ML040710467
| ML040710467 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 03/11/2004 |
| From: | James Trapp Reactor Projects Branch 1 |
| To: | |
| Shared Package | |
| ML040710467 | List: |
| References | |
| MN 04-14 | |
| Download: ML040710467 (4) | |
Text
March 11, 2004 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING No. 04-14 Licensee:
Nine Mile Point Nuclear Station, LLC (NMPNS)
Facility:
Nine Mile Point, Units 1 and 2 Docket No.
50-220 and 50-410 Time and Date:
1:00 p.m. on May 18, 2004 Location:
Joint News Center Oswego County Airport County Route 176 Fulton, NY 13069
Purpose:
The NRC requested an Annual Assessment Meeting with NMPNS management to discuss NRCs assessment of the safety performance of the Nine Mile Point Nuclear Power Plant for calendar year 2003. NRCs assessment is documented in a letter dated March 2, 2004.
NRC Attendees:
H. Miller, Administrator, Nuclear Regulatory Commission, Region I J. Trapp, Chief, Project Branch 1, Division of Reactor Projects, Region I G. Hunegs, Senior Resident Inspector, Nine Mile Point B. Fuller, Resident Inspector, Nine Mile Point E. Knutson, Resident Inspector, Nine Mile Point Licensee Attendees: M. Wallace, President, Constellation Generation Group J. Spina, Vice President, Nine Mile Point L. Hopkins, General Manager, Nine Mile Point Public Participation:
This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
NRCs assessment letter and meeting agenda can be found in the ADAMS Meeting package (Accession Number ML040620013). ADAMS is accessible from the NRC Web Site at:
http://www.nrc.gov/reading-rm/adams.html Additional information relative to the NRCs Annual Assessment process and the safety performance of Nine Mile Point Station can be found on the NRCs web site at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html
2 Meeting
Contact:
James Trapp, Chief Projects Branch 1 (610)-337-5186 E-mail: JMT1@nrc.gov
Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by May 16, 2004, via telephone to the NRC meeting contact.
/RA by Kenneth Jenison Acting For/
Approved by: ____________________________
James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects
3 Distribution:
Mr. James A. Spina, Vice President, Nine Mile Point Nuclear Station, LLC State of New York J. Trapp, DRP N. Perry, DRP R. Junod, DRP Regional Administrator, Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)
4 Distribution (Via E-Mail):
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)
Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)
Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)
Director, Division of Licensing Project Management, NRR (RIDSDLPM)
Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)
P. Tam, Project Manager, NRR G. Vissing, NRR, (Backup)
W. Lanning, DRS R. Crlenjak, DRS Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)
K. Farrar, Regional Counsel J. Jolicoeur, RI EDO Coordinator D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA J. Trapp, DRP N. Perry, DRP G. Hunegs - SRI - Nine Mile Point B. Fuller - RI - Nine Mile Point E. Knutson, RI - Nine Mile Point G. Matakas, ORA PMNS WEBWORK DOCUMENT NAME: G:\\BRANCH1\\2003 ROP 4 Annual Assessment Meetings\\Meeting Notices\\NMP Annual Assessment Meeting Notice.WPD After declaring this document An Official Agency Record it will/will not be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy