 July 2012 2011 Benthos Monitoring and Historical Fish and Benthos Comparisons RS-14-029, Braidwood Station, 2011 Benthos Monitoring and Historical Fish and Benthos Comparisons2012-07-31031 July 2012 Braidwood Station, 2011 Benthos Monitoring and Historical Fish and Benthos Comparisons ML12137A3042012-05-14014 May 2012 Submittal of 2011 Annual Radiological Environmental Operating Report ML12130A1982012-04-26026 April 2012 2011 Radioactive Effluent Release Report RS-14-029, Braidwood Station Kankakee River Fish Monitoring Program, 20102011-12-31031 December 2011 Braidwood Station Kankakee River Fish Monitoring Program, 2010 ML14030A2792011-12-31031 December 2011 Braidwood Station Kankakee River Fish Monitoring Program, 2010 ML11137A0482011-05-13013 May 2011 Annual Radiological Environmental Operating Report ML11122A1092011-04-29029 April 2011 2010 Radioactive Effluent Release Report ML1013904752010-05-14014 May 2010 Annual Radiological Environmental Operating Report ML1012503352010-04-28028 April 2010 Radioactive Effluent Release Report ML1017501232010-02-17017 February 2010 Memo-Analytical Results of Water Samples from the Vicinity of the Braidwood Nuclear Power Station ML0916906572009-05-27027 May 2009 Email Correspondence Between S. Orth USNRC R3 and W. Alderson on 5/27/09 Braidwood End of Cycle Meeting ML0913501882009-05-14014 May 2009 2008 Annual Radiological Environmental Operating Report, Submitted in Accordance with Technical Specification 5.6.2 ML0913303722009-04-30030 April 2009 2008 Radioactive Effluent Release Report Submitted in Accordance with 10 CFR 50.36a ML0915206432009-04-21021 April 2009 Tritium Groundwater Sample Results from American Radiation Services, Inc. for Braidwood 1st Quarter, March 10 and 11, 2009 ML14030A2662009-02-25025 February 2009 Response to NRC Request for Additional Information, Dated December 20, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Braidwood Station Applicant'S Environmental Report ML0814300312008-05-15015 May 2008 Annual Radiological Environmental Operating Report ML0812904082008-04-30030 April 2008 Transmittal of 2007 Radioactive Effluent Release Report ML0809403982008-03-31031 March 2008 Oak Ridge Institute for Science and Education - Braidwood ML0718005002007-06-27027 June 2007 Oak Ridge Institute for Science and Education, Braidwood Water Samples Report No. 050-00456/2007-004 ML0714202552007-05-31031 May 2007 Annual Radiological Environmental Operating Report for 2006 ML0714202592007-05-31031 May 2007 Annual Radiological Groundwater Protection Progam Report for 2006 ML0612904652006-05-0404 May 2006 Oak Ridge Institute for Science and Education, Analytical Results for Thirteen Water Samples, Batch Four, from the Vicinity of the Braidwood Nuclear Generating Station, Braidwood, Illinois ML0612103762006-04-28028 April 2006 Radioactive Effluent Release Report ML0610803242005-12-19019 December 2005 NRC E-mail from John House to Steven Orth Braidwood Ngs Letter Report ML0610107222005-12-19019 December 2005 NRC E-mail from John House to John Cassidy Tritium Sample Results ML0610107172005-12-17017 December 2005 E-mail from Haeger to House Et Al Tritium Sample Results with Attached Chart ML0610106692005-12-16016 December 2005 NRC E-mail from John House to John Cassidy Second Submission of Preliminary Tritium Data for Selected Water Samples from Braidwood Ngs 12-13-05 ML0609700712005-12-0202 December 2005 Midwest Laboratories Email from Ellen Saar to James R. Meister Et Al. Tritium 2023-05-12
[Table view] Category:Letter
MONTHYEARIR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference 05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case2023-11-17017 November 2023 Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case ML23321A0442023-11-17017 November 2023 Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination IR 05000456/20230022023-08-0303 August 2023 Integrated Inspection Report 05000456/2023002 and 05000457/2023002 ML23188A1292023-07-26026 July 2023 Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23110A1152023-06-12012 June 2023 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2023-LLA-0042) (Letter) RS-23-074, Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-06-0909 June 2023 Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23138A1342023-05-18018 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station ML23132A0472023-05-12012 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ML23130A0072023-05-10010 May 2023 Submittal of Core Operating Limits Report Cycle 24, Rev. 16 IR 05000456/20230012023-05-0808 May 2023 Integrated Inspection Report 05000456/2023001 and 05000457/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23118A0202023-04-28028 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 RS-23-055, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2023-04-10010 April 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML23095A1292023-04-0505 April 2023 Steam Generator Tube Inspection Report for Refueling Outage 23 ML23094A1352023-04-0404 April 2023 Request for Information for Nrc Commercial Grade Dedication Inspection Inspection Report 05000456/2023010 05000457/2023010 RS-23-052, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-03-24024 March 2023 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations 2024-02-02
[Table view] |
Text
Exelkn.
Exelon Generation Braidwood Generating Station www.exel oncorp.com Nucl ear 35100 South Route 53, Suite 84 Braceville, IL 60407-9619 Tel 815-458-2801 April 9, 2004 BW040036 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457
Subject:
2003 Annual Environmental Report The attached document includes the Annual Environmental Operating Report for Braidwood Station. This report is being submitted in accordance with Section 5.4.1, "Routine Reports," in Appendix B, "Environmental Protection Plan (Non-radiological)," of Braidwood Station's Facility Operating License, and covers the time period from January 2003 through December 2003.
Braidwood Station evaluated the objectives stated in the Braidwood Station Facility Operating License, Appendix B, "Environmental Protection Plan," Section 1, "Objectives of the Environmental Protection Plan." Exceptions to these objectives are listed in the applicable attachments.
The following Attachments are included in this report.
Attachment A - A list of all changes in Station design or operations, tests, and experiments as required by Appendix B, Section 3.1, "Plant Design and Operation" Attachment B - A list of all nonroutine reports as required by Appendix B, Section 5.4.2, "Nonroutine Reports" Attachment C - A list of non-compliances to the Environmental Protection Plan and the corrective actions
U. S. Nuclear Regulatory Commission April 9, 2004 Page 2 Should you have any questions regarding this submittal, please contact Ms. Kelly Root, Regulatory Assurance Manager, at (815) 417-2800.
Respectfully, Thoma P. Joyce Site Vice President Braidwood Station Attachments:
Attachment A Attachment B Attachment C cc: Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Braidwood Station
ATTACHMENT A List of changes in station design or operations, tests, and experiments as required by Section 3.1, "Plant Design and Operation" in Appendix B, "Environmental Protection Plan (Nonradiological)" of Braidwood Station's Facility Operating License The Braidwood Station cooling lake was designed to operate with a makeup influent rate of 45,000 gpm and a blowdown rate of 21,000 gpm. However, the highest achievable blowdown was only 14,000 gpm when both units are operating. Due to the less than design lake blowdown flowrate (i.e., 14,000 gpm vs. 21,000 gpm), lake pH and lake impurities concentration have steadily increased, and the trend is expected to continue unless blowdown is increased. The increase in lake pH and impurities concentrations resulted in calcium carbonate precipitation of the bulk water in 2002 and later in 2004.
To restore the design conditions for lake blowdown, two blowdown booster pumps were installed to increase the blowdown flow to 25,000 gpm or slightly higher. One pump was installed at the beginning of the CW blowdown line of each unit to boost the pressure, which resulted in increasing the flow. Each of the pumps is driven by a variable speed drive to control the pump speed and the speed change rate to achieve the required flow and operate the system within its design parameters.
ATTACHMENT B List of all nonroutine reports as required by Appendix B, Section 5.4.2, "Non-routine Reports", of Braidwood Station's Facility Operating License Event Description On May 15, 2003, Station personnel discovered leakage in the underground sump discharge line which resulted in a water-filled depression near the Turbine Building wall approximately 45 feet from a storm water drain. Braidwood Station personnel promptly responded by disabling the pre-treatment and low conductivity sumps, thereby stopping any additional leakage, began an investigation of the line leak, and took samples at appropriate locations.
Water in the subject sump is made up primarily of unfiltered drinking water from the pre-treatment drain sump. The water that flowed out of the underground sump discharge line traveled from the leakage point into a nearby storm water drain.
Analysis and Evaluation Following the discovery of the leakage, samples for total residual chlorine (TRC) were taken at various locations including: (1) from the water filled depression (0.03 mg/I), (2) at the oil water separator (0.02 mg/I), and (3) at the confluence of the drainage ditch and spillway at the point where the ditch leaves Braidwood Station property (0.04 mg/I). Other locations were also sampled along the ditch with results of 0.04 mg/I, 0.11 mg/l and 0.12 mg/I, respectively. Since the TRC level at the point closest to the leakage was only 0.03 mg/I, the two higher levels are believed to have resulted from interference, most probably the presence of manganese which was not subtracted from these samples.
Corrective Actions The pre-treatment and low conductivity sumps will remain disabled until the Station completes the line repairs. The effluent from these sumps is being routed to the Wastewater Treatment Plant which is the permitted system for processing these flows.
ATTACHMENT C List of non-compliances to the Environmental Protection Plan and the corrective actions None for 2003