Letter Sequence Other |
---|
TAC:MB2428, Revision to TS Bases Control Program to Incorporate Changes to 10 CFR 50.59 (Approved, Closed) |
Results
Other: ML020330004, ML020880505, ML021280222, ML021360002, ML021370220, ML021690571, ML022190509, ML022350168, ML022600529, ML022630274, ML022700508, ML022700549, ML022830043, ML022950381, RS-03-034, Delegation of Authority of Amergen Energy Company, LLC (Amergen) Nuclear Power Plants
|
MONTHYEARML0131208582002-01-28028 January 2002 Station,- Issuance of Amendment, Incorporate Revisions to 10 CFR 50.59 (Tac No. MB2431) Project stage: Approval ML0203300042002-01-28028 January 2002 Technical Specifications - Oyster Creek - Amendment No. 224 (Tac No MB2431) Project stage: Other ML0208805052002-03-28028 March 2002 Tech. Spec. Page for Amendment No. 146, Revising the Test Frequency for the Containment Spray Nozzles from Once Per 10 Years to Following Activities That Could Result in Nozzle Blockage. Project stage: Other ML0212802222002-05-0707 May 2002 Licensing Actions Project stage: Other ML0214003812002-05-16016 May 2002 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0213702202002-05-17017 May 2002 Request Conference Call Proposed Amendment Project stage: Other ML0213600022002-06-0404 June 2002 License Amendment, Revising the Technical Specifications to Be Consistent with Changes Made to 10 CFR 50.59, Changes, Tests, and Experiments Project stage: Other ML0216905712002-06-0404 June 2002 Tech Specs for Amendment No. 151 Revising the Tech Specs to Be Consistent with Changes Made to 10CFR 50.59, Changes, Tests and Experiments. Project stage: Other ML0216301202002-06-10010 June 2002 Draft RAI on Your 04/26/02 Amendment Request Project stage: Draft RAI ML0220405862002-07-11011 July 2002 Response to Request for Additional Information - Technical Specification Change Request No. 308 General Electric Stability Analysis Methodology Project stage: Response to RAI ML0219705332002-07-24024 July 2002 Request for Withholding Information from Public Disclosure, Oyster Creek Nuclear Generating Station Project stage: Withholding Request Acceptance ML0222607982002-08-0101 August 2002 Response to Request for Additional Information - Technical Specification Change Request No. 291, Safety Limit Minimum Critical Power Ratio Project stage: Response to RAI ML0221905092002-08-0505 August 2002 Conference Call Re. 04/26/02 Proposed Amend Project stage: Other ML0222609462002-08-20020 August 2002 Second Request for Additional Information Regarding Your April 26, 2002, Application for Amendment Project stage: RAI ML0223501682002-08-23023 August 2002 Site Visit to Address Issues Related to Amendment Application of April 26, 2002 Project stage: Other ML0224203602002-08-30030 August 2002 Withholding from Public, Response to Request for Additional Information - Technical Specification Change Request No. 291, Safety Limit Minimum Critical Power Ratio, MB5505 Project stage: RAI ML0226600972002-09-12012 September 2002 Response to Request for Additional Information - Technical Specification Change Request No. 308, General Electric Stability Analysis Methodology Project stage: Response to RAI ML0225600192002-09-18018 September 2002 Issuance of Amendment Licensed and Non-Licensed Operating Personnel Training Programs Project stage: Approval ML0226302742002-09-18018 September 2002 Oyster Creek,Tech Spec Pages/Amend 232 Project stage: Other ML0226005292002-09-24024 September 2002 License Amendment Revision to TSs Change Request - Clarification of Requirements for Licensed Operator Qualifications & Training Project stage: Other ML0227005082002-09-24024 September 2002 Tech Spec Pages for Amendment No. 154, Revision to TSs Change Request - Clarification of Requirements for Licensed Operator Qualifications & Training Project stage: Other ML0226805692002-09-26026 September 2002 Issuance of License Amendment Cycle 19 Safety Limit Minimum Critical Power Ratio Project stage: Approval ML0227005492002-09-26026 September 2002 Tech Spec Pages for Amendment 233 Cycle 19 Safety Limit Minimum Critical Power Ratio Project stage: Other ML0228300432002-10-0909 October 2002 Current TAC List Project stage: Other ML0229103652002-10-18018 October 2002 Issuance of Amendment Use of Option II Solution for Reactor Instability Problem Project stage: Approval ML0229503812002-10-18018 October 2002 Technical Specification Amendment 235 - 2.3 Limiting Safety System Settings Pages 2.3-1, 2.3-2, 2.3-4, 2.3-5, 2.3-6, 3.1-1, 3.1-7, 3.10-2, 3.10-3, and 3.10-4 Project stage: Other RS-03-034, Delegation of Authority of Amergen Energy Company, LLC (Amergen) Nuclear Power Plants2003-02-0606 February 2003 Delegation of Authority of Amergen Energy Company, LLC (Amergen) Nuclear Power Plants Project stage: Other 2002-07-24
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000461/20240032024-11-0505 November 2024 Integrated Inspection Report 05000461/2024003 ML24285A1452024-10-24024 October 2024 Ltr. to Gail Cheatham, Kickapoo Tribe of Indians of the Kickapoo Reservation in Ks Re CPS Sect 106 Consult ML24285A1462024-10-24024 October 2024 Ltr. to Gena Kakkak, Chairwoman, Menominee Indian Tribe of Wisconsin Re CPS Section 106 Consultation IR 05000461/20244032024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024403 ML24285A1482024-10-24024 October 2024 Ltr. to Joseph Rupnick, Chairman, Prairie Band Potawatomi Nation Re CPS Section 106 Consultation ML24285A1442024-10-24024 October 2024 Ltr. to Estavio Elizondo, Sr., Chairman, Kickapoo Traditional Tribe of Texas Re CPS Section 106 Consultation IR 05000461/20244022024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024402 ML24285A1472024-10-24024 October 2024 Ltr. to Geoffrey M. Standing Bear, Principal Chief, Osage Nation Re CPS Section 106 Consultation ML24285A1422024-10-24024 October 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Re CPS Section 106 Consultation ML24283A1642024-10-23023 October 2024 Summary of the 2024 Environmental Audit Related to the Review of the License Renewal Application Environmental Report (EPID Number L-2024-LNE-0000)(Docket Number:50-461) ML24285A1412024-10-21021 October 2024 Ltr. to Craig Harper, Chief, Peoria Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1432024-10-21021 October 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma Re CPS Section 106 Consultation RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24215A2932024-09-27027 September 2024 Scoping Summary Letter 05000461/LER-2023-002-01, Reactor Core Isolation Cooling Inoperable Prior to Mode Change2024-09-24024 September 2024 Reactor Core Isolation Cooling Inoperable Prior to Mode Change ML24211A2302024-09-11011 September 2024 – Request for Partial Site Release for Facility Operating License No. NPF-62 IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) ML24222A3952024-08-23023 August 2024 Regulatory Audit Report to Support the Review of the Amendments to Revise Reactor Water Cleanup Valve Isolation Timing IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24220A2772024-08-0707 August 2024 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000461/2025010 ML24212A2212024-08-0202 August 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-LNE-0000) (Docket Number: 50-461) ML24157A3242024-07-11011 July 2024 Issuance of Amendment No. 254 Revision of Reactor Water Cleanup Isolation Valve Timing ML24158A0772024-07-0303 July 2024 Notice of Consideration of Approval of Partial Site Release, Public Meeting, and Request for Comments (EPID L-2023-LLA-0088) - Letter ML24163A3252024-06-28028 June 2024 Aging Management Regulatory Audit Plan ML24163A3242024-06-28028 June 2024 LRA - Portal Letter ML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24290A0942024-05-21021 May 2024 Letter from Rachael Mangum (Achp) to Stephen Koenick (NRC) License Renewal Application for the Clinton Power Station Unit 1 Dewitt County, Il, Achp Project Number: 020924 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20240012024-05-0707 May 2024 Integrated Inspection Report 05000461/2024001 ML24103A1032024-05-0101 May 2024 SHPO Consultation Letter for Clinton License Renewal ML24120A3442024-04-30030 April 2024 Ltr. to Gena Kakkak, Chairman, Menominee Indian Tribe of Wisconsin; Re., CPS Section 106 Consultation ML24120A3432024-04-30030 April 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma; Re., CPS Section 106 Consultation RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24103A0992024-04-30030 April 2024 Achp Scoping Letter for Clinton License Renewal ML24120A3462024-04-30030 April 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma; Re., CPS Section 106 Consultation ML24120A3452024-04-30030 April 2024 Ltr. to Lester Randell, Chairman, Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas; Re., CPS Section 106 Consultation ML24103A1152024-04-30030 April 2024 Ltr. to Geoffrey Standing Bear, Principal Chief, the Osage Nation; Re., CPS Section 106 Consultation ML24107B0312024-04-29029 April 2024 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24089A2222024-04-11011 April 2024 LRA - Acceptance and Opportunity for Hearing - Letter 2024-09-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24157A3242024-07-11011 July 2024 Issuance of Amendment No. 254 Revision of Reactor Water Cleanup Isolation Valve Timing ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML23338A1102024-02-0606 February 2024 Issuance of Amendment No. 252 Revision of Technical Specification 3.8.3, Diesel Fuel Oil, and Starting Air ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23284A2512023-11-22022 November 2023 Amendment No. 250 to Adopt TSTF-332 ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23031A2972023-03-0101 March 2023 Issuance of Amendment No. 248 Adoption of TSTF-269, Revision 2 ML22263A4732022-11-10010 November 2022 Issuance of Amendment No. 247 Adoption of TSTF-230, Revision 1 ML22292A0352022-11-10010 November 2022 Issuance of Amendment No. 246 Secondary Containment and the Fuel Building Railroad Airlock (EPID L-2022- LLA-0055) ML22095A2702022-05-12012 May 2022 Issuance of Amendment Nos. 227, 227, 229, 229, and 245, Respectively, Regarding Adoption of TSTF 273, Safety Function Determination Program Clarifications ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21306A0002021-12-21021 December 2021 License Amendment to Revise Degraded Voltage Relay Allowable Values ML21307A3422021-12-0707 December 2021 Issuance of Amendments to Adopt Reactor Pressure Vessel Water Inventory Control Enhancements (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) ML21132A2882021-06-28028 June 2021 Issuance of Amendment No. 238, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B ML21090A1932021-05-19019 May 2021 Issuance of Amendment No. 237 Regarding Adoption of 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components of Nuclear Power Reactors ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20266G3432020-10-14014 October 2020 Issuance of Amendment No. 235 Regarding Operation of the Emergency Auxiliary Reserve Transformer Load Tap Changer ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034G5462020-03-12012 March 2020 Issuance of Amendments Revising Instrument Testing and Calibration Definitions ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML19266A5272019-10-0808 October 2019 Issuance of Amendments to Eliminate Second Completion Times from Technical Specifications ML19238A3082019-09-30030 September 2019 Issuance of Amendment - Regarding Adoption of TSTF-476, Improved Banked Position Withdrawal Sequence Control Rod Insertion Process ML19176A0332019-08-28028 August 2019 Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR ML19109A0012019-06-12012 June 2019 Issuance of Amendment Regarding Recapture of Low-Power Testing Time ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18303A3132019-01-0303 January 2019 Issuance of Amendment 221 Regarding Revised Alternative Source Term Dose Calculation ML18254A3672018-10-29029 October 2018 County 1 & 2; and Quad Cities 1 & 2 - Issuance of Amendments 220, 259, 252, 231, 217, 271 and 266 to Revise Technical Specification Requirements for Inoperable Snubbers ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18113A0452018-05-29029 May 2018 Issuance of Amendments to Revise Technical Specification Requirements for Secondary Containment ML18072A0502018-04-30030 April 2018 Issuance of Amendment Regarding the Spent Fuel Pool Level (CAC No. MF9962; EPID L-2017-LLA-0258) ML18110A3542018-04-24024 April 2018 Correction to Facility Operating License ML18043A5052018-03-22022 March 2018 Issuance of Amendment to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MF9666; EPID L-2017-LLA-0223) ML17324A3542018-01-22022 January 2018 Issuance of Amendment Regarding Residual Heat Removal Subsystem Operability Requirements During Decay Heat Removal Operations (CAC No. MF9684; EPID L-2017-LLA-0225) ML17237A0102017-09-26026 September 2017 Issuance of Amendment Regarding Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17073A0672017-05-26026 May 2017 Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) ML17027A0382017-02-22022 February 2017 Issuance of Amendment Regarding Inservice Leak and Hydrostatic Testing Operations ML16217A3322016-08-17017 August 2016 Issuance of Amendment Concerning Incorporation of Revised Alternative Source Term (CAC No. MF7336) (RS-16-019) RS-16-132, Certification of Permanent Cessation of Power Operations2016-06-20020 June 2016 Certification of Permanent Cessation of Power Operations ML16111A1042016-05-11011 May 2016 Issuance of Amendments to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core SLs (CAC Nos. MF6640-MF6644) ML15251A5842015-12-18018 December 2015 Issuance of Amendment Concerning Revision to Integrated Leak Test Intervals (TAC No. MF5291)(RS-14-308) ML15280A2582015-10-22022 October 2015 Issuance of Amendment Related to One-Time Extension of Completion Time for Shutdown Service Water (TAC No. MF6705)(RS-15-264) 2024-07-11
[Table view] Category:Safety Evaluation
MONTHYEARML24211A2302024-09-11011 September 2024 – Request for Partial Site Release for Facility Operating License No. NPF-62 ML24157A3242024-07-11011 July 2024 Issuance of Amendment No. 254 Revision of Reactor Water Cleanup Isolation Valve Timing ML23338A1102024-02-0606 February 2024 Issuance of Amendment No. 252 Revision of Technical Specification 3.8.3, Diesel Fuel Oil, and Starting Air ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML22300A2212023-11-0202 November 2023 Preliminary Decommissioning Cost Estimate and Fuel Management Plan ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23031A2972023-03-0101 March 2023 Issuance of Amendment No. 248 Adoption of TSTF-269, Revision 2 ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22292A0352022-11-10010 November 2022 Issuance of Amendment No. 246 Secondary Containment and the Fuel Building Railroad Airlock (EPID L-2022- LLA-0055) ML22263A4732022-11-10010 November 2022 Issuance of Amendment No. 247 Adoption of TSTF-230, Revision 1 ML22095A2702022-05-12012 May 2022 Issuance of Amendment Nos. 227, 227, 229, 229, and 245, Respectively, Regarding Adoption of TSTF 273, Safety Function Determination Program Clarifications ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22094A0012022-04-15015 April 2022 Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) ML22047A1272022-02-22022 February 2022 Relief from the Requirements of the American Society of Mechanical Engineers Code ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21306A0002021-12-21021 December 2021 License Amendment to Revise Degraded Voltage Relay Allowable Values ML21307A3422021-12-0707 December 2021 Issuance of Amendments to Adopt Reactor Pressure Vessel Water Inventory Control Enhancements (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21132A2882021-06-28028 June 2021 Issuance of Amendment No. 238, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B ML21166A1682021-06-25025 June 2021 ML21090A1932021-05-19019 May 2021 Issuance of Amendment No. 237 Regarding Adoption of 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components of Nuclear Power Reactors ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML21005A0612021-01-14014 January 2021 Proposed Alternatives to Extend the Safety Relief Valve Testing Interval (EPID L-2020-LLR-0014 Through L-2020-LLR-0018) ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20268C2322020-11-0404 November 2020 Proposed Alternative I4R-06 to the Requirements of the ASME Code ML20266G3432020-10-14014 October 2020 Issuance of Amendment No. 235 Regarding Operation of the Emergency Auxiliary Reserve Transformer Load Tap Changer ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20218A6602020-09-0202 September 2020 Proposed Alternative I4R-01 to the Requirements of the ASME Code ML20232A1882020-09-0101 September 2020 Proposed Alternative I4R-02 to the Requirements of the ASME Code ML20232A1712020-09-0101 September 2020 Request to Use Alternative Code Case OMN-26 ML20219A2022020-09-0101 September 2020 Proposed Alternative I4R-05 to the Requirements of the American Society of Mechanical Engineers Code ML20212L3902020-08-31031 August 2020 Proposed Alternative I4r-03 to the Requirements of the Asme Code (Epid L-2019-Llr-0114) ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20163A7172020-06-26026 June 2020 Proposed Alternative to the Requirements of the ASME Code ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML20028E3992020-02-0404 February 2020 Proposed Alternative to Use ASME Code Case N-879 ML20010E8702020-01-27027 January 2020 Proposed Alternative to the Requirements of the ASME Code ML19238A3082019-09-30030 September 2019 Issuance of Amendment - Regarding Adoption of TSTF-476, Improved Banked Position Withdrawal Sequence Control Rod Insertion Process ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19176A0332019-08-28028 August 2019 Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 ML19109A0012019-06-12012 June 2019 Issuance of Amendment Regarding Recapture of Low-Power Testing Time 2024-09-11
[Table view] |
Text
June 4, 2002 Mr. John L. Skolds, President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, Illinois 60555
SUBJECT:
CLINTON POWER STATION, UNIT 1 - ISSUANCE OF AMENDMENT (TAC NO. MB2428)
Dear Mr. Skolds:
The U.S. Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment No. 151 to Facility Operating License No. NPF-62 for the Clinton Power Station, Unit 1. The amendment is in response to your application dated July 9, 2001.
The amendment revises the Technical Specifications to be consistent with changes made to 10 CFR 50.59, Changes, tests, and experiments.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Jon B. Hopkins, Senior Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-461
Enclosures:
- 1. Amendment No. 151 to NPF-62
- 2. Safety Evaluation cc w/encls: See next page
June 4, 2002 Distribution w/encls:
PUBLIC GHill (2)
PD3-2 r/f OGC Mr. John L. Skolds, President ACRS WBeckner and Chief Nuclear Officer GGrant, RIII Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, Illinois 60555
SUBJECT:
CLINTON POWER STATION, UNIT 1 - ISSUANCE OF AMENDMENT (TAC NO. MB2428)
Dear Mr. Skolds:
The U.S. Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment No. 151 to Facility Operating License No. NPF-62 for the Clinton Power Station, Unit 1. The amendment is in response to your application dated July 9, 2001.
The amendment revises the Technical Specifications to be consistent with changes made to 10 CFR 50.59, Changes, tests, and experiments.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Jon B. Hopkins, Senior Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-461
Enclosures:
- 1. Amendment No. 151 to NPF-62
- 2. Safety Evaluation cc w/encls: See next page ADAMS Accession Number: ML021360002 OFFICE PM:LPD3-2 LA:LPD3-2 OGC SC:LPD3-2 NAME JHopkins THarris AHodgdon AMendiola DATE 05/22/02 05/21/02 05/24/02 06/04/02 OFFICIAL RECORD COPY
Clinton Power Station, Unit 1 cc:
Chief Operating Officer Senior Counsel, Nuclear Exelon Generation Company, LLC Mid-West Regional Operating Group 4300 Winfield Road Exelon Generation Company, LLC Warrenville, Illinois 60555 4300 Winfield Road Warrenville, Illinois 60555 Senior Vice President - Nuclear Services Exelon Generation Company, LLC Document Control Desk-Licensing 4300 Winfield Road Exelon Generation Company, LLC Warrenville, Illinois 60555 4300 Winfield Road Warrenville, Illinois 60555 Vice President - Mid-West Opns Support Exelon Generation Company, LLC Illinois Department of Nuclear Safety 4300 Winfield Road Office of Nuclear Facility Safety Warrenville, Illinois 60555 1035 Outer Park Drive Springfield, IL 62704 Senior Vice President - Mid-West Regional Operating Group Site Vice President - Clinton Power Station Exelon Generation Company, LLC AmerGen Energy Company, LLC 4300 Winfield Road Clinton Power Station Warrenville, Illinois 60555 RR 3, Box 228 Clinton, IL 61727-9351 Vice President - Licensing and Regulatory Affairs Clinton Power Station Plant Manager Exelon Generation Company, LLC AmerGen Energy Company, LLC 4300 Winfield Road Clinton Power Station Warrenville, Illinois 60555 RR 3, Box 228 Clinton, IL 61727-9351 Manager Licensing - Clinton and LaSalle Exelon Generation Company, LLC Regulatory Assurance Manager - Clinton 4300 Winfield Road AmerGen Energy Company, LLC Warrenville, IL 60555 Clinton Power Station RR 3, Box 228 Director-Licensing Clinton, IL 61727-9351 Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, Illinois 60555
Clinton Power Station, Unit 1 cc:
Resident Inspector U.S. Nuclear Regulatory Commission RR#3, Box 229A Clinton, IL 61727 R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, CA 95125 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Chairman of DeWitt County c/o County Clerks Office DeWitt County Courthouse Clinton, IL 61727 J. W. Blattner Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago, IL 60603
AMERGEN ENERGY COMPANY, LLC DOCKET NO. 50-461 CLINTON POWER STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 151 License No. NPF-62
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by AmerGen Energy Company, LLC (the licensee), dated July 9, 2001, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-62 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 151 are hereby incorporated into this license. AmerGen Energy Company, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: June 4, 2002
ATTACHMENT TO LICENSE AMENDMENT NO. 151 FACILITY OPERATING LICENSE NO. NPF-62 DOCKET NO. 50-461 Replace the following page of the Appendix "A" Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Pages Insert Pages 5.0-16 5.0-16
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 151 TO FACILITY OPERATING LICENSE NO. NPF-62 AMERGEN ENERGY COMPANY, LLC CLINTON POWER STATION, UNIT 1 DOCKET NO. 50-461
1.0 INTRODUCTION
By letter dated July 9, 2001, AmerGen Energy Company, LLC (AmerGen, the licensee),
submitted an amendment request for changes to the Clinton Power Station, Unit 1 (CPS),
Technical Specifications (TS). The requested changes provide consistency with the changes to Title 10 Code of Federal Regulations (10 CFR) Section 50.59, Changes, tests, and experiments, which became effective on March 13, 2001.
2.0 BACKGROUND
The Commissions regulations in 10 CFR 50.59 establish the conditions for the licensee to implement changes to its facility or procedures that are described in the updated safety analysis report (USAR) prior to U.S. Nuclear Regulatory Commission (NRC) approval. These regulations further establish conditions for the licensee to conduct tests or experiments, which are not described in the USAR, prior to NRC approval.
The amendment revises TS 5.5.11, Technical Specifications (TS) Bases Control Program, in order to adopt NRC-approved Technical Specification Task Force (TSTF) item TSTF-364, Revision 0. TSTF-364 revises NUREG 1431, Standard Technical Specifications Westinghouse Plants, NUREG 1433, Standard Technical Specifications General Electric Plants BWR-4, and NUREG 1434, Standard Technical Specifications General Electric Plants BWR-6, to be consistent with the revisions to 10 CFR 50.59 as published in the Federal Register (Volume 64, Number 191) on October 4, 1999, which became effective on March 13, 2001. The NRC staff approved TSTF-364, Revision 0, on June 16, 2000.
The revisions to 10 CFR 50.59 clarified the specific type of change, test, or experiment that may be implemented prior to NRC approval. The revisions also clarified the specific types of changes, tests, and experiments that require evaluation by the licensee. Additionally, the revisions added definitions for terms that have been subject to differing interpretations, and 10 CFR 50.59 was reorganized for clarity.
The Bases Control Program required by the TS allows licensees to implement changes to the Bases prior to NRC approval provided the changes do not involve a change to the TS or do not involve a change to the USAR or Bases that involve an unreviewed safety question. The definition of unreviewed safety question was previously defined in 10 CFR 50.59. The revisions to 10 CFR 50.59 eliminated the term unreviewed safety question. In TSTF-364, Revision 0, the NRC staff concluded that the phrase requires NRC approval pursuant to 10 CFR 50.59" is an acceptable description to use in the TS in lieu of the eliminated term of unreviewed safety question. By submitting this amendment, AmerGen is requesting NRC authorization to revise the CPS TS for the Bases Control Program to be consistent with the revision to 10 CFR 50.59.
3.0 EVALUATION 3.1 Description of Changes CPS TS Section 5.5.11, Technical Specifications (TS) Bases Control Program, presently requires a program for processing changes to the Bases of the Technical Specifications.
TS 5.5.11.b currently states the following:
- b. Licensees may make changes to Bases without prior NRC approval provided the changes do not involve either of the following:
- 1. A change in the TS incorporated in the license; or
- 2. A change to the USAR or Bases that involves an unreviewed safety question as defined in 10 CFR 50.59.
The proposed amendment would revise TS 5.5.11.b to read as follows:
- b. Licensees may make changes to Bases without prior NRC approval provided the changes do not require either of the following:
- 1. A change in the TS incorporated in the license; or
- 2. A change to the USAR or Bases that requires NRC approval pursuant to 10 CFR 50.59.
The change involves replacing the phrase involves an unreviewed safety question with the phrase requires NRC approval pursuant to.
3.2 Justification The Commissions final rule of October 4, 1999, which revised 10 CFR 50.59, affects the wording of the TS Bases Control Program. In the revision to 10 CFR 50.59, the Commission eliminated the phrase involves an unreviewed safety question, and in TSTF-364, Revision 0, the NRC staff concluded that the phrase requires NRC approval pursuant to 10 CFR 50.59" is an acceptable description to use in the TS, consistent with 10 CFR 50.59, as revised.
The proposed amendment replaces the term involves an unreviewed safety question with the term requires NRC approval. The amended TS 5.5.11 would continue to incorporate the criteria of 10 CFR 50.59 by reference and these criteria provide appropriate and adequate control of changes to the TS Bases. The NRC staff has reviewed the licensees proposed amendment to incorporate the wording of TSTF-364, Revision 0, into CPS TS 5.5.11 and, based on the above discussion, concludes that the change is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Illinois State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
This amendment changes recordkeeping, reporting, or administrative procedures or requirements. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The staff has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: P. Hearn Date: June 4, 2002