Letter Sequence Other |
---|
TAC:MB6468, Missed Surveillance Requirements, Incorporate CEOG Topical Report to Eliminate Pressure Sensor Response Time Testing (Approved, Closed) |
Results
Other: ML021280278, ML022940186, ML030780605, ML031210545, ML031290602, ML031400506, ML031410096, ML031410107, ML031410212, ML031960625, ML032300003, ML032300305, ML032310200, ML032310213, ML032530228, ML032960189
|
MONTHYEARML0205002282002-02-25025 February 2002 Issuance of Order for Interim Safeguards and Compensatory Security Measures Project stage: Approval ML0212802782002-05-22022 May 2002 Reply to Response to Order for Interim Safeguards and Security Compensatory Measures Project stage: Other ML0229401862002-10-25025 October 2002 Biweekly Notice Memo, Notice of Consideration, Testing Prestressed Concrete Containment Tendons Project stage: Other ML0229504532003-01-16016 January 2003 Issuance of License Amendment No. 215, Missed Surveillances & Adoption of Technical Specification Bases Control Program Project stage: Approval ML0302201532003-01-16016 January 2003 Technical Specification Pages for Amendment 215 Missed Surveillances and Adoption of a Technical Specification Bases Control Program Project stage: Acceptance Review ML0306307272003-02-26026 February 2003 Issuance of Amendment No. 216, Relocating TS 3.5(5), Requirements for Testing Prestressed Concrete Containment Tendons to the Updated Safety Analysis Report Project stage: Approval ML0305902712003-02-26026 February 2003 Technical Specifications, Relocation of TS 3.5(5), Requirements for Testing Prestressed Concrete Containment Tendons to the Updated Safety Analysis Report Project stage: Acceptance Review ML0305803512003-02-27027 February 2003 Correction to Amendment No. 215 to Fort Calhoun, Station No. 1. Page 5-17 of Technical Specifications Omitted Reference to SR 3.0.5. Corrected TS Page Encl Project stage: Acceptance Review ML0307806052003-03-18018 March 2003 Pressure-Temperature Limit Report Submittal Project stage: Other ML0308402732003-03-24024 March 2003 RAI, Related to Integrated Leak Rate Test Surveillance Interval Project stage: RAI LIC-03-0052, Response to Request for Additional for Information, Pressure-Temperature Limits Report Amendment Request2003-04-10010 April 2003 Response to Request for Additional for Information, Pressure-Temperature Limits Report Amendment Request Project stage: Request LIC-03-0055, Response to Request for Additional Information Integrated Leak Rate Testing Surveillance Interval Amendment Request2003-04-11011 April 2003 Response to Request for Additional Information Integrated Leak Rate Testing Surveillance Interval Amendment Request Project stage: Response to RAI ML0312004872003-04-29029 April 2003 Issuance of Amendment No. 217 Modifying TS 2.3.a, to Extend the Allowed Outage Time for a Single Low Pressure Safety Injection Pump from the Existing 24 Hours to 7 Days Project stage: Approval ML0312105452003-04-29029 April 2003 Tech Spec Pages for Amendment No. 217 Modifying TS 2.3.a, to Extend the Allowed Outage Time for a Single Low Pressure Safety Injection Pump from the Existing 24 Hours to 7 Days Project stage: Other ML0312906022003-05-0808 May 2003 Tech Spec Pages for Amendment No. 218, Administrative and Editorial Changes to FCS TS 1.3 Basis (1); 2.7 (1)a; 2.7 (1)b; 2.7 (1)d; 2.7 (1)i; 2.7 Basis; 3.0.2; Table 3-5, Item 11; and 3.5 (3)ii Project stage: Other ML0312900812003-05-0808 May 2003 Issuance of Amendment No. 218, Administrative and Editorial Changes to FCS TS 1.3 Basis (1); 2.7 (1)a; 2.7 (1)b; 2.7 (1)d; 2.7 (1)i; 2.7 Basis; 3.0.2; Table 3-5, Item 11; and 3.5 (3)ii Project stage: Approval ML0314102122003-05-20020 May 2003 Thesis (Miscellaneous Report - 134 Pages), Fort Calhoun, S107100 Project stage: Other ML0314005062003-05-20020 May 2003 Ltr RELAP5/MOD3.3 Prediction and Model Simulation Project stage: Other ML0314100962003-05-20020 May 2003 Description/Model Simulation (Technical Paper - 5 Pages), Fort Calhoun, S107101 Project stage: Other ML0314101072003-05-20020 May 2003 Listing (Report, Technical - 3 Pages), Fort Calhoun, S107102 Project stage: Other ML0314103762003-05-21021 May 2003 Request for Additional Information Pressure-Temperature Limit Report Submittal (Tac. MB6468) Project stage: RAI LIC-03-0079, Supplemental Response to Request for Additional Information, Integrated Leak Rate Testing Surveillance Interval Amendment Request2003-05-21021 May 2003 Supplemental Response to Request for Additional Information, Integrated Leak Rate Testing Surveillance Interval Amendment Request Project stage: Supplement ML0316800102003-06-17017 June 2003 Request for Additional Information, Use of the Gothic (Version 7.0) Computer Program Project stage: RAI ML0319606252003-07-11011 July 2003 Correction to Amd. 218 for the Fort Calhoun Station, Unit No. 1 (Tac. MB7498) Project stage: Other ML0320202182003-07-18018 July 2003 Ltr Environmental Assessment Relating to Exemption from the Requirements of Appendix G to 10 CFR Part 50 Project stage: Approval ML0320902422003-07-25025 July 2003 Unit 1, License Amendment 219 Modifying Technical Specification 2.1.6 Project stage: Approval ML0321004542003-07-25025 July 2003 Unit 1, Tech Spec Pages for License Amendment 219 Modifying Technical Specification 2.1.6 Project stage: Approval ML0323102002003-08-15015 August 2003 Tech Spec Pages for Amendment No. 221, Use of a Pressure Temperature Limits Report (Ptlr), Change the Minimum Boltup Temperature, Revise the Low Temperature Overpressure Protection (LTOP) Methodology and Analysis Project stage: Other ML0323102132003-08-15015 August 2003 Tech Spec Page to License Amendment No. 220, Grants One-Time Five-Year Extension to Current Ten-Year Test Interval for Containment Integrated Leak Rate Testing Project stage: Other ML0323003052003-08-15015 August 2003 License Amendment No. 221, Use of a Pressure Temperature Limits Report (Ptlr), Change the Minimum Boltup Temperature, Revise the Low Temperature Overpressure Protection (LTOP) Methodology and Analysis Project stage: Other ML0323000032003-08-15015 August 2003 License Amendment No. 220, Grants One-Time Five-Year Extension to Current Ten-Year Test Interval for Containment Integrated Leak Rate Testing Project stage: Other ML0325302282003-09-0404 September 2003 Ft.Calhoun, Closeout Letter - Response to Order for Compensatory Measures Related to Access Authorization Project stage: Other ML0329601892003-10-23023 October 2003 Reply to Response to Order for Fitness-For-Duty Enhancements for Nuclear Security Force Personnel Project stage: Other ML0331002902003-11-0505 November 2003 Unit #1, Issuance of Amendment 222, Authorizing Revisions to the Updated Safety Analysis Report to Incorporate the NRC Approval of the Gothic 7.0 Computer Program for Performing Containment Analysis, (Tac. MB7496) Project stage: Approval 2003-04-10
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000285/20240032024-10-29029 October 2024 NRC Inspection Report 05000285/2024003 LIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24243A1042024-09-12012 September 2024 Proposed Revision to the OPPD FCS DQAP - Request for Additional Information (License No. DPR-40, Docket Nos. 50-285, 72-054, and 71-0256) ML24255A0962024-09-12012 September 2024 License Amendment Request to Revise the License Termination Plan - Request Supplemental Information (License No. DPR-40, Docket No. 50-285) IR 05000285/20240022024-08-21021 August 2024 NRC Inspection Report 05000285/2024002 ML24235A0822024-08-10010 August 2024 Response to Fort Calhoun Station, Unit No. 1 - Phase 1 Final Status Survey Report to Support Approved License Termination Plan - Request for Additional Information - Request for Additional Information (EPID L-2024-DFR-0002) July 8, 2024 ML24180A2082024-07-0808 July 2024 Phase 1 Final Status Survey Reports Request for Additional Information Letter ML24183A3222024-07-0808 July 2024 Proposed Revision to the Omaha Public Power District Fort Calhoun Station Decommissioning Quality Assurance Plan - Acceptance Review LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) IR 05000285/20240012024-06-0505 June 2024 NRC Inspection Report 05000285/2024001 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan ML24079A1702024-03-10010 March 2024 ISFSI, Unit 1 - 10 CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, 10 CFR 71.106 Quality Assurance Program Approval, Aging Management Review, Commitment Revisions and Revision of Updated Safe LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report ML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf IR 05000285/20230032023-07-10010 July 2023 NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska ML23151A0032023-06-0505 June 2023 Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, Shpo; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commission'S Analysis of Omaha Public Power District'S Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1252022-08-0303 August 2022 Letter to Mr. Timothy Rhodd, Chairperson, Iowa Tribe of Kansas and Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22214A0922022-08-0303 August 2022 Letter to Stacy Laravie, Thpo, Ponca Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 2024-09-18
[Table view] |
Text
May 20, 2003 Mr. R. T. Ridenoure Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550 Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION - RELAP5/MOD3.3 PREDICTION AND MODEL SIMULATION (TAC NO. MB6468)
Dear Mr. Ridenoure:
By letter dated October 8, 2002, Omaha Public Power District (OPPD), requested approval of the revised low-temperature overpressure protection (LTOP) analysis for the Fort Calhoun Station, Unit 1 (FCS). On April 23, 2003, the NRC staff and OPPD held a conference call to discuss the revised LTOP methodology. The staff stated that it would be useful if OPPD could validate its LTOP models. The staff agreed to provide OPPD several references which would assist in this effort. Enclosed are: (1) a MIT Thesis, "Insurge Pressure Response and Heat Transfer for PWR Pressurizer," (2) a short description of the RELAP5/MOD3.3 prediction and model simulation from the RELAP5 Developmental Report, and (3) a listing of the RELAP5 input model for the Test ST4. The thesis contains relevant data to allow OPPD to validate the LTOP models. Note that the RELAP5 prediction of ST4 underpredicts the pressure data due to the lack on nodalization detail in the RELAP5 model. The surge tank was modeled with 10 cells which was determined to be insufficient.
If you have any questions, please contact me at (301) 415-1445.
Sincerely,
/RA/
Alan B. Wang, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-285
Enclosures:
- 1. MIT Thesis
- 2. Description/Model Simulation
- 3. Listing cc: See next page
ML031400506 NRR-088 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME AWang EPeyton SDembek DATE 5/13/03 5/13/03 5/13/03 DOCUMENT NAME: G:\PDIV-2\FortCalhoun\mb6468ltoprai.wpd Ft. Calhoun Station, Unit 1 cc:
Winston & Strawn Mr. Daniel K. McGhee ATTN: James R. Curtiss, Esq. Bureau of Radiological Health 1400 L Street, N.W. Iowa Department of Public Health Washington, DC 20005-3502 401 SW 7th Street, Suite D Des Moines, IA 50309 Chairman Washington County Board of Supervisors Mr. Richard P. Clemens P.O. Box 466 Division Manager - Nuclear Assessments Blair, NE 68008 Omaha Public Power District Fort Calhoun Station Mr. John Kramer, Resident Inspector P.O. Box 550 U.S. Nuclear Regulatory Commission Fort Calhoun, NE 68023-0550 P.O. Box 310 Fort Calhoun, NE 68023 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Ms. Sue Semerera, Section Administrator Nebraska Health and Human Services Systems Division of Public Health Assurance Consumer Services Section 301 Cententiall Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Mr. David J. Bannister, Manager Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. John B. Herman Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550 Fort Calhoun, NE 68023-0550