B.I 4:
UFFH Omaha Public Power ti 444 South 16th Street Mall Omaha NE 68102-2247 January 9, 2004 LIC-04-0006 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
References:
- 1.
Docket No. 50-285
- 2.
Letter from OPPD (R. T. Ridenoure) to NRC (Document Control Desk),
"Closure of NRC TAC Issues for Fort Calhoun Station," dated February 12, 2003 (LIC-03-0016)
SUBJECT:
Closure of NRC TAC Issues for Fort Calhoun Station Unit No. 1 The Omaha Public Power District (OPPD) has implemented the necessary actions associated with the open TAC issues listed in the Attachment. Subject to agreement by the NRC/NRR Project Manager, these items are ready to close. These actions have been taken since the last TAC Closure letter (Reference 2).
No commitments are made to the NRC in this letter. If you have any questions or require additional information, please contact Dr. R. L. Jaworski at (402) 533-6833.
Sincerely, Herman anager ear Licensing JBH/mle Attachment c:
B. S. Mallett, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector Pt00 Employment with Equal Opportunity
U.S. Nuclear Regulatory Commission LIC-04-0006 Attachment Page 1 Table of Implemented TAC Actions Fort Calhoun Station Amendment Description TAC FCS No.
No.
Implementation Date 214 Relocation Of Nuclear Detector Cooling MB6470 3/20/03 System To The Updated Safety Analysis Report 215 Missed Surveillances And Adoption Of A MB5839 3/7/03 Technical Specification Bases Control Program 216 Relocation Of TS 3.5(5), Requirements For MB6472 6/5/03 Testing Prestressed Concrete Containment Tendons To The Updated Safety Analysis Report 217 Extend Allowed Outage Time For A Single MB6469 6/25/03 Low Pressure Safety Injection Pump From 24 Hours To 7 Days 218 Administrative And Editorial Changes To MB7498 7/8/03 The FCS Technical Specifications 219 Increase "As Found" Pressurizer Safety MB7497 8/21/03 Valve (Psv) Lift Setting Tolerance 220 One-Time Five-Year Extension To The MB6473 8/21/03 Current Ten-Year Test Interval For The Containment Integrated Leak Rate Testing 221 Use Of A Pressure Temperature Limits MB6468 9/5/03 Report And Revision Of Low Temperature Overpressure Protection (LTOP)
Methodology 222 Use Of The GOTHIC Computer Program MB7496 12/5/03 For The Peak Containment Pressure Analysis 223 Deletion Of TS 2.3(2)i And The MB7499 1/6/04 Corresponding Bases That Allows The Performance Of The SR Of Table 3-2, Item 20 (Recirculation Actuation Logic Channel Functional Test) Under Administrative Controls
U.S. Nuclear Regulatory Commission LIC-04-0006 Attachment Page 2 Amendment Description TAC FCS No.
No.
Implementation Date N/A Issuance Of Order For Interim Safeguards MB4130 8/31/02 And Security Compensatory Measures For Fort Calhoun Station, Unit 1 N/A Issuance Of Order For Compensatory MB9189 10/29/03 Measures Related To Fitness-For-Duty Enhancements Applicable To Nuclear Facility Security Force Personnel N/A Response To Order For Compensatory MB7416 1/7/04 Measures Related To Access Authorization