MONTHYEARML0215602982002-06-0505 June 2002 Request for Additional Information Weld KC-32 on High Pressure Core Spray Nozzle (Tac No. MB4869) Project stage: RAI ML0307704442003-03-0606 March 2003 Response to Request for Additional Information Regarding High Pressure Core Spray Nozzle Safe-End Extension Weld (KC-32) Project stage: Response to RAI 2002-06-05
[Table View] |
|
---|
Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] |
Text
P.O. Box 63 Lycoming, New York 13093 Constellation Energy Group Nine Mile Point Nuclear Station March 6, 2003 NMP2L 2086 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Nine Mile Point Unit 2 Docket No. 50-410 Facility Operating License NPF-69 Response to NRC Request for Additional Information Regarding High Pressure Core Spray Nozzle Safe-End Extension Weld (KC-32)
TAC No. MB4869 Gentlemen:
On May 21, 2002, the NRC staff transmitted by e-mail a list of questions regarding the High Pressure Core Spray (HPCS) nozzle safe-end extension weld (KC-32). A subsequent telephone conference was held on May 29, 2002 between NRC and Nine Mile Point Nuclear Station, LLC (NMPNS) staff representatives to discuss the questions and disposition the corresponding issues and responses. Following the telephone conference, the NRC staff issued a Request for Additional Information (RAI) by letter dated June 5, 2002. The Attachment to this letter contains the NRC questions and the NMPNS responses.
Sincerely, jBruc~ Mo gomnery M ayger Engineerin Services BSM/DEV/jmr Attachment I"Vl
Page 2 NMP2L 2086 cc: Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector Mr. P. S. Tam, Senior Project Manager, NRR (2 copies)
ATTACHMENT NINE MILE POINT UNIT 2 RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION (RAI)
REGARDING HIGH PRESSURE CORE SPRAY (HPCS)
NOZZLE SAFE-END EXTENSION WELD (KC-32)
Reference:
NRC Letter to Nine Mile Point Nuclear Station, LLC (NMPNS) dated June 5, 2002 RAI (1)
Provide the results of ultrasonictesting (UT)performed in the spring2002 refueling outage on weld KC-32, and compare the results with those of the previouspost-MSIP [mechanicalstress improvement process]inspections.
Response
Table 1 provides the results of UT performed during refueling outage number 8 (RFO-8) in the spring of 2002, as well as the results of UT performed during previous post-MSIP inspections.
The inspection results obtained during RFO-8 are consistent with the evaluation contained in the NRC letter to Mr. K. S. Grewal dated May 5, 2000; i.e., that there have been no significant changes or trends in the UT measurements of the flaw size that would indicate a developing problem.
RAI (2)
Describe the UT equipment andproceduresused in the inspection ofweld KC-32 in the 2002 refueling outage, and identify the differences with those used in previous inspections.If different equipment andprocedureswere used, discuss their impact on the results offlaw size measurements.
Response
The RFO-8 inspection (April 2002) was performed utilizing different inspection tooling than was used in previous inspections. Westinghouse personnel, equipment, and procedures were used for the RFO-8 inspection, whereas General Electric personnel, equipment, and procedures were used for the inspections performed prior to RFO-8. As noted in the response to RAI (1) above, the RFO-8 inspection results are consistent with the evaluation contained in the NRC letter to Mr. K.
S. Grewal dated May 5, 2000; i.e., that there have been no significant changes or trends in the UT measurements of the flaw size that would indicate a developing problem.
Page 1 of5
Forcomparisonpurposes,provide information on the following items pertainingto the UT inspectionsperformedon weld K-32 after implementation ofMSIP.
(a) UT measurement uncertaintiesassociatedwith the reportedflaw length and depth during eachpost-MSIP inspection.
Response
See the response to Question 3 in the Attachment to Niagara Mohawk Power Corporation (NMPC) letter NMP2L 1951 dated April 7, 2000. Since the inspection techniques utilized for the RFO-8 inspections were similarly qualified (as discussed in the response to Item (b) below), the discussion provided in the referenced letter remains applicable.
(b) UT qualificationrequirementsof the procedures/equipment/personnelthat were used in the inspection of weld KC-32 duringeach post-MSIP inspection.
Response
Through RFO-4, the inspections were performed using Electric Power Research Institute (EPRI)-qualified procedures, equipment, and personnel. The RFO-6 and RFO-8 inspection procedures, equipment, and personnel were qualified to the EPRI Performance Demonstration Initiative (PDI) standard.
(c) During eachpost-MSIP UT inspection, clarifywhether the spring hangerforpipe supportnear weld KC-32 waspinned anddescribe the weight of shielding lead that were placedon the HPCSpiping.
Response
Spring Hanger Pinning: Since application of the MSIP, with the exception of the 1992 inspection, direction was given to not pin the spring hanger near weld KC-32 during installation of the lead shielding and performance of the UT inspections.
Weight of Shielding: The weight of shielding lead placed on the HPCS piping during each UT inspection cannot be determined with certainty; however, similar amounts have been used during the various examinations. The HPCS piping has been analytically qualified for a shielding lead weight of 90 lbs/ft applied to the piping and inline valves from the reactor pressure vessel nozzle to 4 feet upstream of containment isolation valve 2CSH*AOV108 (a total shielding weight of approximately 2,200 lbs). Administrative controls assure that the weight of shielding lead installed does not exceed the analytically qualified weight.
Page 2 of 5
RAI (3) (Cont'd)
(d) An estimation of upper bound compressive stresses on theflaw in weld KC-32 resulting from the weight of shielding leadwith unpinnedspringhangers,and the potentialimpact to the results of UT inspection due to these compressive stresses.Specifically, discuss the differences in resulting compressive stresses between pinnedand un-pinnedspring hanger configurations.
Response
The stress at the nozzle-to-pipe connection due to the application of shielding lead (in the amount identified in the response to RAI (3), Item (c) above) is as follows:
- Deadweight with spring hanger pinned: 1,155 psi
- Deadweight with spring hanger unpinned: 1,395 psi These results demonstrate that the difference in the deadweight stress due to the shielding lead with the spring hanger pinned versus unpinned is small. In both cases, the flaw area will be in compression. For comparison, the calculated stress for the American Society of Mechanical Engineers (ASME)Section III, Equation 9 load combination (normal/upset, including pressure, deadweight, and earthquake inertia loads, with the spring hanger unpinned) is 9,642 psi, versus the allowable value of 30,000 psi (1.5 Sm).
NMIPNS concludes that the weight of shielding lead will not have a significant effect on the flaw size or the ability to detect and size the flaw using UT techniques, since:
- 1. The additional compressive forces imposed at the flaw location by the weight of shielding lead are of low magnitude (with the spring hanger either pinned or unpinned);
- 2. The flaw has remained detectable using techniques and tooling that have been qualified to a common standard; and
- 3. There have been no significant changes or trends in the UT measurements of the flaw size that would indicate a developing problem.
RA 1(4)
Describe the design basisfatigue usagefactor limitfor the HPCS system. In addition,provide informationpertainingto the thermalstratfcationstress of the HPCSpiping adjoiningthe reactorpressure vessel nozzle, if any. Furthermore,describehow this thermalstratification stress is consideredin the crack evaluation.
Page 3 of 5
Response
Fatigue Usage Factor: The design basis cumulative usage factor (CUF) limit for the HPCS piping and nozzle is 1.0, in accordance with the ASME Code, Section I[I, Division 1, Subsection NB.
Thermal Stratification: Thermal stratification is caused by cold water flowing at the bottom of the pipe while the top of the pipe is exposed to hot temperatures. The HPCS system design criteria did not anticipate or require that thermal stratification be considered. NMPNS has confirmed by analysis that the differential water temperature between the top and bottom of the piping adjoining the reactor pressure vessel nozzle is small (a few degrees). Thus, thermal stratification stresses need not be considered in the fatigue evaluation.
Page 4 of 5
TABLE 1 WELD KC-32 INSPECTION (UT) RESULTS Length (% of Depth (% of Inspection Internal Circumference) Wall Thickness)
Post-MSIP (RFO-1, 3.40" 1) 0.35"141 December 1990) (11.3%) (41%)
Midcycle (August 1991) 3.3" (1) 0.32'")
(10.9%) (38%)
RFO-2 (April 1992) 2.6" Automated o 3.3" Manual 0.25" k" (8.6%) (10.9%) (29%)
RFO-3 (October 1993) 2.5" Automated co 3.0" Manual 0.25"1(4)
(8.3%) (9.9%) (29%)
RFO-4 (May 1995) 2.5" Automated o 3.0" Manual 0.30" (4)
(8.3%) (9.9%) (35%)
RFO-6 (May 1998) 3.2" Automated (2) N/A 0.30" c2)
(10.6%) (35%)
RFO-8 (April 2002) 2.7" Automated (3) N/A 0.25" k-)
(8.9%) (29%)
(1) General Electric (GE) Smart automated 450 shear wave with manual "re-looks" to determine length (2) GE "Smart 2000" automated system (3) Westinghouse "Intraspect" automated system (4) Depth sizing performed manually Page 5 of 5