Letter Sequence Other |
---|
TAC:MB2694, Revision to TS Bases Control Program to Incorporate Changes to 10 CFR 50.59 (Approved, Closed) |
Results
Other: ML020330004, ML020880505, ML021280222, ML021360002, ML021370220, ML021690571, ML022190509, ML022350168, ML022600529, ML022630274, ML022700508, ML022700549, ML022830043, ML022950381, RS-03-034, Delegation of Authority of Amergen Energy Company, LLC (Amergen) Nuclear Power Plants
|
MONTHYEARML0131208582002-01-28028 January 2002 Station,- Issuance of Amendment, Incorporate Revisions to 10 CFR 50.59 (Tac No. MB2431) Project stage: Approval ML0203300042002-01-28028 January 2002 Technical Specifications - Oyster Creek - Amendment No. 224 (Tac No MB2431) Project stage: Other ML0208805052002-03-28028 March 2002 Tech. Spec. Page for Amendment No. 146, Revising the Test Frequency for the Containment Spray Nozzles from Once Per 10 Years to Following Activities That Could Result in Nozzle Blockage. Project stage: Other ML0212802222002-05-0707 May 2002 Licensing Actions Project stage: Other ML0214003812002-05-16016 May 2002 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0213702202002-05-17017 May 2002 Request Conference Call Proposed Amendment Project stage: Other ML0213600022002-06-0404 June 2002 License Amendment, Revising the Technical Specifications to Be Consistent with Changes Made to 10 CFR 50.59, Changes, Tests, and Experiments Project stage: Other ML0216905712002-06-0404 June 2002 Tech Specs for Amendment No. 151 Revising the Tech Specs to Be Consistent with Changes Made to 10CFR 50.59, Changes, Tests and Experiments. Project stage: Other ML0216301202002-06-10010 June 2002 Draft RAI on Your 04/26/02 Amendment Request Project stage: Draft RAI ML0220405862002-07-11011 July 2002 Response to Request for Additional Information - Technical Specification Change Request No. 308 General Electric Stability Analysis Methodology Project stage: Response to RAI ML0219705332002-07-24024 July 2002 Request for Withholding Information from Public Disclosure, Oyster Creek Nuclear Generating Station Project stage: Withholding Request Acceptance ML0222607982002-08-0101 August 2002 Response to Request for Additional Information - Technical Specification Change Request No. 291, Safety Limit Minimum Critical Power Ratio Project stage: Response to RAI ML0221905092002-08-0505 August 2002 Conference Call Re. 04/26/02 Proposed Amend Project stage: Other ML0222609462002-08-20020 August 2002 Second Request for Additional Information Regarding Your April 26, 2002, Application for Amendment Project stage: RAI ML0223501682002-08-23023 August 2002 Site Visit to Address Issues Related to Amendment Application of April 26, 2002 Project stage: Other ML0224203602002-08-30030 August 2002 Withholding from Public, Response to Request for Additional Information - Technical Specification Change Request No. 291, Safety Limit Minimum Critical Power Ratio, MB5505 Project stage: RAI ML0226600972002-09-12012 September 2002 Response to Request for Additional Information - Technical Specification Change Request No. 308, General Electric Stability Analysis Methodology Project stage: Response to RAI ML0225600192002-09-18018 September 2002 Issuance of Amendment Licensed and Non-Licensed Operating Personnel Training Programs Project stage: Approval ML0226302742002-09-18018 September 2002 Oyster Creek,Tech Spec Pages/Amend 232 Project stage: Other ML0226005292002-09-24024 September 2002 License Amendment Revision to TSs Change Request - Clarification of Requirements for Licensed Operator Qualifications & Training Project stage: Other ML0227005082002-09-24024 September 2002 Tech Spec Pages for Amendment No. 154, Revision to TSs Change Request - Clarification of Requirements for Licensed Operator Qualifications & Training Project stage: Other ML0226805692002-09-26026 September 2002 Issuance of License Amendment Cycle 19 Safety Limit Minimum Critical Power Ratio Project stage: Approval ML0227005492002-09-26026 September 2002 Tech Spec Pages for Amendment 233 Cycle 19 Safety Limit Minimum Critical Power Ratio Project stage: Other ML0228300432002-10-0909 October 2002 Current TAC List Project stage: Other ML0229103652002-10-18018 October 2002 Issuance of Amendment Use of Option II Solution for Reactor Instability Problem Project stage: Approval ML0229503812002-10-18018 October 2002 Technical Specification Amendment 235 - 2.3 Limiting Safety System Settings Pages 2.3-1, 2.3-2, 2.3-4, 2.3-5, 2.3-6, 3.1-1, 3.1-7, 3.10-2, 3.10-3, and 3.10-4 Project stage: Other RS-03-034, Delegation of Authority of Amergen Energy Company, LLC (Amergen) Nuclear Power Plants2003-02-0606 February 2003 Delegation of Authority of Amergen Energy Company, LLC (Amergen) Nuclear Power Plants Project stage: Other 2002-07-24
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML21119A0642021-06-25025 June 2021 License Amendment 299 ML18221A4002018-10-17017 October 2018 Issuance of Amendment No. 294, Revise the Site Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MG0160; L-2017-LLA-0307) ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) RA-15-030, Submittal of Changes to Technical Specifications Bases2015-04-14014 April 2015 Submittal of Changes to Technical Specifications Bases ML14329A6252015-03-30030 March 2015 Issuance of Amendment Regarding Reactor Building Vital Area Access Control ML1019301722010-09-27027 September 2010 Issuance of Amendment Relocation of Surveillance Requirement Frequencies to a Licensee Controlled Document Based on TSTF-425, Revision 3 RA-10-028, Response to Request for Additional Information, License Amendment Request Regarding Relocation of Selected Technical Specification Surveillance Frequencies to a Licensee Controlled Document2010-04-16016 April 2010 Response to Request for Additional Information, License Amendment Request Regarding Relocation of Selected Technical Specification Surveillance Frequencies to a Licensee Controlled Document RA-09-029, Supplement to License Amendment Request Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action, and Clarification of A..2009-03-30030 March 2009 Supplement to License Amendment Request Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action, and Clarification of A.. RA-08-100, Special Report for Inoperability of Turbine Building High Range Radioactive Noble Gas Monitor2008-11-18018 November 2008 Special Report for Inoperability of Turbine Building High Range Radioactive Noble Gas Monitor ML0824703052008-08-28028 August 2008 Technical Specifications, TSTF Change Traveler TSTF-479 & TSTF-497 ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses ML0821301362008-07-25025 July 2008 Braidwood/Byron/Clinton/Dresden/Lasalle/Oyster Creek/Peach Bottom/Quad Cities/Three Mile Island - Tech Spec Pages for Amds to Change TS Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML0812303462008-05-30030 May 2008 Tec Specs to Amd 266/License DPF-16/Oyster Creek ML0810505452008-04-30030 April 2008 Technical Specification Pages for License Amendment No. 265 the Incorporation of TSTF-448, Revision 3, Control Room Habitability. (Tac MD5281) RA-08-024, Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours.2008-04-21021 April 2008 Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours. RA-08-004, Technical Specification Change Request No. 348 - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR)2008-03-10010 March 2008 Technical Specification Change Request No. 348 - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) RS-08-012, Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications2008-02-28028 February 2008 Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications ML0802901792008-02-0101 February 2008 Oyster Creek,Technical Specifications, Corrected, Revised Pages of Facility Operating License No. DPR-16 RA-08-011, Response to Request for Additional Information - Exelon/Amergen Application to Revise Technical Specifications Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement..2008-01-23023 January 2008 Response to Request for Additional Information - Exelon/Amergen Application to Revise Technical Specifications Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement.. ML0729202902007-10-18018 October 2007 Technical Specification Change Request No. 374 - Revision to Mechanical Snubber Functional Testing Requirements ML0722501972007-08-0808 August 2007 Technical Specifications Pages Re Annual Radioactive Effluent Release Report Submittal Date ML0721302932007-07-27027 July 2007 Technical Specifications, Issuance of Amendment Request to Change Technical Specification Definition of Channel Calibration, Channel Check, and Channel Test RS-07-078, Amergen - License Amendment Request to Change Technical Specification Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators2007-07-19019 July 2007 Amergen - License Amendment Request to Change Technical Specification Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML0713603392007-05-16016 May 2007 Technical Specification Change Request No. 327 - Modify Technical Specifications for Primary Containment Oxygen Concentration ML0711703892007-04-26026 April 2007 Technical Specifications Application of Alternate Source Term Methodology ML0633201962006-11-27027 November 2006 Technical Specification Change Request No. 341 - Revision to Required Submittal Date for Annual Radioactive Effluent Release Report ML0626101962006-09-13013 September 2006 Technical Specification Pages Re Increase Safety Valve As-Found Setpoint Tolerance from 1 Percent to 3 Percent ML0624404112006-09-0101 September 2006 Tech Spec Pages for Amendment 260 Regarding Revision to Electromatic Relief Valve Surveillance Requirement ML0623704752006-08-25025 August 2006 Technical Specifications - Deletion of Reporting Requirement in Facility Operating License ML0605500582006-02-22022 February 2006 Tech Spec Page for Amendment 258 Regarding Deletion of Reporting Requirement in Facility Operating License ML0600600152006-01-0404 January 2006 Technical Specifications, 1.0 Environmental Monitoring ML0529701902005-10-18018 October 2005 Technical Specification Change Request No. 328 - Modify Surveillance Requirements for Testing of Main Steam Line Electromatic Relief Valves ML0520000612005-07-14014 July 2005 Tech Spec Pages for Amendment 256 Capability Upgrade of a 69-KV Offsite Power Line to 230-KV ML0517802562005-06-23023 June 2005 Tech Spec Pages for Amendment, Reactor Building Closed Cooling Water Pump and Service Water Pump Trip Conditions ML0516002532005-06-0808 June 2005 Tech Spec Page for Amendment 254 Delete the TS Requirements to Submit Monthly Operating Reports and Annual Occupational Radiation Exposure Reports RS-05-006, Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License2005-02-25025 February 2005 Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License ML0505900852005-02-24024 February 2005 Technical Specification Change Request No. 319 - Revision to Table 3.1.1 Notes Aa and Bb Regarding Reactor Building Closed Cooling Water Pump and Service Water Pump Trip Conditions RS-04-157, Proposed Revision to Appendix B, Environmental Protection Plan (Non-Radiological) of the Facility Operating License2004-12-17017 December 2004 Proposed Revision to Appendix B, Environmental Protection Plan (Non-Radiological) of the Facility Operating License ML0430803562004-11-0202 November 2004 Tech Spec Pages for Amendment 250 Main Steam Line Isolation Valve Leakage Testing ML0433100362004-10-20020 October 2004 Technical Specification, Control Rod Scram Time Testing Requirements ML0429203072004-10-13013 October 2004 Table, Run or Startup Mode (Except for Low Power Physics Testing) ML0427902182004-10-0404 October 2004 Technical Specifications, Modify Control Rod Scram Time Testing Surveillance Requirements ML0425301502004-08-27027 August 2004 Station,Technical Specification Change Request No. 331 - Safety Limit Minimum Critical Power Ratio ML0423604742004-08-19019 August 2004 Technical Specification for Oyster Creek ML0422301962004-08-0909 August 2004 Tech Spec for Oyster Creek, License Amendment No. 246, Elimination of Requirements for Hydrogen Monitors ML0421703712004-07-30030 July 2004 Technical Specifications, Sections 3.7 and 4.7, Auxiliary Electrical Power, and Added a New Section 6.8.5, Station Battery Monitoring and Maintenance Program ML0415600412004-07-13013 July 2004 Unit, 1, License Amendments 244 and 250 Re.: Amendments to Delete a License Condition Regarding the Long Range Planning Program ML0415305902004-05-27027 May 2004 Unit 1, Technical Specifications, Reflect Ownership Change ML0409002892004-03-29029 March 2004 Tech Spec Pages for Amendment 241 Regarding Increasing Flexibility in Mode Restraints ML0333201312003-11-24024 November 2003 Tech Spec Pages for Amendment 239 Regarding Startup Transformer and Emergency Diesel Generator Unavailability 2021-06-25
[Table view] |
Text
TABLE OF CONTENTS (cont'd)
Page Section 5 Design Features 5.1 Size 5.1-1 5.2 Containment 5.2-1 5.3 Auxiliary Equipment 5.3-1 Section 6 Administrative Controls 6.1 Responsibility 6-1 6.2 Organization 6-1 6.3 Facility Staff Qualifications 6-2a 6.4 DELETED 6-3 6.5 Review and Audit 6-3 6-6 Reportable Event Action 6-9 6-7 Safety Limit Violation 6-9 6-8 Procedures and Programs 6-10 6-9 Reporting Requirements 6-13 6-10 Record Retention 6-17 6-11 Radiation Protection Program 6-18 6-12 (Deleted) 6-18 6-13 High Radiation Area 6-18 6-14 Environmental Qualification 6-19*
6-15 Integrity of Systems Outside Containment 6-19 6-16 Iodine Monitoring 6-19 6-17 Post Accident Sampling 6-20 6-18 Process Control Plan 6-20 6-19 Offsite Dose Calculation Manual 6-20 6-20 DELETED 6-20
- Issued by NRC Order dated 10-24-80 OYSTER CREEK iii Amendment No.: 94, 97, 98, 1 115,131,166,186 232
- c. A break of at least eight hours should be allowed between work period, including shift turnover time.
- d. In a, b, and c above, the time required to complete shift turnover is to be counted as break time and is not to be counted as work time.
- e. Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift.
Any deviation from the above guidelines shall be authorized by the Department Managers, or higher levels of management, in accordance with established procedures and with documentation of the basis for granting the deviation.
- j. The Senior Manager - Operations or an Operations Manager, and the Shift Manager require Senior Reactor Operators licenses. The licensed Nuclear Plant Operators require a Reactor Operators license.
6.2.2.3 Individuals who train the operating staff and those who carry out the health physics and quality assurance function shall have sufficient organizational freedom to be independent of operational pressures, however, they may report to the appropriate manager on site.
6.3 Facility Staff Qualifications 6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI/ANS 3.1 of 1978 for comparable positions unless otherwise noted in the Technical Specifications, with the following exceptions: 1) the education and experience eligibility requirements for operator license applicants (described in Exelon letter RS-02-100, dated June 19, 2002), and changes thereto, shall be approved by the NRC and described in an applicable station training procedure, and 2) technicians and maintenance personnel who do not meet ANSI/ANS 3.1 of 1978, Section 4.5, are permitted to perform work for which qualification has been demonstrated.
6.3.2 The management position responsible for radiological controls shall meet or exceed the qualifications of Regulatory Guide 1.8 (Rev. 1-R, 9/75). Each other member of the radiation protection organization for which there is a comparable position described in ANSI N18.1 1971 shall meet or exceed the minimum qualifications specified therein, or in the case of radiation protection technicians, they shall have at least one year's continuous experience in applied radiation protection work in a nuclear facility dealing with radiological problems similar to those encountered in nuclear power stations and shall have been certified by the management position responsible for radiological controls as qualified to perform assigned functions. This certification must be based on an NRC approved, documented program consisting of classroom training with appropriate examinations and documented positive findings by responsible supervision that the individual has demonstrated his ability to perform each specified procedure and assigned function with an understanding of its basis and purpose.
6.3.3 The Shift Technical Advisors shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, response and analysis of the plant for transients and accidents.
OYSTER CREEK 6-2a Amendment No.: 134,203,220,226, 23 2
6.4 DELETED 6.5 REVIEW AND AUDIT 6.5.1 TECHNICAL REVIEW AND CONTROL The director of each department shall be responsible for ensuring the preparation, review, and approval of documents required by the activities described in 6.5.1.1 through 6.5.1.5 within his functional area of responsibility as assigned in the Review and Approval Matrix. Implementing approvals shall be performed at the cognizant manager level or above.
ACTIVITIES 6.5.1.1 Each procedure required by Technical Specification 6.8 and other procedures which affect nuclear safety, and substantive changes thereto, shall be prepared by a designated individual(s)/group knowledgeable in the area affected by the procedure. Each such procedure, and substantive change thereto, shall be reviewed for adequacy by an individual(s)/group other than the preparer, but who may be from the same division as the individual who prepared the procedure or change.
OYSTER CREEK 6-3 Amendment No.: 69,78,125,134,161,194,203,210,213,232