ML032400026

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan
ML032400026
Person / Time
Site: Oconee  
Issue date: 08/27/2003
From:
Division Reactor Projects II
To:
Shared Package
ML032400021 List:
References
Download: ML032400026 (3)


Text

Oconee Inspection / Activity Plan 09/01/2003 - 09/30/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 08/27/2003 09:29:51 Report 22 4

PS-SEC

- SECURITY - TI/ICM Safety Issues 07/28/2003 09/19/2003 Inspection of Nuclear Reactor Safeguards - Interim Compensatory Measures IP 2515/148 1, 2, 3 Baseline Inspections 07/28/2003 09/19/2003 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorizati IP 7113002 1, 2, 3 Baseline Inspections 07/28/2003 09/19/2003 Response to Contingency Events (Protective Strategy and Implementation of Protective Stra IP 7113003 1, 2, 3 Baseline Inspections 07/28/2003 09/19/2003 Performance Indicator Verification IP 71151 1, 2, 3 1

EB2-MR

- MAINTENANCE RULE Baseline Inspections 09/02/2003 09/05/2003 Maintenance Effectiveness IP 7111112B 1, 2, 3 1

PS-RP

- ISFSI Baseline Inspections 09/08/2003 09/12/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 1

OL EP

- EP INSPECTION Baseline Inspections 09/15/2003 09/19/2003 Alert and Notification System Testing IP 7111402 1, 2, 3 Baseline Inspections 09/15/2003 09/19/2003 Emergency Response Organization Augmentation Testing IP 7111403 1, 2, 3 Baseline Inspections 09/15/2003 09/19/2003 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2, 3 Baseline Inspections 09/15/2003 09/19/2003 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2, 3 Baseline Inspections 09/15/2003 09/19/2003 Performance Indicator Verification IP 71151 1, 2 1

EB2-HR

- RPV HEAD REPLACEMENT-U1 Other Routine 09/29/2003 10/03/2003 Reactor Vessel Head Replacement Inspection IP 71007 1

1 EB2-ISI

- INSERVICE INSPECTION-U1 Baseline Inspections 09/29/2003 10/03/2003 Inservice Inspection Activities - PWR IP 7111108P 1

2 OLEXAM

- INITIAL RETAKE EXAM Not Applicable 10/14/2003 10/17/2003 OCONEE/RETAKE EXAMS AT POWER FACILITIES V23225 1

2 CONT REP

- CONTAINMENT REPAIR Other Routine 11/03/2003 11/06/2003 Steam Generator Replacement Inspection IP 50001 1

2 PS-RP

- RADIATION PROTECTION Other Routine 11/03/2003 11/07/2003 Steam Generator Replacement Inspection IP 50001 1

Other Routine 11/03/2003 11/07/2003 Reactor Vessel Head Replacement Inspection IP 71007 1, 2, 3 Baseline Inspections 11/03/2003 11/07/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 Baseline Inspections 11/03/2003 11/07/2003 ALARA Planning and Controls IP 7112102 1, 2, 3 Baseline Inspections 11/03/2003 11/07/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 11/03/2003 11/07/2003 Performance Indicator Verification IP 71151 1, 2, 3 3

PS-RP

- RADIATION PROTECTION Other Routine 11/17/2003 11/21/2003 Steam Generator Replacement Inspection IP 50001 1

Other Routine 11/17/2003 11/21/2003 Reactor Vessel Head Replacement Inspection IP 71007 1, 2, 3 Baseline Inspections 11/17/2003 11/21/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Oconee Inspection / Activity Plan 09/01/2003 - 09/30/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 08/27/2003 09:29:51 Report 22 3

PS-RP

- RADIATION PROTECTION Baseline Inspections 11/17/2003 11/21/2003 ALARA Planning and Controls IP 7112102 1, 2, 3 Baseline Inspections 11/17/2003 11/21/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2, 3 Baseline Inspections 11/17/2003 11/21/2003 Performance Indicator Verification IP 71151 1, 2, 3 2

OL EP

- EP EXERCISE Baseline Inspections 01/12/2004 01/16/2004 Exercise Evaluation IP 7111401 1, 2, 3 Baseline Inspections 01/12/2004 01/16/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2, 3 Baseline Inspections 01/12/2004 01/16/2004 Performance Indicator Verification IP 71151 1, 2, 3 1

EB2 HEAD

- REACTOR HEAD REPLACEMENT Other Routine 03/29/2004 04/02/2004 Reactor Vessel Head Replacement Inspection IP 71007 2

1 EB2-ISI

- INSERVICE INSPECTION Baseline Inspections 03/29/2004 04/02/2004 Inservice Inspection Activities - PWR IP 7111108P 2

2 PS-RP

- RADIATION PROTECTION Other Routine 04/05/2004 04/09/2004 Steam Generator Replacement Inspection IP 50001 2

Other Routine 04/05/2004 04/09/2004 Reactor Vessel Head Replacement Inspection IP 71007 2

Baseline Inspections 04/05/2004 04/09/2004 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 1

PS-RP

- RADIATION PROTECTION - ISFSI Baseline Inspections 04/05/2004 04/09/2004 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 2

EB2SGRP

- STEAM GENERATOR REPLACEMENT Other Routine 04/19/2004 04/23/2004 Steam Generator Replacement Inspection IP 50001 2

Other Routine 05/10/2004 05/14/2004 Steam Generator Replacement Inspection IP 50001 2

Other Routine 05/24/2004 05/28/2004 Steam Generator Replacement Inspection IP 50001 2

3 OL PREP

- INITIAL EXAM PREP Not Applicable 05/24/2004 05/28/2004 OCONEE/EXAMS AT POWER FACILITIES V23216 1

3 OL EXAM

- INITIAL EXAM Not Applicable 06/14/2004 06/25/2004 OCONEE/EXAMS AT POWER FACILITIES V23216 1

1 EB2-HS

- HEAT SINK Baseline Inspections 06/21/2004 06/25/2004 Heat Sink Performance IP 7111107B 1, 2, 3 2

EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 07/26/2004 07/30/2004 Safety System Design and Performance Capability IP 7111121 1, 2, 3 5

EB1SSDPC - SAFETY SYS DESIGN & PERF CAPABILITY Baseline Inspections 08/16/2004 08/20/2004 Safety System Design and Performance Capability IP 7111121 1, 2, 3 Baseline Inspections 08/30/2004 09/03/2004 Safety System Design and Performance Capability IP 7111121 1, 2, 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Oconee Inspection / Activity Plan 09/01/2003 - 09/30/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 08/27/2003 09:29:51 Report 22 3

PS-RP

- RADIATION PROTECTION Baseline Inspections 09/20/2004 09/24/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2, 3 Baseline Inspections 09/20/2004 09/24/2004 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2, 3 Baseline Inspections 09/20/2004 09/24/2004 Radiological Environmental Monitoring Program IP 7112203 1, 2, 3 Baseline Inspections 09/20/2004 09/24/2004 Performance Indicator Verification IP 71151 1, 2, 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.