|
---|
Category:Letter
MONTHYEARML24151A3842024-10-31031 October 2024 – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 ML24303A2782024-10-29029 October 2024 10 CFR 50.46 Annual Report ML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval ML24299A2642024-10-25025 October 2024 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . 2024-09-06
[Table view] |
Text
SExelkns.
Exelon Nuclear www exeloncorp corn Nuclear 20o Exelon Way Kennett Square, PA 19348 10 CFR 50.90 September 12, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
Subject:
License Amendment Request LG 02-00391 Extended Use of Pressure-Temperature Limits Specified in Technical Specifications Figure 3.4.6.1 Supplemental Information
References:
Letter from M. P. Gallagher, Exelon Generation Company, LLC, to U.S. Nuclear Regulatory Commission, Limerick Generating Station, Units 1 and 2, License Amendment Request LG 02-00391, "Extended Use of Pressure-Temperature Limits Specified in Technical Specifications Figure 3.4.6.1-1," dated June 26, 2002.
In the Reference letter, pursuant to 10 CFR 50.90, "Application for amendment of license or construction permit," Exelon Generation Company, LLC (Exelon), requested a change to Facility Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station (LGS), Units 1 and 2, respectively. The request extends the use of the pressure-temperature (P-T) limits specified in Technical Specification (TS) Figure 3.4.6.1-1, "Minimum Reactor Vessel Metal Temperature vs.
Reactor Vessel Pressure," to 32 effective full power years (EFPY) by deleting a note on each unit's TS Figure which was added by a previous license amendment for each respective LGS unit. This note currently limits the applicability of the P-T limits until the end of the current cycle of operation for each LGS unit.
In a teleconference between members of the NRC and Exelon on July 18, 2002, the NRC requested additional information to support their review of the proposed changes. The requested information is provided in the Attachment to this letter.
This supplement does not change the information supporting the finding of No Significant Hazards Consideration and information supporting the need not to perform an Environmental Assessment contained in the Referenced letter.
There are no commitments contained within this letter.
If you have any questions or require additional information, please contact Glenn Stewart at 610 765-5529.
License Amendment Request LG 02-00391 - Supplemental Information Docket Nos. 50-352 & 50-353 September 12, 2002 Page 2 I declare under penalty of perjury that the foregoing is true and correct.
Respectfully, Executed on .) i'oZ M. P. Gallagher Director, Licensing & Regulatory Affairs Mid-Atlantic Regional Operating Group
Attachment:
Supplemental Information cc: H. J. Miller, Administrator, Region I, USNRC w/ attachment A. L. Burritt, USNRC Senior Resident Inspector, LGS S. Wall, Senior Project Manager, USNRC R. R. Janati - Commonwealth of Pennsylvania
License Amendment Request LG 02-00391 Docket Nos. 50-352 & 50-353 Extended Use of P-T Limits Supplemental Information Attachment By letter dated June 26, 2002, pursuant to 10 CFR 50.90, "Application for amendment of license or construction permit," Exelon Generation Company, LLC (Exelon), requested a change to Facility Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station (LGS), Units 1 and 2, respectively. The request extends the use of the pressure temperature (P-T) limits specified in Technical Specification (TS) Figure 3.4.6.1-1, "Minimum Reactor Vessel Metal Temperature vs. Reactor Vessel Pressure," to 32 effective full power years (EFPY) by deleting a note on each unit's TS Figure which was added by a previous license amendment for each respective LGS unit. This note currently limits the applicability of the P-T limits until the end of the current cycle of operation for each LGS unit.
In a teleconference between members of the NRC and Exelon on July 18, 2002, the NRC requested additional information to support their review of the proposed changes in the original License Amendment Request submittal. The requested information is provided below.
- 1. Provide information on the correlation between the license amendment request and any past or possible future power uprates with respect to predicted neutron fluence.
Response
For power rerate considerations, the original peak reactor pressure vessel (RPV) inside diameter fluence (1.7 x 1018 n/cm 2) was assumed to increase proportional to the increase in power. To be conservative, it was also assumed that the power increased from the first day of commercial operation rather than when the power rerate was implemented. As a result, for a proposed 10% power rerate, the peak RPV inside diameter fluence was increased by 10% to 1.9 x 1018 n/cm 2. Although LGS, Units 1 and 2, are only licensed for 5% power rerate (from 3293 MWth to 3458 MWth), the peak RPV inside diameter fluence of 1.9 x 10'8 n/cm 2 was conservatively used to develop the P-T curves contained in both our current and proposed TS Figure 3.4.6.1-1. Similarly, the 1.3x1 018 n/cm 2 referenced in our current license amendment request is the predicted 32 EFPY neutron fluence for the 110% power rerate condition at the one quarter thickness (1/4T) of the vessel beltline, which is the current licensing basis for LGS, Units 1 and 2.
- 2. Provide information concerning the assumptions for fuel loadings in the license amendment request.
Response
The operating condition assumed for the bounding fluence analysis is based on the projected LGS Unit 2 Cycle 6 core data. The analysis inputs were based on the core design data generated by Global Nuclear Fuel - America (GNF-A). The core power used is the currently licensed power of 3458 MWth. The LGS Unit 2 Cycle 6 core load contains 544 bundles of GE13, 104 bundles of GEl 1, and 116 bundles of GE6 (Shoreham fuel).
The 8x8 GE6 fuels are loaded solely into the peripheral zone of the core.
1
Ifs-License Amendment Request LG 02-00391 Docket Nos. 50-352 & 50-353 Extended Use of P-T Limits Supplemental Information Attachment
- 3. Provide the name of the specific cross section libraries used in the calculations referenced in the license amendment request.
Response
The cross section library used in the calculations is based on Version V of the Evaluated Nuclear Data File (ENDF/B-V). However, cross sections for the important components of BWR neutron flux calculation - oxygen, hydrogen, and individual iron isotopes - have been upgraded to ENDF/B-VI to meet the guidelines of Regulatory Guide 1.190.
2