Site Visit to Address Issues Related to Amendment Application of April 26, 2002
ML022350168
Person / Time
Site: Oyster Creek
Issue date: 08/23/2002
From: Tam P
NRC/NRR/DLPM/LPD1
To: Skolds J
Exelon Generation Co, Exelon Nuclear
Tam P, NRR/DLPM, 415-1451
References
TAC MB4960
Download: ML022350168 (5)


Text

August 23, 2002 Mr. John L. Skolds, President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OYSTER CREEK NUCLEAR GENERATING STATION - SITE VISIT TO ADDRESS ISSUES RELATED TO AMENDMENT APPLICATION OF APRIL 26, 2002 (TAC NO. MB4960)

Dear Mr. Skolds:

The Nuclear Regulatory Commission (NRC) staff is reviewing the subject application for amendment whereby AmerGen proposed to incorporate the Boiling Water Reactor Owners Group stability Option II solution methodology to ensure that coupled neutronic/thermal-hydraulic instabilities are detected and suppressed. As part of its review, the NRC staff needs to perform a site review which would include viewing of onsite documents, and discussion with your personnel who are familiar with the proposed action. As agreed with Mr. David Distel of your staff, the site review is scheduled to take place on August 29, 2002. Participants of the site review are Messrs. Tai Huang, Christopher Graham, and Jose March-Leuba (NRC contractor from Oak Ridge National Laboratory). The issues to be addressed in the site review are set forth in the enclosure.

Mr. Huang will contact Mr. Distel to arrange for the logistics of this site review. If you need clarification, please feel free to contact me at 301-415-1451.

Sincerely,

/RA/

Peter S. Tam, Senior Project Manager, Section 1 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-219

Enclosure:

As stated cc w/encl: See next page

August 23, 2002 Mr. John L. Skolds, President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OYSTER CREEK NUCLEAR GENERATING STATION - SITE VISIT TO ADDRESS ISSUES RELATED TO AMENDMENT APPLICATION OF APRIL 26, 2002 (TAC NO. MB4960)

Dear Mr. Skolds:

The Nuclear Regulatory Commission (NRC) staff is reviewing the subject application for amendment whereby AmerGen proposed to incorporate the Boiling Water Reactor Owners Group stability Option II solution methodology to ensure that coupled neutronic/thermal-hydraulic instabilities are detected and suppressed. As part of its review, the NRC staff needs to perform a site review which would include viewing of onsite documents, and discussion with your personnel who are familiar with the proposed action. As agreed with Mr. David Distel of your staff, the site review is scheduled to take place on August 29, 2002. Participants of the site review are Messrs. Tai Huang, Christopher Graham, and Jose March-Leuba (NRC contractor from Oak Ridge National Laboratory). The issues to be addressed in the site review are set forth in the enclosure.

Mr. Huang will contact Mr. Distel to arrange for the logistics of this site review. If you need clarification, please feel free to contact me at 301-415-1451.

Sincerely,

/RA/

Peter S. Tam, Senior Project Manager, Section 1 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-219

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC S. Little B. Platchek, RGI PDI-1 Reading File R. Laufer P. Tam T. Huang S. Richards S. Little C. Graham S. Athavale E. Marinos R. Caruso Accession Number: ML022350168 OFFICE PDI-1/PM PDI-1/LA SRXB/SC EEIB/SC PDI-1/SC NAME PTam SLittle RCaruso EMarinos*

RLaufer DATE 8/22/02 8/23/02 8/22/02 8/21/02 8/23/02 OFFICIAL RECORD COPY

  • Concurred by phone

OYSTER CREEK NUCLEAR GENERATING STATION AMENDMENT APPLICATION DATED APRIL 26, 2002 NRC STAFF SITE REVIEW ISSUES (1)

An overview of Long Term Solution (LTS) implementation: where Oyster Creek is now, what has Oyster Creek implemented in the past, dates of implementation.

(2)

An explanation of AmerGens past experience with LTS implementation at Oyster Creek:

any problems/issues with the Interim Corrective Actions, any problems/issues with the original Solution II implementation.

(3)

The steps involved in the new "Generic" Solution II implementation, including at least the following items:

a. Rationale for change
b. Differences between the old and new "Generic" Solution II
c. Implementation steps
d. Justification that Solution II applies to Oyster Creek
e. Supporting calculations
f. Testing requirements
g. Schedule for full implementation (4)

The impact on implementation of the 10 CFR Part 21 issue of the Generic DIVOM curve. Which DIVOM curve was used for the Oyster Creek analyses?

(5)

Hardware changes, including at least the following items:

a. Rationale for change
b. Implementation steps
c. Initial testing - How long? Under what conditions?
d. Long-term testing implications
e. Schedule for implementation
f. The issue of spares - How many in hand? Long-term supplier?

(6)

Does the current LTS implementation include any upgrade to the plant computer software? Any significant impact on operator training?

Enclosure

Oyster Creek Nuclear Generating Station cc:

Chief Operating Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President - Nuclear Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Mid-Atlantic Operations Support Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Senior Vice President -

Mid Atlantic Regional Operating Group Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Kevin P. Gallen, Esquire Morgan, Lewis, & Bockius LLP 1800 M Street, NW Washington, DC 20036-5869 Kent Tosch, Chief New Jersey Department of Environmental Protection Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 Vice President -

Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Site Vice President Oyster Creek Nuclear Generating Station AmerGen Energy Company, LLC PO Box 388 Forked River, NJ 08731 H. J. Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mayor of Lacey Township 818 West Lacey Road Forked River, NJ 08731 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ 08731 Director - Licensing Exelon Generation Company, LLC Correspondence Control Desk P.O. Box 160 Kennett Square, PA 19348 Oyster Creek Generating Station Plant Manager AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731 Regulatory Assurance Manager Oyster Creek Nuclear Generating Station AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731 Vice President, General Counsel and Secretary Exelon Generation Company, LLC 300 Exelon Way Kennett Square, PA 19348 J. Rogge, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Manager Licensing - Oyster Creek and Three Mile Island Exelon Generation Company, LLC Nuclear Group Headquarters Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Correspondence Control Desk Exelon Generation Company, LLC 200 Exelon Way, KSA 1-N-1 Kennett Square, PA 19348