Letter Sequence Draft RAI |
|---|
|
Results
Other: ML020880505, ML021280222, ML021360002, ML021370220, ML021690571, ML022190509, ML022350168, ML022630274, ML022700549, ML022830043, ML022950381, RS-03-034, Delegation of Authority of Amergen Energy Company, LLC (Amergen) Nuclear Power Plants
|
MONTHYEARML0205706382002-03-28028 March 2002 Issuance of Amendment Revises the Test Frequency for the Containment Spray Nozzles from Once Per 10 Years to Following Activities That Could Result in Nozzle Blockage Project stage: Approval ML0208805052002-03-28028 March 2002 Tech. Spec. Page for Amendment No. 146, Revising the Test Frequency for the Containment Spray Nozzles from Once Per 10 Years to Following Activities That Could Result in Nozzle Blockage Project stage: Other ML0212802222002-05-0707 May 2002 Licensing Actions Project stage: Other ML0214003812002-05-16016 May 2002 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0213702202002-05-17017 May 2002 Request Conference Call Proposed Amendment Project stage: Other ML0213600052002-06-0404 June 2002 Biweekly Notice Memo, Notice of Issuance of Amendment 151. Amendment Revises Technical Specifications to Be Consistent with Changes Made to 10 CFR 50.59, Changes, Tests, & Experiments Project stage: Approval ML0213600022002-06-0404 June 2002 License Amendment, Revising the Technical Specifications to Be Consistent with Changes Made to 10 CFR 50.59, Changes, Tests, and Experiments Project stage: Other ML0216905712002-06-0404 June 2002 Tech Specs for Amendment No. 151 Revising the Tech Specs to Be Consistent with Changes Made to 10CFR 50.59, Changes, Tests and Experiments Project stage: Other ML0216301202002-06-10010 June 2002 Draft RAI on Your 04/26/02 Amendment Request Project stage: Draft RAI ML0220405862002-07-11011 July 2002 Response to Request for Additional Information - Technical Specification Change Request No. 308 General Electric Stability Analysis Methodology Project stage: Response to RAI ML0219705332002-07-24024 July 2002 Request for Withholding Information from Public Disclosure, Oyster Creek Nuclear Generating Station Project stage: Withholding Request Acceptance ML0222607982002-08-0101 August 2002 Response to Request for Additional Information - Technical Specification Change Request No. 291, Safety Limit Minimum Critical Power Ratio Project stage: Response to RAI ML0221905092002-08-0505 August 2002 Conference Call Re. 04/26/02 Proposed Amend Project stage: Other ML0222609462002-08-20020 August 2002 Second Request for Additional Information Regarding Your April 26, 2002, Application for Amendment Project stage: RAI ML0223501682002-08-23023 August 2002 Site Visit to Address Issues Related to Amendment Application of April 26, 2002 Project stage: Other ML0224203602002-08-30030 August 2002 Withholding from Public, Response to Request for Additional Information - Technical Specification Change Request No. 291, Safety Limit Minimum Critical Power Ratio, MB5505 Project stage: RAI ML0226600972002-09-12012 September 2002 Response to Request for Additional Information - Technical Specification Change Request No. 308, General Electric Stability Analysis Methodology Project stage: Response to RAI ML0225600192002-09-18018 September 2002 Issuance of Amendment Licensed and Non-Licensed Operating Personnel Training Programs Project stage: Approval ML0226302742002-09-18018 September 2002 Oyster Creek,Tech Spec Pages/Amend 232 Project stage: Other ML0226005292002-09-24024 September 2002 License Amendment Revision to TSs Change Request - Clarification of Requirements for Licensed Operator Qualifications & Training Project stage: Approval ML0227005082002-09-24024 September 2002 Tech Spec Pages for Amendment No. 154, Revision to TSs Change Request - Clarification of Requirements for Licensed Operator Qualifications & Training Project stage: Approval ML0226805692002-09-26026 September 2002 Issuance of License Amendment Cycle 19 Safety Limit Minimum Critical Power Ratio Project stage: Approval ML0227005492002-09-26026 September 2002 Tech Spec Pages for Amendment 233 Cycle 19 Safety Limit Minimum Critical Power Ratio Project stage: Other ML0228300432002-10-0909 October 2002 Current TAC List Project stage: Other ML0229103652002-10-18018 October 2002 Issuance of Amendment Use of Option II Solution for Reactor Instability Problem Project stage: Approval ML0229503812002-10-18018 October 2002 Technical Specification Amendment 235 - 2.3 Limiting Safety System Settings Pages 2.3-1, 2.3-2, 2.3-4, 2.3-5, 2.3-6, 3.1-1, 3.1-7, 3.10-2, 3.10-3, and 3.10-4 Project stage: Other RS-03-034, Delegation of Authority of Amergen Energy Company, LLC (Amergen) Nuclear Power Plants2003-02-0606 February 2003 Delegation of Authority of Amergen Energy Company, LLC (Amergen) Nuclear Power Plants Project stage: Other 2002-07-24
[Table View] |
Text
From:
Peter Tam To:
david.distel@exeloncorp.com Date:
6/10/02 4:57PM
Subject:
Draft RAI on your 4/26/02 amendment request (TAC MB4960)
Dave:
We had a telecon on 5/30/02 on this amendment request. After the telecon, our reviewer Christopher Graham developed the following draft questions. Please take a look at them. We would be glad to hold another telecon with you if you so desire.
This e-mail, by itself, does not convey a formal NRC staff position, and does not formally request information. Please discuss with me how we should disposition these questions.
Questions regarding instrumentation and control: FCTR and setpoint calculation.
- 1. Please identify the manufacturer and model of the digital FCTR cards and identify the vendor documentation that is available for the cards.
- 2. Enclosure 1 states that "New Digital FCTR cards are being installed under 10CFR50.59.."
Please provide the staff with the 10CFR50.59 screening and evaluation for the FCTR cards.
- 3. Please identify the process involved to ensure that procured digital FCTR cards under 10 CFR 50.59 for this project are similar in design, specification and functionality as those for the product line previously approved by the NRC staff. If modifications have been made by the vendor or the licensee, please provide the details of the changes.
- 4. Please provide the nvironmental "qualification parameters" mentioned in enclosure 1, page 8 that the FCTR cards are being designed to.
- 5. Please confirm: (1) for your plant-specific location, Electromagnetic Interference (EMI) and Radio Frequency Interference (RFI) susceptibility-qualification of the new digital FCTR cards was determined based on guidance of EPRI Report TR-102323, and (2) the new digital hardware will not become a source of conducted and/or radiated EMI and RFI for other safety-related circuits.
- 6. Please provide any reports or evaluation of the " burn-in process" mentioned in enclosure 1, page 8 for the digital FCTR cards.
- 7. Please provide any reports or evaluations for the "shakedown period" that occurred at the end of cycle 18 for the digital FCTR cards
- 8. Please report on any failures or abnormal operation of the FCTR cards during the burn-in or shakedown process. Please provide proposed or performed plant specific changes that have or are planned to occur as a result of the burn-in and shakedown process.
- 9. If your in-house setpoint calculation methodology was previously approved by the NRC, please cite the approval document. If your methodology was not previously reviewed and approved by the staff, please confirm that your setpoint calculation methodology is based on the staff approved Industry standards, and meets the 95/95 confidence level requirement.
CC:
john.hufnagel@exeloncorp.com Mail Envelope Properties (3D0512D3.555 : 10 : 21854)
Subject:
Draft RAI on your 4/26/02 amendment request (TAC MB4960)
Creation Date:
6/10/02 4:57PM From:
Peter Tam Created By:
pst@nrc.gov Recipients Action Date & Time exeloncorp.com Transferred 06/10/02 04:58PM david.distel john.hufnagel CC Post Office Delivered Route exeloncorp.com Files Size Date & Time MESSAGE 2613 06/10/02 04:57PM Options Auto Delete:
No Expiration Date:
None Notify Recipients:
Yes Priority:
Standard Reply Requested:
No Return Notification:
Send Mail Receipt when Undeliverable Concealed
Subject:
No Security:
Standard To Be Delivered:
Immediate Status Tracking:
Delivered & Opened