Letter Sequence Response to RAI |
---|
TAC:MB6473, Missed Surveillance Requirements, Incorporate CEOG Topical Report to Eliminate Pressure Sensor Response Time Testing (Approved, Closed) |
Results
Other: ML021280278, ML022940186, ML030780605, ML031210545, ML031290602, ML031400506, ML031410096, ML031410107, ML031410212, ML031960625, ML032300003, ML032300305, ML032310200, ML032310213, ML032530228, ML032960189
|
MONTHYEARML0205002282002-02-25025 February 2002 Issuance of Order for Interim Safeguards and Compensatory Security Measures Project stage: Approval ML0212802782002-05-22022 May 2002 Reply to Response to Order for Interim Safeguards and Security Compensatory Measures Project stage: Other ML0229401862002-10-25025 October 2002 Biweekly Notice Memo, Notice of Consideration, Testing Prestressed Concrete Containment Tendons Project stage: Other ML0229504532003-01-16016 January 2003 Issuance of License Amendment No. 215, Missed Surveillances & Adoption of Technical Specification Bases Control Program Project stage: Approval ML0302201532003-01-16016 January 2003 Technical Specification Pages for Amendment 215 Missed Surveillances and Adoption of a Technical Specification Bases Control Program Project stage: Acceptance Review ML0306307272003-02-26026 February 2003 Issuance of Amendment No. 216, Relocating TS 3.5(5), Requirements for Testing Prestressed Concrete Containment Tendons to the Updated Safety Analysis Report Project stage: Approval ML0305902712003-02-26026 February 2003 Technical Specifications, Relocation of TS 3.5(5), Requirements for Testing Prestressed Concrete Containment Tendons to the Updated Safety Analysis Report Project stage: Acceptance Review ML0305803512003-02-27027 February 2003 Correction to Amendment No. 215 to Fort Calhoun, Station No. 1. Page 5-17 of Technical Specifications Omitted Reference to SR 3.0.5. Corrected TS Page Encl Project stage: Acceptance Review ML0307806052003-03-18018 March 2003 Pressure-Temperature Limit Report Submittal Project stage: Other ML0308402732003-03-24024 March 2003 RAI, Related to Integrated Leak Rate Test Surveillance Interval Project stage: RAI LIC-03-0052, Response to Request for Additional for Information, Pressure-Temperature Limits Report Amendment Request2003-04-10010 April 2003 Response to Request for Additional for Information, Pressure-Temperature Limits Report Amendment Request Project stage: Request LIC-03-0055, Response to Request for Additional Information Integrated Leak Rate Testing Surveillance Interval Amendment Request2003-04-11011 April 2003 Response to Request for Additional Information Integrated Leak Rate Testing Surveillance Interval Amendment Request Project stage: Response to RAI ML0312004872003-04-29029 April 2003 Issuance of Amendment No. 217 Modifying TS 2.3.a, to Extend the Allowed Outage Time for a Single Low Pressure Safety Injection Pump from the Existing 24 Hours to 7 Days Project stage: Approval ML0312105452003-04-29029 April 2003 Tech Spec Pages for Amendment No. 217 Modifying TS 2.3.a, to Extend the Allowed Outage Time for a Single Low Pressure Safety Injection Pump from the Existing 24 Hours to 7 Days Project stage: Other ML0312906022003-05-0808 May 2003 Tech Spec Pages for Amendment No. 218, Administrative and Editorial Changes to FCS TS 1.3 Basis (1); 2.7 (1)a; 2.7 (1)b; 2.7 (1)d; 2.7 (1)i; 2.7 Basis; 3.0.2; Table 3-5, Item 11; and 3.5 (3)ii Project stage: Other ML0312900812003-05-0808 May 2003 Issuance of Amendment No. 218, Administrative and Editorial Changes to FCS TS 1.3 Basis (1); 2.7 (1)a; 2.7 (1)b; 2.7 (1)d; 2.7 (1)i; 2.7 Basis; 3.0.2; Table 3-5, Item 11; and 3.5 (3)ii Project stage: Approval ML0314102122003-05-20020 May 2003 Thesis (Miscellaneous Report - 134 Pages), Fort Calhoun, S107100 Project stage: Other ML0314005062003-05-20020 May 2003 Ltr RELAP5/MOD3.3 Prediction and Model Simulation Project stage: Other ML0314100962003-05-20020 May 2003 Description/Model Simulation (Technical Paper - 5 Pages), Fort Calhoun, S107101 Project stage: Other ML0314101072003-05-20020 May 2003 Listing (Report, Technical - 3 Pages), Fort Calhoun, S107102 Project stage: Other ML0314103762003-05-21021 May 2003 Request for Additional Information Pressure-Temperature Limit Report Submittal (Tac. MB6468) Project stage: RAI LIC-03-0079, Supplemental Response to Request for Additional Information, Integrated Leak Rate Testing Surveillance Interval Amendment Request2003-05-21021 May 2003 Supplemental Response to Request for Additional Information, Integrated Leak Rate Testing Surveillance Interval Amendment Request Project stage: Supplement ML0316800102003-06-17017 June 2003 Request for Additional Information, Use of the Gothic (Version 7.0) Computer Program Project stage: RAI ML0319606252003-07-11011 July 2003 Correction to Amd. 218 for the Fort Calhoun Station, Unit No. 1 (Tac. MB7498) Project stage: Other ML0320202182003-07-18018 July 2003 Ltr Environmental Assessment Relating to Exemption from the Requirements of Appendix G to 10 CFR Part 50 Project stage: Approval ML0320902422003-07-25025 July 2003 Unit 1, License Amendment 219 Modifying Technical Specification 2.1.6 Project stage: Approval ML0321004542003-07-25025 July 2003 Unit 1, Tech Spec Pages for License Amendment 219 Modifying Technical Specification 2.1.6 Project stage: Approval ML0323102002003-08-15015 August 2003 Tech Spec Pages for Amendment No. 221, Use of a Pressure Temperature Limits Report (Ptlr), Change the Minimum Boltup Temperature, Revise the Low Temperature Overpressure Protection (LTOP) Methodology and Analysis Project stage: Other ML0323102132003-08-15015 August 2003 Tech Spec Page to License Amendment No. 220, Grants One-Time Five-Year Extension to Current Ten-Year Test Interval for Containment Integrated Leak Rate Testing Project stage: Other ML0323003052003-08-15015 August 2003 License Amendment No. 221, Use of a Pressure Temperature Limits Report (Ptlr), Change the Minimum Boltup Temperature, Revise the Low Temperature Overpressure Protection (LTOP) Methodology and Analysis Project stage: Other ML0323000032003-08-15015 August 2003 License Amendment No. 220, Grants One-Time Five-Year Extension to Current Ten-Year Test Interval for Containment Integrated Leak Rate Testing Project stage: Other ML0325302282003-09-0404 September 2003 Ft.Calhoun, Closeout Letter - Response to Order for Compensatory Measures Related to Access Authorization Project stage: Other ML0329601892003-10-23023 October 2003 Reply to Response to Order for Fitness-For-Duty Enhancements for Nuclear Security Force Personnel Project stage: Other ML0331002902003-11-0505 November 2003 Unit #1, Issuance of Amendment 222, Authorizing Revisions to the Updated Safety Analysis Report to Incorporate the NRC Approval of the Gothic 7.0 Computer Program for Performing Containment Analysis, (Tac. MB7496) Project stage: Approval 2003-04-10
[Table View] |
|
---|
Category:Letter type:LIC
MONTHYEARLIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0006, Annual 2021 Decommissioning Funding/Irradiated Fuel Management Status Report2021-09-0808 September 2021 Annual 2021 Decommissioning Funding/Irradiated Fuel Management Status Report LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2024-06-18
[Table view] |
Text
Omaha Public PowerDM 444 South 16th Street Mall Omaha NE 68102-2247 April 11, 2003 LIC-03-0055 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
References:
- 1. Docket No. 50-285
- 2. Letter from OPPD (D.J. Bannister) to NRC (Document Control Desk) dated October 8, 2002, Fort Calhoun Station Unit No. 1 License Amendment Request, LAR - Risk-Informed One Time Increase in Integrated Leak Rate Test Surveillance Interval (LIC-02-0108)
- 3. Letter from NRC (A. B. Wang) to OPPD (R. T. Ridenoure) dated March 24, 2003, Request for Additional Information Related to Ft. Calhoun Station Integrated Leak Rate Test Surveillance Interval (TAC No. MB6473) (NRC 055)
SUBJECT:
Response to Request for Additional Information, Integrated Leak Rate Testing Surveillance Interval Amendment Request (TAC No. MB6473)
In support of license amendment request, "Risk-Informed One Time Increase in Integrated Leak Rate
- Test Surveillance Interval" (Reference 2), the Omaha Public Power District (OPPD) provides the attached response to the Nuclear Regulatory Commission's (NRC's) Request for Additional Information of A-:
Reference 3, questions 1 through 5. The response to question 6, currently being prepared, will be provided by June 30, 2003.
,,^ i:: : S 2 I declare under penalty of perjury that the forgoing is true and correct. (Executed on April 11, 2003). No
- 0: :f: j:
i commitments are made in this letter.
- _L3
- D f i If you have any questions or require additional information, please contact Dr. R. L. Jaworski of the FCS 1 Licensing staff at (402) 533-6833.
- : S :1
,.,: X, Sincerely,
- i i
i, y
..d A.
k' Employment with Equal Opportunity
U. S. Nuclear Regulatory Commission LIC-03-0055 Page 2 c: E. W. Merschoff, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector Winston & Strawn
LIC-03-0055 Attachment Page 1 Response to NRC Request for Additional Information Fort Calhoun Station, Unit 1 One Time Increase in Integrated Containment Leak Rate Test Interval
Reference:
Letter from D.J. Bannister (OPPD) to NRC, "Fort Calhoun Station, Unit 1 License Amendment Request, Risk-Informed One-Time Increase in Integrated Leak Rate Test Surveillance Interval," October 8, 2002.
NRC Question 1:
The Reference does not provide any information regarding the implementation of 10 CFR 50.55a related to the inservice inspection (ISI) of the Fort Calhoun Station (FCS) containment. Please provide the following information regarding the containment ISI program implemented in accordance with the requirements of 10 CFR 50.55a:
- a. The Edition and the Addenda of Subsections IWE and IWL of Section XI of the ASME Boiler and Pressure Vessel Code used for developing the ISI program.
- b. A summary of the significant degradation (e.g., liner corrosion in excess of 10%
of the nominal thickness, or pre-stressing force trend that may not meet the minimum required pre-stress at the next scheduled tendon inspection) found during the expedited examination of the containment and corrective actions taken.
- c. The areas of containment identified for augmented examination in accordance with IWE-1240.
OPPD Response:
FCS has implemented inservice inspection (ISI) requirements mandated by 10 CFR 50.55a for containment structure inspection using the requirements of the 1992 Edition with the 1992 Addenda of the ASME Boiler and Pressure Vessel Code, Section XL Division I, Subsections IWE and IWL, as modified by NRC final rulemaking to 10 CFR 50.55a published in the Federal Register on August 8, 1996.
Expedited inspections conducted in accordance with the FCS IWE/IWL Program Plan revealed no significant degradation of the containment liner. Deficiencies were limited to minor areas of surface corrosion which were repaired or documented for further monitoring by FCS condition reporting and maintenance processes. Concrete inspections and Containment Tendon Testing conducted by or in conjunction with the FCS IWE/IWL Program Plan also had only minor identified deficiencies. Results of tendon tension measurements were within the boundaries established by existing relaxation curves and were projected over the period until the next scheduled test by a regression analysis. All results are within the expected range and do not indicate that minimum required pre-stress is a concern over the next inspection period.
LIC-03-0055 Attachment Page 2 No areas of containment have been identified as requiring augmented inspection per the requirements of IWE-1240.
NRC Question 2:
IWE-5200, and IWL-5000, requires an ILRT (pressure testing) after a major repair/replacement activity. In order for the staff to make a consistent assessment of the amendment request, the licensee is requested to provide information about its plan to have major repair/replacement to the containment (e.g. cut a hole in the containment for steam generator or reactor pressure vessel head replacement) during the requested ILRT interval extension period.
OPPD Response:
OPPD is preparing to replace steam generators and possibly other reactor coolant system components within the next four years. These replacements will require constructing and repairing a containment wall opening larger than the existing equipment hatch. FCS understands ASME Code Section XI requires an ILRT (pressure testing) after major repair/replacement activity to the containment structure. This relief request does not address any relief from the repair and replacement test requirements; it only requests relief from the periodic ELRT requirement. If FCS determines that alternative methods to ensure safe and reliable containment conditions are appropriate, separate relief from the containment structure repair/replacement testing requirement will be requested.
NRC Question 3:
Please provide a summary of findings of the examination of containment concrete performed in accordance with 10 CFR 50.55a and Subsection IWL including the acceptance criteria used for accepting concrete and reinforcing bar degradation.
OPPD Response:
Containment Concrete Inspection conducted in accordance with 10 CFR 50.55a and ASME Section XI, Subsection IWL resulted in no areas which indicated significant degradation or required repair. All accessible exposed areas were inspected using a VT-3C general inspection criteria. Potential areas of concern were given a detailed VT-lC inspection. VT-IC inspection results were evaluated for acceptability by the FCS Responsible Engineer. Definitions of disintegration, deterioration, large spall, severe scaling, and D-cracking as found in the American Concrete Institution Publication, ACI 201.1 R-68, were used in conducting the inspection and in evaluation of the inspection results.
LIC-03-0055 Attachment Page 3 NRC Question 4:
Recognizing the hardship associated with examining seals, gaskets, and pressure retaining bolts, during each inspection period, and that the examination will be performed prior to Type B testing as required by Option A of Appendix J, the staff had granted such relief to a number of licensees. However, implementation of Option B of Appendix J allows flexibility in performing Type B testing based on the leak rate performance of the penetrations. As the performance based testing allows certain leak rate through the penetrations, minor initial degradation of the associated seals, gaskets and bolting can go undetected, and 10 year examination interval could be too long for the degraded components. Thus, examination of seals, gaskets and pressure retaining bolting should be scheduled based on their performance (i.e., plant-specific experience, replacement schedules for resilient seals, etc.), to ensure that, if Type B testing is not performed during the ILRT extension period, the examination schedule will detect degradation of these components. In view of this discussion the licensee is requested to provide a schedule for examining (testing) of these components for equipment hatches and other penetrations with resilient seals.
OPPD Response:
No Type B containment tests at FCS have been extended beyond a 5-year test interval.
Although longer test intervals are allowed by Option B, FCS has determined that additional engineering analysis to support a 10 year test interval is not warranted. The FCS Leakage Rate Test Program Basis Document (PBD-5) schedules all Type B tests, at a maximal interval of 5 years based on specific plant performance. In compliance with the FCS Containment Leakage Rate Program, access openings (Fuel Transfer Flange, Personnel Access Lock and Equipment Hatch) are scheduled for Type B testing at a Refueling Outage frequency. Testing is performed subsequent to closure following outage operation.
NRC Question 5:
The stainless steel bellows have been found to be susceptible to trans-granular stress corrosion cracking, and the leakages through them are not readily detectable by Type B testing (see NRC Information Notice 92-20). The licensee is requested to provide information regarding inspection and testing of the bellows of the FCS containment.
LIC-03-0055 Attachment Page 4 OPPD Response:
Bellows forming containment boundaries at FCS are limited to those at the piping penetrations for Main Steam and Feedwater Systems. Type B testing is currently performed on all bellows at a Refueling Outage interval. Type B test results have been effective in identifying leakage and have been critical to determinations for bellows replacement. These bellows have significant design differences from those described in NRC Information Notice 92-20 in that they are not manufactured in layers (not tested between layers) which may inhibit effective Type B testing.
NRC Question 6:
Inspections of some reinforced and steel containments (e.g., North Anna, Brunswick, and D. C. Cook, Oyster Creek) have indicated degradation from the uninspectable (embedded) side of the steel shell and liner of primary containments. The major uninspectable areas of the FCS containment would include those at the liner concrete interface in the dome and the cylinder, and in the basemat liner embedded in the concrete.
Please provide a quantitative assessment of the impact on LERF due to age related degradation in these areas, in support of the requested ILRT interval extension OPPD Response:
This question will be answered by a probabilistic risk assessment analysis to be submitted by June 30, 2003.