JAFP-02-0086, March 2002 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant

From kanterella
(Redirected from ML021150203)
Jump to navigation Jump to search
March 2002 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant
ML021150203
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/15/2002
From: Ted Sullivan
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-02-0086
Download: ML021150203 (6)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP P.O. Box 110

-'-::ýEntergy Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 T.A. Sullivan Vice President, Operations-JAF April 15, 2002 JAFP-02-0086 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station O-P1-17 Washington, D. C. 20555

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Monthly Operating Report

Dear Sir:

Enclosed is the Monthly Operating Report for the James A. FitzPatrick Nuclear Power Plant for the month of March 2002.

If there are any questions concerning this report, please contact Sherard Anderson, Thermal Performance Engineer, (315) 349-6558.

Ve ly urstf TAS:BO:RD:SA:tmb Enclosure

V Cc: Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Guy Vissing, Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail stop OWFN 8C2 Washington, DC 20555 JENG JAFP Files RMS (JAF)

RMS (WPO)

ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORT MONTH: MARCH 2002 Docket No.: 50-333 Unit Name: F itzPatrick Date: ALpril 5, 2002 Completed By:  ;. Anderson Telephone: (315)349-6558 OPERAATING STATUS I. Unit name: FitzPatrick

2. Reporting period: 3/01/2002 - 3/31/2002
3. Licensed thermal power (MWT): 2536
4. Nameplate rating (gross MWE): 883.0
5. Design electrical rating (net MWE): 816
6. Maximum dependable capacity (gross MWE): 839
7. Maximum dependable capacity (net MWE): 813
8. If changes occur in capacity ratings (Items 3-7) since last report, give reasons:
9. Power level to which restricted, if any (net MWE):
10. Reasons for restrictions, if any:

NO. DATA REQUESTED THIS YR-TO-DATE CUMULATIVE MONTH 11 Hours in reporting period: 744 2,160 233,856 12 Number of hours reactor was critical: 744 2,160 175,320.1 13 Reactor reserve shutdown hours: 0.00 0.00 0.00 14 Hours generator on-line: 744 2,160 170,181.9 15 Unit reserve shutdown hours: 0.00 0.00 0.00 16 Gross thermal energy generated (MWH): 1,839,935.5 5,404,420.3 387,133,929.9 17 Gross electrical energy generated (MWH): 631,340 1,856,120 130,936,260 18 Net electrical energy generated (MWH): 611,280 1,797,275 126,142,045 19 Unit service factor: 100 100 72.77 20 Unit availability factor: 100 100 72.77 21 Unit capacity factor (using MDC net): 101.06 102.35 74.4 22 Unit capacity factor (using DER net) 100.69 101.97 66.1 23 Unit forced outage rate: 0.00 0.00 11.18

24. Shutdowns scheduled over next 6 months (type, date, and duration of each): None
25. If shutdown at end of report period, estimated date of startup: N/A
26. Units in test status (prior to commercial operation): FORECAST ACHIEVED Initial Criticality:

Initial Electricity:

Commercial Operation:

ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORT MONTH: MARCH 2002 Docket No.: 50-333 Unit Name: FitzPatrick Date: April 5, 2002 Completed By: S. Anderson Telephone: (315)349-6558 DAY NET AVERAGE DAILY DAY NET AVERAGE DAILY POWER LEVEL POWER LEVEL 1 843 17 841 2 761 18 844 3 843 19 844 4 843 20 843 5 843 21 691 6 843 22 771 7 843 23 843 8 843 24 843 9 843 25 843 10 842 26 843 11 842 27 843 12 843 28 843 13 807 29 843 14 657 30 843 15 716 31 843 16 841

REPORT MONTH: MARCH 2002 Docket No.: 50-333 Unit Name: FitzPatrick Date: April 5, 2002 Completed By: S. Anderson Telephone: (315)349-6558 NO. DATE TYPE DURATION REASON METHOD OF LICENSEE SYSTEM COMPONENT CAUSE and CORRECTIVE HOURS SHUTTING EVENT CODE CODE ACTION TO PREVENT DOWN THE REPORT RECURRENCE REACTOR NO.

F: FORCED REASON: METHOD: EXHIBIT G: Instructions for preparation of S: SCHEDULED A. Equipment failure (explain) 1. Manual data entry sheets for Licensee Event Report B. Maintenance or Test 2. Manual Scram (LER) file (NUREG-0161)

C. Refueling 3. Automatic Scram D. Regulatory Restriction 4. Continued E. Operator training and license examination 5. Reduced load F. Administrative 9. Other G. Operational error (explain)

H. Other (explain)

REPORT MONTH: MARCH 2002 Docket No.: 50-333 Unit Name: FitzPatrick Date: April 9, 2002 Completed By: S. Anderson Telephone: (315)349-6558 OPERATIONAL

SUMMARY

The FitzPatrick plant - with the exception of minor derates for rod adjustments - operated at or near rated power during the month of March 2002 except for the following:

" March 2, 2002 - 0950 The plant commenced a load reduction to support scheduled activities, including control rod stroke timing and speed adjustments. Power was reduced to approximately 70% and the control rod manipulations began at 1055. Control rod timing was completed at 1345. Power ascension was commenced at 1553 with the plant reaching full power at 2210. The total duration of the load reduction was 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and 20 minutes.

" March 13, 2002 - 2040 The 'C' circulating water pump tripped offline. Power was initially reduced to 65% power then raised to 80%. Investigation and repairs to the

'C' circulating water pump motor were begun immediately. Repairs were completed and the 'C' circulating water pump was returned to service at 10:30 on March 15. The 'A' and 'B' circulating water pump motors were then inspected. All work was completed at 15:28 and power ascension began at 16:09, with the plant returning to full power at 02:52 on March

16. Including a minor control rod pattern adjustment completed early on March 16"h, the total duration of the load reduction was 2 days, 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, and 12 minutes.

" March 21,2002 - 1651 During MG Set brush replacement, the 'B' Reactor Water Recirculation Pump tripped offline. Power was reduced to 40% to support single loop operation. The 'B' RWR pump was restarted 2306, recirc loop startup checks completed at 2308, and the 'B' RWR pump returned to service at 2316. Power ascension began at 23:35, and the plant reached 98% power at 500 on March 22. The plant was maintained at 98% power until 1918, when further power ascension began. The plant returned to full power at 2137. The total duration of this load reduction was 1 day, 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, and 46 minutes.