LR-N17-0070, Stations - Revision 21 to the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program

From kanterella
Jump to navigation Jump to search
Stations - Revision 21 to the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program
ML17079A221
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 03/16/2017
From: Mannai D
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17079A220 List:
References
LR-N17-0070
Download: ML17079A221 (9)


Text

SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection

  • from unauthoriz'ed disclosure.
  • PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0PSEG Nuclear LLC LR-N 17-0070 10 CFR 50.54(p) 10 CFR 73.21 MAR i..6 2017 10 CFR 2.~90 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Salem Nuclear Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRG Docket Nos. 50-272 and 50-311
  • Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRG Docket No. 50-354

Subject:

Salem-Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent

_Spent Fuel Storage Installation Security Program, Revision 21 Pursuant to the requirements of 10 CFR 50.54(p)(2), PSEG Nuclear, LLC (PSEG),

hereby submits Revision 21 to the Salem-Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program. Enclosure 1 contains Form 2 -

  • 10 CFR 50.54(p) Evaluation Form for the Salem-Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 21, that was implemented on January 17, 2017 and reflects changes associated with the ,Security Protective Strategy and changes to staffing levels in Section 18 associated with physical changes to the plant. Enclosure 1 also contains the NEI security plan change template from NEI 11-08, Guidance on Submitting Security Plan Changes. A copy of the revised.

Salem-Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation

  • Security Program document in its entirety is included in Enclosure 2. This revision contains the nomenclature from NEI 03-12 Revision 7, "Template for the Security Plan, SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure. ~Db \

N(({<...

SAFEGUARDS INFORMATION Wheri separated from Safeguards Information in Enclosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

MAR t 2017 10 CFR 50.54(p)

Page2 LR-N17-0070 10 CFR 73.21 10 CFR2.390 Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program."

  • The documents included in Enclosures 1, 2, 3, and 4, have been determined to contain safeguards information. PSEG requests that this information be withheld from public disclosure in accordance with 10 CFR 73.21, "Protection of Safeguards Information:

Performance Requifements, paragraph (a)(1 ). There are no regulatory commitments contained in this letter. In accordance with the requirements of 10 CFR 50.54(p)(2), the signed original is being sent to the Document Control Desk and one copy is being sent to Region I. PSEG requests that Enclosure 5, which contains security-related information, be withheld from public disclosure in accordance with 10 CFR 2.390.

If you have any questions or require additional information, please do not hesitate to contact me at (856) 339-2061.

Sincerely, j)~

David J. Mannai Sr. Director Regulatory Operations Enclosures - (1, 2, 3, and 4) - contain Safeguards Information (5) - Before and After Changes of Affected Security-Related, Non Safeguards Procedures and Training Documents cc (with Enclosures)

D. Dorman, Administrator - Region 1 NRC U.S. Nuclear Regulatory Commission 2100Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713

- SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, and attachment, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

MAR 1.6 2017 Page 3 10 CFR 50.54(p)

LR-N17-0070 1o,CFR 73.21 10 CFR 2.390 cc (all w/o Enclosures)

Carleen Parker, Project Manager, US NRC NRC _Senior Resident Inspector, Salem NRC Senior Resident Inspector, Hope Creek P. Mulligan, Chief, NJBNE .

T. Cachaza, Commitment Tracking Coordinator, Salem T. MacEwen, Commitment Tracking Coordinator, Hope Creek L. Marabella, Corporate Commitment Tracking Coordinator SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, and attachment, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

MAR t 2017 Page 4 10 CFR 50.54(p)

LR-N17-0070 10 CFR 73.21 10 CFR 2.390 bee: (all w/o Enclosures)

Director, Security Man*ager, Licensing Records Management SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

LR_;N17-0070 Enclosure 1 Form 2 - 10 CFR 50.54(p) Evaluation Form and NEI Security Plan Change Template from NEI 11-08 SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

LR-N17-0070 Enclosure 2 Salem-Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 21 SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

LR-N17-0070 Enclosure 3 Before and After Changes of Affected Safeguards Post Orders and Safeguards Procedures SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

  • SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

LR-N17-0070 Page 1 of 1 Before and After Changes ofAffected Safeguards Post Orders and Safeguards Procedures

1. POST 32A & 328 POST ORDERS-GAS/SAS Revision 33 (Page 7)
2. POST 32A & 328 POST ORDERS-GAS/SAS Revision 34 (Page 8)
3. SY-AA-101-0001 Reyision 11 (Pages 10 & 11, 13-17 & 24-30) 4*. SY-AA-101-0001 Revision 12 (Pages 10, 12-15 & 18-25)
5. SY-AA-101-0001-F2 Revision 1 (Pages 5-44)
6. SY-AA-101-0001-F2 Revision 2 (Pages 5-37)
7. SY-AA-101-102-1001 Revision 9 (Pages 10-13 & 16-17)
8. SY-AA-101-102-1001 Revision 10 (Pages 10-13 &16-17)

SAFEGUARDS INFORMATION When separated from Safeguards Information in Enelosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection from* unauthorized disclosure.

LR-N17-0070 Enclosure 4 SGI CD - Overlapping Bullet Resistant Enclosure and BlasUBullet Resistant Enclosure Fields Of Fire And Distances (1) Cd

  • SAFEGUARDS INFORMATION When separated from Safeguards Information in Enclosures 1, 2, 3, and 4, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.