November 10, 2003 Mr. Peter E. Katz Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT NO. 2 - REQUEST FOR ADDITIONAL INFORMATION - AMENDMENT APPLICATION RE: ULTIMATE HEAT SINK TEMPERATURE REQUIREMENTS (TAC NO. MC0594)
Dear Mr. Katz:
The Nuclear Regulatory Commission (NRC) staff is reviewing the subject proposed amendment, requested by your application dated August 22, 2003. On October 24, 2003, we held a telephone conference with Mr. John Dosa, et al., of your staff, on comments we previously e-mailed to your staff (available in the Agencywide Documents Access and Management System under Accession No. ML032830009). Participants agreed that a formal request for additional information (RAI) be issued. Enclosed please find the RAI. Your staff agreed that it can respond before January 15, 2004.
If you have any questions, please call me at 301-415-1451.
Sincerely,
/RA/
Peter S. Tam, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-410
Enclosure:
As stated cc w/encl: See next page
November 10, 2003 Mr. Peter E. Katz Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT NO. 2 - REQUEST FOR ADDITIONAL INFORMATION - AMENDMENT APPLICATION RE: ULTIMATE HEAT SINK TEMPERATURE REQUIREMENTS (TAC NO. MC0594)
Dear Mr. Katz:
The Nuclear Regulatory Commission (NRC) staff is reviewing the subject proposed amendment, requested by your application dated August 22, 2003. On October 24, 2003, we held a telephone conference with Mr. John Dosa, et al., of your staff, on comments we previously e-mailed to your staff (available in the Agencywide Documents Access and Management System under Accession No. ML032830009). Participants agreed that a formal request for additional information (RAI) be issued. Enclosed please find the RAI. Your staff agreed that it can respond before January 15, 2004.
If you have any questions, please call me at 301-415-1451.
Sincerely,
/RA/
Peter S. Tam, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-410
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION:
PUBLIC PDI-1 R/F RLaufer PTam OGC DCullison ACRS CBixler, Region I SLittle Accession Number: ML033140089 OFFICE PDI-1/PM PDI-1/LA SPLB SPLB/SC PDI-1/SC NAME PTam SLittle DCullison DSolorio RLaufer DATE 10/29/03 10/28/03 10/29/03 11/07/03 11/07/03 OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION NINE MILE POINT NUCLEAR STATION, UNIT NO. 2 AMENDMENT APPLICATION REGARDING ULTIMATE HEAT SINK TEMPERATURE REQUIREMENTS
Reference:
Letter, P. E. Katz of Nine Mile Point Nuclear Station, LLC, to Nuclear Regulatory Commission, August 22, 2003.
(1)
At worst-case current licensing basis conditions with an ultimate heat sink (UHS) temperature of 84 F, what temperatures are expected in the cooling system of the emergency diesel generators (EDGs), and what are the associated limits?
(2)
What is the peak suppression pool temperature following a main steam line isolation transient from 100% power coincident with a loss of offsite power assuming a UHS temperature of 84 F? Describe how the residual heat removal system heat exchanger tube plugging limit described in the submittal is administratively controlled.
(3)
The application is worded in such a way that it is not clear that analyses at the proposed UHS temperature of 84 F were performed for various systems and parameters. It appears that, in most cases, a conclusion of acceptability was based on margin at the current UHS temperature. Please verify that analyses were performed at the proposed higher temperature and that the conclusions in the application remain valid at the higher temperature for the following. Note, that there is no need to submit the analyses; simple statements that analyses were done would suffice.
- a. EDG building heating, ventilation, and air conditioning
- b. Control building safety-related area coolers
- c. The maximum post-LOCA peak suppression pool temperature
- d. Reactor building supply air cooler
- e. Reactor core isolation room unit coolers
- f. Turbine building closed loop cooling system.
Enclosure
Nine Mile Point Nuclear Station, Unit No. 2 cc:
Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector Nine Mile Point Nuclear Station P.O. Box 126 Lycoming, NY 13093 Mr. James R. Evans LIPA P.O. Box 129 Lycoming, NY 10393 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. Paul D. Eddy Electric Division NYS Department of Public Service Agency Building 3 Empire State Plaza Albany, NY 12223 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 C. Adrienne Rhodes Chairman and Executive Director State Consumer Protection Board 5 Empire State Plaza, Suite 2101 Albany, NY 12223-1556 Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street, NW.
Washington, DC 20005-3502 Mr. Michael J. Wallace President Nine Mile Point Nuclear Station, LLC c/o Constellation Energy Group 750 East Pratt Street Baltimore, MD 21202 James M. Petro, Jr., Esquire Counsel Constellation Energy Group, Inc.
750 East Pratt Street, 5th Floor Baltimore, MD 21202 Mr. William M. Flynn, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399